Loading...
HomeMy WebLinkAboutNC0020591_Headworks Analysis_20191017 CITY of it Otat e NORTH CAROLINA October 17, 2019 Mr. Monti Hassan RECEIVED NC-DENR, DWQ, Pretreatment 1617 Mail Service Center OCT 2 5 2019 Raleigh, NC 27699-1617 NCDEQ/DWR/NPDES Re: Permit for SDFC, LLC # 3002 Dear Mr. Hassan: Enclosed, for your approval, is the proposed permit for SDFC, LLC, Permit # 3002. The headwork's analysis was approved on October 16th, 2019. The allocation table, Industrial Permit Application and Synopsis are included. If you have any questions, please call Brandy Johnson or me at (704) 878-3438. Sincerely, V\MCL6 Brandy Johnson, Pretreatment Coordinator Water Resources Department Enclosures PO Box 1111 • Statesville, NC 28687 • ci.statesville.nc.us CITY of ` ` 0 tat e NORTH CAROLINA October 17, 2019 SDFC, LLC RECEIVE® Lance Dunn 2201 Mocaro Dr. OCT 2 5 2019 Statesville NC, 28677 NCDEQIDWRINPDES Re: Transmittal Letter for Industrial User Pretreatment Permit No. 3002 Dear Mr. Dunn: Your Industrial User Pretreatment Permit, No. 3002, is enclosed. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and the local Sewer Use Ordinance. Please read this permit carefully. If any parts, measurement frequencies, or sampling requirements contained in this permit are unacceptable to you, you have the right to an adjudicatory hearing upon written request within thirty(30) days following receipt of this letter. Unless such demand is made, this decision shall be final and binding. Industries must submit report to City WWTP Semi-Annually. I recommend sampling at the beginning of each six month period, in case of a resample needs to be done. Keep in mind that if a report is late, you will be in Siginficant Non- Compliance (SNC). Reports will be due by the 15t"of the following month. Please sign the receipt page of this permit and return one copy to this office. Sincerely, ---- ( -11‘5 ) Brandy Johnson Pretreatment Coordinator Water Resources Department Enclosure PO Box 1111 • Statesville,NC 28687 • ci.statesville.nc.us SIU INSPECTION FORM Name Of Industry: . toa • I- _ LC-• IUP# 3oc Address Of Industry: 4Ntog e l rl-cc l r. ILTP D : s es;�t tie_ i rue. rui�y11 ► on OateO In Representatives: - Titleit a,, c. A,--e I11 nr TW Representatives: T e . v.V1t Lc r� .At:,' 11.X r1 p.�: --iG"ci.L.,t-in;;. (I c 0,-6: �' i rr�t�'1 k - n �: f1G: Date Oflnspection: i OIi to LS`q Tinie OfInspection: _ ��}n,v op, Purpose of Inspection: Annual X. Other(Describe) POTW to which IU discharges r-c4 y( (,J L --p NPDES# A)C OO Q D 5 q I Is SIU currently in SNC? If yes,for what? PART I-IN ThLINTERVIEV` RECEIVED Has anything changed since the last inspection or IUP application m the following: �j� coNarrrs OCT 2 5 2019 Product YES ..itpr Raw materials used YES 4Fr47, NCDEQIDWRINPDES Manufacturing processes YES Categorical,if applicable YES , a • Production rate /,* /NO 5CWfd_ ,r,(1 /a Number of employees —4 b a r Number of shifts YES r '\1`.-}-'- - Comments: PART II-PLANT TOUR-Visit all areas where wastewater is generated or where there are drains to the POTW. Plant Tour Section A-PRODUCTION AND STORAGE AREAS 1. Are there floor in the production area? YES NO Where do they go? 1-( �'}",'\,r h-t- 2. Are production areas diked,contained,or otherwise constructed in such way as to prevent harm to the WWTP, especially fr or ugs? YES/NO Comments: -2.. - yr L -- �� S o y l ?=API 1 0.... C- Ci�i�b� , (-I. tti, 3. Are ere floor drains in the storage ? YES/NO Where do they go? 4. Are storage tanks and areas diked,contained,or otherwise constructed in such a way as to prevent harm to the t rn 1 Cs'J S- WWTP,especially from spills or slugs? YES/NO Comments: \ A( 1 ( 5. Are process and storage tanks and pipes labeled? YES/NO Mc`:,1-4& L+LE 1c €m t - ecl)Linde(Cr, -if i 6. How oec raw ate als,and products disposed of?. ,` t� ff-sp 7. When is a produ tion area cleaned? 6itr,te i''N eC 8. Is the wastewater from cleaning the production area discharged to the POTW? \E /NO 9. What process wastewaters are discharged to POTW? Comments: Title: SIU Inpsection Form File name: COMP_R TSP App 7 I) Revision data: August 1,1994 Page 1 SIU INSPECTION FORM PART II-Plant Tour Section B-PRETREATMENT SYSTEM N j14' Ask the operator to describe pretreatment system. 1. Does operator seem knowledgable about the system? YES/NO Comments: 2. Are all units operational? YES/NO 3. How often does operator/maintenance person check system? 4. Is there an operator for each shift? YES/NO 5. How and when is sludge disposed of? 6. Is there a schedule for preventative maintenance? YES/NO Comments: PART II-Plant Tour Section C-SAMPLING POINT(S)AND FLOW MEASUREMENT (Collect a sample if desired) (( , 1. Does an outside lab complete sampling. /NO If yes,name of lab * €5 0 i i o q C 2. If industry completes sampling,aak thae industry .-•reseeip�tive to describe sampling procedures. Comments: 3. Is flow measurement equipment operational-4T YES / 0 Comments: 4. Is there a calibration log for the flow meter?(�YES,PNO Comments: Comments: V\z,L.3 \ k PART III-EXIT INTERVIEW Review monitoring records and other SIU records required by . 1. Are files well organized? YES/NO Comments: 1_W.- c\ C e 2. Me sample collection/chain-of-custody forms filled out P ram. i _YE,0/NO Comments: 3. Do results in files agree with reports sent to POTWer YESJINO Comments: f )st Q 4. Who has autho ' to m ut do production should a spill or slug discharge occur? 5. Hgw does SIU info m us emplo of,whow to call at WOW in ca,s,p o spill/s ?? A"-Cti Z. "PO r If slug/spill plan is already required by O3=W,review procedures. 6. Is SIU implementing slug/spill pla t ? YE�NO Comments:�kikArN� : ` -(ArM Comments: tj nt INSPECTION RESULTS .-. ‘ 1 Slug/Spill Control Plan Needed?C O + \ Comments,Required Or Recommended Actions: • ✓ Signature Of Inspector( 'Date: rci • / Date: ey Title: SIU Inpsection Form File name: COMP.INSP App 7-D Revision data: August 1,1994 Page 2 Workbook Name : Statesville.3rd Creek-New Permit Limits for Industries, Worksheet Narikr!t ,l0/17/2019,9:04 AM Q Page 1 of 5 Allocation Table Spreadsheet Instructions: RECEIVED Headworks last approved: 06/01/18 1)Applicable Values should be entered in the Heavy Bordered cells. Rest of worksheet is protected,password is Allocation Table updated: 07/17/18 2)Formulas are discussed in the Comprehensive Guidance,Chapter 6,Section C. OCT 2 5 2019 Permits last modified: 07/17/18 3)HWA and AT worksheets in this workbook are linked. Pollutant Names,MAHLs,Basis,and Uncontrollable load in this AT worksheet are automatically entered from the HWA spreadsheet. This includes pollutant names in NCDEQIDWRINPDES columns AT through BK. POTW=> 3RD CREEK WWTP NPDES#=> NC0020591 FLOW BOD TSS Industry Type Renewal Modification Date Permit Limits _ Permit Limits Permit Limits IUP INDUSTRY NAMES Permit Pipe of Effective Effective Permit Conc. Load Conc. Load Count (please listelphabeticly) number number Industry Date Date Expires MGD gal/day m I lbs/da m I lbs/da 1 JPS Composite Materials 3005 NA 03/01/16 07/17/18 03/01/21 0.0700 70,000 750.00 437.85 300.00 175.14 2 Hi-Tec Plating 3008 433 09/30/15 07/17/18 09/30/20 0.0060 6,000 300.00 15.01 300.00 15.01 3 Kewaunee 3009 433 03/01/16 07/17/18 03/01/21 0.0700 70,000 350.00 204.33 300.00 175.14 4 SDFC,LLC 3002 textile 05/01/20 07/17/18 05/01/25 0.7500 750,000 350.00 2189.25 300.00 1876.50 5 Rental Uniform 3001 laundry 05/01/15 07/17/18 05/01/20 0.0850 85,000 600.00 425.34 400.00 283.56 6 KECO Engineered Coatings,Inc:T 3004 433 04/01/18 07/17/18 04/01/23 i 0.0050 5,000 8 , 9 _ 10 ,-1 Column Totals=> 0.9860 986,0001 3272 ( 2525 Basis=> NPDES NPDES Design MAHL from HWA(lbs/day)_> NPDES Permitted Flow=> 4.0000, 4633 8006 Uncontrollable Loading(lbs/day)_> 0.4460 360 1127 Total Allowable for Industry(MAIL)(lbs/day)_> 3.5540 4273 6879 Total Permitted to Industry(lbs/day)_> 0.9860 3272 2525 MAIL left(lbs/day)_> 2.5680 1002 4354 Percent Allow.Ind.