HomeMy WebLinkAbout19980081 Ver 1_COMPLETE FILE_19980129F-- A
MEMORANDUM
Division of Water Quality
March 10, 1998
A 11?'
ll LAI?
NCDENR
NORTH GROUNA Du%PTmrNT or ^
ENVIRONMENT ANO NQULL RrsoL Rces
?S
jpv"-
To: John Parker
DCM/Raleigh
ORIGINAL SIGNED BY
From: Jim Mulligan, Regional Supervisor , JIM MULLIGAN
Subject: CAMA Major Permit Application Review Comments
Southern Shores Civic Association, inc.
Dare County
The above subject project has been reviewed by this office. There is no fill proposed by the applicant
in waters or wetlands therefore there is no Section 401 required. Review of this project for a
determination of whether water quality standards will be violated has been made and a determination
made that there should be no violation of the State water quality standards if the project is
constructed as proposed. This office has no objections to the issuance of the CAMA Major Permit.
If you have any questions or comments, please call this office at (919)946-6481. Thank you,
cc: De Sawyer
hn Dorney
WaRO File
Central File
993 WaS::'_naton Square Mall, Washinc_on, North Carolina 27889 Telephone 919-946-6981 FAX 919-
An Equal Oroortunity Affirmative Action Employer
f WR
To: John Dorney
Planning Branch
DIVISION OF ENVIRONMENTAL MANAGEMENT
CAMA/COE PERMIT APPLICATION REVIEW
WaRO PROJECT # WQ SUPERVISOR: THO E
REVIEWER: SAWYER DATE: 31p 7 g
WETLAND INFORMATION FOR CENTRAL OFFICE TRACKING
M PERMIT YR:
Ir-fy 1 PROJECT NAME : P T N0. • /J COUNTY: ar
rr? ?es ?•U, `C /? $ Soee?C^`
I
YPE
?? PERMIT TYPE: COB
.
PROJECT T
COE #: -
DOT #:
?
RCD FROM CDA: DATE FROM CDA: 1
s
REG OFFICE. WaRO RIVER QNIDUB -R- #:
c '
STREAM OR JACENT WATER BODY:
- l
/11
CLASS : S
E
CLOS
OPEN OR STREAM IND #: 30-1
,,
/
?
WL Il?ACT : / WL TYPE :
WL REQUESTED: WL ACR EST:
HYDRO CNECT?: WL SCORE:
MITIGATION: MITIGATION TYPE:
MITIGATION SIZE: TING SHEET ATTACHED?
RECOMMENIDATIO S UE ISSUE/COND DENY HOLD
-
STORMWATER PLAN REQ' D: IF YES, DATE APPROVED: -
PROJECT DESCRIPTION:
4&vx4-1&- V ?(" /( ?/
C?-o4--dA-4?'
WATER QUALITY CERT. (401)
CERT. REQ' D: fv
IF YES, TYPE :
SEWAGE DISPOSAL ,/
TYPE OF DISPOSAL PROPOSED: /?D"-P
(EXISTING, PROPOSED, SEPTIC TANK ETC.)
TO BE PERMITTED BY:
(DEM, DHS, COUNTY)
IF BY DEM, IS SITE AVAILABLE AND PERMIT ISSUANCE PROBABLE:
WATER/WETLAND FILL
AREA OF FILL: WATER: - 0 - WETLAND: -v -?
IS FILL ELIMINATING A SIGNIFICANT USE?
DREDGING J/
AREA TO BE DREDGED : A t9- -
IS DREDGING ACTIVITY EXPECTED TO CAUSE A SIGNIFICANT LOSS OF
RESOURCE? '
IS SPOIL DISPOSAL ADEQUATELY ADDRESSED?
MARINA
ARE THE FOLLOWING ADEQUATELY ADDRESSED?
