Loading...
HomeMy WebLinkAboutSWA000058_C400-GRADING & STORM DRAIN PLAN_10/23/2019STANDARD GRADING NOTES DRAINAGE NOTES GENERAL NOTES 2 NORTH G 1. ALL REQUIRED PERMITS MUST BE OBTAINED AND A TO THE ENGINEER FOR EVALUATION AND REDESIGN 7. AREAS CUT TO GRADE (RESIDUAL SOILS) TO 10. COMPACTION WITHIN ROAD RIGHTS -OF -WAY SHALL ROADWAY RIGHT-OF-WAY SHALL BE GOVERNED BY COPY MAINTAINED ON SITE PRIOR TO (IF NECESSARY). THE CONTRACTOR SHALL NOT RECEIVE FILL SHALL BE PROOFROLLED (MIN. BE AS REQUIRED BY THE GOVERNING AGENCY. AT THE NCDOT STANDARD SPECIFICATIONS. COMMENCING WORK. ALL REQUIRED EROSION COMMENCE WORK IN THE AREA UNTIL THE 50,000 LBS) OR TESTED BY OTHER MEANS TO A MINIMUM, THE FOLLOWING STANDARDS SHALL BE 13. CONTRACTOR SHALL PROVIDE MASS GRADING FOR CONTROL DEVICES SHALL BE INSTALLED PRIOR TO CONFLICT IS RESOLVED. ENSURE THAT MATERIAL IS SUITABLE FOR MET: PROJECT CURE SITE AND ROADWAY PER THE INSTALLATION OF ANY UNDERGROUND UTILITIES 4. DURING EXCAVATION, ALL FOREIGN DEBRIS AND STRUCTURAL LOADING. PLASTIC SOILS SHALL BE A.SUBGRADE SHALL BE COMPACTED GRADES/ELEVATIONS CONTOURS INDICATED ON THE OR SITE GRADING ACTIVITIES. SEE THE UNSUITABLE FILL MATERIALS SHALL BE REMOVED UNDERCUT AND DISPOSED OF ON SITE AT A TO 100% STANDARD PROCTOR MAXIMUM DRY GRADING. THE OTHER AREAS MAY BE ADJUSTED APPLICABLE PLAN SHEETS FOR THE REQUIRED AND DISPOSED OF OFFSITE. LOCATION APPROVED BY OWNER AND REPLACED DENSITY (UPPER 12"). WITH APPROVAL FROM OWNER/ENGINEER TO EROSION CONTROL REQUIREMENTS, MAINTENANCE 5. ON -SITE WASTE AREAS, WHEN APPROVED, SHALL WITH SUITABLE FILL MATERIAL, AS DIRECTED BY B.AGGREGATE BASE COURSE SHALL BE COMPACTED BALANCE SITE. AND STABILIZATION OF THE WORK SITE. BE CLEARLY MARKED ON THE FIELD RECORD THE GEOTECHNICAL ENGINEER. TO 100 DENSITY. 1. CONTRACTOR SHALL VERIFY ALL FIELD CONDITIONS DRAWINGS AND A COPY OF THOSE DRAWINGS 8. ALL FILL FOR STRUCTURAL AREAS SHALL BE C.INTERMEDIATE AND SURFACE HOT MIX ASPHALT PRIOR TO BEGINNING WORK. CONTRACTOR SHALL SHALL BE PROVIDED TO THE OWNER. THE USE PLACED IN 8"-12" LIFTS AND COMPACTED COURSES SHALL BE COMPACTED TO A MIN. OF VERIFY LOCATION AND DEPTH OF ALL APPLICABLE OF ON -SITE BURIAL PITS SHALL NOT BE ALLOWED TO 100% STANDARD PROCTOR MAXIMUM DRY 92% MAXIMUM SPECIFIC GRAVITY. UTILITIES AFFECTING THE PROJECT (ON AND OFF FOR THIS PROJECT. DENSITY (ASTM D698) AT NEAR OPTIMUM D.SUBGRADE AND BAS COURSE SHALL BE SITE). 