Loading...
HomeMy WebLinkAbout20071140 Ver 1_Compliance Inspection Letter_20091006AJ?A NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary October 6, 2009 Mr. Kevin Holdenrid Beazer Homes 1300 South Bv. Suite K Charlotte, NC 28203 Subject: 401 Certification Compliance The Arbor at Mallard Creek, WQ #07-1140 Mecklenburg County, NC Dear Mr. Holdenrid: On October 5, 2009, 1 conducted a 401 Certification compliance inspection at the subject site to determine if the project was constructed as submitted to the Division of Water Quality (DWQ). As of the date of this letter, it appears that construction at the site has not yet commenced. Be reminded that once construction at the site begins DWQ must be notified. If ownership of the property changes, the certification will remain with the property. If you have any questions, please do not hesitate to me at (704) 663-1699. incerely, V Vv Michael W. Burkhard Surface Water Protection Environmental Specialist cc: John Hennessy - Compliance/Enforcement Ian McMillan - Wetlands Group Mr. Guy Peters, PE, ESP Associates 3475 Lakemont Bv. Fort Mill, SC 29708 Mooresville Regional Office Location: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 Phone: (704) 663-1699\Fax: (704) 663-6040\ Customer Service: 1-877-623-6748 Internet: www.ncwaterguality.org Noi thCarolina Naturally An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper