HomeMy WebLinkAbout20191431 Ver 1_BEAM ROAD WET POND HYDROGRAPHS_2019101701S 2S Pre SITE DA Post SI E DA 47P CLT Wetpond 5P EXIST 84 IN CMP Subcat Reach on Link Routing Diagram for SEEFRIED - USING CITY POND Prepared by Burton Engineering , Printed 10/16/2019 HydroCAD® 10.00-17 s/n 03513 © 2016 HydroCAD Software Solutions LLC SEEFRIED - USING CITY POND Charlotte 6-hr 2-yr 2 Yr. 6 Hr. Rainfall=2.28" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 1S: Pre SITE DA Runoff = 53.60 cfs @ 3.57 hrs, Volume= 4.587 af, Depth= 0.57" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr 2 Yr. 6 Hr. Rainfall=2.28" Area (ac) CN Description 48.700 55.0 Woods, Good, HSG B 45.000 98.0 Paved parking, HSG B 2.300 98.0 Water Surface, 0% imp, HSG B 96.000 76.2 Weighted Average 51.000 53.13% Pervious Area 45.000 46.88% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 18.1 150 0.0100 0.14 Sheet Flow, Grass: Short n= 0.150 P2= 3.12" 3.0 415 0.0200 2.28 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.5 1,160 0.0050 5.52 17.33 Pipe Channel, RCP Round 24" 24.00" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.012 Concrete pipe, finished 5.3 450 0.0800 1.41 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 2.4 740 0.0070 5.22 260.80 Channel Flow, CHANNEL FLOW Area= 50.0 sf Perim= 23.0' r= 2.17' n= 0.040 Winding stream, pools & shoals 32.3 2,915 Total SEEFRIED - USING CITY POND Charlotte 6-hr 2-yr 2 Yr. 6 Hr. Rainfall=2.28" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 3 Subcatchment 1S: Pre SITE DA Hydrograph 60 ■Runoff --+-------+--+--+--+--+--+----+--+--+--+--+--+-------+--+--+--+--+-- 55 3. l-----i-- - - - -I --i --i - - - -IL I -I Vi`h4r1Qt#ji-0-hT - 50-----------il-- -----------------il-- -------------' 45 1 1 --t - -t- -- --2 Yr-S-Hr-� Rai tfalll�2.28"-- 40 35- --t--t-- --t-- -- -- - Rof =9 �00 aq- f�tr t fira ---1--J--1--+--L----------J--1-- � R rfa## l u me=,4. 58 i7- a# - 3 30 I I I I -- -- - -- -- -- ----RUn6ff Depth-Ta 57"-- a 25 20---------�,-- -- �,I --,I --,I --,---,---,-- -- -- ,--F1pw-`F Yngt l'' �,-910'-- -----t--t--t--t-- t--t--t--t--t--t- -- + 1- T=2.,3 rnt� 5 -------- -- -- ----------'-- -- -- -- -- --' ----------1N=76a- 10 I I I 1 ---------- -- --------------- -- -- -------------i-- -- -- -- -- 5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) SEEFRIED - USING CITY POND Charlotte 6-hr 2-yr 2 Yr. 6 Hr. Rainfall=2.28" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 2S: Post SITE DA Runoff = 258.51 cfs @ 3.22 hrs, Volume= 11.543 af, Depth= 1.44" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr 2 Yr. 6 Hr. Rainfall=2.28" Area (ac) CN Description 45.000 98.0 Paved parking, HSG B 34.000 98.0 Paved parking, HSG B 14.700 55.0 Woods, Good, HSG B 2.300 98.0 Water Surface, 0% imp, HSG B 96.000 91.4 Weighted Average 17.000 17.71 % Pervious Area 79.000 82.29% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, USER INPUT Subcatchment 2S: Post SITE DA Hydrograph 280 Runoff 258.51 cfs----7--7--r--r--7----7--7--7--r--I -------7--r--r--7__I---I--7--T-- z6o - - - - - - - - - - - - - - - - - - - - - 4 r ptt,''e-0-tiK - 240 220 -r T-- 7--7--r- 2-Yr1-67Hf-RailnfaH:T2:2W' 200 ------------------------- 180 RLjn6ff'Aeea'=96.000 a'c 160 _Runoff V61ume=11.543 of - +- O p } A 3 140---,---,--,--,---,-----------,--,-----------nIIlrDF'�16h-=14'k��- a 120E p J--1--1----J--L--1--L--1--- L--L--L T1,.=10-,a1ji 100 r--i--r--r--+--r--r--i--r--r--t--r--r--i---i--r--+--r--r--��9� 80 60 ---'-- L -- L -- L -- L --L --'-- L-- -- L -- L--------'-- -- L -- L--------'-- 1 -- L -- 40 r--i--r--r--r--r--r--i--r--r--r--r--r--i---i--r--r--r--r--i---i--r--+-- 20 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) SEEFRIED - USING CITY POND Charlotte 6-hr 2-yr 2 Yr. 6 Hr. Rainfall=2.28" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 5 Summary for Pond 5P: EXIST 84 IN CMP [57] Hint: Peaked at 621.44' (Flood elevation advised) Inflow Area = 96.000 ac, 82.29% Impervious, Inflow Depth = 1.44" for 2 Yr. 6 Hr. event Inflow = 52.53 cfs @ 3.61 hrs, Volume= 11.541 of Outflow = 52.53 cfs @ 3.61 hrs, Volume= 11.541 af, Atten= 0%, Lag= 0.0 min Primary = 52.53 cfs @ 3.61 hrs, Volume= 11.541 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 621.44' @ 3.61 hrs Device Routing Invert Outlet Devices #1 Primary 618.57' 84.00" Round CMP—Round 84" L= 150.0' CMP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 618.57' / 617.82' S= 0.0050'/' Cc= 0.900 n= 0.024, Flow Area= 38.48 sf Primary OutFlow Max=52.50 cfs @ 3.61 hrs HW=621.43' (Free Discharge) L1=CMP_Round 84" (Barrel Controls 52.50 cfs @ 5.24 fps) Pond 5P: EXIST 84 IN CMP Hyd rog raph --I-- -- -- -----I-- -- -----I-- -- -- --I-- -- -- -----I-- -- -- --I-- ■ Inflow 52.53 1 ❑ Primary 55 52.53cfs ---- ---------II- Inflow rOe-g6:0bGla`- 50 � II ---II-- �I--II,--II---II-- �I--II, --II,--II---II-- II, --II, --II- Re�kll� Ele�'r=C21.441� 45 -- ----r---I-- --r--r --I----r--r--I--T--r-------7--r--I-- 84�.U0'I' 40 --r--r--r-------r--r--r----r--r--r----r--r----r-------r--r--r-- I-- 35 -- ----r----------r----------r--r-------+RQ_I_I__ 4IVert_ y I I I I I I I I I I I I I I I I I I V � =-0'fy� �w 30-J--1--L--1---I--1--L--1---1--J--1--L--1--J--1--L--1---I- °----II------II-------I---------II----II�h1115E.{�'- a 25 I I I I I I I I I I I I I I I I I 20 --'I-'--'------------------------------------f�.�05f'1`- 15 10 i--r--r--r--I--r--r--r--I--r--r--r--r-r--r--r--I---I--r--r--r--I-- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) SEEFRIED - USING CITY POND Charlotte 6-hr 2-yr 2 Yr. 6 Hr. Rainfall=2.28" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 6 Elevation Primary (feet) (cfs) 618.57 0.00 618.61 0.01 618.65 0.03 618.69 0.06 618.73 0.12 618.77 0.19 618.81 0.29 618.85 0.40 618.89 0.54 618.93 0.69 618.97 0.87 619.01 1.07 619.05 1.29 619.09 1.53 619.13 1.79 619.17 2.08 619.21 2.39 619.25 2.72 619.29 3.07 619.33 3.45 619.37 3.84 619.41 4.26 619.45 4.70 619.49 5.17 619.53 5.65 619.57 6.16 619.61 6.69 619.65 7.25 619.69 7.82 619.73 8.42 619.77 9.03 619.81 9.67 619.85 10.34 619.89 11.02 619.93 11.72 619.97 12.45 620.01 13.20 620.05 13.96 620.09 14.75 620.13 15.56 620.17 16.39 620.21 17.24 620.25 18.11 620.29 19.00 620.33 19.92 620.37 20.85 620.41 21.80 620.45 22.77 620.49 23.76 620.53 24.77 620.57 25.80 620.61 26.85 Stage -Discharge for Pond 5P: EXIST 84 IN CMP Elevation Primary (feet) (cfs) 620.65 27.92 620.69 29.00 620.73 30.11 620.77 31.23 620.81 32.37 620.85 33.54 620.89 34.71 620.93 35.91 620.97 37.13 621.01 38.36 621.05 39.61 621.09 40.87 621.13 42.16 621.17 43.46 621.21 44.78 621.25 46.12 621.29 47.47 621.33 48.84 621.37 50.22 621.41 51.62 621.45 53.04 621.49 54.47 621.53 55.92 621.57 57.38 621.61 58.86 621.65 60.36 621.69 61.87 621.73 63.39 621.77 64.93 621.81 66.49 621.85 68.06 621.89 69.64 621.93 71.24 621.97 72.85 622.01 74.47 622.05 76.11 622.09 77.76 622.13 79.43 622.17 81.11 622.21 82.80 622.25 84.50 622.29 86.22 622.33 87.95 622.37 89.69 622.41 91.44 622.45 93.21 622.49 94.99 622.53 96.78 622.57 98.58 622.61 100.39 622.65 102.21 622.69 104.05 Elevation Primary (feet) (cfs) 622.73 105.89 622.77 107.75 622.81 109.61 622.85 111.49 622.89 113.38 622.93 115.27 622.97 117.18 623.01 119.09 623.05 121.02 623.09 122.95 623.13 124.89 623.17 126.84 623.21 128.80 623.25 130.77 623.29 132.75 623.33 134.73 623.37 136.73 623.41 138.73 623.45 140.73 623.49 142.75 623.53 144.77 623.57 146.80 623.61 148.83 623.65 150.87 623.69 152.92 623.73 154.98 623.77 157.03 623.81 159.10 623.85 161.17 623.89 163.25 623.93 165.33 623.97 167.41 624.01 169.50 624.05 171.59 624.09 173.69 624.13 175.79 624.17 177.90 624.21 180.01 624.25 182.12 624.29 184.23 624.33 186.35 624.37 188.47 624.41 190.59 624.45 192.72 624.49 194.84 624.53 196.97 624.57 199.10 624.61 201.22 624.65 203.35 624.69 205.48 624.73 207.61 624.77 209.74 Elevation Primary (feet) (cfs) 624.81 211.87 624.85 214.00 624.89 216.13 624.93 218.25 624.97 220.37 625.01 222.50 625.05 224.62 625.09 226.73 625.13 228.85 625.17 230.96 625.21 233.07 625.25 235.17 625.29 237.27 625.33 239.36 625.37 241.46 625.41 243.54 625.45 245.62 625.49 247.69 625.53 249.76 625.57 251.82 SEEFRIED - USING CITY POND Charlotte 6-hr 2-yr 2 Yr. 6 