Loading...
HomeMy WebLinkAbout510007_Correspondence_Sludge Survey_20191018ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Director Donald E Byrd Donald E Byrd 755 Powhatan Rd Clayton, NC 27527 Dear Donald E Byrd: NC Dept of Environmental Quality OCT 2 3 2019 Raleigh Regional Office NORTH CAROLINA EnAronmental Quatity October 18, 2019 Subject: Sludge Survey Testing Dates Certificate of Coverage No. AWS510007 Donald E Byrd Animal Waste Management System Johnston County The Division of Water Resources (Division) received your sludge survey information on September 20, 2019. With the survey results, you requested an extension of the sludge survey requirement for lagoon structure "1" at the Donald E Byrd facility. Due to the amount of treatment volume available, and the rate of sludge accumulation for the lagoon, the Division agrees that a sludge survey is not needed until December 31, 2024. The next sludge survey for lagoon structure "1" at Donald E Byrd should be performed before December 31, 2024. Please retain this letter and keep it with your farm records for reference. Please call me at (919) 707-3705 if you have any questions. Sincerely, Heath C. Robinson Animal Feeding Operations Program CC: Raleigh Regional Office, Water Quality Regional Operations Section Permit File AWS510007 D � North Carolina Department of Environmental Quality I Dlvislon of Water Resources 512 North Salisbury Street i 1636 Mall Service Center I Ralciyh. North Carulina 27699 1636 r��\ 919.707.9000 Sludge Survey Evaluation Form Today's Date 10118'2019 Facility # 510007 Owner: Donald Byrd Lagoon ID I Sludge Survey Rr -.cive i 9120/2019 Sludge Survey Performed: 1111912018 Sludge Depth (Row O): (ft) 2.9 Existing Treatment Depth (Row P): (ft) 6.30 Start Date: 813/1992 Facility age at time of survey:(yr) 26 Average Sludge Accumulation (ft/ 0.11 Requested Extension: (yr) 5 Re nested Due Date 2024 Sludge Accumulation during extension period: (ft) 0.55 Treatment Depth Available after Extension: (ft) 5.75 Sludge level OK? YES Ratio Estimates Based on Depth EXISTING EXEMPTION Ratio of Sludge layer to total trmt depth 0.32 0,38 Ratio of Sludge depth OK? iSlope=Horizontal/vertical YES EXISTING EXEMPTION Average Sludge layer thickness (T) 2.9 3.4 Depth of the lagoon from top of bank to bottom soil surface 13 13 side slope (S) 3 3 Length at the top of inside bank (L) 19 196 Width at the top inside slope (W) 19 196 Thickness of existing liquid treatment zone (Y) 6.3 5.75 Length at midpoint of sludge layer (Lm)=L-2S(D-(I 2)) 126.70 128.35 Width at midpoint of sludge layer (Wm)=W-2S(D-(i 2)) 126.70 128.35 Volume of sludge (Vs)=Lm*Wm*T 46553.38 56854.86 Volume in gallons (Vsg)=Vs*7.481 348265.84 425274.36 Thickness of total treatment zone (Z)=T+Y 9.20 9.20 Length at midpoint of total treatment zone (Lz)=L-2(S)(D-(Z 2)) 145.60 145.60 Width at midpoint of total treatment zone (Wz)=W-2(S)(D-(Z'2)) 145.60 145.60 Volume of total treatment zone (Vz)=Lz*Wz*Z 195034.11 195034.11 Ratio(R) of sludge layer volume to total trmt volume 0.239 0.292 Sludge Volume Ratio OK? YES Maximum extension until end of permit cycle Next survey to be done: calendar r 12/31/2024 Notification letter mailed: 10(18i2019