Loading...
HomeMy WebLinkAbout310750_Inspection_20190920Division of Water Resources Facility Number - - ;iV 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: 0 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: 0 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: tC1=i Departure Time: County:+.'�),O) N%l Region:�k)L Farm Name: ��� �' lil�1 1X.�-a�i{�, Owner Email: Owner Name: ( L . Phone: q 101 Mailing Address: Physical Address: Facility Contact: f 9)ff S 1J nr l i o N CB 1-0014,53 c '63 ! Z, Title: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Other a Latitude: �— zS / / Phone: q, f"1} Integrator:(ii4�'T{� Certification Number: Certification Number: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. La er Non -Layer Design Current Dry Poultry Canacity Pon_ Layers Non -Layers Pullets Turkeys Turkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? Longitude: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑Yes E�No ❑NA ❑NE ❑ Yes Ln No ❑ Yes M No ❑ NA ❑ NE ❑NA ❑NE d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes r-7] No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes LN No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes C4 No ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412015 Continued Facility Number: 51- Date of inspection:q-20-19 Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes] No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes !'Z" No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.). 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes A No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? Yes ❑ No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes 4 No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes Zj No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes [� No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes [& No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): i S <j 1 / 13. Soil Type(s): Ot U�r'L/ l) { It , I V o 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ff No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? Yes DO ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps [:]Lease Agreements ❑ Yes No ❑ NA ❑ NE ❑ Yes EjNo ❑ NA ❑ NE ❑ Yes ❑ Yes EJ-No 51�0� ❑ NA ❑ NE ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. Ld Yes ❑ Nc ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall 0 Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ NA ❑ NE ❑ NA ❑ NE ❑ Weather Code 21sludge Survey ❑ Yes [no ❑ NA ❑ NE ❑ Yes EK0 ❑ NA ❑ NE Page 2 of 3 21412015 Continued SIOUY/Z t 615' L�� :auogd 0J, ��- c *-:Z uj 1- 00 � �? b'c £ fo £ ag»d MmStS .to;oodsul/.tan-,31na21 :autelsl zo;oadsul/.ramatna2i ?-L-7 tZ I L z r, G. 5' e h 1 L,1 - Z .- c,4 sC V -a.�sb M (faessaaau se saSed leuol;lppe asn) suoi;en;ls uteldxa aa;;aq o;,411►ae33o sSul, cip asn •s;uaulmoa I q;o Suu ao suol;upuammoaa.t leuot;ippu lCuu .to/pub, s.ramsuu SgA Sue utuldxg :(# uol;sanb o; .caja i) s;uammoa El dN El oN sal El&KouaSe autus aqj Xq;tstn dn-nnollo3 a a.ztnbai �titou3 aq; saoa •},£ gN ❑ dN ❑ ON sak ❑ Lant;e;umatda.t arts-uo ue g;inn uotpoadsut/malnat ssnostp o; Ite3 .to;oodsul/.tamolA d aq; ma '££ ax ❑ dN ❑ oN 66 saA ❑ LdWANVD jo;tuuad oq; jo aouegdutoo-uou asnuo gotgm pa;ou swolgoid leuot;tppe Cue a.raM -Z£ :zaq;o ❑ puod aSe.to;SNooSe-I ❑ plaid not;eotlddd ❑ gN ❑ vN ❑ ON M s0A ❑ •molag xoq a;eudotdde oq; 3loog3`saf,,3I Lfqt1t3E3 aq;it, ;stxa surezp alp aoujinsgns oQ -1 £ (uot;eatldde-.tano `swolgold pteogaa4 `aS.tegostp `•a•t) L;tuuad dN ❑ dN ❑ ON QQ sat, ❑ aq;,Cq patmbai se suot;eruts XmaS.tam33o aoWo IeuotSna aq; Spou o; Itul f4mm3 aq; maw •fila;etpautmt ant;e;uasatdai f4quno .ttd Ieuolsai a;oe;uoo `s3.C3I 3N ❑ wq ❑ oNlo s3A ❑ Lutaouoo f4tlunb ne ao jopo uu asod �titoe3 ag; pip not;oadsut 3q;3o amt; aq;;d '6Z Llmutou ueq; .tagStg anmjuq; sa;uz Altleltout uodat pue IN ❑ dN ❑ ON C� saA ❑ ;uautnoop .to/pue smog bZ q;yA sleuitue pu3p jo asodstp Aliadozd o; Ite3 Altltoe3 oql PiQ •gZ sanssl jaq;p 3N ❑ dN ❑ ON It saA ❑ Luot;eogt:tao (Zd ld) s;uamssasse ssol stuogdsogd a amom o; Ite3 f4t1t3u3 aq3 MI LZ AN ❑ VN ❑ oN M saA ❑ LaS.tugo ut io;e.rado p4)gt1133 Alant;oe ue 3o uot;e;umnoop aptnoid Itu3 f4t1tou3 aq; PiQ •9Z :aouetldutoo-uou Sut;eotput Aanms ;s rg 3o a;ep puu (s)aan;oru;s ;stZ uooSel ,Cue ut slanal aSpnls ;uetlduzoo-uoK ❑ slanal aSpnls .tol dod e dolanap o; arnitu3 ❑ Aims aSpnls Ienuue a;aldutoo o; amlted ❑ •emlaq (so)xoq a;ettdo.tdde aq; am ❑ vm ❑ oN saA ❑ 3loago `soAjl LaSpnls o; pa;elat suot;tpuoo;tuuad q;tm aouetldtuoop ino f4titoe3 oql sl •SZ gN El dN ❑ oN sa'k ❑ L;tuuad aq; Aq paunbat se;uamdtnbo uot;eotldde a;sum a;e.tgtiso o; pu3 AItitoel aq; PtQ "tiZ :uol;aadsuI;o a;eQ :.iagwnl i f4qlae3