Loading...
HomeMy WebLinkAboutNCG170314_Renewal COC Effective 8/1/2019_20191023Certificate of Coverage STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES GENERAL PERMIT NO. NCG170000 Certificate of Coverage No. NCG170314 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, American & Efird LLC is hereby authorized to discharge stormwater from a site located at: Dyeing & Finishing Plant #15 22 American St Mount Holly Gaston County to receiving waters designated as CATAWBA RIVER (Lake Wylie below elevation 570), class WS-IV,B;CA waters in the Catawba River Basin, in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in N.C. General Permit No. NCG170000, issued on 8/1/2019. This Certificate of Coverage shall become effective on 8/1/2019. This Certificate of Coverage shall remain in effect for the duration of the General Permit. forS. Daniel Smith Director, Division of Energy, Mineral, and Land Resources By the Authority of the Environmental Management Commission