Hr. Rainfall=2.28" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 7 Summary for Pond 47P: CLT Wetpond Inflow Area = 96.000 ac, 82.29% Impervious, Inflow Depth = 1.44" for 2 Yr. 6 Hr. event Inflow = 258.51 cfs @ 3.22 hrs, Volume= 11.543 of Outflow = 52.53 cfs @ 3.61 hrs, Volume= 11.541 af, Atten= 80%, Lag= 23.8 min Primary = 52.53 cfs @ 3.61 hrs, Volume= 11.541 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 639.73' @ 3.61 hrs Surf.Area= 124,286 sf Storage= 279,279 cf Plug -Flow detention time= 118.7 min calculated for 11.541 of (100% of inflow) Center -of -Mass det. time= 118.4 min ( 332.9 - 214.5 ) Volume Invert Avail.Storage Storage Description #1 637.00' 991,606 cf Custom Stage Data (Prismatic)-isted below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 637.00 86,751 0 0 638.00 97,974 92,363 92,363 638.50 100,000 49,494 141,856 644.00 209,000 849,750 991,606 Device Routing Invert Outlet Devices #1 Primary 637.00' 4.00' long x 2.80' rise Sharp -Crested Rectangular Weir 2 End Contraction(s) 10.00' Crest Height #2 Primary 639.80' 8.00' long Sharp -Crested Rectangular Weir End Contraction(s) 11.00' Crest Height #3 Primary 641.70' 10.00' long Sharp -Crested Rectangular Weir2 End Contraction(s) 12.00' Crest Height #4 Secondary 642.20' 40.00' long x 15.00' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=52.50 cfs @ 3.61 hrs HW=639.72' TW=621.43' (Dynamic Tailwater) 1=Sharp-Crested Rectangular Weir(Weir Controls 52.50 cfs @ 5.58 fps) 2=Sharp-Crested Rectangular Weir( Controls 0.00 cfs) 3=Sharp-Crested Rectangular Weir( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=637.00' TW=618.57' (Dynamic Tailwater) L4= Broad -crested Rectangular Weir( Controls 0.00 cfs) SEEFRIED - USING CITY POND Charlotte 6-hr 2-yr 2 Yr. 6 Hr. Rainfall=2.28" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 8 Pond 47P: CLT Wetpond Hyd rog raph -r--r-r--r-r--r-r--r-r--r--i--r-r--r--i--r--i--r--i--r--i--r--i-- 258.51 cfs -- — -- — -- — -- — -- ---- — ----�--�pn_n low Inf ow Ae-ea=9 a-c - Lw ary280ondary .000 y--Ir-y--Ir-y--r-y--r-y--Ir--li--r-y--r r - Peak-E1eV;639.73►- 260 240 ------- - -- ---- - -- ---- ----'S ora je_=-279 79 cf - 220 --I'+- --I'+- --IL- --IL- --+--I'--I ---+--'-- --'-- --'------+--'-- 180 3 140 LL 120 ' 52.53 cfs__________________�__�__�__�_�__�__�__�_�__�__�__ 80 52.53 cfs 60 40 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) SEEFRIED - USING CITY POND Charlotte 6-hr 2-yr 2 Yr. 6 Hr. Rainfall=2.28" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 9 Stage -Discharge for Pond 47P: CLT Wetpond Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 637.00 0.00 0.00 0.00 637.10 0.41 0.41 0.00 637.20 1.16 1.16 0.00 637.30 2.12 2.12 0.00 637.40 3.26 3.26 0.00 637.50 4.54 4.54 0.00 637.60 5.94 5.94 0.00 637.70 7.46 7.46 0.00 637.80 9.07 9.07 0.00 637.90 10.78 10.78 0.00 638.00 12.58 12.58 0.00 638.10 14.45 14.45 0.00 638.20 16.40 16.40 0.00 638.30 18.42 18.42 0.00 638.40 20.50 20.50 0.00 638.50 22.64 22.64 0.00 638.60 24.83 24.83 0.00 638.70 27.08 27.08 0.00 638.80 29.38 29.38 0.00 638.90 31.72 31.72 0.00 639.00 34.11 34.11 0.00 639.10 36.54 36.54 0.00 639.20 39.01 39.01 0.00 639.30 41.51 41.51 0.00 639.40 44.05 44.05 0.00 639.50 46.62 46.62 0.00 639.60 49.22 49.22 0.00 639.70 51.85 51.85 0.00 639.80 54.51 54.51 0.00 639.90 57.98 57.98 0.00 640.00 61.89 61.89 0.00 640.10 66.09 66.09 0.00 640.20 70.54 70.54 0.00 640.30 75.20 75.20 0.00 640.40 80.07 80.07 0.00 640.50 85.11 85.11 0.00 640.60 90.32 90.32 0.00 640.70 95.69 95.69 0.00 640.80 101.22 101.22 0.00 640.90 106.88 106.88 0.00 641.00 112.68 112.68 0.00 641.10 118.62 118.62 0.00 641.20 124.68 124.68 0.00 641.30 130.85 130.85 0.00 641.40 137.15 137.15 0.00 641.50 143.56 143.56 0.00 641.60 150.07 150.07 0.00 641.70 156.69 156.69 0.00 641.80 164.45 164.45 0.00 641.90 173.15 173.15 0.00 642.00 182.51 182.51 0.00 642.10 192.40 192.40 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 642.20 202.76 202.76 0.00 642.30 216.94 213.55 3.39 642.40 234.32 224.73 9.59 642.50 253.96 236.28 17.68 642.60 275.49 248.17 27.32 642.70 298.57 260.39 38.18 642.80 323.11 272.92 50.19 642.90 348.29 285.74 62.55 643.00 374.41 298.84 75.56 643.10 402.21 312.22 89.99 643.20 431.06 325.86 105.20 643.30 461.35 339.75 121.60 643.40 492.69 353.88 138.81 643.50 524.77 368.25 156.52 643.60 557.77 382.84 174.93 643.70 591.29 397.66 193.63 643.80 625.60 412.69 212.91 643.90 661.10 427.92 233.18 644.00 697.41 443.36 254.05 SEEFRIED - USING CITY POND Charlotte 6-hr 10-yr 10 Yr. 6 Hr. Rainfall=3.72" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment 1S: Pre SITE DA Runoff = 150.47 cfs @ 3.54 hrs, Volume= 12.326 af, Depth= 1.54" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 10-yr 10 Yr. 6 Hr. Rainfall=3.72" Area (ac) CN Description 48.700 55.0 Woods, Good, HSG B 45.000 98.0 Paved parking, HSG B 2.300 98.0 Water Surface, 0% imp, HSG B 96.000 76.2 Weighted Average 51.000 53.13% Pervious Area 45.000 46.88% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 18.1 150 0.0100 0.14 Sheet Flow, Grass: Short n= 0.150 P2= 3.12" 3.0 415 0.0200 2.28 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.5 1,160 0.0050 5.52 17.33 Pipe Channel, RCP Round 24" 24.00" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.012 Concrete pipe, finished 5.3 450 0.0800 1.41 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 2.4 740 0.0070 5.22 260.80 Channel Flow, CHANNEL FLOW Area= 50.0 sf Perim= 23.0' r= 2.17' n= 0.040 Winding stream, pools & shoals 32.3 2,915 Total SEEFRIED - USING CITY POND Charlotte 6-hr 10-yr 10 Yr. 6 Hr. Rainfall=3.72" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 11 Subcatchment 1S: Pre SITE DA Hydrograph 160 cs 150------'- --' --'--------'- - --'--------' arlottq 6,-hr-1 r- 140 --------+----- +-- *0-Yr, 61H1. RainfaH=-3.72"-- 130 r- ---r--r--r--r--r----r--r--r--r--I------I--r--r--r--I------I--r--+ -- 120 ---'-- -- -- -- --' --'-- -- -- ------- Runoff aArea=9'6,000-ac- 110 _-RUndff Vblu M6=9 2.-32-6 -6f - 100 N-----,----r--r--r-- r--,--r--r-- Runoff D --WiO 54"- 90 ----- -- -- -- -- ---- -- --+------------ -- ----ryJ------('�--+-- 0 80-------- -- -------------- ----------0 ��s'T:Jt �7Y-' - a 70 ---r-r--r--r--r--r--i--r--r--r--r--r--r--i--r--r--r i- 60 5o CN=76.2 40 30 -I- - + - - + - - + - - + - - + - -I- - + - - + - - + - - + - -I-- 20 10 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) SEEFRIED - USING CITY POND Charlotte 6-hr 10-yr 10 Yr. 6 Hr. Rainfall=3.72" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment 2S: Post SITE DA Runoff = 445.04 cfs @ 3.21 hrs, Volume= 22.311 af, Depth= 2.79" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 10-yr 10 Yr. 6 Hr. Rainfall=3.72" Area (ac) CN Description 45.000 98.0 Paved parking, HSG B 34.000 98.0 Paved parking, HSG B 14.700 55.0 Woods, Good, HSG B 2.300 98.0 Water Surface, 0% imp, HSG B 96.000 91.4 Weighted Average 17.000 17.71 % Pervious Area 79.000 82.29% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, USER INPUT Subcatchment 2S: Post SITE DA Hydrograph � � 480 --�--�--r--r--r--r--I--�--r--r--r--r--� -J--1--1--L--L--1--J--1--1--1---1--------J--1--L----------1--1-- � � � � � � � � � � � � � � � � � � � � � � --�---�--r--r--r--I--�- �--r--T-- ■Runoff 46 445.04ots 1---1--J--J--J--L--L--'--J--J--J--L--'---'---'-�-+�--i�,,,,-�-r-##-----yy-,-1--1--1-- 4407---li--y--rt--+--r--Ir--li--y-----+--r--Ir--li---I l�Oadottgfill{�_1�yr- 420 -'----J---' 400 ' ------ --+--+-- --' --' --' -- --------'---' ----+-- --+--+-*08-r,-6;Hr.-kainfaHs3;72;"- --' - - -'-- - 380----�---- 360 ;------�-- --------; --; --; -- -----;-- ----�-- -- -- ------------- --; --'�, ------------------- --- --Runoff Area��=9�'6.000-a-t- 340-------r--r--I--I-------r--r--r--I-- 320---1--J--1--1--L--L----J-- --1--L--RUndff-Vbluh*--Z2.