(MAIL)still available(%)=> 72.3% 23.4% 63.3% Percent MAHL still available(%)_> 64.2% 21.6% 54.4% 5 Percent MAHL(Ibs/day)_> 0.2000 232 400 HWA.AT Revised:November 2005 Workbook Name : Statesville.3rd Creek-New Permit Limits for Industries, Worksheet Naniigo..t r0/17/2019,9:04 AM Page 2 of 5 Allocation Table Headworks last approved: 06/01/18 Allocation Table updated: 07/17/18 Permits last modified: 07/17/18 POTw=> 3RD CREEK WWTP NPDES#=> NC0020591 Ammonia Arsenic Cadmium Chromium Copper Cyanide Industry Permit Limits Permit Limits Permit Limits Permit Limits Permit Limits Permit Limits IUP INDUSTRY NAMES Permit Pipe Conc. Load Conc. Load Conc. Load Conc. Load Conc. Load Conc. Load Count (please listalphabeticly) number ) number mg/1 lbs/day mg/I lbs/day mg/1 lbs/day mg/I lbs/day mg/I lbs/day mg/I lbs/day 1 JPS Composite Materials 3005 25.00 14.6000 0.0058 0.9000 0.5254� 0.2000 0.1168 2 Hi-Tec Plating 3008 25.00 1.25 0.2600 0.0130 1.0000 0.0500 0.7000 0.0350 0.6500 0.0325 3 Kewaunee 3009 25.00 14.60 0.0100 0.0058 0.1000 0.0584 0.1000 0.0584 0.0400 0.0234 4 SDFC,LLC 3002 25.00 156.38� 0.0100 0.0626 0.1000 0.6255 0.2000 1.2510 _ _ 5 Rental Uniform 3001 25.00 17.72 0.01421 0.3000 02127 0.6000 0.4253 6 KECO Engineered Coatings,Inc T 3004 25.00 1.04.. 1�: 0.0029 0.5000 0.0209 0.5000 0.0209 0.6500 0.0271 8 ' 9 __ __ 10 4 __Column Totals=> I 2061 I 0.0000 I 0.10431 1.4929 1.9074 0.0830 AS/Nit/TF Stream AS/Nit/TF AS/Nit/TF AS/Nit/TF Basis=> Design inhibition Std inhibition inhibition inhibition MAHL from HWA(lbs/day)=> 667.20 0.7289' 0.3641 2.8719 3.4988 0.7289 Uncontrollable Loading(lbs/day)_> 59.14 0.0074 0.0074 0.0067 0.0889 0.0179 Total Allowable for Industry(MAIL)(lbs/day)=> 608.06 0.7215 0.3567 2.8652 3.4099 0.7111 Total Permitted to Industry(lbs/day)=> 205.58 0.0000 0.1043 1.4929 1.9074 0.0830 MAIL left(lbs/day)=> 402.48 0.7215 02524 1.3724 1.5025 0.6281 Percent Allow.Ind.(MAIL)still available(%)=> 662% 100.0% 70.7% 47.9% 44.1 % 88.3% Percent MAHL still available(%)=> 60.3% ' 99.0% 693% 47.8% 42.9% .213/0 5 Percent MAHL(lbs/day)_> 33.36 0.0364 0,0182 0.1436 0.1749 0.0364 HWA.AT Revised:November 2005 Workbook Name : Statesville.3rd Creek-New Permit Limits for Industries, Worksheet Nanii '.t99ll1o/17/2019,9:04 AM Page 3 of 5 Allocation Table Headworks last approved: 06/01/18 Allocation Table updated: 07/17/18 Permits last modified: 07/17/18 POTw=> 3RD CREEK WWTP NPDES#=> NC0020591 Lead Mercury Molybdenum Nickel Selenium Silver Industry Permit Limits Permit Limits Permit Limits Permit Limits Permit Limits Permit Limits IUP INDUSTRY NAMES Permit Pipe Conc. Load Conc. Load Conc. Load Conc. Load Conc. Load Conc. Load Count (please list alphabeticly) number J number mg/1 lbs/day mg/1 lbs/day mg/I lbs/day mg/1 lbs/day mg/1 lbs/day mg/1 lbs/day 1 JPS Composite Materials 3005 ' 03000 0.1751 0.0500 0.0292 0.0100 0.0058 2 Hi-Tec Plating 3008 0.4300 0.0215 1.0000 0.0500 0.2400 0.0120 3 Kewaunee 3009 0.0500 0.0292 `., 0.2000 0.11680...N 0.0500 0.0292 4 SDFC,LLC 3002 0.1000 0.6255 0.0500 0.3128 0.0100 0.0626 5 Rental Uniform 3001 03000 0.2127, 0.2000 0.1418 0.0400 0.0284 6 KECO Engineered Coatings,Inc:T 3004 _ 0.4300 0.0179 0.5000 0.0209 , 0.2400 0.0100 8 i 9 10 Column Totals=> 1.0819 1 0.000000 0.0000 1 0.6714 0.00001 0.14801 AS/Nit/TF Sludge AS/Nit/TF Stream AS/Nit/TF Basis=> inhibition NPDES Ceiling inhibition Std inhibition MAHL from HWA(lbs/day)_> 3.6446 0.005870 3.1831 1.8223 0.6008 1.8223 Uncontrollable Loading(lbs/day)_> 0.0465 0.000818 0.0052 0.0279 0.0063 0.0004 Total Allowable for Industry(MAIL)(lbs/day)=> 3.5981 0.005052 3.1779 1.7944 0.5945 1.8219 Total Permitted to Industry(Ibs/day)_> 1.0819 0.000000 0.0000 0.6714 0.0000 0.1480 MAIL left(Ibs/day)_> 2.5161 0.005052 3.1779 1.1230 0.5945 1.6740 Percent Allow.Ind.(MAIL)still available(%)_> 69.9% 100.0% 100.0% 62.6% 100.0% 91.9% Percent MAHL still available(%)=> 69.0% 86.1% 99.8% 61.6% 98.9% 91.9 5 Percent MAHL(lbsiday)=> 0.1822 0.000294 0.1592 0.0911 0.0300 0.0911 HWA.AT Revised:November 2005 Workbook Name : Statesville.3rd Creek-New Permit Limits for Industries, Worksheet Nanii6n.t4710/17/2019, 9:04AM Page 4 of 5 Allocation Table Headworks last approved: 06/01/18 Allocation Table updated: 07/17/18 Permits last modified: 07/17/18 Po-w., 3RD CREEK WWTP NPDES#=> NC0020591 Zinc Total Nitrogen Total Phos. COD o e Industry Permit Limits _ Permit Limits Permit Limits Permit Limits Permit Limits Permit Limits IUP INDUSTRY NAMES Permit Pipe Conc. Load Conc. Load Conc. Load Conc. Load Conc. Load Conc. Load Count (pieasehAMpnebdidy) number number mg/I lbs/day mg/I lbs/day mg/1 lbs/day mg/1 lbs/day mg/1 lbs/day mg/1 lbs/day 1 JPS Composite Materials 3005 0.5000 0.2919 2000.0000 1167.6000_ _ 2 Hi-Tec Plating 3008 0.5000 0.0250 700.0000 35.0280 _ IMMINNEMMI 3 Kewaunee 3009 0.5000 02919_ �� 4 SDFC,LLC 3002 03000 1.8765 2000.0000 12510.0000 _ _ 5 Rental Uniform 3001 1.0000 0.7089........ ... _ 2150.0000 1524.1350 6 KECO Engineered Coatings,Inc:T 3004 0.6000 0.0250 , r 8 9 10 �^ Column Totals=> 32192 0.00 0.00i 15236.7630 0.00001 I 0.0000 AS/N it/TF Basis=> inhibition MAHL from HWA(lbs/day)=> 7.2892 Uncontrollable Loading(lbs/day)=> 0.4274 415.7814 Total Allowable for Industry(MAIL)(lbs/day)=> 6.8618 Total Permitted to Industry(lbs/day)=> 3.2192 0.00 0.00 15236.7630 0.0000 0.0000 MAIL left(lbs/day)=> 3.6425 Percent Allow.Ind.(MAIL)still available(%)_> 53.1% ####### ###### #VALUE! #VALUE! ####### Percent MAHL still available(%)=> 50.0% ####### ###### #VALUE! #VALUE! ####### 5 Percent MAHL(lbs/day)=> 0.3645 HWA.AT Revised:November 2005 Workbook Name : Statesville.3rd Creek-New Permit Limits for Industries, Worksheet Naniifi'.twr0/17/2019,9:04 AM Page 5 of 5 Allocation Table Headworks last approved: 06/01/18 Allocation Table updated: 07/17/18 Permits last modified: 07/17/18 POTw=> 3RD CREEK WWTP NPDES#=> NC0020591 f g h I Industry Permit Limits Permit Limits _ Permit Limits Permit Limits IUP INDUSTRY NAMES Permit Pipe Conc. Load Conc. Load Conc. Load Conc. Load Count (please listalphabeticly) number number mg/1 lbs/day mg/1 lbs/day mg/I lbs/day mg/I lbs/day 1 JPS Composite Materials 3005 , 2 Hi-Tec Plating 3008 3 Kewaunee 3009 _ 4 SDFC,LLC 3002 5 Rental Uniform 3001 6 KECO Engineered Coatings,Inc-T, 3004 8 1111 10 Column Totals=> 0.0000 0.00001 0.0000 0.0000 Basis=> MAHL from HWA(lbs/day)_> Uncontrollable Loading(lbs/day)_> Total Allowable for Industry(MAIL)(lbs/day)_> Total Permitted to Industry(lbs/day)_> 0.0000 0.0000 0.0000 0.0000 MAIL left(lbs/day)_> Percent Allow.Ind.(MAIL)still available(%)_> ####### ####### ####### ####### Percent MAHL still available(%)_> ####### ####### ####### ####### 5 Percent MAHL(lbs/day)=> HWA.AT Revised:November 2005 City of Statesville Permit Synopsis Application for Permit to Discharge Pretreated Wastewater To A Publicly-Owned Treatment Works Date: October 17, 2019 1. Receiving Stream: 3rd Creek WWTP NC0020591 2. IU Name & Address: SDFC,LLC 2201 MoCaro Drive Statesville,NC 28677 3. Effective Date of Permit: May 1st 2020 4. Expiration Date of Permit: May 1st, 2025 5. Permit Number: 3002 6. IU 40 CFR #: 7. Industrial Waste Survey & Application Form: Enclosed. 8. IU Inspection Form: Inspection was completed October 16th,2019 9. Rationale For Limitations: All parameters were assigned numerical limits based on review of monitoring data for the permittee to determine the range of concentrations being discharged.No over allocations were noted. Allocation Table is enclosed. IINDUSTRIAL USER WASTEWATER SURVEY • & PERMIT APPLICATION COVER PAGE Company Name: SDFC,LLC pka Mocaro aka Synergy Dyeing and Finishing Name of responsible person on site at the facility authorized to represent the Name of alternative on site person familiar with the day to day operations, company in official dealings with the Sewer Authority and/or the City. environmental permitting requirements, monitoring, record keeping,and Lance Dunn data mans emen .Abid All Jon g t. , Title Manager Years with firm 2 Title Member Manager Years with firm 2 Phone#704-819-7435 Fax#704-873-6139 Phone#704-878-6645 Fax#704-873-6139 Physical street address of facility Official mailing address,if different. Note if same. 2201 Mocaro Dr same city Statesville State NC zip 28677 City State Zip The information provided by you on this questionnaire serves two functions: 1. The information is used to determine if your facility needs an Industrial User Pretreatment Permit(IUP) for the discharge of wastewater to the local sewer. 2. If an Industrial User Pretreatment Permit (IUP) is required, this survey serves as the application for an Industrial User Pretreatment Permit(IUP). Requests for confidential treatment of information provided on this form shall be governed by procedures specified in 40 CFR Part 2. In accordance with Title 40 of the Code of Federal Regulations Part 403, Section 403.14 and the Local Sewer Use Ordinance (SUO), information and data provided in this questionnaire which identifies the content,volume and frequency of discharge shall be available to the public without restriction. This is to be signed by an authorized official of your firm,as defined in the Local Sewer Use Ordinance or the NC Model Sewer Use Ordinance,Section 1.2,after completion of this form. I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based upon my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and/or imprisonment for knowing viola 10/9/2019 igna e of Authorized Representative Date listed above (seal if applicable) Page 1 • Industrial User Wastewater Survey & Permit Application 13. Do you have,or have you ever applied for,been issued,or been denied an NPDES permit to discharge to the surface waters or storm sewers of North Carolina? If yes,list all other NPDES permits,permit numbers, dates,and names used to apply for them, or reason denied. If yes: Permit,#,date,applicant name NCDENR STORMWATER NCG[170411 Effective October 4,2019 to May 31,2024,SDFC,LLC Yes X If yes: Permit,#,date,applicant name No 14. Do you have, or have you ever applied for or been issued an Industrial User Pretreatment Permit (IUP)to discharge wastewater to the sewer collection system. If yes,list all other IUP permits, permit numbers, dates,and names used to apply for them. If yes: Permit,#,date,applicant name Permit number unknown previous application rec'd Oct 22,2014 for Mocam Dyeing&Finishing,Inc Yes X If yes: Permit,#,date,applicant name No 15. Do you have,or have you ever applied for or been issued any other Environmental Permits(for example; air,RCRA,groundwater, stormwater,general,Non-Discharge,septic tank,etc.). If yes,list all other permits,permit numbers,dates,and names used to apply for them. If yes: Permit type,#,date,applicant name NCDENR-DAQ Air Permit class Synthetic Minor#07296R10 April 13,2017 to August 31,2024 SDFC,LLC Facility ID Yes X 49002I6 If yes: Permit type,#,date,applicant name No If yes: Permit type,#,date,applicant name 16. Is a Spill Prevention Control and Countermeasure(SPCC)Plan prepared for this facility? Yes YES No 17. Is a Spill/Slug Control Plan required by the POTW,prepared for this facility? Yes YES No 18. Do you have any underground storage tanks at your facility? If yes,list contents and volume of each tank. Yes No NO 19. Do you have any above ground storage tanks at your facility? If yes, for each tank,list the contents,volume,whether the tank has any spill prevention or containment devices,such as dikes, and procedures for draining any containment devices. YES #of Tanks 11 INSIDE-Diked,self(double bather 2019)contained tank roon e with valve that discharges to equalization tank if needed. s 8,000 gal Hydrogen Peroxide,8000 gal alkafow LSA, 6,000 gal citric Acid, No 4 @.6,000 gal water for increased demand levels, 8,000 unused OUTSIDE-2@20,000 gallon fuel tanks with secondary containment that are currently empty with no plans to use them. One 10,000 water storage for heat recovery Page 3 • (INDUSTRIAL USER WASTEWATER SURVEY • &PERMIT APPLICATION PART III, PRETREATMENT FACILITIES: Are there any pretreatment devices or processes used for treating wastewater before being discharged to the sewer? Check all that are present,and describe. No pretreatment facilities=> 1. Flow equalization Aerated equalization=> ALL NON-Aerated equalization=> Total volume of equalization (million gal.)=> .04 2. Activated Carbon Yes No X Describe any,if present. 3. Activated Sludge Yes No X 4. Air Stripping Yes No X 5. Centrifugation Yes No X 6. Chemical Precipitation Yes No X 7. Chlorination Yes No X 8. Cyanide Destruction Yes No X 9. Cyclone Yes No X 10. Dissolved Air Floatation Yes No X 11. Filtration Yes No X 12. Flocculation Yes No X 13. Grease Trap Yes No X 14. Grit Removal Yes X No 15. Ion Exchange Yes No X 16. Neutralize,pH adjust Yes X No 17. Other Biological Treatment Yes No X 18. Ozonation Yes No X 19. Reverse Osmosis Yes No X 20. Screening Yes X No 21. Sedimentation Yes No X 22. Septic Tank Yes No X 23. Silver Recovery Yes No X 24. Solvent Separation Yes No X 25. Spill protection Yes No X List any others. 