HomeMy WebLinkAbout20071140 Ver 1_Compliance Inspection Letter_20091006AJ?A
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins Dee Freeman
Governor Director Secretary
October 6, 2009
Mr. Kevin Holdenrid
Beazer Homes
1300 South Bv. Suite K
Charlotte, NC 28203
Subject: 401 Certification Compliance
The Arbor at Mallard Creek, WQ #07-1140
Mecklenburg County, NC
Dear Mr. Holdenrid:
On October 5, 2009, 1 conducted a 401 Certification compliance inspection at the subject site to
determine if the project was constructed as submitted to the Division of Water Quality (DWQ). As of the date
of this letter, it appears that construction at the site has not yet commenced. Be reminded that once
construction at the site begins DWQ must be notified. If ownership of the property changes, the certification will
remain with the property.
If you have any questions, please do not hesitate to me at (704) 663-1699.
incerely,
V Vv
Michael W. Burkhard
Surface Water Protection
Environmental Specialist
cc: John Hennessy - Compliance/Enforcement
Ian McMillan - Wetlands Group
Mr. Guy Peters, PE, ESP Associates 3475 Lakemont Bv. Fort Mill, SC 29708
Mooresville Regional Office
Location: 610 East Center Avenue, Suite 301, Mooresville, NC 28115
Phone: (704) 663-1699\Fax: (704) 663-6040\ Customer Service: 1-877-623-6748
Internet: www.ncwaterguality.org
Noi thCarolina
Naturally
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper