HomeMy WebLinkAbout310750_Inspection_20190920Division of Water Resources
Facility Number - - ;iV 0 Division of Soil and Water Conservation
0 Other Agency
Type of Visit: 0 Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: 0 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: Arrival Time: tC1=i Departure Time: County:+.'�),O) N%l Region:�k)L
Farm Name: ��� �' lil�1 1X.�-a�i{�, Owner Email:
Owner Name: ( L . Phone: q 101
Mailing Address:
Physical Address:
Facility Contact:
f
9)ff S 1J nr l i o N CB 1-0014,53
c '63 ! Z, Title:
Onsite Representative:
Certified Operator:
Back-up Operator:
Location of Farm:
Swine
Wean to Finish
Wean to Feeder
Feeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Other
Other
a
Latitude:
�— zS / /
Phone: q, f"1}
Integrator:(ii4�'T{�
Certification Number:
Certification Number:
Design Current Design Current
Capacity Pop. Wet Poultry Capacity Pop.
La er
Non -Layer
Design Current
Dry Poultry Canacity Pon_
Layers
Non -Layers
Pullets
Turkeys
Turkey Poults
Other
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)?
Longitude:
Design Current
Cattle Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
❑Yes E�No ❑NA ❑NE
❑ Yes Ln No
❑ Yes M No
❑ NA ❑ NE
❑NA ❑NE
d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes r-7] No ❑ NA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? ❑ Yes LN No ❑ NA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes C4 No ❑ NA ❑ NE
of the State other than from a discharge?
Page I of 3 21412015 Continued
Facility Number: 51- Date of inspection:q-20-19
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate?
❑ Yes]
No
❑ NA
❑ NE
a. If yes, is waste level into the structural freeboard?
❑ Yes
No
❑ NA
❑ NE
Structure 1 Structure 2 Structure 3 Structure 4
Structure 5
Structure 6
Identifier:
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in):
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes
!'Z" No
❑ NA
❑ NE
(i.e., large trees, severe erosion, seepage, etc.).
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes
A No
❑ NA
❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental
threat,
notify DWR
7. Do any of the structures need maintenance or improvement?
Yes
❑ No
❑ NA
❑ NE
8. Do any of the structures lack adequate markers as required by the permit?
❑ Yes
4 No
❑ NA
❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑ Yes
Zj No
❑ NA
❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ Yes
[� No
❑ NA
❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes [& No ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s): i S <j 1 /
13. Soil Type(s): Ot U�r'L/ l) { It , I V o
14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ff No ❑ NA ❑ NE
15. Does the receiving crop and/or land application site need improvement? Yes DO
❑ NA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
18. Is there a lack of properly operating waste application equipment?
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
the appropriate box.
❑ WUP ❑ Checklists ❑ Design ❑ Maps [:]Lease Agreements
❑ Yes
No
❑ NA
❑ NE
❑ Yes
EjNo
❑ NA
❑ NE
❑ Yes
❑ Yes
EJ-No
51�0�
❑ NA
❑ NE
❑ Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. Ld Yes ❑ Nc
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers
❑ Rainfall 0 Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections
22. Did the facility fail to install and maintain a rain gauge?
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment?
❑ NA ❑ NE
❑ NA ❑ NE
❑ Weather Code
21sludge Survey
❑ Yes [no ❑ NA ❑ NE
❑ Yes EK0 ❑ NA ❑ NE
Page 2 of 3 21412015 Continued
SIOUY/Z
t 615' L�� :auogd
0J, ��- c *-:Z uj 1- 00 �
�? b'c
£ fo £ ag»d
MmStS .to;oodsul/.tan-,31na21
:autelsl zo;oadsul/.ramatna2i
?-L-7
tZ I
L z r, G. 5' e h 1 L,1 - Z .- c,4 sC V -a.�sb M
(faessaaau se saSed leuol;lppe asn) suoi;en;ls uteldxa aa;;aq o;,411►ae33o sSul, cip asn
•s;uaulmoa I q;o Suu ao suol;upuammoaa.t leuot;ippu lCuu .to/pub, s.ramsuu SgA Sue utuldxg :(# uol;sanb o; .caja i) s;uammoa
El dN El oN sal El&KouaSe
autus aqj Xq;tstn dn-nnollo3 a a.ztnbai �titou3 aq; saoa •},£
gN ❑ dN ❑ ON sak ❑
Lant;e;umatda.t arts-uo ue g;inn uotpoadsut/malnat ssnostp o; Ite3 .to;oodsul/.tamolA d aq; ma '££
ax ❑ dN ❑ oN 66 saA ❑
LdWANVD jo;tuuad oq; jo aouegdutoo-uou asnuo gotgm pa;ou swolgoid leuot;tppe Cue a.raM -Z£
:zaq;o ❑ puod aSe.to;SNooSe-I ❑ plaid not;eotlddd ❑
gN ❑ vN ❑ ON M s0A ❑
•molag xoq a;eudotdde oq; 3loog3`saf,,3I Lfqt1t3E3 aq;it, ;stxa surezp alp aoujinsgns oQ -1 £
(uot;eatldde-.tano `swolgold pteogaa4 `aS.tegostp `•a•t) L;tuuad
dN ❑ dN ❑ ON QQ sat, ❑
aq;,Cq patmbai se suot;eruts XmaS.tam33o aoWo IeuotSna aq; Spou o; Itul f4mm3 aq; maw
•fila;etpautmt ant;e;uasatdai f4quno .ttd Ieuolsai a;oe;uoo `s3.C3I
3N ❑ wq ❑ oNlo s3A ❑
Lutaouoo f4tlunb ne ao jopo uu asod �titoe3 ag; pip not;oadsut 3q;3o amt; aq;;d '6Z
Llmutou ueq; .tagStg anmjuq; sa;uz Altleltout uodat pue
IN ❑ dN ❑ ON C� saA ❑
;uautnoop .to/pue smog bZ q;yA sleuitue pu3p jo asodstp Aliadozd o; Ite3 Altltoe3 oql PiQ •gZ
sanssl jaq;p
3N ❑ dN ❑ ON It saA ❑
Luot;eogt:tao (Zd ld) s;uamssasse ssol stuogdsogd a amom o; Ite3 f4t1t3u3 aq3 MI LZ
AN ❑ VN ❑ oN M saA ❑
LaS.tugo ut io;e.rado p4)gt1133 Alant;oe ue 3o uot;e;umnoop aptnoid Itu3 f4t1tou3 aq; PiQ •9Z
:aouetldutoo-uou Sut;eotput Aanms ;s rg 3o a;ep puu (s)aan;oru;s ;stZ
uooSel ,Cue ut slanal aSpnls ;uetlduzoo-uoK ❑
slanal aSpnls .tol dod e dolanap o; arnitu3 ❑ Aims aSpnls Ienuue a;aldutoo o; amlted ❑
•emlaq (so)xoq a;ettdo.tdde aq;
am ❑ vm ❑ oN saA ❑ 3loago `soAjl LaSpnls o; pa;elat suot;tpuoo;tuuad q;tm aouetldtuoop ino f4titoe3 oql sl •SZ
gN El dN ❑ oN sa'k ❑ L;tuuad aq; Aq paunbat se;uamdtnbo uot;eotldde a;sum a;e.tgtiso o; pu3 AItitoel aq; PtQ "tiZ
:uol;aadsuI;o a;eQ :.iagwnl i f4qlae3