Loading...
HomeMy WebLinkAbout20191431 Ver 1_BEAM ROAD WET POND CALCS_20191017B U R T O N BEAM ROAD E N G IN E ER ING Sheet: WQ-Pond WATER QUALITY POND DESIGN PROCEDURE (Based on Chapter 4.2.8 Example from Charlotte -Mecklenburg BMP Design Manual) Design Efficiency Pond Volume Linked to Worksheet: Pond Volume TSS-Only Table 4.2.1 Design Values and Pollution Removal Rates Threshold Min. WQv Detention Time Maximum WQv/PPv Ratio Pollution Removal Rate Optimal 4.0 Days 0.3 85% TSS 70% TP Standard 2.0 Days 0.6 60% TSS 60% TP TSS-Only 4.0 Days 0.4 85% TSS 0% TP WATER QUALITY VOLUME SURFACE AREA REQ D Drainage Area to WQ Pond = 96.00 ac Percent Imp. = 80.0 % Curve Number= 91.7 (Std. CN) COMPUTE WATER QUALITY PEAK FLOW (WQP) Compute Runoff Coefficient, Equation 3.1 Rv= 0.770 Design Storm = 1.00 in Compute Water Quality Vol, Equation 3.2 WQv = 6.1600 ac-ft 268,330 jcf Convert Water Quality Vol to Inches, Equation 3.3 WQv = 0.77 Inches Compute modified SCS curve number, Equation 3.4 CNModified = 97.8 PModified = 1.49 Inches Release Rate = 1.461 cfs ( Approximate for Static Method B U R T O N R I N G Sheet:Pond Volume Elev Perm Pool = Area of Perm. Pool = Vol. Main Pond= Vol.PreBay= Vol.Perm Pool= Temp. Pool Elev= Temp. Pool Vol= Temp. Pool Area= Pond Volumes 637 1.730 16.410 0.000 16.410 639.75 -16.410 0.000 sf ac-ft ac-ft ac-ft ac-ft ac BEAM ROAD 10/16/2019 Pond Volume Linked to Worksheet: WQ-Pond Main Pond PreBay Total Inc. Total Avg. Inc. Total Total Contour Area Avg. Area Vol. Vol. Area Area Vol. Vol. Area Cum. Vol. Elev (ac) (ac ac-ft ac-ft ac ac ac-ft ac-ft ac ac-ft 625 1.030 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.030 0.000 626 1.080 1.055 1.055 1.055 0.000 0.000 0.000 0.000 1.080 1.055 628 1.190 1.135 2.270 3.325 0.000 0.000 0.000 0.000 1.190 3.325 630 1.310 1.250 2.500 5.825 0.000 0.000 0.000 0.000 1.310 5.825 632 1.420 1.365 2.730 8.555 0.000 0.000 0.000 0.000 1.420 8.555 634 1.540 1.480 2.960 11.515 0.000 0.000 0.000 0.000 1.540 11.515 636 1.660 1.600 3.200 14.715 0.000 0.000 0.000 0.000 1.660 14.715 637 1.730 1.695 1.695 16.410 0.000 0.000 0.000 0.000 1.730 16.410 637.5 1.880 1.805 0.903 17.313 0.000 0.000 0.000 0.000 1.880 17.313 638 2.210 4.790 2.045 3.500 1.023 21.000 18.336 39.336 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.210 4.790 18.336 39.336 644 645 640 635 rn 630 625 620 0.0 STAGE / STORAGE 10.0 20.0 30.0 Volume (ac-ft) 40.0 50.0 10/16/2019N:\Excel Templates\Char-Meck PCCO B U R T O N BEAM ROAD E N G I N E E R I N G CHANNEL PROTECTION VOLUME COMPUTE CHANNEL PROTECTION VOLUME XPO S=(1000/CN)-10 S= 0.905 P= 2.58 Q= (P-.2S)^2 /(P + .8S) Q= 