HomeMy WebLinkAbout20181446 Ver 1_More Info Requested_20191025Strickland, Bev From: Price, Zan (George) Sent: Friday, October 25, 2019 1:32 PM To: Jon Swaim; Fuemmeler, Amanda J CIV (US) Subject: RE: [External] N Fork Water Line update Jon, Since the permit was issued based on the description in the PCN (see below) and details on the plans provided, the agencies will need additional information if the City wishes to keep the riprap in place. PCN Description below the impact table: Temporary impacts associated with water line installation as open cut trench excavation. River/Stream beds and banks to be returned to original contours and stabilized with coir matting, seeded with native seed mix impacted stream bank areas outside of the permanent maintenance corridor will be live staked. As discussed at our site meeting, there are 2 options: 1). Remove the riprap and stabilize the banks per the description above or 2). Provide a justification for using the riprap including calculations demonstrating that the size rock used will remain stable during over bank events. Additionally, please submit a revised stream impact table with a permanent impact for this location and a typical cross-section detail. Let us know if you have any questions or concerns. Regards, Zan Price_ PE ,4ssistamtRegional,S'Upervisar,AshevilleRegional 0ffice __ Q3Mater Quality Regional Operations 3,ction N rth arolma Department of En--ironmental Quality is 8 8_296.4662. (Office) 8 9-231.9634 (Cell) an.Price ncdenr_gov {;9r4 9 #'try acords l.aw any may be dL9GtzE'f fa pAR+sx From: Jon Swaim[mailto:jon.swaim@mcgillassociates.com] Sent: Monday, October 21, 2019 5:18 PM To: Price, Zan (George) <Zan.Price@ncdenr.gov>; Fuemmeler, Amanda J CIV (US) <Amanda.Jones@usace.army.mil> Subject: RE: [External] N Fork Water Line update External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Hey Guys, I found the project description that was attached to the PCN submittal that calls for rip rap in the N Fork Swannanoa. Not sure if this will help their case, but figured I'd give it a shot. Thanks, Jon Swaim Project Manager McGill Associates, P.A. 1013 State Farm Road, Boone, NC 28607 T 828.386.1920 C 828.434.0951 ion.swaima-mcgillassociates.com mcgillassociates.com We launched a refreshed brand. Please note email / web address changes above. From: Price, Zan (George) <Zan.Price@ncdenr.gov> Sent: Wednesday, October 16, 2019 3:55 PM To: Jon Swaim <Ion.swaim@mcgillassociates.com>; Fuemmeler, Amanda J CIV (US) <Amanda.Jones@usace.army.mil> Subject: RE: [External] N Fork Water Line update 1pm work? DEQ� Zan Price_ PE 4ssistamt Regional Superviso7, Asheville Regional Office Mater Quality Regional Operations S�,ction North Carolina Department of Env ronmental uaht�, 829-296_4662 (Office) 829-231.9634 (Cell) anTrice cdenr_goy- En,w ca7esc open to and trcm u Ls Inc fp- j�, suL? uiv r'+kurr i c a FL"c fkcords Law arrx maybe dL9Gb5ed to t+kdpales From: Jon Swaim[mailto:ion.swaim@mcgillassociates.com Sent: Wednesday, October 16, 2019 3:52 PM To: Price, Zan (George) <Zan.Price@ncdenr.gov>; Fuemmeler, Amanda J CIV (US) <Amanda.Jones@usace.army.mil> Subject: Re: [External] N Fork Water Line update a7mr.17 External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to ort.s am nc. ov Works for me Get Outlook for iOS From: Price, Zan (George) <Zan.Price@ncdenr.gov> Sent: Wednesday, October 16, 2019 2:50:38 PM To: Jon Swaim <Ion.swaim@mcgillassociates.com>; Fuemmeler, Amanda J CIV (US) <Amanda.Jones@usace.army.mil> Subject: RE: [External] N Fork Water Line update Does Monday before 2pm work? From: Jon Swaim[mailto:ion.swaim@mcgillassociates.com] Sent: Tuesday, October 15, 2019 9:31 AM To: Price, Zan (George) <Zan.Price@ncdenr.gov>; Fuemmeler, Amanda J CIV (US) <Amanda.Jones@usace.army.mil> Subject: RE: [External] N Fork Water Line update External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Will do, I'm out of town for the rest of this week, but next week is open. Sent from Mail for Windows 10 From: Price, Zan (George) <Zan.Price@ncdenr.gov> Sent: Tuesday, October 15, 2019 8:53:48 AM To: Jon Swaim <Ion.swaim@mcgillassociates.com>; Fuemmeler, Amanda J CIV (US) <Amanda.Jones@usace.army.mil> Subject: RE: [External] N Fork Water Line update I would like to schedule a site visit. Let me know some dates that would work in the next week or so. Please also remind the contractor and your construction manager of the following condition of the approved 401. To date, we have not received any notifications of sediment impacts to waters. 6. The permittee shall report to the Asheville Regional Office any noncompliance with this certification, any violation of stream or wetland standards [15A NCAC 02B .0200] including but not limited to sediment impacts. Information shall be provided orally within 24 hours (or the next business day if a weekend or holiday) from the time the applicant became aware of the circumstances. A written submission shall also be provided within 5 business days of the time the applicant becomes aware of the circumstances. The written submission shall contain a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, if the noncompliance has not been corrected, the anticipated time compliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. The Division may waive the written submission requirement on a case -by -case basis. Zan Price _ PE AssistaV Regional S'Upervis07, Ashe 'ille Regional Office Mate- Oualrty Regional Operations 3`,ctaon D North Carolina Department ofEnvi-ronmental uaht�, ;.,...,.�..:.:_..,.a.r� 828.296_4662 (Office) 829-231.9634 (Cell) Zan.Price cdenr_gov Y?7c 4Y �' L101r1[ 9 iQ a�ldliC�7] df bti iJ[1[Ift--,S j�, s2JL1 xA i j ux jWuI Cau"FLbicacordsLawaw n y be afsdais d to d pales From: Jon Swaim<jon.swaim@mcgillassociates.com> Sent: Monday, October 14, 2019 9:55 AM To: Fuemmeler, Amanda J CIV (US) <Amanda.Jones@usace.army.mil> Cc: Price, Zan (George) <Zan.Price@ncdenr.gov> Subject: [External] N Fork Water Line update 0 rnal email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to o nc. ov Hey Amanda, Please find the attached letter and photos detailing my site inspection last week. I've reached out to our construction manager this morning for an update but haven't heard back from him yet. I'll keep you posted. Thanks, let me know about a site visit if you feel one is needed. Jon Swaim Project Manager McGill Associates, P.A. 1013 State Farm Road, Boone, NC 28607 T 828.386.1920 C 828.434.0951 ion.swaim0mcaillassociates.com mcgillassociates.com We launched a refreshed brand. Please note email / web address changes above.