Loading...
HomeMy WebLinkAboutNCG170412_Inspection Report_20190801ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director Valdese Weavers Inc. Attention: Eddie Atkinson Post Office Box 70 Valdese, North Carolina 28690 NORTH CAROLINA Environmental Quality October 29, 2019 Subject: Compliance Evaluation Inspection Permit: NCG170412 Burke County, North Carolina Dear Mr. Atkinson: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on October 17, 2019. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Sincer Isaiah Ree SWQ, CEPSCI, MS4CECI Environmental Specialist Land Quality Section Enclosure: Inspection Report D_EQ5A North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 828.296.4500 iwamcuvouwn Compliance Inspection Report Permit: NCG170412 Effective: 08/01/19 Expiration: 05/31/24 Owner: Valdese Weavers Inc SOC: Effective: Expiration: Facility: Valdese Weavers, Inc. (Circa Plant) County: Burke One Jaquard Dr Region: Asheville Connelly Spg INC 28612 Contact Person: Eddie Atkinson Title: Phone: 828-874-2181 Directions to Facility: INC Rt. 1540 West to Rt. 1-40 West to Exit 113 to left on Malcolm Blvd. to left on Mineral Springs to right on Rt. 18 to left on River Road. System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 10/1712019 Entry Time: 11:30AM Exit Time: 12:45PM Primary Inspector: Isaiah L Reed Phone: 828-296-4614 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Textile Mill Products Stormwater Discharge COO Facility Status: N Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG170412 Owner -Facility: Valdese Weavers Inc Inspection Date: 10/17/2019 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: On October 17, 2019 this facility was inspected for compliance. I met with Phill Eller on site. No major issues were observed. However, the Stipe plane should be reviewed and updated with the next annual review. Please see General Permit NCG170000 for specifics and Site Plan requirements. If you have any questions, please contact this office at (828) 296-4614. Page 2 of 3 Permit: NCG170412 Owner -Facility: Valdese Weavers Inc Inspection Date: 10/1712019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? N ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? E ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? E ❑ ❑ ❑ Comment Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? E ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment: Page 3 of 3