5 I.INDUSTRIAL USER WASTEWATER SURVEY • &PERMIT APPLICATION PART IV, CATEGORICAL INFORMATION: (continued) Check 40 Industrial Activity Check 40 Industrial Activity below CFR# below CFR# 424 Ferro allay Manufacturing 463 Plastics molding and forming 418 Fertilizer Manufacturing 466 Porcelain enameling 464 Foundries,Metal Mold&Casting 4.30 Pulp,paper,and paperboard 426 Glass Manufacturing 428 Rubber Manufacturing 406 Grain mills 417 Soap&Detergent Manufacturing 454 Gum&Wood Chemicals Mfg. 423 Steam Electric power Generation 460 Hospitals 409 Sugar processing 447 Ink formulating - 410 Textile Mills 415 Inorganic chemical Manufacturing 429 Timber products processing 420 Iron&Steel Manufacturing 442 Transportation Equipment Cleaning 425 Leather Tanning&Finishing Others • IINDUSTRIAL USER WASTEWATER SURVEY • &PERMIT APPLICATION Wastewater Pollutant Checklist Chemical Name EPA Check if Check if Check if Check if Concentration Storet Present at Absent at Present in Absent in in Discharge, Code Facility Facility Discharge Discharge if Known (mg/1) Base Neutral Organics (continued) Di-n-octyl phthalate 34596 X X Dibenzo(a,h) anthracene 34556 X X Diethyl phthalate 34336 X X Dimethyl phthalate 3434I X X - Fluoranthene 34376 X X Fluorene 34381 X X Hexachlorobenzene 39700 X X Hexachlorobutadiene 34391 X X Hexachlorocyclopentadiene 34386 X X Hexachloroethane 34396 X X Indeno(1,2,3-cd)pyrene 34403 X X Isophorone 34408 X X N-nitroso-di-n-propylamine 34428 X X N-nitrosodimethylamine 34438 X X N-nitrosodiphenylamine 34433 X X Naphthalene 34696 X X Nitrobenzene 34447 X X Phenanthrene 34461 X X Pyrene 34469 X X Metals Aluminum 01104 X X Antimony 01097 X X Arsenic 01002 X X Beryllium 01012 X X Cadmium 01027 X X 0.0004 Chromium 01034 X X .005 Copper 01042 X X .012 - Lead 01051 X . X <.003 Mercury 71900 X X Molybdenum 01062 X X Nickel 01067 X X 0.002 Selenium 01147 X X. Silver 01077 X X 0.001 Thalium 00982 X X Zinc ,01092 X X .055 9 IINDUSTRIAL USER WASTEWATER SURVEY Data 1ERMIy APPLICATION rm <=Receiving POTW <=Receiving NPDES# <=Specific Sample Location! i.e.,Give IU Name, IUP#, and/or pipe# BOD TSS Ammonia Lab=> Laboratory performing analysis=> MDL=> Laboratory Method Detection Limits=> Notes Notes=> _> Q =Flow Sample Date Notes about Sample M=Metered Conc.Results Conc.Results Conc. ID, or Sample E=Estimated from Lab from Lab Results from Count Collecte Lab d mgd gal/day <? mg/1 <? mg/1 <? mg/I 1 PLEASE SEE 2 ATTACHED 3 LABORATORY 4 RESULTS 5 SHEETS 6 7 8 9 10 11 12 etc TNS=> Total number of samples=> Max. value=> Maximum data value(mg/1)_> Avg. (use 1/2 BDL)_> Avg.data value,Include BDL values as 1/2 detection limit=> 11 IINDUSTRIAL USER WASTEWATER SURVEY & PERMIT APPLICATION Data Summary Form <=Receiving POTW <=Receiving NPDES# <=Specific Sample Location! i.e.,Give IU Name,IUP#,and/or pipe# Cyanide Lead Mercury Nickel Silver 'Zinc Lab=> MDL=> Notes=> Sample Date Sample Conc.Results Conc.Results Conc.Results Conc.Results Conc.Results Conc. ID or Collected from Lab from Lab from Lab from Lab from Lab Results from Count <? Lab mg/1 ' . <? Mg/1 <? mg/1 <? mg/1 <? mg/1 <? mg/1 1 2 3 PLEASE SEE 4 ATTACHED 5 LABORATOR Y 6 RESULTS 7 SHEETS 8 9 10 11 12 etc TNS=> Max.Value => Avg.(usel/2 BDL)=> 13 Industrial User Wastewater Survey &Permit Application • Part V, Waste Reduction Information : State Pretreatment Rule 15A NCAC 2H.0916(c)(1)(M)requires Significant Industrial Users to include a description of current and projected waste reduction(pollution prevention) activities. The codes listed are standard EPA codes found on Toxic Release Inventory and other environmental forms. Please check all applicable codes for your facility related to wastewater discharge. Current Projected Code Description x x W13 Improved maintenance scheduling recordkeeping,or procedures W14 Changed production schedule to minimize equipment and feedstock changeovers W 19 Other changes in operating practices(explain briefly in comments) W21 Instituted procedures to ensure that materials do not stay in inventory beyond shelf-life x W22 Began to test outdated material-continue to use if still effective W23 Eliminated shelf-life requirements for stable materials W24 Instituted better labeling procedures x W25 Instituted clearinghouse to exchange materials that would otherwise be discarded W29 Other changes in Inventory control(explain briefly in comments) W31 Improved storage or stacking procedures W32 Improved procedures for loading,unloading and transfer operations W33 Installed overflow alarms or automatic shutoff valves x W34 Installed secondary containment W35 Installed vapor recovery systems x W36 Implemented inspection or monitoring program of potential spill or leak sources W39 Other spill and leak prevention(explain briefly in comments) W41 Increased purity of raw materials x x W42 Substituted raw materials W49 Other raw material modifications(explain briefly in comments) x W51 Instituted recirculation within a process W52 Modified equipment, layout,or piping W53 Use of a different process catalyst W54 Instituted better controls on operating bulk containers to minimize discarding of empty containers W55 Changed from small volume containers to bulk containers to minimize discarding of empty containers W58 Other process modifications(explain briefly in comments) W59 Modified stripping/cleaning equipment W60 Changed to mechanical stripping/cleaning devices(from solvents or other materials) W61 Changed to aqueous cleaners (from solvents or other materials) 15 • y ilAc CITY of \/ { e •L'ate CAROLINA September 11,2019 • • Mr.Lance Dunn SDFC,LLC. 2201 MoCaro Drive Statesville,NC 28677 Re:Third Quarter Analysis Dear Mr. Dunn: Enclosed please find the results on the third quarter analysis performed on 8/6/2019 through 8/7/2019. Results of these analyses indicate that no surcharge will be assessed during the following quarter. If you have any questions please call me at 704-878-343&. Sincerely, (\9fr\ci. O kAl1/411.:51 Brandy Johnson,Pretreatment Coordinator Water Resources Department BJ • Enclosure PO Box 1111 • Statesville,NC 28687 • ci.statesville,nc.us June 25, 2019 Mr. Lance Dunn SDFC, LLC. 2201 Mocaro Drive Statesville, NC 28677 SECOND QUARTER ANALYSIS SAMPLED ON 5/6/2019 through 5/7/2019 t Daily Permit Daily Surcharge Amount to be Parameter Results(mg/1) Limit(mg/1) Limit(mg/1) Surcharged PH 7.6 ---. ---- ---- NII3-N <.100 mg/1 25 mg/1 25 mg/I 0 mg/1 COD 561 mg/I 2000 mg/1 700 mg/1 0 mg/1 TSS 116.7 mg/I 300 mg/1 300 mg/1 0 mg/1 BOD 57 mg/1 350 mg/I ---- ---- OIL&GREASE mg/1 200 mg/1 ---- ---- . CADMIUM mg/1 .010 mg/1 ---- ---- CHROMIUM mg/I .100 mg/1 ---- ---- COPPER mg/1 .200 mg/1 -- ___ LEAD mg/1 .100 mg/1 ---- ---- NICKEL mg/1 .050 mg/1 • ' ---- ---- SILVER mg/1 .010 mg/1 ---- ---- ZINC mg/1 .300 mg/1 ---- --__ T.CYANIDE N/A mg/I N/A mg/I ---- -_-- # I t iN c.‘N r . City of Statesville-Third Creek WWTP Control Authority and/or Municipality PERMIT Industrial User Pretreatment Permit(IUP) To Discharge Wastewater Under the Industrial Pretreatment Program 3002 N/A tUP Number 40 CFR Category (if Applicable) In compliance with the provisions of North Carolina General Statute 143-215.1, any applicable federal categorical pretreatment regulations, all other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Control Authority and/or Municipality Sewer Use Ordinance. The following Industry,hereafter referred to by name or as the permittee: Industry name,permittee: SDFC, LLC. Facility Located at Street Address 2201 MoCaro Drive City Statesville State,Zip NC,28677 is hereby authorized to discharge wastewater from the facility located at the above listed address into the sanitary sewer collection system and the wastewater treatment facility of the Control Authority and/or Municipality listed below: IUP Control Authority and/or Municipality WWTP name: Third Creek WWTP NPDES Number: NC0020591 WWTP Address: 444 Third Creek Road City,State,Zip Statesville,NC 28677 in accordance with effluent limitations, monitoring requirements, and all other conditions set forth in Parts I, II, and III of this Industrial User Pretreatment Permit(IUP). Effective date, this permit and the authorization to discharge shall become effective at midnight on this date:. May 1st, 2020 Expiration date,this permit and the authorization to discharge shall expire at midnight on this date: May 1st, 2025 jard‘ fr i°7/ // Date Andy Smi ,Operations Manager Water R•sources Department Industrial User Pretreatment Permit (IUP) PART I Specific Conditions IUP, PART I, OUTLINE: A.) IUP Basic Information B.) IUP Modification History C.) Authorization Statement D. Description of Discharges P g E.) Schematic and Monitoring Locations F.) Effluent Limits&Monitoring Requirements G.) Definitions and Limit Page(s)notes A. IUP Basic Information: Receiving Control Authority&WWTP name: POTW NPDES#: Third Creek WWTP NC0020591 IUP Name: IUP Number: SDFC, LLC. 3002 IUP Effective date: Pipe Numbers,list all regulated pipes: May 1st,2020 01 IUP Expiration date: IUP 40 CFR#(if applicable),or N/A: May 1st, 2025 N/A B. IUP History: Effective Date: Reason for& Description of modifications: 4/1/98 Change in surcharge parameters-dropped the BOD limit. 5/1/00 Renewal permit issued. 5/9/00 Special Condition revised to be more general, less restrictive. 5/1/02 Change in Oil and Grease limit due to Council Action. 6/1/04 Change in Ammonia surcharge limit due to Council Action. 5/1/05 Renewal of permit issued. 5/1/10 Renewal of permit issued. 5/1/15 Renewal of permit issued. 2/2/16 Modified permit to reflect the self-monitoring samplings for flow and pH for every sample. 4/30/2018 Modified permit to reflect name change. 7/18/2018 Modified permit to lower Chromium, Copper,Nickle, and Zinc limits 5/1/2020 Renewal of permit issues. 2 Industrial User Pretreatment Permit (IUP) PART I Specific Conditions C.) Authorization Statement: 1.) The Permittee is hereby authorized to discharge wastewater in accordance with the effluent limitations, monitoring requirements, and all other conditions set forth in'this Industrial User Pretreatment Permit (IUP) into the sewer collection system and wastewater treatment facility of the Control Authority and/or Municipality. 2.) The Permittee is hereby authorized to continue operation of and discharge wastewater from the following treatment or pretreatment facilities. These facilities must correspond to the treatment units listed on both the application and inspection forms. IU Treatment Units Flow Equalization Grit Removal Neutralization, pH adjust Screening 3.) The Permittee is hereby authorized to, if required by the Control Authority and/or Municipality and after receiving Authorization to Construct (A to C) from the Control Authority and/or Municipality, construct and operate additional pretreatment units as needed to meet final effluent limitations. D.) Description of IUP Discharge(s): 1. Describe the discharge(s) from all regulated pipes. Pipe # 01 , Description of Discharge: Wastewater, boiler blow down and equipment wash down E.) Schematic and Monitoring Locations: The facility schematic and description of monitoring location(s) given below must show enough detail such that someone unfamiliar with the facility could readily find and identify the monitoring location(s) and connection to the sewer. Include and identify all regulated pipes. The sampling point for Pipe 01 shall be from the weirbox in the equalization 3 Industrial User Pretreatment Permit (I UP) PART I Specific Conditions tank. 4 5 IUP, Part 1 Section F: Receiving POTW name=> Third Creek WWTP IU nai Effluent Limits and Monitoring Requirements Receiving POTW NPDES#_> NC0020591 IUP# Effective date for these Limits=> 5/1/2020 Pipe h The Permittee may discharge from this specific Expiration date for these Limits=> 5/1/2025 40 CF Pipe number according to these specific dates, effluent limits, and monitoring requirements THE LIMITS ON THIS PAGE ARE,(Check one below): LIMITS for ENTIRE permit period => Yes INTERIM Limits for period# 1 => INTERIM Limits for period#2 => FINAL Limits Page => Concentration Limits Mass Limits Monitoring Surcharge Monthly Monthly Daily Max Limit** Average Units Daily Max Average Units By Industry* 1 Flow .750 MGD 2 BOD 350 mg/1 3 TSS 300 300 mg/1 4 Temperature 5 PH***$ OTHER PARAMETERS;Please List Alphabetically 6 Ammonia Nitrogen 25 25 mg/1 7 Cadmium .010 mg/1 8 T.Chromium .100 mg/1 9 Copper .200 mg/1 10 T.Cyanide 11 COD 2000 700 mg/1 12 Lead .100 mg/1 13 Nickel .050 mg/1 14 Oil&Grease 200 mg/1 15 Silver .010 mg/I 16 Zinc .300 mg/1 17 18 *Industries must submit report to City WWTP monthly by the 15th day of the following month. **Surcharge imposed for all in excess of: (See above) ****pH shall not be less than 6.0 nor greater than 11.0 Standard Units. 5 Industrial User Pretreatment Permit (IUP) PART I Specific Conditions G.) Definitions and Limit Page(s) notes: In addition to the definitions in the City of Statesville Sewer Use Ordinance the following definitions apply: 1. Composite Sample: Unless defined differently below, a composite sample for the monitoring requirements of this IUP, is defined as the automatic or manual collection of one grab sample of constant volume, not less than 100 ml, collected every hour during the entire discharge period on the sampling day. Sampling day shall be a typical production, and discharge day. 2. Daily Monitoring Frequency Daily Monitoring Frequency as specified in this IUP shall mean each working day. 3. Grab Sample Grab sample for the monitoring requirements of this IUP, is defined as a single "dip and take" sample collected at a representative point in the discharge stream. 4. Instantaneous measurement An Instantaneous measurement for the monitoring requirements of this IUP is defined as a single reading, observation, or measurement. 5. Monitoring and Reporting All Monitoring shall be performed by a North Carolina state certified laboratory by standard methods. All data shall be reported to the Division as specified in Part II, 2 of this permit, note that violations shall be reported within 24 hours, and that all sampling (even if done more frequently than required) shall be summarized on forms approved by the Division and sent to the following addresses: Director of Water Resources P.O. Box 1111 Statesville,NC 28687 6. Notice to Permittees Permittee is subject to the thirty(30) general conditions attached, found in Part II of this permit. 