HomeMy WebLinkAboutWQ0034097_Sewer Extension Permit Status Update_20191025 Request for Engineering Certification Date of letter: August 9,2019
Sewer Extension Permit Status Update
Please complete the applicable portion of this form for each permit and return to the Division by the delivery method below and
within 30 days of the date of this letter:
NCDEQ/DWR
WQPS—PERCS UNIT
By U.S. Postal Service: By Courier/Special Delivery: By Email:
1617 Mail Service Center 512 N.Salisbury St.Suite 925 Nyle Hothem
Raleigh,NC 27699-1617 Raleigh, NC 27604 Nyle.Hothem@ncdenr.gov
Permit No.: WQ0034097 Permittee: Yadkin Valley Sewer Authority
Project Name: NCDOT Project B-4820
Project Status (Check appropriate box to indicate Permittee's response and complete&sign below)
❑ Permit to Remain Open: The Permittee certifies that the permitted project has not been constructed but shall be constructed in
the future in conformity with the approved Permit,project plans,specifications,and supporting documents.The Permittee
understands that the appropriate certification documents will need to be forwarded to the Division prior to operation. Subject
permit shall be maintained in Active status.
O The Permitted project pas been constructed and the required Engineer's Certification and supporting documents will be
submitted to the Division with this form. Permittee understands that failure to submit required certification documents for an
active,in-service system may result in enforcement action.
❑ Request Extension: Permittee requests extension to reply to this letter not to exceed 60 days of the date of this letter.
Name&Title(print):
RECEIVED
Signature: Date:
OCT 2 5 2019
Comments:
NCDEQii.)a R{NPDES
Permit Rescission Request
The Permittee requests that the subject permit be rescinded and certifies that the permitted sewer system has not been and shall
not be constructed nor made operational.We understand that,in the future,should we wish to operate a non-discharge sewer
system,we shall apply for and receive a new Wastewater Collection System Permit.
Name&Title(Print):
Nicole Johnston, Executive Director
Signature: C Date: `0 1919)Vl q
Comments:When the old bridge was removed in Elkin,the sewers were not altered at the request of the Yadkin
Valley Sewer Authority (see attached letter). Trent Beaver w/ NCDOT will also verify if needed.
Contact Information Updates
Updated Contact Person:
Updated Mailing Address:
Updated Email:
08-12-11 :03: 26PM; ;336 835 9840 # 2/ 2
CHAIRMAN
EXECUTIVE DIRECTOR ak�t/_y Wayne Moore
Nicole Johnston
* VICE-CHAIR
ADMINISTRATIVE ASSISTANT * t J. L.Lowe,Jr.
Susan White *. I *
DIRECTORS
itrA J°" E ,► Tommy Casstevens
SECRETARY/TREASURER ;. � � Victor Varela
John W, Holcomb � T,a 't � Harold Lee Wagoner
A
August 12, 2011
RECEIVED
Mr. Patrick Wade
Project Manager OCT 2 5 2019
ALB INC.
P 0 Box 1239 NCDEa1.JW7/!VPDEs
Hillsville,VA 24343
Re: Order#B4820
Dear Mr. Wade,
Regarding your project order#8-4820, please accept this as my acceptance of your plan to modify
the existing manhole and cap with concrete and leave the existing sewer line in place at the
intersection of Gwyn Avenue and Market Street in Elkin. Further,your design to raise the footers for
the stairs so as to not be in direct conflict with the existing sewer line seems fine to me.
We appreciate your contacting us and including us on this project. If you have further needs or
concerns, please feel free to contact me at the number below or on my cell at 336-366-0870.
Sincerely,
Nicole Johnston
Executive Director
Yadkin Valley Sewer Authority
NJ/sw
209 Memorial Park Drive Elkin,NC 28621 — P 0 Box 828
Phone: 336-835-9819 - Fax: 636-835-1284
www.yvsa.org