6. ALL FILL SHALL BE COMPACTED TO 95% STANDARD MOISTURE CONTENT FOR UPPER 12" AS MEASURED PROOFROLLED (50,000 LBS MIN.). 2. THE CONTRACTOR SHALL CONTACT THE NORTH PROCTOR (ASTM D698) MAXIMUM DRY DENSITY FROM FINISHED GRADE (TOLERANCE SHALL BE E.HOT MIX ASPHALT TEMPERATURE AT TIME OF CAROLINA ONE CALL CENTER AT LEAST 72 HOURS FOR SPECIFIED MATERIAL. "LIGHTWEIGHT' OR �2%)' LAYDOWN SHALL BE WITHIN 20•F OF THE PLANT IN ADVANCE OF THE CONSTRUCTION. INDIVIDUAL HIGHLY PLASTIC SOILS SHALL NOT BE USED AS 9 SLOPES SHALL BE GRADED NO STEEPER THAN 2:1, MIX TEMPERATURE MIN. TEMPERATURE SHALL BE UTILITY AGENCIES NOT PARTICIPATING IN ONE CALL FILL UNDER ROADWAYS, BUILDINGS AND OTHER UNLESS SPECIALLY NOTED ON THE PLANS. FOR NO LESS THAN 220-230 DEGREES). SHALL BE CONTACTED INDEPENDENTLY BY THE STRUCTURAL AREAS. LIGHTWEIGHT OR PLASTIC ALL SLOPES GREATER 2:1, EROSION CONTROL F. VARIATIONS OF THE MINIMUM REQUIREMENTS CAN CONTRACTOR. SOILS AS DEFINED BY THE GEOTECHNICAL MATTING WILL BE REQUIRED. ALL 2:1 SLOPES BE CONSIDERED ON A CASE -BY -CASE BASIS AND 3. UPON VERIFICATION OF THE LOCATION AND DEPTH ENGINEER. 100% STANDARD PROCTOR OF ARE RECOMMENDED TO HAVE EROSION CONTROL MUST BE APPROVED BY THE GEOTECHNICAL OF ALL UTILITIES, CONTRACTOR SHALL VERIFY THAT MAXIMUM DRY DENSITY SHALL BE ATTAINED FOR MATTING TO ASSIST IN STABILIZATION. SEE ENGINEER. THERE ARE NO CONFLICTS WITH THE EXISTING DRIVEWAYS, PARKING LOTS AND VEGETATIVE MATTING DETAILS ON EROSION SHEETS 12. THE CONSTRUCTION OF ALL STREETS AND UTILITIES. ANY CONFLICTS SHALL BE REPORTED BUILDINGS (UPPER 12" OF SUBGRADE). FOR INSTALLATION REQUIREMENTS. DRAINAGE IMPROVEMENTS LOCATED WITHIN THE \1 \CD \� t MON.' ' C 401 \ _ F W-1 I � FUTURE LUTETIUM \ \ \ \ \\ CIRCLE EXTENSION \V C403\ CITY OF HICKORY \\ \ \ 0 RIGHT-OF-WAY \\\\\ 1 \ \ 1. ALL STORM DRAINAGE PIPING SHALL BE CLASS III RCP UNLESS OTHERWISE NOTED. 2. CLASS IV RCP PIPE SHALL BE USED WHEN COVER OVER TOP OF DRAINAGE PIPE IS GREATER THAT 12'. 