6 Industrial User Pretreatment Permit (IUP) PART II General Conditions Outline of PART II, 1. Monitoring and Reporting 3. Responsibilities a. Reporting by Permittee i. Civil and Criminal Liability b. Representative Sampling j. Federal and/or State Laws c. Test Procedures - k. Penalties d. Additional Monitoring by Permittee 1. Need to Halt or Reduce not a Defense e. Records Retention m. Severability 2. Operational Requirements n. Expiration of Permit a. Change In Discharge o. Dilution Prohibition b. Non-Compliance Notification p. Construction c. Duty to Comply q. Permit Modification, Revocation, Termination d. Facilities Operation r. Reopener e. Adverse Impact 4. Non-Compliance Enforcement f. General Prohibitive Standards g. Bypassing h. Removed Substances i. Upset Conditions j. Power Failures 3. Responsibilities a. Right of Entry b. Transfer of Ownership or Control c. Availability of Reports d. Duty to Provide Information e. Signatory Requirements f. Toxic Pollutants g. Oil and Hazardous Substance Liability h. Property Rights i. Civil and Criminal Liability j. Federal and/or State Laws k. Penalties 1. Need to Halt or Reduce not a Defense m. Severability n. Expiration of Permit 7 Industrial User Pretreatment Permit (IUP) PART II General Conditions 1. Monitoring and Reporting a.) Reporting By Permittee Monitoring results required by the conditions of this Permit, or by any Federal or State regulation, are to be submitted to: Director of Water Resources P. O. Box 1111 Statesville,NC 28687 in addition to any specified Federal or State agency at a frequency specified by the Permit or applicable regulations. All analyses required by the Permit or regulations must be performed by a laboratory certified by the State of North Carolina. Failure to submit monitoring reports with Chain of Custody by the 15th following the month the data is generated may be considered grounds for revocation of the Permit, and prohibition of the discharge to the Sewer System. If no discharge occurs during the reporting period, "no discharge" shall be reported. In situations where Federal or State regulations require reporting directly to the USEPA or the State DWQ, copies of the monitoring reports must also be submitted to the City. Records of all monitoring results shall be retained by the Permittee for at least three (3) years and shall include the following information: I. The exact place, date,time of sampling. II. The dates the analyses were programmed. III. The person(s) who performed the analyses. IV. The analytical techniques of methods used; V. The results of all required analyses. b.) Representative Sampling: Samples and measurements taken as required herein shall be representative of the volume and nature of the monitored discharge. All samples shall be taken at the monitoring points specified in this permit and, unless otherwise specified,before the effluent joins or is diluted by any other wastestream, body of water, or substance. Monitoring points shall not be changed without notification to, and approval by,the permit issuing authority. c.) Test Procedures: Test procedures for the analysis of pollutants shall be performed in accordance with techniques prescribed in 40 CFR Part 136, and amendments there to unless specified otherwise in the monitoring conditions of this permit. d.) Additional Monitoring by Permittee: If the permittee monitors any pollutant at the location(s) designated herein at the same frequency as does the City and/or more frequently than required by this Permit,using approved analytical methods as specified above,the results of such monitoring shall be IDMR Form, with Chain of Custody. Such increased monitoring to the City on the y frequency shall also be indicated. The Citymayrequire monitoringon a more frequent basis q Y q q or require monitoring of other pollutants not required in this Permit by written notification to Permittee. 8 Industrial User Pretreatment Permit (IUP) PART II General Conditions e.) Records Retention: All records and information resulting from the monitoring activities required by this Permit including all records of analyses performed and calibration and maintenance of instrumentation, and recordings from continuous monitoring instrumentation shall be retained by the City for a minimum of three (3)years, or longer if requested in writing by the permittee. 2. Operational Requirements a.) Change in Discharge: All permittee's discharges and the operation of its facilities shall be in compliance with the terms and conditions of this Permit and Ordinance. The discharge of any pollutant identified in this Permit more frequently than, or at a level in excess of,that authorized shall constitute a violation of the Permit and the Ordinance. Ninety(90) days prior to any anticipated facility expansions,production increases, or process modifications which will result in new, different, or increased discharges of pollutants must be reported by submission of a new Permit application, or, if such changes will not violate the effluent limitations specified in this Permit, by written notice to the City of such changes. Following such notice,this Permit may be modified to specify and limit any pollutants not previously limited. b.) Non-Compliance Notification: If, for any reason,the permittee does not comply with or will be unable to comply with any effluent limitation specified in the Permit or any other act or requirement of this Permit, the permittee shall provide the City with the following information, in writing, within five (5) days of becoming aware of such condition: I. A description of the discharge or other non-complying act and cause of non-compliance; and II. The period of non-compliance, including exact dates and times, or if not corrected,the anticipated time the non-compliance is expected to continue, and steps being taken to reduce, eliminate and prevent recurrence of the non-complying discharge. In no event,however, shall continued non-compliance of whatever duration, or notice of non-compliance, or any extension of time or other indulgence granted by the City with respect to the same be deemed a waiver to the City and permittee shall, at all times of non- compliance, remain subject to the procedures prescribed in the event of non-compliance outlined in Section 5 hereof and in the Ordinance. c.) Duty to Comply: The permittee must comply with all conditions of this permit. Any permit noncompliance constitutes a violation of the City of Statesville Sewer Use Ordinance and is grounds for possible enforcement action. 9 Industrial User Pretreatment Permit (IUP) PART II General Conditions d.) Facilities Operation: The permittee shall at all times maintain in good working order and operate as efficiently as possible all treatment or control facilities or systems installed or used by the Permittee to achieve compliance with the terms and conditions of this Permit and the Ordinance. e.) Adverse Impact: The permittee shall take all reasonable steps to minimize any adverse impact to the City's sewers, wastewater treatment plant and navigable waters resulting from noncompliance with any effluent limitations specified in the Permit, including such accelerated or additional monitoring as necessary to determine the nature and impact of the non-complying discharge. The permittee shall notify the City immediately of all discharges that could cause problems to the POTW including any slug loadings as defined by 40 CFR 403.5 (b). If the permittee experiences such a discharge they shall inform the Director of Water Resources immediately upon the first awareness of the commencement of the discharge. A written follow-up report thereof shall be filed by the permittee within five (5) days. f.) General Prohibitive Standards: The permittee shall comply with the general prohibitive discharge standards in 40 CFR 403.5 (a) and(b) of the Federal pretreatment regulations. g.) Bypassing: Any diversion from, or bypass of, facilities necessary to maintain compliance with the terms and conditions is prohibited, except, (1)where temporarily unavoidable to prevent