-311-;0- I - --I - -r-- r - - I - - I -- I - --I - - r- -r -- 300 wU 280, --- 260-----+--+--+--+--+----+--+--+--+----------+--+--+--- -- r- - r- '-- - r --- --- r ----- r- --- - r- --- ' r- '--- -r- ----- -�-- I---�-r-r-r-- I---�-r - -T -- u�-1--J-- I -RfDath=27wt- -- 0 240--1--'I---'I a 220_____+__+__+__+__+____+__+__+__+----------+--+__+�__I_ - - 'I - - 'I --'1 --'�---'�---'�---11 --' --' --'---'---'--' --' T -�� V---I--- -T _fn - 200---I---�I-- -I -- �I---�I---�I---�I---�I-- �I-- �I--�I---�I---�I---�I-- �I-- �I---�I---�I---�` 180---1--J--1--1--L--L--1--J--1--1--L--1--------J--1--L-----N'M-_ 160 - -,-- I -- I -- -I -- �__ �-- 140 ---1--J--J--J--J--L--'--J--J--J--L--'--------J--J--J----------J--J-- 120 r--i--r--r--r--r--r--i--r--r--r--r--r--i---i--r--r--r--r--i---i--r--r-- 100 ---'---'---'--'---'---'---'---'---'---'--'---'----------------------------'--- 60--------?--------------�---- 40-----+--+--+--+--+----+--+--+--+----------+--+--+----------+--+-- -----------------------------?-- -- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) SEEFRIED - USING CITY POND Charlotte 6-hr 10-yr 10 Yr. 6 Hr. Rainfall=3.72" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 13 Summary for Pond 5P: EXIST 84 IN CMP [57] Hint: Peaked at 623.29' (Flood elevation advised) Inflow Area = 96.000 ac, 82.29% Impervious, Inflow Depth = 2.79" for 10 Yr. 6 Hr. event Inflow = 132.60 cfs @ 3.52 hrs, Volume= 22.309 of Outflow = 132.60 cfs @ 3.52 hrs, Volume= 22.309 af, Atten= 0%, Lag= 0.0 min Primary = 132.60 cfs @ 3.52 hrs, Volume= 22.309 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 623.29' @ 3.52 hrs Device Routing Invert Outlet Devices #1 Primary 618.57' 84.00" Round CMP—Round 84" L= 150.0' CMP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 618.57' / 617.82' S= 0.0050'/' Cc= 0.900 n= 0.024, Flow Area= 38.48 sf Primary OutFlow Max=132.39 cfs @ 3.52 hrs HW=623.28' (Free Discharge) L1=CMP_Round 84" (Barrel Controls 132.39 cfs @ 6.79 fps) Pond 5P: EXIST 84 IN CMP Hyd rog raph ----y--+--Ir--li----r--Ir--li--rt--r--+-y--+--r--li--y--+--Ir--li-----r--li ■ Inflow 132.60 cfs + + _ _ El Primary 140 132.60cfs - I --li -- i --li --i-- 1n f 1pw ATe -9, 6,.OPO+aq- 130 --'---' --Peak-Gfcpp'' ^^v;V��++ ��}} 2aT -----------'---'--------'---'------.i2W- 120 1 110 --+--+--+-+--+--+--+-+--+--+--+-+--+--+---����-kr����1�i- N y 1 80 70---i-- --i------i --i------i-----i-- --i-----i-- --i _p��fY.Y1�l/�_ 0 ------------i --il----------+-------------1-i1� IIT/--lT+/--fii��- LL - -- 60 -- -- - -- -- - -- -- - -- -----L-'1�Q�0-- ---+--�- 4 - - ------- --I---- --+-- 50 40 30 20 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) SEEFRIED - USING CITY POND Charlotte 6-hr 10-yr 10 Yr. 6 Hr. Rainfall=3.72" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 14 Elevation Primary (feet) (cfs) 618.57 0.00 618.61 0.01 618.65 0.03 618.69 0.06 618.73 0.12 618.77 0.19 618.81 0.29 618.85 0.40 618.89 0.54 618.93 0.69 618.97 0.87 619.01 1.07 619.05 1.29 619.09 1.53 619.13 1.79 619.17 2.08 619.21 2.39 619.25 2.72 619.29 3.07 619.33 3.45 619.37 3.84 619.41 4.26 619.45 4.70 619.49 5.17 619.53 5.65 619.57 6.16 619.61 6.69 619.65 7.25 619.69 7.82 619.73 8.42 619.77 9.03 619.81 9.67 619.85 10.34 619.89 11.02 619.93 11.72 619.97 12.45 620.01 13.20 620.05 13.96 620.09 14.75 620.13 15.56 620.17 16.39 620.21 17.24 620.25 18.11 620.29 19.00 620.33 19.92 620.37 20.85 620.41 21.80 620.45 22.77 620.49 23.76 620.53 24.77 620.57 25.80 620.61 26.85 Stage -Discharge for Pond 5P: EXIST 84 IN CMP Elevation Primary (feet) (cfs) 620.65 27.92 620.69 29.00 620.73 30.11 620.77 31.23 620.81 32.37 620.85 33.54 620.89 34.71 620.93 35.91 620.97 37.13 621.01 38.36 621.05 39.61 621.09 40.87 621.13 42.16 621.17 43.46 621.21 44.78 621.25 46.12 621.29 47.47 621.33 48.84 621.37 50.22 621.41 51.62 621.45 53.04 621.49 54.47 621.53 55.92 621.57 57.38 621.61 58.86 621.65 60.36 621.69 61.87 621.73 63.39 621.77 64.93 621.81 66.49 621.85 68.06 621.89 69.64 621.93 71.24 621.97 72.85 622.01 74.47 622.05 76.11 622.09 77.76 622.13 79.43 622.17 81.11 622.21 82.80 622.25 84.50 622.29 86.22 622.33 87.95 622.37 89.69 622.41 91.44 622.45 93.21 622.49 94.99 622.53 96.78 622.57 98.58 622.61 100.39 622.65 102.21 622.69 104.05 Elevation Primary (feet) (cfs) 622.73 105.89 622.77 107.75 622.81 109.61 622.85 111.49 622.89 113.38 622.93 115.27 622.97 117.18 623.01 119.09 623.05 121.02 623.09 122.95 623.13 124.89 623.17 126.84 623.21 128.80 623.25 130.77 623.29 132.75 623.33 134.73 623.37 136.73 623.41 138.73 623.45 140.73 623.49 142.75 623.53 144.77 623.57 146.80 623.61 148.83 623.65 150.87 623.69 152.92 623.73 154.98 623.77 157.03 623.81 159.10 623.85 161.17 623.89 163.25 623.93 165.33 623.97 167.41 624.01 169.50 624.05 171.59 624.09 173.69 624.13 175.79 624.17 177.90 624.21 180.01 624.25 182.12 624.29 184.23 624.33 186.35 624.37 188.47 624.41 190.59 624.45 192.72 624.49 194.84 624.53 196.97 624.57 199.10 624.61 201.22 624.65 203.35 624.69 205.48 624.73 207.61 624.77 209.74 Elevation Primary (feet) (cfs) 624.81 211.87 624.85 214.00 624.89 216.13 624.93 218.25 624.97 220.37 625.01 222.50 625.05 224.62 625.09 226.73 625.13 228.85 625.17 230.96 625.21 233.07 625.25 235.17 625.29 237.27 625.33 239.36 625.37 241.46 625.41 243.54 625.45 245.62 625.49 247.69 625.53 249.76 625.57 251.82 SEEFRIED - USING CITY POND Charlotte 6-hr 10-yr 10 Yr. 6 Hr. Rainfall=3.72" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 15 Summary for Pond 47P: CLT Wetpond Inflow Area = 96.000 ac, 82.29% Impervious, Inflow Depth = 2.79" for 10 Yr. 6 Hr. event Inflow = 445.04 cfs @ 3.21 hrs, Volume= 22.311 of Outflow = 132.60 cfs @ 3.52 hrs, Volume= 22.309 af, Atten= 70%, Lag= 18.3 min Primary = 132.60 cfs @ 3.52 hrs, Volume= 22.309 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 641.33' @ 3.52 hrs Surf.Area= 156,044 sf Storage= 503,890 cf Plug -Flow detention time= 92.0 min calculated for 22.299 of (100% of inflow) Center -of -Mass det. time= 93.6 min ( 303.1 - 209.5 ) Volume Invert Avail.Storage Storage Description #1 637.00' 991,606 cf Custom Stage Data (Prismatic)-isted below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 637.00 86,751 0 0 638.00 97,974 92,363 92,363 638.50 100,000 49,494 141,856 644.00 209,000 849,750 991,606 Device Routing Invert Outlet Devices #1 Primary 637.00' 4.00' long x 2.80' rise Sharp -Crested Rectangular Weir 2 End Contraction(s) 10.00' Crest Height #2 Primary 639.80' 8.00' long Sharp -Crested Rectangular Weir End Contraction(s) 11.00' Crest Height #3 Primary 641.70' 10.00' long Sharp -Crested Rectangular Weir2 End Contraction(s) 12.00' Crest Height #4 Secondary 642.20' 40.00' long x 15.00' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=132.39 cfs @ 3.52 hrs HW=641.32' TW=623.28' (Dynamic Tailwater) 1=Sharp-Crested Rectangular Weir(Orifice Controls 84.22 cfs @ 8.74 fps) 2=Sharp-Crested Rectangular Weir(Weir Controls 48.17 cfs @ 4.11 fps) 3=Sharp-Crested Rectangular Weir( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=637.00' TW=618.57' (Dynamic Tailwater) L4= Broad -crested Rectangular Weir( Controls 0.00 cfs) SEEFRIED - USING CITY POND Charlotte 6-hr 10-yr 10 Yr. 6 Hr. Rainfall=3.72" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 16 Pond 47P: CLT Wetpond Hyd rog raph W Inflow 445.04 cfs WOutflow ' ❑ PrimaryInfowArea-96.00Uac — Secondary Peak EleV'641.133' 450 r--r-r--r-r--r-r--r-r--r--I--r-r--r--I--r--I--r--I--r--I--r--I-- ' Stora e1=503,890 d 400 350 �--I�-�--I�-�--r-�--r-�--I�--li--r-�--r--li--r--li--r--li--r--li--r--li-- 300 N -- - -- - -- - -- - -- --I-- - -- --I-- --I-- --I-- --I-- --I-- V I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 250 o _ � I I I I I I I I I I I I I I I I I I I I I I I LL 200 ' �132.60 cfs 132.60 cfs I I I I I I I I I I I I I I I I I I I I I I I 150 __I--- --- --- --- ---------------------------------I-- 100 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) SEEFRIED - USING CITY POND Charlotte 6-hr 10-yr 10 Yr. 6 Hr. Rainfall=3.72" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 17 Stage -Discharge for Pond 47P: CLT Wetpond Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 637.00 0.00 0.00 0.00 637.10 0.41 0.41 0.00 637.20 1.16 1.16 0.00 637.30 2.12 2.12 0.00 637.40 3.26 3.26 0.00 637.50 4.54 4.54 0.00 637.60 5.94 5.94 0.00 637.70 7.46 7.46 0.00 637.80 9.07 9.07 0.00 637.90 10.78 10.78 0.00 638.00 12.58 12.58 0.00 638.10 14.45 14.45 0.00 638.20 16.40 16.40 0.00 638.30 18.42 18.42 0.00 638.40 20.50 20.50 0.00 638.50 22.64 22.64 0.00 638.60 24.83 24.83 0.00 638.70 27.08 27.08 0.00 638.80 29.38 29.38 0.00 638.90 