3. ALL PERMANENT DRAINAGE SWALES SHALL BE MATTED WITH STRAW AND COCONUT COMPOSITE MATTING UNLESS OTHERWISE NOTED. r 1. CONTRACTOR WILL BE REQUIRED TO PROVIDE A SUBGRADED PAD FOR PROJECT CURE BY JULY 25, 2019. SEE BID DOCUMENTS FOR MILESTONE DATES AND LIQUIDATED DAMAGE INFO. 2. IF ROADWAY ACCESS IS NOT PROVIDED TO PROJECT CURE PAD BY JULY 25, 2019, CONTRACTOR TO PROVIDE TEMPORARY CONSTRUCTION ENTRANCE AS DETAILED ON SHEET C305 FOR ACCESS UNTIL ROADWAY IS COMPLETE. 3. CONTRACTOR WILL BE REQUIRED TO PROVIDE ALL MASS p GRADING OF THE PROJECT CURE SITE BY SEPTEMBER 1ST. cc CONTRACTOR WILL BE REQUIRED TO REMOVE TEMPORARY O ACCESS DRIVE TO PROJECT CURE SITE AFTER ROADWAY IS COMPLETE. W o Z m co O w N w � z z Lu Lu 20 0 0 0 m W m Q a a- F a Q 0 o 0 0 0 U) � Q 0 o U) w d 0 z w 0 0 m s N o N m N v N o oz N --------------- cu -A. C> If jl� / ,�--- /.95 \ \ \ \ \ I 40-P' -------- LOT W1 - /o, ss /� ' /X: ems? �9s2 \ \\ \ \ SEDIMENT 3------- �\ \ J \ \\ _ BASIN #2 i/ �� —�— 52 STORMWATER EASEMENT PER PLAT BOOK 079 PAGE 0175 \\ _— \1 (SEE SHEET \ EXISTING C407 FOR CITY OF \\ L BMP HICKORY _ ^�--- �� - — - ✓// 1' /// —_ —_ -- \ \ \ \ \\ \ \\ \. \� __ —���_ RIG 0000l WAY — _ _��%�%�_ �// , /�/ '-\ \ /// ���--„ _ — `• \ 1 \ \\ \ \\ \ \\ \ \\ \\\\`___ /� 44 _ \ Q TRIBUTARY �\ //-��i-\ / �/ // MUDDY CREEK REFERENCES 1. TOPOGRAPHICAL DATA SURVEYED IN OCTOBER 2016 BY ACCUTECH SURVEYING AND MAPPING LLP. 2. STREAMS/WETLANDS INFO BASED UPON A REPORT COMPILED BY ECS SOUTHEAST, LLP DATED OCTOBER 5, 2017. m m D Z ROBINWOOD ROAD C402 - (SR 1 148) _ 980 99— — s7o s ... \ \\ \ •� \/ \ LOT W3 LOT W2 \ \ \\ \\ \ \ 9s FUTURE PROJECT CURE SITE ` \ 9S PIX NOTE: THE PERMANENT AND ACCESS EASEMENTS / RIGHT-OF-WAY INDICATED ARE FOR THE PURPOSE OF GRANTING ACCESS TO THE CITY OF HICKORY AND NCDEQ TO CARRY OUT ALL PROVISIONS OF NCDEQ STORMWATER REGULATIONS DATED 1/1/2017. A CU o) ti I� N co 0 z N N O M i O co ti N Q O 1 O 00 E qcT U 1 ry x 1 U N CM 1 c 1 o M 0 � N O Q 0) � wo U a o "~ M U cn Lu SCALE IN FEET iiiii 0 100 200 Q cc 0 } � 0 } m m o z Y w Wca _ � U 0 O o O O Z = II BEFORE YOU DI(31 cc r CALL 1-800-632-4949 Q a N.C. ONE -CALL CENTER IT'S THE LAWI "It1IIII'l / % �.���d1 GA os�.,� J Q ,. "=; _3 ° o `.,q .; — LLI w w w —) o m - .�- 0 o c7 o ° IL IL IL a DRAWING NO.: ' C400 NORTH CAROLINA BOARD OF EXAMINERS FOR SHEET 13 OF 39 G U 5 I 4 I 3 pa