loss of life or severe property damage, or, (2) where temporary excessive storm drainage or runoff would damage any facilities necessary for compliance with the effluent limitations and prohibitions of this Permit. The Permittee shall promptly notify the City and submit within 5 days in writing of each such diversion or bypass and shall, as soon as possible, restore the facility to normal operation. If the permittee knows in advance of the need to bypass, a written notice shall be submitted to the City at least 10 days before the bypass. Bypass approval shall be given only when such bypass is in compliance with 40 CFR 403.17. h.) Removed Substances: Solids, sludges, filter backwash, or other pollutants removed in the course of treatment or control of wastewaters shall be disposed of in an approved manner such as to prevent any pollutant from such materials from entering the Sewer system. The permittee is responsible for assuring its compliance with any requirements regarding the generation,treatment, storage, and/or, disposal of"Hazardous Waste" as defined under the Federal Resource Conservation and Recovery Act. i.) Upset Conditions: An "upset" means an exceptional incident in which there is an unintentional and temporary noncompliance with the effluent limitations of this permit because of factors beyond the reasonable control of the permittee. An upset does not include noncompliance to the extent caused by operational error, improperly designed or inadequate treatment facilities, lack of preventative maintenance, or careless or improper operations. 10 Industrial User Pretreatment Permit (IUP) PART II General Conditions An upset may constitute an affirmative defense for action brought for the noncompliance. The permittee has the burden of proof to provide evidence and demonstrate that none of the factors specifically listed above were responsible for the noncompliance. j.) Power Failures: In order to maintain compliance with the effluent limitations and prohibitions of this Permit, the permittee shall halt,reduce or otherwise control facilities upon the reduction, loss, or failure of the primary source of power to said wastewater control facilities. 3. Responsibilities a.) Right of Entry: The permittee shall allow the staff of the State of North Carolina Department of Environment and Natural Resources, Division of Water Quality,the Regional Administrator of the Environmental Protection Agency,the City of Statesville, and/or their authorized representatives, upon the presentation of credentials: I. To enter upon the permittee's premises where an effluent source is located or in which any records are required to be kept under the terms and conditions of this Permit; and, II. At reasonable times to have access to and copy any records required to be kept under the terms and conditions of this Permit; to inspect any monitoring equipment or monitoring method required in this Permit, and to sample any discharge of pollutants. b.) Transfer of Ownership or Control: This Permit shall not be reassigned or transferred or sold to a new owner, new user, different premises, or a new or changed operation without approval of the City. c.) Availability of Reports: Except for data determined to be confidential under the Sewer Use Ordinance all reports prepared in accordance with the terms of this permit be available for public inspection at the offices of the Director. Effluent data shall not be considered confidential. Knowingly making any false statement on any such report may result in the imposition of criminal penalties as provided for in N.C.G.S. Section 143-215.6 (b)(2). The permittee shall retain records of all monitoring information, including all calibration and maintenance records as well as copies of reports and information used to complete the application for this permit for at least three years. All records that pertain to matters that are subject to any type of enforcement action shall be retained and preserved by the permittee until all enforcement activities have concluded and all periods of limitation with respect to any and all appeals have expired. 11 Industrial User Pretreatment Permit (IUP) PART II General Conditions d.) Duty to Provide Information: The permittee shall furnish to the Director of Water Resources or his designees, within a reasonable time, any information which the Director, his designee, or the Division of Environmental Management may request to determine whether cause exists for modifying, revoking and reissuing, or terminating this permit or to determine compliance with this permit. The permittee shall also furnish, upon request, copies of records required to be kept by this permit. e.) Signatory Requirements: All reports or information submitted pursuant to the requirements of this permit must be signed and certified by a ranking official or duly authorized agent of the permittee. f.) Toxic Pollutants: If toxic effluent standard or prohibition(including any schedule of compliance specified in such effluent standard or prohibition) is established under Section 307 (a) of the Federal Clean Water Act for a toxic pollutant which is present in Permittee's discharge and such standard or prohibition is more stringent than any limitation for such pollutant in this Permit, this Permit shall be revised or modified in accordance with the toxic effluent standard or prohibition and the Permittee so notified. g.) Oil and Hazardous Substance Liability: Nothing in this Permit shall be construed to preclude the institution of any legal action or relieve the Permittee from any responsibilities, liabilities or penalties to which the Permittee is or may be subject under N.C.G.S. Section 143-215.75 et. seq. or the Ordinance. h.) Property Rights: The issuance of this Permit does not convey any property rights in either real or personal property, or any exclusive privileges, nor does it authorize any injury to private property or any invasion of personal rights, nor any infringement of Federal, State or local laws or regulations. i.) Civil and Criminal Liability: Nothing in this permit shall be construed to relieve the permittee from civil or criminal penalties for noncompliance. j.) Federal and/or State Laws: Nothing in this permit shall be construed to preclude the institution of any legal action or relieve the permittee from any responsibilities, liabilities, or penalties established pursuant to any applicable Federal and/or State law regulation. k.) Penalties: The City of Statesville Sewer Use Ordinance provides that any person who violates a permit condition is subject to a civil penalty not to exceed $25,000 dollars per day of such violation. Under State law, (NCGS 143-215.6B), under certain circumstances it is a crime to violate 12 Industrial User Pretreatment Permit (IUP) PART II General Conditions • terms, conditions, or requirements of pretreatment permits. It is a crime to knowingly make any false statement,representation, or certification in any record or other document submitted or required to be maintained under this permit, including monitoring reports or reports of compliance or noncompliance. These crimes are enforced at the prosecutorial discretion of the local District Attorney. 