31.72 31.72 0.00 639.00 34.11 34.11 0.00 639.10 36.54 36.54 0.00 639.20 39.01 39.01 0.00 639.30 41.51 41.51 0.00 639.40 44.05 44.05 0.00 639.50 46.62 46.62 0.00 639.60 49.22 49.22 0.00 639.70 51.85 51.85 0.00 639.80 54.51 54.51 0.00 639.90 57.98 57.98 0.00 640.00 61.89 61.89 0.00 640.10 66.09 66.09 0.00 640.20 70.54 70.54 0.00 640.30 75.20 75.20 0.00 640.40 80.07 80.07 0.00 640.50 85.11 85.11 0.00 640.60 90.32 90.32 0.00 640.70 95.69 95.69 0.00 640.80 101.22 101.22 0.00 640.90 106.88 106.88 0.00 641.00 112.68 112.68 0.00 641.10 118.62 118.62 0.00 641.20 124.68 124.68 0.00 641.30 130.85 130.85 0.00 641.40 137.15 137.15 0.00 641.50 143.56 143.56 0.00 641.60 150.07 150.07 0.00 641.70 156.69 156.69 0.00 641.80 164.45 164.45 0.00 641.90 173.15 173.15 0.00 642.00 182.51 182.51 0.00 642.10 192.40 192.40 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 642.20 202.76 202.76 0.00 642.30 216.94 213.55 3.39 642.40 234.32 224.73 9.59 642.50 253.96 236.28 17.68 642.60 275.49 248.17 27.32 642.70 298.57 260.39 38.18 642.80 323.11 272.92 50.19 642.90 348.29 285.74 62.55 643.00 374.41 298.84 75.56 643.10 402.21 312.22 89.99 643.20 431.06 325.86 105.20 643.30 461.35 339.75 121.60 643.40 492.69 353.88 138.81 643.50 524.77 368.25 156.52 643.60 557.77 382.84 174.93 643.70 591.29 397.66 193.63 643.80 625.60 412.69 212.91 643.90 661.10 427.92 233.18 644.00 697.41 443.36 254.05 SEEFRIED - USING CITY POND Charlotte 6-hr25-yr 25 Yr. 6 Hr. Rainfall=4.34" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 18 Summary for Subcatchment 1S: Pre SITE DA Runoff = 196.81 cfs @ 3.53 hrs, Volume= 16.148 af, Depth= 2.02" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 25-yr 25 Yr. 6 Hr. Rainfall=4.34" Area (ac) CN Description 48.700 55.0 Woods, Good, HSG B 45.000 98.0 Paved parking, HSG B 2.300 98.0 Water Surface, 0% imp, HSG B 96.000 76.2 Weighted Average 51.000 53.13% Pervious Area 45.000 46.88% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 18.1 150 0.0100 0.14 Sheet Flow, Grass: Short n= 0.150 P2= 3.12" 3.0 415 0.0200 2.28 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.5 1,160 0.0050 5.52 17.33 Pipe Channel, RCP Round 24" 24.00" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.012 Concrete pipe, finished 5.3 450 0.0800 1.41 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 2.4 740 0.0070 5.22 260.80 Channel Flow, CHANNEL FLOW Area= 50.0 sf Perim= 23.0' r= 2.17' n= 0.040 Winding stream, pools & shoals 32.3 2,915 Total SEEFRIED - USING CITY POND Charlotte 6-hr25-yr 25 Yr. 6 Hr. Rainfall=4.34" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 19 Subcatchment 1S: Pre SITE DA Hydrograph ---------------------- -------- 220 ---------- --r 210-----L-- ----L--------�------L--------�---- ■Runoff 96.81 cfs 200 --- -- -- -- -- -- -- -- -- -- C �� Qr- i�]C-2� 180 190'r------rt--r--r--Ir--------7--r--Ir--I--�- '--------',------------------ -- -5-fir;-6 ��,r�.-tai��#11-=4.-�3��- 170------I---I--------------I---I ---I ------------------------------------ ,I I I I I I I I I I I I I I I I I I I I I I I 160 ----- -- -- -- -- ---- -- --+-- -----Runoff AteaI1=96.000-a'G- 150 r----r--r--r--r——r—---r——r--r--r--r--I---I--r——r--r--I---I—--I--r--r-- 140 ----- -- - -T-- I ---- ----T--r--RUn6ffT1/ 1uh=1$.148-6f- 130 — — — — — — — — — — — — — — — — — — — — — — —I II — — —I — — I— — — I— — —I— — —I — — —I — — I— — — — I— — — — —I II — — II _ _ 120---------------- Runoff Depth=MZ" - 110 ---I----+--+--r--r--I-- ----+--r--------I-- -+--r--------I-- 100 --I-- -- T--T--r--r --I-- ----T--r- - LL90 f� *� 80 _ -- -- - TI -*31 2 `7 of - � I I____J__1__1__L__L__I__J__L__1__L__I___I___I__L__1__L T_ 70 CN=76.2 60 r----r--7--r--r--r----r--r--r--r-----r---r--r--r--r--I---I r--r-- 50 ----- --?-- I_--Ii --�i------- -- --Ii --�i------- -- I_--Ii --�i-- - - - -- I -- 40 -----L----L--L------L----L--L-----------L--L------------L-- I I I I I I I I I I I I I I I I I I I I I I 30 20 --r--r--r--r----r--r--r--r--r-------r--r--r--r-------r--r-- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) SEEFRIED - USING CITY POND Charlotte 6-hr25-yr 25 Yr. 6 Hr. Rainfall=4.34" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 20 Summary for Subcatchment 2S: Post SITE DA Runoff = 526.69 cfs @ 3.21 hrs, Volume= 27.078 af, Depth= 3.38" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 25-yr 25 Yr. 6 Hr. Rainfall=4.34" Area (ac) CN Description 45.000 98.0 Paved parking, HSG B 34.000 98.0 Paved parking, HSG B 14.700 55.0 Woods, Good, HSG B 2.300 98.0 Water Surface, 0% imp, HSG B 96.000 91.4 Weighted Average 17.000 17.71 % Pervious Area 79.000 82.29% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, USER INPUT Subcatchment 2S: Post SITE DA Hydrograph --'---'---'-- I'--'---'---'---'---'-- I'-- I'--'---'---'---'-- I'--'---'- '---'---'-- I'--'--- ■Runoff 55 526.69 cfs -- -- - - - -- -- -- - - ---I C arlott 6�-hr,-2 yrr- 500 450 -1---1--J--1-- ----L----J--1--1--L--1--- Rurr�##tAtea=96:E�00-aG- 400 pp ,y �,,y { n ------i------------------ -------Rl�t bff �V V1uM -Z7V78 A#- 350 w ---I----rt--+--r--'r--I-- ----t--r--------'Runoff, Depth=33W'- 3 300 Tpp ,n ;'m a 250 200 7 - - 7 - - r - - 7 - - T - - r 7 - - r - - 7 7 - - T - - 1501 100 50 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) SEEFRIED - USING CITY POND Charlotte 6-hr25-yr 25 Yr. 6 Hr. Rainfall=4.34" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 21 Summary for Pond 5P: EXIST 84 IN CMP [57] Hint: Peaked at 624.05' (Flood elevation advised) Inflow Area = 96.000 ac, 82.29% Impervious, Inflow Depth = 3.38" for 25 Yr. 6 Hr. event Inflow = 171.43 cfs @ 3.49 hrs, Volume= 27.076 of Outflow = 171.43 cfs @ 3.49 hrs, Volume= 27.076 af, Atten= 0%, Lag= 0.0 min Primary = 171.43 cfs @ 3.49 hrs, Volume= 27.076 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 624.05' @ 3.49 hrs Device Routing Invert Outlet Devices #1 Primary 618.57' 84.00" Round CMP—Round 84" L= 150.0' CMP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 618.57' / 617.82' S= 0.0050'/' Cc= 0.900 n= 0.024, Flow Area= 38.48 sf Primary OutFlow Max=171.25 cfs @ 3.49 hrs HW=624.04' (Free Discharge) L1=CMP_Round 84" (Barrel Controls 171.25 cfs @ 7.30 fps) Pond 5P: EXIST 84 IN CMP Hyd rog raph ' 190 --1----+----1----r--1---1----L--1--J--+--r--1----+----1----+--1-- 171.43 cfs__+__+__+__1--+--+--1---1--+--+--1--+--+--+--11--+__+--1-- ■ Inflow ■ Prima ry 180 171.43 cfs 1--+--+--r--1 --+--r--r--+--r--r+nrowIAf-e-96.�AA IOnn , - 170 160 1--+--+--r--1--+--r--r--1--+--r--r F-1EaR- E1 ev; 624. 0 5! - -+--+-- 150 140 =-r--r--r--1--r--r--r--1--r--r--1--r--r--r--1--r--r--r--1-���1 -r--T--r----r--r-------r--r----r--r--r----r--r--r--1Q - 4F1-- 130 120 -- 1 --r-- 1 1 --1-- 1 1 --r-- 1 1 --1----r--1--r--r-- 1 1 1 1 1 - -1-RoUnrd-GUIVeit- 1 1 1 1 - w 110 V 100 1--r--r--r--1--r--r 1 1 -; --; 1 1 1 r--r--r-r--r--r--1--r--r--r--1--r--r--i --1-- --; 1 --1---1-- 1 e�w --;--1---1-- - Z4- 1 0 90 — LL 1 ----------------------------------------------- ---1-- 1 1 --i 1 1 --1-- 1 --i 1 --i 1 1 1 --1-- --i 1 1 --1---1-- __1___1 - - _1-- 1 1 1 1 1 1 1 1� 1 � --i--1---1--1 --1 L1=150.0- 80 - 70 ---1---1-- 1-----1---1-- 1-----1---1--1-----1-- 1--�=�,1vt�Jk� �� 60 -J--1--L--1--J--L--1---1--J--L--1--J--1--L--1--J--1--L--1--J--L--1-- 50 -J--1--L--1--J--L--1---1--J--L--1--J--1--L--1--J--1--L--1--J--L--1-- 40 -J-- -- --1-- --L--1---1-- --L--1-- ----L--1--J-- -- --1----r--1-- 30------1----L--1---1----L--1--J----L--1--J------1----r--1-- 20 10 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) SEEFRIED - USING CITY POND Charlotte 6-hr25-yr 25 Yr. 6 Hr. Rainfall=4.34" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 22 Elevation Primary (feet) (cfs) 618.57 0.00 618.61 0.01 618.65 0.03 618.69 0.06 618.73 0.12 618.77 0.19 618.81 0.29 618.85 0.40 618.89 0.54 618.93 0.69 618.97 0.87 619.01 1.07 619.05 1.29 619.09 1.53 619.13 1.79 619.17 2.08 619.21 2.39 619.25 2.72 619.29 3.07 619.33 3.45 619.37 3.84 619.41 4.26 619.45 4.70 619.49 5.17 619.53 5.65 619.57 6.16 619.61 6.69 619.65 7.25 619.69 7.82 619.73 8.42 619.77 9.03 619.81 9.67 619.85 10.34 619.89 11.02 619.93 11.72 619.97 12.45 620.01 13.20 620.05 13.96 620.09 14.75 620.13 15.56 620.17 16.39 620.21 17.24 620.25 