Loading...
HomeMy WebLinkAbout20190089 Ver 1_Bridge #83 clarification_20191022MMA PROJECT REFERENCE NO. SHEET NO. 178PJ1.RJ18 I EC-6 /CONST.4 PIPE EXTENSION CONSTRUCTION SEQUENCE Raleigh, NC 27605 sEPi Te997899977e ENGINEERING 8 Fax:919-789-9591 C O N S T R U C T I O N License: C-2197 STA. 11 + 31 -DET- PHASE I PHASE II 1 1. UTILIZE SPECIAL STILLING BASINS DURING CONSTRUCTION AS DIRECTED BY THE ENGINEER. 1. UTILIZE SPECIAL STILLING BASINS DURING CONSTRUCTION AS DIRECTED BY THE ENGINEER. 2. INSTALL PERIMETER EROSION CONTROL MEASURES AS SHOWN ON SHEET EC-5. 2. REMOVE IMPERVIOUS DIKES 5 AND 6. 3. INSTALL IMPERVIOUS DIKES 5 AND 6 AS SHOWN IN PHASE I, BYPASS PUMP, AND TEMPORARY FLEXIBLE HOSE DIVERTING FLOW 3. INSTALL IMPERVIOUS DIKES 3 AND 4. REMOVE EXISTING BRIDGE STRUCTURE. TO A POINT DOWNSTREAM OF THE DUAL TEMPORARY PIPES. 4. CONSTRUCT ROADWAY BRIDGE AND —L— LINE ACCORDING TO APPROVED PLANS. REMOVE IMPERVIOUS DIKES 3 AND 4. 4. INSTALL IMPERVIOUS DIKE 1 AND BYPASS PUMP TO A POINT UPSTREAM OF IMPERVIOUS DIKE 5. EXTEND EXISTING 18" CMP. 5. INSTALL IMPERVIOUS DIKE 2, BYPASS PUMP, AND TEMPORARY FLEXIBLE PIPE TO A POINT UPSTREAM OF IMPERVIOUS DIKE 5. 6. INSTALL 2@60" CSP TEMPORARY PIPES ALONG DETOUR AND CONSTRUCT DETOUR AS SHOWN ON APPROVED PLANS. SHIFT TRAFFIC ONTO DETOUR. � fl WISTER �� WISTER 2 >y Plb IMPERVIOUS IMPERVIOUS DIKE 3 acb RETAIN FOR DETOUR PHASE �� \ RETAIN R GL DETOUR ASE Or w \ `y s / S9 0 0 — TUE S9 UE T 7UE 0 0 0 \ F �TUE ICJ S/ TUE—TUE ,S \ S T — WE—WE X TUE / PIS NCB' J$S��y/ems\ X TUE—TUE— 'TB TB _0 is =E�B='�e / _ - '— I // // uIAINE B S W ZN 5 X X x I/I '/ ZN-91 X x EE/2-- 8---- i 0403 T T 1340 SST — 1340 �T 0 5� 0 — G FALSE SUMP 0-- 5„ — � / ° FALSE SUMP SEE DETAIL 4 PDE Ep D SEE DETAIL 4 IMPERVIOUS 050 I OE REM VE I �E 050 c' � 0501 DIKE 6 I / OEP —E BLK F/ I�BLK OUNDAT19N �/ �� 050 I�OUNDATIgN A� 1—FT BASE CHANNEL CHANGE 0503 E ® �E PROPOSED 2@72" CSP I �m E I , �E SEE DETAAIIIL FIBER MATTING PROPOSED 2@72" CSP BURIED 1—FT WITH IMPERVIOUS IMPERVIOUS '0 e —� � TEMPORARY HEADWALLS �� IMPERVIOUS F � � t �' BURIED 1—FT WITH TEMPORARY HEADWALLS DIKE 2 DIKE 5 r DIKE 2 IMPERVIOUS ,"E M. WARD DIKE 1 o� IMPERVIOUS YE M. WARD c DIKE 1 90 2�, �90 20 x = x = * M = * NOTE:xTHE 11' CLEAR xROADWAY ` / v , x * , _ * _ _ * , MNOTE: THE 11' CLEAR ROADWAY BY •1 ELEVATION = 3554,9189' BY •1 ELEVATION = 3554,9189' N 956546, E 1218200, GRAPHIC SCALES N 956546. E 12102U0, GRAPHIC SCALES 8" SPIKE IN A 12" MAPLE 30 0 30 60 8" SPIKE IN A 12" MAPLE 30 0 30 60 PLANS Wei PLANS