1.) Need to Halt or Reduce Not A Defense: It shall not be a defense for a permittee in an enforcement action that it would have been necessary to halt or reduce the permittee activity to maintain compliance with the conditions of the permit. m.) Severability: The provisions of this Permit are severable, and if any provision of this Permit or the application of any provision of this Permit to any circumstance, is held invalid, the application of such provision to other circumstances and the remainder of this Permit shall not be affected thereby. n.) Expiration of permit: Permittee is not authorized to discharge after the expiration date set forth herein. In order to receive authorization to discharge beyond the expiration date the Permittee shall submit an application for reissuance of this permit at least 180 days prior to such expiration date. o.) Dilution Prohibition: The permittee shall not increase the use of potable or process water or in any other way attempt to dilute the,discharge as a partial or complete substitute for adequate treatment to achieve compliance with the limitations contained in this permit. p.) Construction: No construction of pretreatment facilities or additions thereto shall be begun until Final Plans and Specifications have been submitted to the City, and written approval and an Authorization to Construct(A to C)have been issued. q.) Permit Modification, Revocation, Termination: This permit may be modified, revoked and reissued or terminated with cause in accordance to the requirements of the City's Sewer Use Ordinance and North Carolina General Statute or implementing regulations. r.) Reopener: This permit shall be modified or, alternatively, revoked and reissued to comply with any applicable effluent standards or limitation issued or approved by the City, for the control of any pollutant not now controlled by this permit or the City Ordinance. This may also include any other requirements of State or Federal pretreatment regulations then applicable. 13 Industrial User Pretreatment Permit (IUP) PART II General Conditions 4. Non-Compliance Enforcement: Any failure by Permittee to continuously meet and comply with the provisions of the Ordinance and this Permit, and any misrepresentation or failure to fully disclose all relevant facts in the application shall constitute a violation of this Permit, and the City is, if it determines that such violation constitutes an immediate danger to the operation of maintenance of the City's Sanitary Sewer System or wastewater treatment plant, or if it determines that such violation can not be cured within what it deems to be a reasonable time, authorized immediately upon written notification mailed or delivered to Permittee to terminate this Permit or suspend Permittee's right to discharge pursuant to this Permit pending implementation of steps by Permittee necessary to achieve compliance. In the event the City determines that such violation does not constitute an immediate danger to the operation or maintenance of the City's Sanitary Sewer System or wastewater treatment plant and that such non-compliance can be cured within a reasonable time, it shall inform Permittee by written notice of the violation and provide what it, in the exercise of its judgement, deems to be a reasonable time to achieve compliance. If compliance is not achieved with such time allotted by the City, the City is authorized to assert any remedies for non-compliance. Discharges by Permittee into the City's sewer system following termination, suspension or expiration of this Permit are unlawful, and in the event of such unlawful discharge,the City is authorized to: II. Require that the Permittee provide protection from accidental discharges of prohibited materials or other substances regulated by this Permit. Within five (5) days following an accidental discharge the Permittee shall submit to the Director of Water Resources a detailed written report describing the cause of the discharge and measures taken to prevent similar future occurrences. Such notification shall not relieve the Permittee from any liability which may be incurred as a result of the discharge: III. Levy a civil penalty for each day of non-compliance upon failure of Permittee to take corrective action following notification of non-compliance; IV. Discontinue water service to Perm' ittee's facility; V. Disconnect Permittee's connection to the City's sewer system; and/or; VI. Take such other remedies as may be available at law or equity to prevent such unlawful discharge and otherwise enforce the Ordinance and the provisions of this Permit. The foregoing remedies are cumulative and not exclusive, and the exercise of one or more shall not preclude the exercise of any other remedy at subsequent time. In addition the failure to exercise any remedy or other indulgence or extension of time or whatever nature or duration granted by the City in the event of violation shall in no event constitute a waiver of the right to exercise any or all of such remedies, and any or all of such remedies, may be exercised at any time. 14 Industrial User Pretreatment Permit (IUP) PART III Special Conditions **Additional Definitions that may be added*** 1. Slug/Spill Control Plan The permittee shall provide protection from accidental and slug discharges of prohibited materials and other substances regulated by this permit. The permittee shall develop a written slug/spill control plan and submit it to the Control Authority on or before the 30th day following production startup for the approval by the Control Authority. The plan shall include,but is not limited to: - description of discharge practices, including non-routine batch discharges - description of stored chemicals - procedures for immediately notifying the POTW of slug discharges that would cause violation of 40 CFR 403.5(b), with procedures for follow up notification within 5 days; - and if necessary, procedures to prevent adverse impact from accidental spills, including inspection and maintenance of storage areas,handling and transfer of materials, loading and unloading operations, control of plant site run-off,worker training,building of containment structures or equipment, measures for containing toxic organic pollutants (including solvents), and/or measures and equipment for emergency response. 2. Flow Measurement Requirements The permittee shall maintain appropriate discharge flow measurement devices and methods consistent with approved scientific practices to ensure the accuracy and reliability of measurements of the volume of monitored discharges. Devices installed shall be a continuous recording flow meter capable of measuring flows with a maximum deviation of less than 10% from true discharge rates throughout the range of expected discharge volumes. The devices shall be installed, calibrated, and maintained to ensure accuracy. At the time of issuance of the permit, this method consists of an Isco Bubbler Flow Meter. The meter shall be calibrated every year or more often as needed. Modifications to the flow metering equipment shall be approved by the Control Authority prior to installation. If a required flow measurement device fails,the Control Authority shall be notified within 24 hours. 15