18.11 620.29 19.00 620.33 19.92 620.37 20.85 620.41 21.80 620.45 22.77 620.49 23.76 620.53 24.77 620.57 25.80 620.61 26.85 Stage -Discharge for Pond 5P: EXIST 84 IN CMP Elevation Primary (feet) (cfs) 620.65 27.92 620.69 29.00 620.73 30.11 620.77 31.23 620.81 32.37 620.85 33.54 620.89 34.71 620.93 35.91 620.97 37.13 621.01 38.36 621.05 39.61 621.09 40.87 621.13 42.16 621.17 43.46 621.21 44.78 621.25 46.12 621.29 47.47 621.33 48.84 621.37 50.22 621.41 51.62 621.45 53.04 621.49 54.47 621.53 55.92 621.57 57.38 621.61 58.86 621.65 60.36 621.69 61.87 621.73 63.39 621.77 64.93 621.81 66.49 621.85 68.06 621.89 69.64 621.93 71.24 621.97 72.85 622.01 74.47 622.05 76.11 622.09 77.76 622.13 79.43 622.17 81.11 622.21 82.80 622.25 84.50 622.29 86.22 622.33 87.95 622.37 89.69 622.41 91.44 622.45 93.21 622.49 94.99 622.53 96.78 622.57 98.58 622.61 100.39 622.65 102.21 622.69 104.05 Elevation Primary (feet) (cfs) 622.73 105.89 622.77 107.75 622.81 109.61 622.85 111.49 622.89 113.38 622.93 115.27 622.97 117.18 623.01 119.09 623.05 121.02 623.09 122.95 623.13 124.89 623.17 126.84 623.21 128.80 623.25 130.77 623.29 132.75 623.33 134.73 623.37 136.73 623.41 138.73 623.45 140.73 623.49 142.75 623.53 144.77 623.57 146.80 623.61 148.83 623.65 150.87 623.69 152.92 623.73 154.98 623.77 157.03 623.81 159.10 623.85 161.17 623.89 163.25 623.93 165.33 623.97 167.41 624.01 169.50 624.05 171.59 624.09 173.69 624.13 175.79 624.17 177.90 624.21 180.01 624.25 182.12 624.29 184.23 624.33 186.35 624.37 188.47 624.41 190.59 624.45 192.72 624.49 194.84 624.53 196.97 624.57 199.10 624.61 201.22 624.65 203.35 624.69 205.48 624.73 207.61 624.77 209.74 Elevation Primary (feet) (cfs) 624.81 211.87 624.85 214.00 624.89 216.13 624.93 218.25 624.97 220.37 625.01 222.50 625.05 224.62 625.09 226.73 625.13 228.85 625.17 230.96 625.21 233.07 625.25 235.17 625.29 237.27 625.33 239.36 625.37 241.46 625.41 243.54 625.45 245.62 625.49 247.69 625.53 249.76 625.57 251.82 SEEFRIED - USING CITY POND Charlotte 6-hr25-yr 25 Yr. 6 Hr. Rainfall=4.34" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 23 Summary for Pond 47P: CLT Wetpond Inflow Area = 96.000 ac, 82.29% Impervious, Inflow Depth = 3.38" for 25 Yr. 6 Hr. event Inflow = 526.69 cfs @ 3.21 hrs, Volume= 27.078 of Outflow = 171.43 cfs @ 3.49 hrs, Volume= 27.076 af, Atten= 67%, Lag= 16.9 min Primary = 171.43 cfs @ 3.49 hrs, Volume= 27.076 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 641.88' @ 3.49 hrs Surf.Area= 167,002 sf Storage= 593,197 cf Plug -Flow detention time= 85.7 min calculated for 27.065 of (100% of inflow) Center -of -Mass det. time= 87.2 min (295.7 - 208.5 ) Volume Invert Avail.Storage Storage Description #1 637.00' 991,606 cf Custom Stage Data (Prismatic)-isted below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 637.00 86,751 0 0 638.00 97,974 92,363 92,363 638.50 100,000 49,494 141,856 644.00 209,000 849,750 991,606 Device Routing Invert Outlet Devices #1 Primary 637.00' 4.00' long x 2.80' rise Sharp -Crested Rectangular Weir 2 End Contraction(s) 10.00' Crest Height #2 Primary 639.80' 8.00' long Sharp -Crested Rectangular Weir End Contraction(s) 11.00' Crest Height #3 Primary 641.70' 10.00' long Sharp -Crested Rectangular Weir2 End Contraction(s) 12.00' Crest Height #4 Secondary 642.20' 40.00' long x 15.00' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=171.25 cfs @ 3.49 hrs HW=641.88' TW=624.04' (Dynamic Tailwater) 1=Sharp-Crested Rectangular Weir(Orifice Controls 92.73 cfs @ 9.63 fps) 2=Sharp-Crested Rectangular Weir(Weir Controls 76.05 cfs @ 4.82 fps) 3=Sharp-Crested Rectangular Weir(Weir Controls 2.47 cfs @ 1.39 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=637.00' TW=618.57' (Dynamic Tailwater) L4= Broad -crested Rectangular Weir( Controls 0.00 cfs) SEEFRIED - USING CITY POND Charlotte 6-hr25-yr 25 Yr. 6 Hr. Rainfall=4.34" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 24 Pond 47P: CLT Wetpond Hyd rog raph -+--+-+--+-+--+-+--+-+--+--1--+-+--+--1--+--1--+--1--+--1--+--1-- ■ Inflow 526.69 cfs 1 r Outflow +--+-+--+-+--r-+--+-+--+--1--r- '6E'.�0+C�. 1/�111 1nfV0�%-/�a�V ❑Primary Secondary 550 �--1r-7--1r-�--r-7--r-�--1r--1i--r-7--r- r - 1Peak-EleV�4T.88r 500 --------------------------1-----II--III-Storage'=593.11197 d 450 --1--; --1--; --1--; --1--; --1--; --1--; --1--; --1--; --1--; --1--; --1-- 400 --- --1-- --1-- --1-- --1-- --1-- --1--I ----I ----I ----I ----I ---- 350 N --11-- 300 0 E 250 171.43 cfs 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 171.43 cfs 200 150 -- -+--r---r-+--r- --+--1--r-+--+--1--r--1--+--1--+--1--+--1-- 100 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) SEEFRIED - USING CITY POND Charlotte 6-hr25-yr 25 Yr. 6 Hr. Rainfall=4.34" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 25 Stage -Discharge for Pond 47P: CLT Wetpond Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 637.00 0.00 0.00 0.00 637.10 0.41 0.41 0.00 637.20 1.16 1.16 0.00 637.30 2.12 2.12 0.00 637.40 3.26 3.26 0.00 637.50 4.54 4.54 0.00 637.60 5.94 5.94 0.00 637.70 7.46 7.46 0.00 637.80 9.07 9.07 0.00 637.90 10.78 10.78 0.00 638.00 12.58 12.58 0.00 638.10 14.45 14.45 0.00 638.20 16.40 16.40 0.00 638.30 18.42 18.42 0.00 638.40 20.50 20.50 0.00 638.50 22.64 22.64 0.00 638.60 24.83 24.83 0.00 638.70 27.08 27.08 0.00 638.80 29.38 29.38 0.00 638.90 31.72 31.72 0.00 639.00 34.11 34.11 0.00 639.10 36.54 36.54 0.00 639.20 39.01 39.01 0.00 639.30 41.51 41.51 0.00 639.40 44.05 44.05 0.00 639.50 46.62 46.62 0.00 639.60 49.22 49.22 0.00 639.70 51.85 51.85 0.00 639.80 54.51 54.51 0.00 639.90 57.98 57.98 0.00 640.00 61.89 61.89 0.00 640.10 66.09 66.09 0.00 640.20 70.54 70.54 0.00 640.30 75.20 75.20 0.00 640.40 80.07 80.07 0.00 640.50 85.11 85.11 0.00 640.60 90.32 90.32 0.00 640.70 95.69 95.69 0.00 640.80 101.22 101.22 0.00 640.90 106.88 106.88 0.00 641.00 112.68 112.68 0.00 641.10 118.62 118.62 0.00 641.20 124.68 124.68 0.00 641.30 130.85 130.85 0.00 641.40 137.15 137.15 0.00 641.50 143.56 143.56 0.00 641.60 150.07 150.07 0.00 641.70 156.69 156.69 0.00 641.80 164.45 164.45 0.00 641.90 173.15 173.15 0.00 642.00 182.51 182.51 0.00 642.10 192.40 192.40 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 642.20 202.76 202.76 0.00 642.30 216.94 213.55 3.39 642.40 234.32 224.73 9.59 642.50 253.96 236.28 17.68 642.60 275.49 248.17 27.32 642.70 298.57 260.39 38.18 642.80 323.11 272.92 50.19 642.90 348.29 285.74 62.55 643.00 374.41 298.84 75.56 643.10 402.21 312.22 89.99 643.20 431.06 325.86 105.20 643.30 461.35 339.75 121.60 643.40 492.69 353.88 138.81 643.50 524.77 368.25 156.52 643.60 557.77 382.84 174.93 643.70 591.29 397.66 193.63 643.80 625.60 412.69 212.91 643.90 661.10 427.92 233.18 644.00 697.41 443.36 254.05 SEEFRIED - USING CITY POND Charlotte 6-hr50-yr 50 Yr. 6Hr. Rainfall=4.88" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 26 Summary for Subcatchment 1S: Pre SITE DA Runoff = 237.20 cfs @ 3.48 hrs, Volume= 19.633 af, Depth= 2.45" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 50-yr 50 Yr. 6 Hr. Rainfall=4.88" Area (ac) CN Description 48.700 55.0 Woods, Good, HSG B 45.000 98.0 Paved parking, HSG B 2.300 98.0 Water Surface, 0% imp, HSG B 96.000 76.2 Weighted Average 51.000 53.13% Pervious Area 45.000 46.88% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 18.1 150 0.0100 0.14 Sheet Flow, Grass: Short n= 0.150 P2= 3.12" 3.0 415 0.0200 2.28 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.5 1,160 0.0050 5.52 17.33 Pipe Channel, RCP Round 24" 24.00" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.012 Concrete pipe, finished 5.3 450 0.0800 1.41 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 2.4 740 0.0070 5.22 260.80 Channel Flow, CHANNEL FLOW Area= 50.0 sf Perim= 23.0' r= 2.17' n= 0.040 Winding stream, pools & shoals 32.3 2,915 Total SEEFRIED - USING CITY POND Charlotte 6-hr50-yr 50 Yr. 6Hr. Rainfall=4.88" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 27 Subcatchment 1S: Pre SITE DA Hydrograph 260 ■Runoff ---�---- -- --�--------�-- -- ----------�------------�-- -- -- 237.20 cfs i i i i i i i i i i i i i i i i i i 240------'- --' --'--------'-- '- --'---------C-1jar1ottq- Ihr-5 0 r- 220---1--J--1--i-- ------J--1--i--L- j 