Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
310124_Inspection_20190806
Division of Water Resources Facility Number -0 Division of Soil and Water Conservation O Other Agency Type of Visit: 0 Compliance Inspection 0 Operation Review 0 Structure Evaluation O Technical Assistance Reason for Visit: • Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: Arrival Time: 1�+„v� Departure Time: County: 1 Region: Farm Name: J �5�� C�A.a� �U�� 1 ` Owner Email: Owner Name: CaA-e' . Cty�`— Phone: Mailing Address: o►' 1�rw� W &A'rh l� "Z_ 0 k�(� Physical Address: Facility Contact: (—C%&Xr% tw�� Title: Onsite Representative: J A.Sor% CCEA..)CI C:W,�� Certified Operator: `j Cx S CCt ue_A'-G V�A_ Back-up Operator: Location of Farm: 54elv%-d 54'a.. ) key Design Current Swine Capacity Pop. Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boar, Other Other Latitude: Phone: ,.�r Integrator: 5"1\ +1: ,ii 1j Vl Certification Number: g �� Certification Number: Longitude: Design Current Wet Poultry Capacity Pop. Layer Non -La er Design Current Dry Poultry Capacity Pop. Layers Non -Layers Pullets Turkeys Turkey Poults Other Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow Dischar¢es and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes [ZNo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes Y . ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ;No ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 21412015 Continued Facili Number: - Date of Inspection: — 'Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes o ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes §o ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes JjNo ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes KNo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes 1� No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes E(No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes/No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes dNo ❑ NA ❑ NE maintenance or improvement. 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes UNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): '? C. , ':�_r. 13. Soil Type(s): Mom c C_ v v G 14. Do the receiving crops differ from those designated in the CAWMP? ❑Yes o ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes 2 No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes [%f No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes o ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes [/N/o ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check [:]Yes ❑/No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists []Design [:]Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes [Y`No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes D<O ❑ NA ❑ NE 1-1 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes [—]No C],-IGA ❑ NE Page 2 of 3 21412015 Continued S10Vp/Z £.io £ agvd :am;t,u2iS ao;oodsuuoamatna-d L C Sorl _ 1 l-% t_ :auog(l V C- %- - /� I ' li - :otuvM oo;oodsul/aamatnag ' va to � • � � `� •� L� i - Z��}� S{-r�u� ��� v,� tax LL --IVA c Cc-- t) •(CaBssaaau se sa2sd lsuol;lppe asn) suol;gn;is ulsldxa to;;aq o; f4lItae;;o sNuln+e.ip asn s;uamwoa oag;o Sue oo suopupuammoaaa leuol;lppv Sus io/pus saamsus SgA Cus uleldxg :(# uol;sanb o; oajaa) s;uammoa gN ❑ dN ❑ oN Pm soA ❑ gN ❑ dN ❑ saA ❑ gN ❑ vN ❑, ON 21 SoA ❑ 3N ❑ dN ❑ oN saA ❑ 3 N ❑ dN ❑ oN so k ❑ LAoua& oozes oq; Aq ;tsin dn-molloj u aatnbaa fItitouj aq; saoQ • j7£ Lant;p;uasaodaa arts-uo ue q;tm uor;oadsut/matnaa ssnostp o; ltu3 oopodsul/aamotnag oq; pIQ •££ LdWAkVD ao ltuuad aq;3o aout,tlduzoo-uou osnuo gotgm polou suzalgoad 1puop!ppt, Am aiaM 'Z£ :a3q;0 ❑ Puod a2t,00;S/uoo5t,7 ❑ plot3 not;t,otlddd ❑ •molag xoq a;t,udoaddu agl xoago `soA31 Lf4gt3ej aq;;t, ;stxo sutuip alt; onjinsgns oQ • I £ (uot;uotldds-aano `suzalgoad pauogaag `ogngostp `•a•t) Lltuuod ag; gig paambaa su soot;t,ttats �ioua�aama 3o aot p lt,uotSag aq; �3t;ou o; Itt,3 ,C;tiJ aql PIQ '0£ •Xla;ptpautmt ant;uluosaodaa Ajtlunb .ttd luum9w t, ;ot,;uoo `soA ii l� ❑ VN ❑ ON sat, ❑ Lutaouoo Altlt,nb oat, so aopo ut, asod tltot,3 oq; ptp not;oadsut oq; jo aunt; aql id •6Z Lleuuou uugl tagStq aoam ;uq; solt,a Altluuout l todao put, A,,,, ❑ v N ❑ oN saA ❑ juautnoop io/puu smog bZ g;tm slt,urtuu puap 3o asodstp Alaadoad o; pej 14t1t3t,3 aql PtQ •8Z sanssl 35q;0 gN El dm © ON ❑ saA ElLuot;t,ogtuao (ZdZd) s;uoutssasst, ssol snaogdsogd u amoas o; Itu3 fqtlt3e3 aq; PKI 'LZ qx ❑ b'N ❑ ox,0 saA ❑ La2.reg3 ut aolundo pagtuao Alant;ot, uu jo uot;u;uautnoop aptnood Itu3 Altltou3 oql PtQ -qZ :aout,tldutoo-uou tut;umput Aanons ;sag 3o a;up pup (s)aon;otu;s ;sri uooBul Sulu ut slanal o2pnls ;uutldutoo-uoM ❑ slanal 38pnls o03 dod u dolanap o; ainpel ❑ ,Canons o2pnls lunuut, a;alduzoo o; amltt,,3 ❑ •molaq (sa)xoq 31uudoaddu aq; gN ❑ dN ❑ ON� sad ❑ �loago `sa�C�l �a�pnls o; pa;plan soot;tpuoo;ttzzaad g;tnn aouuildwo3 jo ino fttltouj aqj sI •SZ gN ❑ dN ❑ ofl sa,k ❑ �I!uuad aq; Aq paatnbaa st,;uauzdtnbo uot;uotlddp a;sum aSuagtluo o; pe3 Aitlt3e3 aq; ptQ •bZ. — _ :uol;oa suI to a;sQ - :aagmnK nlos3