Loading...
HomeMy WebLinkAbout20191431 Ver 1_PCN Beam Road_print_20191017a�'�F wArE�o� fl vflllll::� Y Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ❑X Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 39 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes ❑X No 1d. Type(s) of approval sought from the DWQ (check all that apply): ❑X 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑X No For the record only for Corps Permit: ❑ Yes ❑X No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑X Yes ❑ No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ❑X No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑X No 2. Project Information 2a. Name of project: Beam Road Industrial Park 2b. County: Mecklenburg 2c. Nearest municipality / town: Charlotte 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: N/A 3. Owner Information 3a. Name(s) on Recorded Deed: South 36R, LLC 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): Mid South Realty P.O. Box 30456 3d. Street address: 440 Silas Creek Parkway, Suite 302 3e. City, state, zip: Charlotte 3f. Telephone no.: (336) 722-2236 3g. Fax no.: 3h. Email address: rblizzard1@me.com Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑X Other, specify: Interested buyer. 4b. Name: Paul Seefried 4c. Business name (if applicable): Seefried Industrial Properties, Inc. 4d. Street address: 3333 Riverwood Parkway, Suite 200 4e. City, state, zip: Atlanta, Georgia, 30339 4f. Telephone no.: (678) 904 1917 4g. Fax no.: 4h. Email address: paulseefried@seefriedproperties.com 5. Agent/Consultant Information (if applicable) 5a. Name: Patrick Korn 5b. Business name (if applicable): Terracon 5c. Street address: 2701 Westport Raod 5d. City, state, zip: Charlotte, North Carolina, 28208 5e. Telephone no.: (704) 509 1777 5f. Fax no.: (704) 509 1888 5g. Email address: Patrick.Korn@terracon.com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 14312201-02, 14312204-08, 14312210-17, 14312220 1b. Site coordinates (in decimal degrees): Latitude: 35.187711 Longitude:-80.931289 1c. Property size: 50.369 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Sugar Creek 2b. Water Quality Classification of nearest receiving water: C 2c. River basin: Catawba 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The Site consists of multiple parcels comprising approximately 49.69 acres of wooded terrain, historically used for agricultural and residential uses. Land use to the east and south of the proposed project area consist of business and commercial structures. Land use to the west and north consist of wooded parcels. 3b. List the total estimated acreage of all existing wetlands on the property: 0.1 1 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 288 3d. Explain the purpose of the proposed project: To maintain profitability, meet the foretasted required logistical needs, and provide a minimum satisfactory level of customer service; Seefried Properties is proposing the construction of a warehouse and distribution center, at the proposed location, to meet the forecasted growth and service projections for their client 3e. Describe the overall project in detail, including the type of equipment to be used: The proposed project would be constructed in a fashion and using equipment and materials similar to previously constructed warehouses and distribution centers in the area. Land clearing and construction equipment would be those typically used for this type of project. Grading and filling activities would create terrain suitable for construction of multiple cargo storage buildings. Grading would also serve to bring land elevation similar to existing road grade. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the ❑ Yes ❑X No ❑ Unknown Corps or State been requested or obtained for this property / Comments: project (includingall prior phases)in the past? 4b. If the Corps made the jurisdictional determination, what type ❑ Preliminary ❑ Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. N/A 5. Project History 5a. Have permits or certifications been requested or obtained for El Yes 0 No ❑ Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. N/A 6. Future Project Plans 6a. Is this a phased project? ❑X Yes ❑ No 6b. If yes, explain. The initial phase of construction would consist of constructing multiple warehouse buildings with an option to expand these warehouses as needed. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑X Wetlands ❑X Streams —tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 P Fill Headwater Wetland Yes Corps 0.11 W2 Choose one Choose one Yes/No W3 Choose one Choose one Yes/No W4 Choose one Choose one Yes/No W5 Choose one Choose one Yes/No W6 Choose one Choose one Yes/No 2g. Total Wetland Impacts: 0.11 2h. Comments: N/A 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 P Fill RPW 1 INT Corps 2 135 S2 P Fill PRW 2 INT Corps 2 153 S3 Choose one S4 Choose one S5 Choose one S6 Choose one 3h. Total stream and tributary impacts 288 3i. Comments: N/A Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then indivi ually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 Choose one Choose 02 Choose one Choose 03 Choose one Choose 04 Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: N/A 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): N/A 5j. Size of pond watershed (acres): N/A 5k. Method of construction: N/A 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require miti ation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number — Permanent (P) or Temporary T 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet B1 Yes/No B2 Yes/No B3 Yes/No B4 Yes/No B5 Yes/No B6 Yes/No 6h. Total Buffer Impacts: 6i. Comments: N/A Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The chosen site was the only site that met economic, buildability, and safety criteria for the project.Once the site was chosen, alternative site designs were evaluated to minimize impacts to wetlands and WOTUS. The site plans were altered on multiple occasions to reduce the impacts to the RPWs found at the site. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. The selected contractor would implement best management practices during construction to reduce potential temporary, minor construction related effects from the proposed project. These could include the use of silt fences, phased grading and earth moving activities, gravel and rocked entrances to site, dust control, and the immediate application of seed and matting/straw upon completion of earth moving activities. . 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑X Yes ❑ No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑X Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑X Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: NC DEQ DIMS Service 3b. Credits Purchased (attach receipt and letter) Type: Riparian wetland Type: Stream Type: Choose one Quantity: 0.11 Quantity: 288 Quantity: To be determined pending final site layout and Army Corps of Engineers permit approval. 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑X Yes 4b. Stream mitigation requested: 288 linear feet 4c. If using stream mitigation, stream temperature: warm 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: 0.11 acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ❑X No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ❑X No within one of the NC Riparian Buffer Protection Rules? 1b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑X No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 2b. Does this project require a Stormwater Management Plan? ❑X Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: Stormwater piping will be installed throughout the site to manage stormwater runoff. Runoff would be directed towards the on -site existing City of Charlotte stormwater management pond. Piped stormwater will drain onto riprap aprons prior to collecting in the pond. Discharge from the existing stormwater pond would be into a reinforced concrete pipe that daylights onto a riprap apron. Discharged stormwater pond flow would be to the west and into a culverted and piped unnamed intermittent stream that flows to the south of the dam. 2e. Who will be responsible for the review of the Stormwater Management Plan? Mecklenburg County 3. Certified Local Government Stormwater Review 3a. In which localgovernment's jurisdiction is thisproject? Mecklenburg County ❑ Phase II ❑ NSW 3b. Which of the following locally -implemented stormwater management programs ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑X No attached? 4. DWQ Stormwater Program Review ❑Coastal counties ❑HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ORW (check all that apply): ❑Session Law 2006-246 ❑Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑X No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑X Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑X Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑ Yes ❑X No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State El Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑Yes ❑X No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ❑Yes 0 No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): N/A 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in El Yes 0 No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. N/A 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. The proposed project would utilize the local municipal sewage treatment system. Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? ❑ Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ impacts? x❑ Yes No 5c. If yes, indicate the USFWS Field Office you have contacted. Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Terracon contacted the NCNHP and IPaC and requested a review for of the proposed project site. In a response letters dated 09/11/19 and 9/25/19 respectively, NCNHP and IPaC stated that no threatened or endangered species exist for this location. EvE 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes 0 No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? Terracon reviewed the National Marine Fisheries Service Habitat Protection Mapper. No essential fish habitat were present for the proposed project location. -4 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes x❑ No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? Terracon contacted the SHPO on 9/11/19 and requested a review for of the proposed project. As of the date of this application no response was received. Terracon also conducted an online review using the NCHPO on line mapper, there where no listings for the proposed area. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ::::❑ Yes ��FE]�No� 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? Terracon reviewed the FEMA National Flood Hazard Layer (NFHL) Viewer for the proposed project. The NFHL indicates the proposed project location is within an area of minimal flood hazard Zone X. Paul Seefried� 09-25-2019 ApplicanVAgent's Printed Name Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant isprovided.) Page 10 of 10