Loading...
HomeMy WebLinkAbout19980188 Ver 1_COMPLETE FILE_19980225• State of North Carolina Department of Environment, Health and Natural Resources Division of Coastal Management James B. Hunt, Jr., Governor Wayne McDevitt, Secretary - 401 1VSV-TED Roger N. Schecter, Director 02/18/98 Mr. John R. Dorney NC DEN&NR Division of Water Quality P.O. Box 27687 Raleigh, NC 27611 li `? I- ??8 2 5 ? s ??- 4 REFERENCE: CD98-05 County: Hyde Applicant/Sponsor: U.S. Fish and Wildlife Service Rehabilitate and Install Pump Stations, Lake Mattamuskeet NWR Dear Mr. Dorney: The attached Consistency Determination, dated 02112198 describing a proposed Federal Activity is being circulated to State agencies for comments concerning the proposal's consistency with the North Carolina Coastal Management Program. Please indicate your viewpoint on the proposal and return this form to me before 03106198 Si cerely, ?/ L- g J Step en B. Beaton Consistency Coordinator REPLY This office objects to the project as proposed. Comments on this project are attached. ct proposal. roje This office stets ty No comment. Signed -\ Date P.O. Box 27687, Raleigh, North Carolina 2761 1-7687 Telephone 919-733-2293 An Equal Opportunity Affirmative Action Employer 50% Recycled / 10% Post-Consumer Paper DEPARTMENT OF THE INTERIOR FISH AND WILDLIFE SERVICE MATTAMUSKEET-SWANQUARTER-CEDAR ISLAND NWRs tea` RourE I, Box N-2 SWAN QUARTER, NC 27885 919-926-402 1 FAX: 9 19-926-1 743 February 12, 1998 Mr. Steve Benton Division of Coastal Management North Carolina Department of Environment, Health, and Natural Resources Post Office Box 27687 Raleigh, NC 27611-7687 Dear Mr. Benton: P., COASi'AC A4A1VAGFME «?. Nt A Federal Consistency Determination in accordance with the Coastal Zone Management Act for the rehabilitation of an existing pump station and the installation of a new pump station located on Mattamuskeet National Wildlife Refuge is enclosed for your agency's review and comments. If you or your agency have questions please contact the undersigned or Biological Technician Kris Fair at (919)926-4021. Sincerely, ?1'lcr Donald E. Temple Refuge Manager ,,_ . CONSISTENCY DETERMINATION Proposed Action: The rehabilitation and replacement of pump facilities at the Farm Area-1 pump station and the installation of a new pump station between Farm Area-2 and Moist-soil Impoundment-9 on the Mattamuskeet National Wildlife Refuge, Swan Quarter, NC . Proponent: U. S. Fish & Wildlife Service, Mattamuskeet NWR, Swan Quarter, NC I. PROJECT DESCRIPTION The Farm Area Pump Project is needed to improve water level management capabilities at three impoundments located on the east end of Mattamuskeet National Wildlife Refuge. The project will enhance the conservation and management of migratory birds and other wildlife in the area through the use of two strategically located pump stations which will enable refuge personnel to manipulate water levels in three impoundments. The pumps will also be used to dewater the farm areas during the growing season to allow cooperative farmers access to their crops. The project involves two pump station work sites: the Farm Area-1 (FA-1) pump station and the combined Moist-soil Impoundment=9 (MI-9)/Farm Area- 2 (FA-2) pump station (see maps). FA-1 Pump Station: After installation of two temporary coffer dams, the existing pump shed and two low-lift pumps will be removed from the site. The two existing pumps at the site are in need of-major rehabilitation. The 30" low-lift pump will be reconditioned and the 18" low lift pump will be salvaged. Steel sheet piling bulkheads will be placed approximately two feet out from existing bulkheads on the intake and outlet sides of the station. The two foot gap between the walls will be filled with earth fill from an upland source. An outlet pipe with a stainless steel flapgate and the reconditioned 30" low-lift pump will be installed in the bulkhead. A concrete pad will be poured to support the pump shed, power unit and fuel storage tank. A new pump shed will be constructed to house the power unit and fuel storage tank. The temporary coffer dams will be removed upon completion of the project. MI-9/FA-2 Pump Station: A new pump station will be constructed at this site. A temporary coffer dam will be constructed to facilitate excavation activities. The area for the placement of the pipe/pump and bulkheads will be excavated using a backhoe or clamshell. A new bulkhead and wingwalls constructed of steel sheet piling will be driven into place with a crane/pile driver. A new 24" low-lift pump will be fabricated and placed in the new bulkhead. A pump shed will be s'. constructed as above for the power unit and fuel storage tank. The temporary coffer dam will be removed upon completion of the project. II. CONSISTENCY DETERMINATION In accordance with Federal Consistency requirements of Section 307 of the Coastal Zone Management Act of 1972, as amended, the project has been reviewed for consistency with the North Carolina Coastal Management Program (NCCMP). Based upon this review it has been determined that the project is consistent with that program. The following information is being submitted to support that determination. A. Areas of Environmental Concern (AECs): This project will not take place in an Area of Environmental Concern as defined by the North Carolina Coastal Management Program. B. Land Use Plan: The project site is entirely within Hyde County. Local land classification maps designate the project site as conservation lands. The project is expected to be consistent with local land management objectives. III CONCLUSION The Farm Area Pump Project located on the Mattamuskeet NWR in Hyde County, North Carolina has been reviewed for consistency with the N.C. Coastal Management Program. Based upon this review it has been determined that the project is consistent with the N.C. Coastal Management Program. z Donald E. Tem re Refuge Manager V- " ?J- ft? Date fa 1 f c " c O C 2?II } LU C ? f? C7 ? C U ti CO Sin c7 LLJ U 3 .?? ZV e?Ea. G q n I s ?r. t (,r f 1 i tea. ?o -`( -- ?- ??? •= f 11 /r . ? ? rv't =. If= ? Sr d C a' CIMIL - ?, _ --_ W I CMS 1 ?' ? ? + `= -U 1 _ _ sll --------------- SL :r" 'ANAL f- U N? n 3 - C li } .f1f I __ ? V I 1 b Map 2: Farm Area I Pump Station Site s, UNITED STATES s? DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY 76°07'30" =99000m£ 5. '02 3928 1 - - E - A E MAT AM USS FA-1 Site I - FA-1 Pump Station: 3927 --- Lake Latda,g(p0)-_,' _ ?, -ems ° X?•? ' XJ 3926 W Q {?. -v G i `il I ? 27'30" LTT ? T i 1924 _--------_________ I slocu TIC NORTH IF SHEET 0 f.)4 / NE 1 SCALE 1:24000 0 1 MILE 1000 0 1000 2000 3000 4000 5000 6000 7000 FEET 1 .5 0 1 KILOMETER CONTOUR INTERVAL 5 FEET. NATIONAL GEODETIC VERTICAL DATUM OF 1929 -IV 406 OIIAC)PANrl