Loading...
HomeMy WebLinkAbout20171338 Ver 1_Div 9 Compliance Review at B-5152 Lasater Rd and I-0911A_20191024 Wanucha, Dave From:Wanucha, Dave Sent:Thursday, October 24, 2019 11:26 AM To:Braquet, Stephanie Cc:Scott, Jordan C; Nicholle Braspennickx; Marciniak, Katherine J Subject:Div 9 Compliance Review at B-5152 Lasater Rd and I-0911A Attachments:Stream protection.jpg; Site 2 Upstream_basin.jpg; Site 2 Upstream slope_.jpg Stephanie, Thanks to you, Jordan, Kat and all other DOT staff for assisting the Corps and myself with reviewing the above projects. Overall, the projects appeared to be in good shape and in compliance. Erosion control measures appeared to be in good shape and stormwater discharge outfalls were well maintained. B-5152 Lasater Road, Sites 1 - 4 were reviewed and while the project is still under construction, what work has been completed thus far, regarding each permit site, has been completed satisfactorily. Stream protection practices taken while working with wet concrete on the bridge were indeed notable (picture attached). I-0911A Sites 2, 4, 5 and 8 (bridge causeways) were reviewed. The only concern Jordan and I discussed was the slope area upstream of Site 2 north of the interstate (pictures attached) . At the outlet, some turbidity was noted downstream of the outlet of which was related to the previous evening’s storm event. Jordan stated he would focus work towards toe and slope protection and areas upstream of the outlet at Site 2 as soon as possible. We appreciate all you can do to expedite that work. Thanks again and let me know if any clarifications are needed. Dave W. Dave Wanucha Division of Water Resources 401 & Buffer Transportation Permitting NC Department of Environmental Quality 336-776-9703 office 336-403-5655 mobile Dave.Wanucha@ncdenr.gov NC DEQ Winston Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston Salem, NC 27105 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 1