200 -----J--1--1--L--L--1--J--1--1--L--1--- Runoff tAltea=- 6.000-ac- 180 ---1--J--1-- -- -- --'--J--1--1--L--Runoff -Vbluin6=1-9:633-etf- 1 60 I I I I I I I I 1 w -- -- - - ---- -- -- - - Munoff Depth-=2 4W'- 140 3 il--il--�--�--r--�--�--i--�--�--+--r--i---i---iF�ow 4er19t�=�'2,�T�`- ° 120 LL 100 Tic=32;3 m i n r--r-r--r--r--r--r--i--r--r--r--r--r--r-r--r--r--r--r--r--i--r--r-- 8o CN=76.2 -- r--------I-- r -- r -- r --I_ --I_ --I-- r -- r -- 60 r--i-- -- -- -- -- ---- -- --T - ----------- -- ------------ -- -- 40 20 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) SEEFRIED - USING CITY POND Charlotte 6-hr50-yr 50 Yr. 6Hr. Rainfall=4.88" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 28 Summary for Subcatchment 2S: Post SITE DA Runoff = 596.07 cfs @ 3.17 hrs, Volume= 31.265 af, Depth= 3.91" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 50-yr 50 Yr. 6 Hr. Rainfall=4.88" Area (ac) CN Description 45.000 98.0 Paved parking, HSG B 34.000 98.0 Paved parking, HSG B 14.700 55.0 Woods, Good, HSG B 2.300 98.0 Water Surface, 0% imp, HSG B 96.000 91.4 Weighted Average 17.000 17.71 % Pervious Area 79.000 82.29% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, USER INPUT Subcatchment 2S: Post SITE DA Hydrograph — — F 7— — T — — 7 7 7 7 — — 7 — — + I , + 7 I 7 — — T —6506.01 cfs77Tr7777r-1 II7r 77T600 IIIIIC�arlottq-fi,-hr-5�-yK- 550 -- -- -- -- -- -- -- A50Y�-61Hr.-kail�#-au=4.8W' - 500 I -- -- - -- -- -- - Runoff Aiiea-J6:00©-a-t- 450 - +--+- -- -- +--+--RUndff VbluM6--3-F.-26 -Af- 400 w-----J--;--;--;--L----J--;--;----------MunoffDeDth-=3 91"- .V.. 350 I I I I I ------ -- --+-- -- ---- --- -+-- +---- - - - - -- --+-- - +-- �—°° 300 ��-'1�T�I� — + — — + — — + — — + — — + — —I— — + — — + — — + — — + — —I— — —I— — — 250 `i 1.4 +----+--+--+--+--+----+--+--+--+-------+--+--+--+--+--+-+--+--+-- 200 r------7--r--r--r----7-- --7--+-------------+--r--r--r---------- 150 r------7--r--r--r----7----7--+-------------r--r--r--r---- --+-- 100 50 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) SEEFRIED - USING CITY POND Charlotte 6-hr50-yr 50 Yr. 6Hr. Rainfall=4.88" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 29 Summary for Pond 5P: EXIST 84 IN CMP [57] Hint: Peaked at 624.87' (Flood elevation advised) Inflow Area = 96.000 ac, 82.29% Impervious, Inflow Depth = 3.91" for 50 Yr. 6 Hr. event Inflow = 214.94 cfs @ 3.42 hrs, Volume= 31.263 of Outflow = 214.94 cfs @ 3.42 hrs, Volume= 31.263 af, Atten= 0%, Lag= 0.0 min Primary = 214.94 cfs @ 3.42 hrs, Volume= 31.263 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 624.87' @ 3.42 hrs Device Routing Invert Outlet Devices #1 Primary 618.57' 84.00" Round CMP—Round 84" L= 150.0' CMP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 618.57' / 617.82' S= 0.0050'/' Cc= 0.900 n= 0.024, Flow Area= 38.48 sf Primary OutFlow Max=213.89 cfs @ 3.42 hrs HW=624.85' (Free Discharge) L1=CMP_Round 84" (Barrel Controls 213.89 cfs @ 7.77 fps) Pond 5P: EXIST 84 IN CMP Hyd rog raph --1--r--r--r--1--r--r--r--1--r--r--r-r--r--r--1--r--r--r--1--r--r--r- 240-----11--1�--1� z1a.94 cfs -+--+--r--1--+--+--1---1--+--r--1--+--+--+--1--+--+--+--1--+--+--1-- J -----11--1� --1� -----11--1� --1� --11II---11--1�-----11--1�--1�--11----1_--1� - ■Inflow ■Prima ry 23 - 22 214.94 cfs -- - - - +-- --1-- --+--1---I--4--I--1---1nf y� [d YAT-ea=96.-00 i 1 210 ---1-- 200 r --1--i-- r --1-- --1---1-- --1---1-- r--1--i-- r 1 - 10 Pea Ele —,V24./1 180 1--J--1--L--1--1--L--1---1--1--L--1--J--1--L--1--J--i--L--1- 1 I I ii- 8� 170 -- --r--r--1-- --r--1---1-- --r--r- --7--r--1--1--r--r--I- FF�^-- 160 11---1111--1� 150--r--r--r--1--r--r--r--1--r--r--r-r--r--r--1- --1� --11---11--1� --1� --11---11--1� --11---1�-- I�--1i I �{���1�-�i��ii�G� 1 - 140 y I I I I I I I I I I I I I I I I I I - - - - - - - - - - - u 130 -- -- -- --1-- --r--1---1-- --r--1-- --+--r--1-- -- ---n=O.-024- 3 120---11-- 0 110 -- LL � -- 11---11---11-- -- --1-- 1--11---11---11--?--1r--11---11-- --r--1---1-- --r--1-- 1--1r--11---11-- 11---11---1-- ;--T 11-- --+--r--1-- -- -- L-450-V1- I� 100 1--r--r--r--1--r--r I 1 r--r--1--r--r--r--1--r--r--r--1--r--r' -1-- 90 -- -J--1--L--1--1--L--1---1--1--L--1--J--1--L--1--J-- I --1- - - - - 80 r--r--r--1--r--r-- r--r--r-r--r--r--1--r-- r 70 -J--1--L--1--1--L--1---1--1--L--1--J--1--L--1--J--1--L--1--1--L--1-- 1 I I 1 50 --1-- 1--1---1-- -- --1---1-- -- --1---1-- ----1---1----1---1-- -- --1-- 40 ---+--+--1-- --+--1---1-- --r--1--+--+--+--1-- --+--+--1----+--1-- 30 -1--1--1 --11---11--1--1 --11---11--1--11---11---11--1--11---11--1--1 --11---11--1--1 - 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) SEEFRIED - USING CITY POND Charlotte 6-hr50-yr 50 Yr. 6Hr. Rainfall=4.88" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 30 Elevation Primary (feet) (cfs) 618.57 0.00 618.61 0.01 618.65 0.03 618.69 0.06 618.73 0.12 618.77 0.19 618.81 0.29 618.85 0.40 618.89 0.54 618.93 0.69 618.97 0.87 619.01 1.07 619.05 1.29 619.09 1.53 619.13 1.79 619.17 2.08 619.21 2.39 619.25 2.72 619.29 3.07 619.33 3.45 619.37 3.84 619.41 4.26 619.45 4.70 619.49 5.17 619.53 5.65 619.57 6.16 619.61 6.69 619.65 7.25 619.69 7.82 619.73 8.42 619.77 9.03 619.81 9.67 619.85 10.34 619.89 11.02 619.93 11.72 619.97 12.45 620.01 13.20 620.05 13.96 620.09 14.75 620.13 15.56 620.17 16.39 620.21 17.24 620.25 18.11 620.29 19.00 620.33 19.92 620.37 20.85 620.41 21.80 620.45 22.77 620.49 23.76 620.53 24.77 620.57 25.80 620.61 26.85 Stage -Discharge for Pond 5P: EXIST 84 IN CMP Elevation Primary (feet) (cfs) 620.65 27.92 620.69 29.00 620.73 30.11 620.77 31.23 620.81 32.37 620.85 33.54 620.89 34.71 620.93 35.91 620.97 37.13 621.01 38.36 621.05 39.61 621.09 40.87 621.13 42.16 621.17 43.46 621.21 44.78 621.25 46.12 621.29 47.47 621.33 48.84 621.37 50.22 621.41 51.62 621.45 53.04 621.49 54.47 621.53 55.92 621.57 57.38 621.61 58.86 621.65 60.36 621.69 61.87 621.73 63.39 621.77 64.93 621.81 66.49 621.85 68.06 621.89 69.64 621.93 71.24 621.97 72.85 622.01 74.47 622.05 76.11 622.09 77.76 622.13 79.43 622.17 81.11 622.21 82.80 622.25 84.50 622.29 86.22 622.33 87.95 622.37 89.69 622.41 91.44 622.45 93.21 622.49 94.99 622.53 96.78 622.57 98.58 622.61 100.39 622.65 102.21 622.69 104.05 Elevation Primary (feet) (cfs) 622.73 105.89 622.77 107.75 622.81 109.61 622.85 111.49 622.89 113.38 622.93 115.27 622.97 117.18 623.01 119.09 623.05 121.02 623.09 122.95 623.13 124.89 623.17 126.84 623.21 128.80 623.25 130.77 623.29 132.75 623.33 134.73 623.37 136.73 623.41 138.73 623.45 140.73 623.49 142.75 623.53 144.77 623.57 146.80 623.61 148.83 623.65 150.87 623.69 152.92 623.73 154.98 623.77 157.03 623.81 159.10 623.85 161.17 623.89 163.25 623.93 165.33 623.97 167.41 624.01 169.50 624.05 171.59 624.09 173.69 624.13 175.79 624.17 177.90 624.21 180.01 624.25 182.12 624.29 184.23 624.33 186.35 624.37 188.47 624.41 190.59 624.45 192.72 624.49 194.84 624.53 196.97 624.57 199.10 624.61 201.22 624.65 203.35 624.69 205.48 624.73 207.61 624.77 209.74 Elevation Primary (feet) (cfs) 624.81 211.87 624.85 214.00 624.89 216.13 624.93 218.25 624.97 220.37 625.01 222.50 625.05 224.62 625.09 226.73 625.13 228.85 625.17 230.96 625.21 233.07 625.25 235.17 625.29 237.27 625.33 239.36 625.37 241.46 625.41 243.54 625.45 245.62 625.49 247.69 625.53 249.76 625.57 251.82 SEEFRIED - USING CITY POND Charlotte 6-hr50-yr 50 Yr. 6Hr. Rainfall=4.88" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 31 Summary for Pond 47P: CLT Wetpond Inflow Area = 96.000 ac, 82.29% Impervious, Inflow Depth = 3.91" for 50 Yr. 6 Hr. event Inflow = 596.07 cfs @ 3.17 hrs, Volume= 31.265 of Outflow = 214.94 cfs @ 3.42 hrs, Volume= 31.263 af, Atten= 64%, Lag= 15.3 min Primary = 212.21 cfs @ 3.42 hrs, Volume= 31.237 of Secondary = 2.73 cfs @ 3.42 hrs, Volume= 0.026 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 642.29' @ 3.42 hrs Surf.Area= 175,068 sf Storage= 662,816 cf Plug -Flow detention time= 82.8 min calculated for 31.263 of (100% of inflow) Center -of -Mass det. time= 82.3 min (287.6 - 205.3 ) Volume Invert Avail.Storage Storage Description #1 637.00' 991,606 cf Custom Stage Data (Prismatic)-isted below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 637.00 86,751 0 0 638.00 97,974 92,363 92,363 638.50 100,000 49,494 141,856 644.00 209,000 849,750 991,606 Device Routing Invert Outlet Devices #1 Primary 637.00' 4.00' long x 2.80' rise Sharp -Crested Rectangular Weir 2 End Contraction(s) 10.00' Crest Height #2 Primary 639.80' 8.00' long Sharp -Crested Rectangular Weir End Contraction(s) 11.00' Crest Height #3 Primary 641.70' 10.00' long Sharp -Crested Rectangular Weir2 End Contraction(s) 12.00' Crest Height #4 Secondary 642.20' 40.00' long x 15.00' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=211.43 cfs @ 3.42 hrs HW=642.28' TW=624.85' (Dynamic Tailwater) 1=Sharp-Crested Rectangular Weir(Orifice Controls 98.53 cfs @ 10.23 fps) 2=Sharp-Crested Rectangular Weir(Weir Controls 98.51 cfs @ 5.29 fps) 3=Sharp-Crested Rectangular Weir(Weir Controls 14.39 cfs @ 2.51 fps) Secondary OutFlow Max=2.46 cfs @ 3.42 hrs HW=642.28' TW=624.85' (Dynamic Tailwater) L4= Broad -crested Rectangular Weir(Weir Controls 2.46 cfs @ 0.76 fps) SEEFRIED - USING CITY POND Charlotte 6-hr50-yr 50 Yr. 6Hr. Rainfall=4.88" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 32 Pond 47P: CLT Wetpond ..... ' I i • i - C • �Sto - • • • • •• %%%%%%%%%%%%%%%%%%%/------ %%/%�%/%�%%%%%%%/�% ......