Loading...
HomeMy WebLinkAboutWQ0034097_Sewer Extension Permit Status Update_20191025 Request for Engineering Certification Date of letter: August 9,2019 Sewer Extension Permit Status Update Please complete the applicable portion of this form for each permit and return to the Division by the delivery method below and within 30 days of the date of this letter: NCDEQ/DWR WQPS—PERCS UNIT By U.S. Postal Service: By Courier/Special Delivery: By Email: 1617 Mail Service Center 512 N.Salisbury St.Suite 925 Nyle Hothem Raleigh,NC 27699-1617 Raleigh, NC 27604 Nyle.Hothem@ncdenr.gov Permit No.: WQ0034097 Permittee: Yadkin Valley Sewer Authority Project Name: NCDOT Project B-4820 Project Status (Check appropriate box to indicate Permittee's response and complete&sign below) ❑ Permit to Remain Open: The Permittee certifies that the permitted project has not been constructed but shall be constructed in the future in conformity with the approved Permit,project plans,specifications,and supporting documents.The Permittee understands that the appropriate certification documents will need to be forwarded to the Division prior to operation. Subject permit shall be maintained in Active status. O The Permitted project pas been constructed and the required Engineer's Certification and supporting documents will be submitted to the Division with this form. Permittee understands that failure to submit required certification documents for an active,in-service system may result in enforcement action. ❑ Request Extension: Permittee requests extension to reply to this letter not to exceed 60 days of the date of this letter. Name&Title(print): RECEIVED Signature: Date: OCT 2 5 2019 Comments: NCDEQii.)a R{NPDES Permit Rescission Request The Permittee requests that the subject permit be rescinded and certifies that the permitted sewer system has not been and shall not be constructed nor made operational.We understand that,in the future,should we wish to operate a non-discharge sewer system,we shall apply for and receive a new Wastewater Collection System Permit. Name&Title(Print): Nicole Johnston, Executive Director Signature: C Date: `0 1919)Vl q Comments:When the old bridge was removed in Elkin,the sewers were not altered at the request of the Yadkin Valley Sewer Authority (see attached letter). Trent Beaver w/ NCDOT will also verify if needed. Contact Information Updates Updated Contact Person: Updated Mailing Address: Updated Email: 08-12-11 :03: 26PM; ;336 835 9840 # 2/ 2 CHAIRMAN EXECUTIVE DIRECTOR ak�t/_y Wayne Moore Nicole Johnston * VICE-CHAIR ADMINISTRATIVE ASSISTANT * t J. L.Lowe,Jr. Susan White *. I * DIRECTORS itrA J°" E ,► Tommy Casstevens SECRETARY/TREASURER ;. � � Victor Varela John W, Holcomb � T,a 't � Harold Lee Wagoner A August 12, 2011 RECEIVED Mr. Patrick Wade Project Manager OCT 2 5 2019 ALB INC. P 0 Box 1239 NCDEa1.JW7/!VPDEs Hillsville,VA 24343 Re: Order#B4820 Dear Mr. Wade, Regarding your project order#8-4820, please accept this as my acceptance of your plan to modify the existing manhole and cap with concrete and leave the existing sewer line in place at the intersection of Gwyn Avenue and Market Street in Elkin. Further,your design to raise the footers for the stairs so as to not be in direct conflict with the existing sewer line seems fine to me. We appreciate your contacting us and including us on this project. If you have further needs or concerns, please feel free to contact me at the number below or on my cell at 336-366-0870. Sincerely, Nicole Johnston Executive Director Yadkin Valley Sewer Authority NJ/sw 209 Memorial Park Drive Elkin,NC 28621 — P 0 Box 828 Phone: 336-835-9819 - Fax: 636-835-1284 www.yvsa.org