Loading...
HomeMy WebLinkAbout20170887 Ver 1_Initial and As-Built Credit Release_20191021Strickland, Bev From: Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil> Sent: Monday, October 21, 2019 1:06 PM To: Jeff Keaton; John Hutton Cc: Tugwell, Todd J CIV USARMY CESAW (US); Kim Browning; Haupt, Mac; Davis, Erin B; Wilson, Travis W.; Merritt, Katie Subject: [External] SAW-2016-02365 / Wildlands / Cane Creek UMBI / Bethel Branch / Initial and As -Built Credit Release Attachments: Cane Creek Creek UMBI-Bethel Branch 1st & 2nd Credit Releases.pdf Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<mailto:report.spam@nc.gov> Good afternoon Jeff/John, Attached is the initial and as -built implementation (2nd) credit release letter for the: SAW-2016-02365 / Wildlands Engineering, Inc. / Cane Creek UMBI / Bethel Branch Mitigation Site / Chatham County Please let me know if you have any questions. Sincerely, Sam Samantha Dailey Regulatory Project Manager U.S. Army Corps of Engineers Regulatory Division 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 (919) 554-4884, Ext. 22 Samantha.j.dailey@usace.army.mil 1 DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 October 21, 2019 REPLY TO ATTENTION OR Regulatory Division/1200A Action ID No. SAW-2016-02365 Re: Initial and As -Built Implementation Credit Releases associated with Cane Creek Umbrella Mitigation Bank, Bethel Branch Mitigation Site Mr. Jeff Keaton Wildlands Engineering, Inc. 312 W Millbrook Road, Suite 225 Raleigh, North Carolina 27609 Dear Mr. Keaton: This correspondence is in reference to the Cane Creek Umbrella Mitigation Bank, Bethel Branch Mitigation Site, located within the South Fork Cane Creek watershed of the Cape Fear River Catalog Unit (03030002). The site is located at 277 R E Wright Road, near Snow Camp, in Chatham County, North Carolina. The purpose of this letter is to confirm the Initial and As -Built Implementation credit releases for this mitigation site. Pursuant to the Mitigation Banking Instrument (UMBI) entitled, Agreement to Establish the Cane Creek Umbrella Mitigation Bank in the Cape Fear River Basin within the state of North Carolina, approved February 1, 2018; the site -specific Bethel Branch Mitigation Site Final Mitigation Plan (Plan), dated October 2018 and approved November 8, 2018; and the Baseline Monitoring Document and As -Built Baseline Report — Bethel Branch Mitigation Site dated July 2019, 30 percent of the mitigation site's total restoration and enhancement credits shall be available for sale immediately upon all of the following: a. Approval of the Plan (November 8, 2018); b. Issuance of the 404 permit authorization for construction of the site (November 8, 2018); c. Delivery of the executed financial assurance documents as described in Section Dt of the UMBI and Section 15.0, page 35 (and Appendix 10), of the Plan, dated October 2018; d. Recordation of the Corps -approved site protection mechanism described in Section X of the UMBI, and Appendix 1 of the Plan, Dated October 2018, including a title opinion covering the property; e. Successful completion of all stream restoration and enhancement activities (As -Built Construction) as described in the Plan, dated October 2018; f. Successful completion of all planting activities as described in the Plan, dated October 2018; and g. Successful completion of easement fencing suitable for livestock exclusion as outlined in the Plan, dated October 2018, Please note the following comments from the October 1, 2019 IRT site visit: a. Privet was present along UT 2 and should be removed; b. Multiple large bare areas were observed along the Upper UT3 section that requires remedial action; c. Wetland areas along UTl appear to have upland pockets and marginal soils. It would be beneficial to check soil profiles in a year or two, along with the installation of wells in areas that might be of concern; and d. Regarding the as -built drawing and report review, DWR has a request to identify the tree species to be used to correlate bud burst with soil temperature for growing season start in future monitoring reports. By copy of this correspondence, we confirm that you have satisfied the above requirements for the Initial and As -Built Implementation credit releases. As such, 1,560.6 stream mitigation units (SMUs), and 0.94 wetland mitigation units ()VMUs), constituting 30 percent of the mitigation bank site's total stream and wetland credits are now available for sale. Thank you for your interest in restoring and protecting waters of the United States, If you have questions regarding this letter, please contact Samantha Dailey, Raleigh Regulatory Field Office at Samantha.J.Dailey@a usace.army.mil or telephone (919) 554-4884, Extension 22. Sincerely, �Jean B. Gibby rl Chief, Raleigh Regulatory Field Office Regulatory Division Electronic Copies Furnished: NCIRT Distribution List