///% SEEFRIED - USING CITY POND Charlotte 6-hr50-yr 50 Yr. 6Hr. Rainfall=4.88" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 33 Stage -Discharge for Pond 47P: CLT Wetpond Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 637.00 0.00 0.00 0.00 637.10 0.41 0.41 0.00 637.20 1.16 1.16 0.00 637.30 2.12 2.12 0.00 637.40 3.26 3.26 0.00 637.50 4.54 4.54 0.00 637.60 5.94 5.94 0.00 637.70 7.46 7.46 0.00 637.80 9.07 9.07 0.00 637.90 10.78 10.78 0.00 638.00 12.58 12.58 0.00 638.10 14.45 14.45 0.00 638.20 16.40 16.40 0.00 638.30 18.42 18.42 0.00 638.40 20.50 20.50 0.00 638.50 22.64 22.64 0.00 638.60 24.83 24.83 0.00 638.70 27.08 27.08 0.00 638.80 29.38 29.38 0.00 638.90 31.72 31.72 0.00 639.00 34.11 34.11 0.00 639.10 36.54 36.54 0.00 639.20 39.01 39.01 0.00 639.30 41.51 41.51 0.00 639.40 44.05 44.05 0.00 639.50 46.62 46.62 0.00 639.60 49.22 49.22 0.00 639.70 51.85 51.85 0.00 639.80 54.51 54.51 0.00 639.90 57.98 57.98 0.00 640.00 61.89 61.89 0.00 640.10 66.09 66.09 0.00 640.20 70.54 70.54 0.00 640.30 75.20 75.20 0.00 640.40 80.07 80.07 0.00 640.50 85.11 85.11 0.00 640.60 90.32 90.32 0.00 640.70 95.69 95.69 0.00 640.80 101.22 101.22 0.00 640.90 106.88 106.88 0.00 641.00 112.68 112.68 0.00 641.10 118.62 118.62 0.00 641.20 124.68 124.68 0.00 641.30 130.85 130.85 0.00 641.40 137.15 137.15 0.00 641.50 143.56 143.56 0.00 641.60 150.07 150.07 0.00 641.70 156.69 156.69 0.00 641.80 164.45 164.45 0.00 641.90 173.15 173.15 0.00 642.00 182.51 182.51 0.00 642.10 192.40 192.40 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 642.20 202.76 202.76 0.00 642.30 216.94 213.55 3.39 642.40 234.32 224.73 9.59 642.50 253.96 236.28 17.68 642.60 275.49 248.17 27.32 642.70 298.57 260.39 38.18 642.80 323.11 272.92 50.19 642.90 348.29 285.74 62.55 643.00 374.41 298.84 75.56 643.10 402.21 312.22 89.99 643.20 431.06 325.86 105.20 643.30 461.35 339.75 121.60 643.40 492.69 353.88 138.81 643.50 524.77 368.25 156.52 643.60 557.77 382.84 174.93 643.70 591.29 397.66 193.63 643.80 625.60 412.69 212.91 643.90 661.10 427.92 233.18 644.00 697.41 443.36 254.05 SEEFRIED - USING CITY POND Charlotte 6-hr 100-yr 100 Yr. 6 Hr. Rainfall=5.33" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 34 Summary for Subcatchment 1S: Pre SITE DA Runoff = 276.67 cfs @ 3.48 hrs, Volume= 22.625 af, Depth= 2.83" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 100-yr 100 Yr. 6 Hr. Rainfall=5.33" Area (ac) CN Description 48.700 55.0 Woods, Good, HSG B 45.000 98.0 Paved parking, HSG B 2.300 98.0 Water Surface, 0% imp, HSG B 96.000 76.2 Weighted Average 51.000 53.13% Pervious Area 45.000 46.88% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 18.1 150 0.0100 0.14 Sheet Flow, Grass: Short n= 0.150 P2= 3.12" 3.0 415 0.0200 2.28 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.5 1,160 0.0050 5.52 17.33 Pipe Channel, RCP Round 24" 24.00" Round Area= 3.1 sf Perim= 6.3' r= 0.50' n= 0.012 Concrete pipe, finished 5.3 450 0.0800 1.41 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 2.4 740 0.0070 5.22 260.80 Channel Flow, CHANNEL FLOW Area= 50.0 sf Perim= 23.0' r= 2.17' n= 0.040 Winding stream, pools & shoals 32.3 2,915 Total SEEFRIED - USING CITY POND Charlotte 6-hr 100-yr 100 Yr. 6 Hr. Rainfall=5.33" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 35 Subcatchment 1S: Pre SITE DA Hydrograph --+----+--+--+--+--+----+--+--+--+----------+--+--+--+--+-+--+--+-- 300 ■Runoff ------------------- 280 -C;4a rlo ttc;-6 -h it-;1 0'0-j'% r - 260 ' 240 ---I----------'I--- --II-- ------10(� ��r= '1r.-0-.-Za�nf;a11=5,3T'- 220-kupoff p= zoo ----- -- --+-- --' --I-- ----+--}--_Rlun7off -YjaI-umje=-22.&Z5-If- w 180-------- -- ------------ -- ------------Runoff-Qeplth 160 3----+--+--+--+--+-+--+--+--+--+--+----- --Fiov. Length=�,gRIW- ° 140 LL 120 Tic '321.3 irn r h 100 CN=/ 6.2 80 60 40 20 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) SEEFRIED - USING CITY POND Charlotte 6-hr 100-yr 100 Yr. 6 Hr. Rainfall=5.33" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 36 Summary for Subcatchment 2S: Post SITE DA Runoff = 669.92 cfs @ 3.17 hrs, Volume= 34.772 af, Depth= 4.35" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Charlotte 6-hr 100-yr 100 Yr. 6 Hr. Rainfall=5.33" Area (ac) CN Description 45.000 98.0 Paved parking, HSG B 34.000 98.0 Paved parking, HSG B 14.700 55.0 Woods, Good, HSG B 2.300 98.0 Water Surface, 0% imp, HSG B 96.000 91.4 Weighted Average 17.000 17.71 % Pervious Area 79.000 82.29% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, USER INPUT Subcatchment 2S: Post SITE DA Hydrograph -- --1-- 750 '--'---'---'---'--'---'---'---'---'---'---'--'---'---'---'---'--'---'---'---'---'---'--'--- ■Runoff 70 s6s.92 cfs -+----+--+--+--+--+-+--+--+--+--+--+- --+ a�lote', 6=r'1100=yr 650 ----'-- --'------'--- --'- --'---'---------------------------- 600 � _Ra'nfall=5s33+„ 550 Ru-qO#f Area=+f i+ 6-00%� �- -i - -1- - �� si unloff VQ1-umje=34.1772-a€- 450 {�I1 11 1 1 1 1 ^-r--1--r--r--r--r--r--1--r--r--r--r--r--1---1- f��Alil�lil �eptft 4t,35j' N V400 1 1 1 1 1 1 1 1 1 1 1 1 1 1 '---'---'i-- it --'i --'i--'---'---'-- it-- it --'i--'---'---'-- it--'i --'i - --' -- o 350 I I C-11 0��-0 m i n LL I-----__1__1______--____+____----__I__�__1__�__I___I___I__�__+__ 300 I C N=91.'4 250 1 200 r--1--r--r--r--r--r--1--r--r--r--r--r--1---1--r--r--r--r--1---1--r--+-- 150 100 +----+--+--+--+--+----+--+--+--+-------+--+--+--+--+--+-+--+--+-- 50 1 1 I I I 1 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) SEEFRIED - USING CITY POND Charlotte 6-hr 100-yr 100 Yr. 6 Hr. Rainfall=5.33" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 37 Summary for Pond 5P: EXIST 84 IN CMP [57] Hint: Peaked at 626.02' (Flood elevation advised) Inflow Area = 96.000 ac, 82.29% Impervious, Inflow Depth = 4.35" for 100 Yr. 6 Hr. event Inflow = 274.55 cfs @ 3.39 hrs, Volume= 34.770 of Outflow = 274.55 cfs @ 3.39 hrs, Volume= 34.770 af, Atten= 0%, Lag= 0.0 min Primary = 274.55 cfs @ 3.39 hrs, Volume= 34.770 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 626.02' @ 3.39 hrs Device Routing Invert Outlet Devices #1 Primary 618.57' 84.00" Round CMP—Round 84" L= 150.0' CMP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 618.57' / 617.82' S= 0.0050'/' Cc= 0.900 n= 0.024, Flow Area= 38.48 sf Primary OutFlow Max=273.81 cfs @ 3.39 hrs HW=626.01' (Free Discharge) L1=CMP_Round 84" (Barrel Controls 273.81 cfs @ 8.33 fps) Pond 5P: EXIST 84 IN CMP Hyd rog raph I I I I I I I I I I I I I I I I I I I I ■ Inflow cfs 1--1---1----- 1I----- - l -- ■ Primary 300 274.55 274.55 c 28 fs T-000aq_� ^�I� 1--+--+--+--1--+--+--1---1--+--r--1--+--+--+--1--+--+--��+��-;y-Imo�++-��+-��++45�-+--I-- 260---1--1---1---1----1---1---1----1---1---1----Peal�_Ele1Y_JOZ- 240 I 8 220 ----r--r--I-- --r--i 1I --1----r----r--+--r------r--r--1- - - 1--J--1--L--1--1--L--1---1--1--L--1--J--1--L--1--J--1--L--1--1--L--1-- 200 RoUn'1d CUIVei t 180--r--r--r--1--r--r r--r--r-r--+--r--1--r--r--r--1--r--r--I - y I I I I I I I I I I I I I I I I I I I V (y' (1�n-=O.