1.74 in. CPv= 13.920 ac-ft Release Rate = 4.679 cfs ( Approximate for Static Method) COMPUTE PERMANENT POOL VOLUME SIZE THE PERMANENT POOL VOLUME WQv/PPv = 0.400 ac-ft Ppvol = 15.400 SIZE PERMANENT POOL SURFACE AREA sum. Average Depth = 3.0 ft Surface Area Req'd = 5.133 ac Area Prov'd = 1.730 ac at Elev = 637.00 Vol Perm Pool = 16.410 ac-ft (Includes PreBay) verage Depth Prov'd = 9.49 ft WQv/PPv Prov'd = 0.38 OK 10/16/2019 NAExceffemplates\Char-heck PCC0\PCC0-Wgca1cs6.6.x1sm 3 of 5 B U R T O N BEAM ROAD E N G I N E E R I N G COMPUTE PRETREATMENT VOLUME Size forebay to treat 0.2 inch/impervious area Forebay volume is included in the WQv within the permanent pool Fbvol = 1.280 ac-ft FbVol Prov'd = 01 000 lac-ft COMPUTE REQUIRED OUTLET STRUCTURE FOR WATER QUALITY VOLUME ,g Ext. Release Rate = 1.461 cfs Average Head = 0.6 ft WQv / Surface Area / 2 Orifice = 8.47 Inch At Elev = 638.20 COMPUTE REQUIRED OUTLET STRUCTURE FOR CHANNEL PROTECTION VOLUME ,g Ext. Release Rate = 4.679 cfs Average Head = 1.4 ft CPv / Surface Area / 2 Orifice = 12.27 Inch At Elev = 645.05 ROUTE RUNOFF HYDROGRAPH THROUGH WQ POND Design Goals: • Hold min. of 5% of the 1st Inch of runoff within the wq pond for detention time + 1/2 of 6 hour storm • Hold min. of 5% of the 1 year storm within the wq pond at 24 hrs + 1/2 of 24 hour storm = 36 hours 1.280 AC -FT 0.823 ac-ft WQv=l 6.160 AC -FT L35.7% 2.660 AC -FT 0.553 Ac-ft CPv= 13.920 ac-ft 79.2% 10/16/2019 (From HydroCad Summary) Remaining afterl 2.125 1 Days (From HydroCad Summary) Remaining afterl 36 jHrs NAExcel-remplates\Char-heck PCC0\PCC0-Wgca1cs6.6.x1sm 4 of 5 B U R T O N BEAM ROAD E N G I N E E R I N G EMERGENCY DRAWDOWN Vol Perm. Pool = 16.410 ac-ft Avg Drawdown Rate = 8.273 cfs Average Head = 4.74 ft Orifice = 12.03 Inch FROM ORIFICE CALC'S: USE 14.0 IN DIA ORIFICE BOUYANCY CALCULATIONS Top of Col Water = 858.00 Bottom of Col Water = 850.00 Width of Box = 5.00 ft Length of Box = 5.00 ft BF= VOLstruct x densityH2O 12,480 Ibs WT str= 9,400 Ibs S F= 1 1.2 (Outside Dims) (Outside Dims) Weiaht of Structure Total = 19 10/16/2019 Component Height (in) Weight (Ibs) Base 48 3,000 Riser 36 2,400 Riser 24 1,600 Top 12 2,400 for cohesive soils from A.C.P.A. DD21 qu = 500 Ib/cf for soft clay Rsliding = A x H x qu / 2 depth = 3 ft, contact with soil Rsliding = 3,000 lb WT OF ANCH. REQ'D= 2,576 Ibs ANCHOR DIMS= L=�ft W= 4ft Thickness Reqd= 2.075 ft Thickness Prov'd = 3 ft Total WT str = 16,120 Ibs VOL OF ANCH REQ'D=1 33.2 cf Compute Combined FS = (WT str + Rsliding) / BF Combined FS = 1.53 Should be >= 2.0 NAExceffemplates\Char-heck PCC0\PCC0-Wgca1cs6.6.x1sm 5 of 5