{024- 160 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 T 1 0 140---11--11---11---11---11--11---11---11-- 1--11---11---11---11--11---11---11--11---1, L1'=1'5©.a'- LL 1- 120 C h r 100 1---11--11---11---11-- �1--11---11---11-- 80 r--r--r--1--r--r----1--r--r--1--7--+--r--1--r--r--r--1--r--r-- - 60 40 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) SEEFRIED - USING CITY POND Charlotte 6-hr 100-yr 100 Yr. 6 Hr. Rainfall=5.33" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 38 Elevation Primary (feet) (cfs) 618.57 0.00 618.61 0.01 618.65 0.03 618.69 0.06 618.73 0.12 618.77 0.19 618.81 0.29 618.85 0.40 618.89 0.54 618.93 0.69 618.97 0.87 619.01 1.07 619.05 1.29 619.09 1.53 619.13 1.79 619.17 2.08 619.21 2.39 619.25 2.72 619.29 3.07 619.33 3.45 619.37 3.84 619.41 4.26 619.45 4.70 619.49 5.17 619.53 5.65 619.57 6.16 619.61 6.69 619.65 7.25 619.69 7.82 619.73 8.42 619.77 9.03 619.81 9.67 619.85 10.34 619.89 11.02 619.93 11.72 619.97 12.45 620.01 13.20 620.05 13.96 620.09 14.75 620.13 15.56 620.17 16.39 620.21 17.24 620.25 18.11 620.29 19.00 620.33 19.92 620.37 20.85 620.41 21.80 620.45 22.77 620.49 23.76 620.53 24.77 620.57 25.80 620.61 26.85 Stage -Discharge for Pond 5P: EXIST 84 IN CMP Elevation Primary (feet) (cfs) 620.65 27.92 620.69 29.00 620.73 30.11 620.77 31.23 620.81 32.37 620.85 33.54 620.89 34.71 620.93 35.91 620.97 37.13 621.01 38.36 621.05 39.61 621.09 40.87 621.13 42.16 621.17 43.46 621.21 44.78 621.25 46.12 621.29 47.47 621.33 48.84 621.37 50.22 621.41 51.62 621.45 53.04 621.49 54.47 621.53 55.92 621.57 57.38 621.61 58.86 621.65 60.36 621.69 61.87 621.73 63.39 621.77 64.93 621.81 66.49 621.85 68.06 621.89 69.64 621.93 71.24 621.97 72.85 622.01 74.47 622.05 76.11 622.09 77.76 622.13 79.43 622.17 81.11 622.21 82.80 622.25 84.50 622.29 86.22 622.33 87.95 622.37 89.69 622.41 91.44 622.45 93.21 622.49 94.99 622.53 96.78 622.57 98.58 622.61 100.39 622.65 102.21 622.69 104.05 Elevation Primary (feet) (cfs) 622.73 105.89 622.77 107.75 622.81 109.61 622.85 111.49 622.89 113.38 622.93 115.27 622.97 117.18 623.01 119.09 623.05 121.02 623.09 122.95 623.13 124.89 623.17 126.84 623.21 128.80 623.25 130.77 623.29 132.75 623.33 134.73 623.37 136.73 623.41 138.73 623.45 140.73 623.49 142.75 623.53 144.77 623.57 146.80 623.61 148.83 623.65 150.87 623.69 152.92 623.73 154.98 623.77 157.03 623.81 159.10 623.85 161.17 623.89 163.25 623.93 165.33 623.97 167.41 624.01 169.50 624.05 171.59 624.09 173.69 624.13 175.79 624.17 177.90 624.21 180.01 624.25 182.12 624.29 184.23 624.33 186.35 624.37 188.47 624.41 190.59 624.45 192.72 624.49 194.84 624.53 196.97 624.57 199.10 624.61 201.22 624.65 203.35 624.69 205.48 624.73 207.61 624.77 209.74 Elevation Primary (feet) (cfs) 624.81 211.87 624.85 214.00 624.89 216.13 624.93 218.25 624.97 220.37 625.01 222.50 625.05 224.62 625.09 226.73 625.13 228.85 625.17 230.96 625.21 233.07 625.25 235.17 625.29 237.27 625.33 239.36 625.37 241.46 625.41 243.54 625.45 245.62 625.49 247.69 625.53 249.76 625.57 251.82 625.61 253.87 625.65 255.92 625.69 257.96 625.73 259.99 625.77 262.01 625.81 264.02 625.85 266.02 625.89 268.01 625.93 269.99 625.97 271.96 626.01 273.92 626.05 275.87 SEEFRIED - USING CITY POND Charlotte 6-hr 100-yr 100 Yr. 6 Hr. Rainfall=5.33" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 39 Summary for Pond 47P: CLT Wetpond Inflow Area = 96.000 ac, 82.29% Impervious, Inflow Depth = 4.35" for 100 Yr. 6 Hr. event Inflow = 669.92 cfs @ 3.17 hrs, Volume= 34.772 of Outflow = 274.55 cfs @ 3.39 hrs, Volume= 34.770 af, Atten= 59%, Lag= 13.6 min Primary = 247.66 cfs @ 3.39 hrs, Volume= 34.265 of Secondary = 26.88 cfs @ 3.39 hrs, Volume= 0.505 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.05 hrs Peak Elev= 642.60' @ 3.39 hrs Surf.Area= 181,171 sf Storage= 717,663 cf Plug -Flow detention time= 76.5 min calculated for 34.755 of (100% of inflow) Center -of -Mass det. time= 77.9 min (282.7 - 204.7 ) Volume Invert Avail.Storage Storage Description #1 637.00' 991,606 cf Custom Stage Data (Prismatic)-isted below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 637.00 86,751 0 0 638.00 97,974 92,363 92,363 638.50 100,000 49,494 141,856 644.00 209,000 849,750 991,606 Device Routing Invert Outlet Devices #1 Primary 637.00' 4.00' long x 2.80' rise Sharp -Crested Rectangular Weir 2 End Contraction(s) 10.00' Crest Height #2 Primary 639.80' 8.00' long Sharp -Crested Rectangular Weir End Contraction(s) 11.00' Crest Height #3 Primary 641.70' 10.00' long Sharp -Crested Rectangular Weir2 End Contraction(s) 12.00' Crest Height #4 Secondary 642.20' 40.00' long x 15.00' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=247.26 cfs @ 3.39 hrs HW=642.59' TW=626.01' (Dynamic Tailwater) 1=Sharp-Crested Rectangular Weir(Orifice Controls 102.86 cfs @ 10.68 fps) 2=Sharp-Crested Rectangular Weir(Weir Controls 117.07 cfs @ 5.63 fps) 3=Sharp-Crested Rectangular Weir(Weir Controls 27.32 cfs @ 3.12 fps) Secondary OutFlow Max=26.54 cfs @ 3.39 hrs HW=642.59' TW=626.01' (Dynamic Tailwater) L4= Broad -crested Rectangular Weir(Weir Controls 26.54 cfs @ 1.69 fps) SEEFRIED - USING CITY POND Charlotte 6-hr 100-yr 100 Yr. 6 Hr. Rainfall=5.33" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 40 250 200 150 100 274.55 cfs r..-I Pond 47P: CLT Wetpond Hyd rog raph -+--+-+--+-+--+-+--+-+--+----+-+--+----+----+----+----+---- ■Inflow :fs — L _ L _ _ L _ L _ _ L _ J _ _ L _ L _ _ L _ J _ _ L _ L _ _ L _ _I _ _ L _ _I _ _ L _ _I _ _ L _ _I _ ac �UtfIOW ❑Primary -------,---,----------,--,--------InfIolwl,Area=96�I.0001 r r Secondary --Ir-7--Ir- --r-7--r- --Ir--li--r-7--r-Peak-E1eV=,64Z.60'- pp ��11 JJr�� AA'' ��yy --' - ------------ ,--r-r--r-r--r-r--r-r--r--I--r-r--r--I--r--I--r--I--r--I--r--I-- r--r-r--r-r--r-r--r-r--r--I--r-r--r--I--r--I--r--I--r--I--r--I-- L--L-L--L-L--L-L--L-L--L--'--L-L--L--'--L--'--L--'--L--'--L--'-- --' - -- - -- - --' --'-- -----------L-I -- - -- Sto'-6&7�1',�',63 cf- ra ---- ---- ------------------- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) SEEFRIED - USING CITY POND Charlotte 6-hr 100-yr 100 Yr. 6 Hr. Rainfall=5.33" Prepared by Burton Engineering Printed 10/16/2019 HydroCAD®10.00-17 s/n 03513 ©2016 HydroCAD Software Solutions LLC Page 41 Stage -Discharge for Pond 47P: CLT Wetpond Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 637.00 0.00 0.00 0.00 637.10 0.41 0.41 0.00 637.20 1.16 1.16 0.00 637.30 2.12 2.12 0.00 637.40 3.26 3.26 0.00 637.50 4.54 4.54 0.00 637.60 5.94 5.94 0.00 637.70 7.46 7.46 0.00 637.80 9.07 9.07 0.00 637.90 10.78 10.78 0.00 638.00 12.58 12.58 0.00 638.10 14.45 14.45 0.00 638.20 16.40 16.40 0.00 638.30 18.42 18.42 0.00 638.40 20.50 20.50 0.00 638.50 22.64 22.64 0.00 638.60 24.83 24.83 0.00 638.70 27.08 27.08 0.00 638.80 29.38 29.38 0.00 638.90 31.72 31.72 0.00 639.00 34.11 34.11 0.00 639.10 36.54 36.54 0.00 639.20 39.01 39.01 0.00 639.30 41.51 41.51 0.00 639.40 44.05 44.05 0.00 639.50 46.62 46.62 0.00 639.60 49.22 49.22 0.00 639.70 51.85 51.85 0.00 639.80 54.51 54.51 0.00 639.90 57.98 57.98 0.00 640.00 61.89 61.89 0.00 640.10 66.09 66.09 0.00 640.20 70.54 70.54 0.00 640.30 75.20 75.20 0.00 640.40 80.07 80.07 0.00 640.50 85.11 85.11 0.00 640.60 90.32 90.32 0.00 640.70 95.69 95.69 0.00 640.80 101.22 101.22 0.00 640.90 106.88 106.88 0.00 641.00 112.68 112.68 0.00 641.10 118.62 118.62 0.00 641.20 124.68 124.68 0.00 641.30 130.85 130.85 0.00 641.40 137.15 137.15 0.00 641.50 143.56 143.56 0.00 641.60 150.07 150.07 0.00 641.70 156.69 156.69 0.00 641.80 164.45 164.45 0.00 641.90 173.15 173.15 0.00 642.00 182.51 182.51 0.00 642.10 192.40 192.40 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 642.20 202.76 202.76 0.00 642.30 216.94 213.55 3.39 642.40 234.32 224.73 9.59 642.50 253.96 236.28 17.68 642.60 275.49 248.17 27.32 642.70 298.57 260.39 38.18 642.80 323.11 272.92 50.19 642.90 348.29 285.74 62.55 643.00 374.41 298.84 75.56 643.10 402.21 312.22 89.99 643.20 431.06 325.86 105.20 643.30 461.35 339.75 121.60 643.40 492.69 353.88 138.81 643.50 524.77 368.25 156.52 643.60 557.77 382.84 174.93 643.70 591.29 397.66 193.63 643.80 625.60 412.69 212.91 643.90 661.10 427.92 233.18 644.00 697.41 443.36 254.05