SEWAGE DISPOSAL:` MARINA SERVICES:
OXYGEN IN BASIN: CLOSURE OF SHELLFISHING WATER? /V
CC: WaRO; Central Files; DCM Field Offices; COE Washington Office
State of North Carolina
Department of Environment
and Natural Resources
Division of Water Quality
James B. Hunt, Jr., Governor
Wayne McDevitt, Secretary
A. Preston Howard, Jr., P.E., Director
MEMORANDUM
TO: John Parker, DCM
FROM: John Dorney, D D
RE: Water Quality comments
Southern Shores Civic Association
Dare County
DWQ Project # 980081
A- r-
NCDENR
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
March 12, 1998
DWQ has no objections to this project plans to expand a marina
at Southern Shores Civic Association on Dogwood Trail in Dare County.
Please call me at 733-1786 if you have any questions.
cc: Washington DWQ Regional Office
John Dorney
Central Files
980081.dcm
Environmental Sciences Branch 4401 Reedy Creek Road Raleigh, North Carolina 27607
Telephone 919-733-1786 FAX # 733-9959
An Equal Opportunity Affirmative Action Employer 50% recycled/10% post consumer paper
DEHNR Fax :9199753716 Mar 10 '98 1135 P.04/04
Ta: john porney
Planning Branch
vMSION OF RRVIROMGWAL NANAGWW
CANA/COE pMUT APPLICATION REVIEW
VaW PROJSGT? wQ suPuvlsoa: Ta
DATE= 30?' ?'
xxv =
WrTLAND . ,INPOtt!lATION FOR C?ITRAL OFFICE TRAC "r-Z r te."
PHO T NO:: I -V PICT YR? 1:?•v.
y'Yf OCT
OJPEWuT TYPE: c?COE
_
PROJECT TYPE;71 DOT
Cox 0: D
R DATE FROM CDA: t ?
GD I8ER4 CAA • ? ? £? # • . 1 ? ?i
REG 'OI!FICN: WHO
STREAM 0 PJACENT WATER BODY: STREAK.
CLUS:
OPEN OR
9. LdSEp.
wL IMPA WL TYPE :.
WL RMUESTED WL ACR BST :
Hym CNRCT4: WL 5CQRS.:
I{ITTGATION: MITIGATION TYPE:
MITIGATION SIZE-*-- ..? im: SMT ,ATTACHED?
RgCq iDATEO mgsux/COND DENY HOLD
IF YES, DATE APPROVED: -? ~
STORMWATER PLAN REQ'D: 7
PROJECT DESCRIPTION:.
4 - 0? it abql
wATF? .QUALI7'Y.'GBRT. 401
CERT. htW'p-
IF YES, TYPE:
SEWA?GB
TYPE OF DISPOSAL PROPOSED; . SEpT,zG TANK FTC-)
(EXISTING,, PROPOSED,
TO'BE PERMITTED BY:
(DEM, DHS, COUNTY)
IF aY DEM, IS SITE AVAILABLE AND PERMIT ISSUANCE PROBABLE:
WATZRIVETLAIW-1 FILL WETLANT);
ARFA OF FILL: WATER: IS FILL ELIMINATING A SIGNIFICANT USE?
I1RSY7GING
AREA TO BE DREDGED : +PU• 4P---f
13 DREDGING ACTIVITY EXPECTED T.O CAUSE A SIGNIFICANT LOSS OF
RESOURCE?
IS SPOIL DISPOSAL ADEQUATELY ADDRESSED?
MARINA
ARE T. FOLLOWING ADEQUATELY ADDRESSED? MARINA SERVICES_
SEWAGE DISPOS.AL:1
CLOSURE OF SHELLFIST?ING WATER
OXYGEN IN BASIN;
CC: WaRO; Central Files; 1DCM Field Offices; CX3L Washin,4LoM office
DIVISION OF COASTAL MANAGEMENT 9 O O
FIELD INVESTIGATION REPORT
I. APPLICANT'S NAME: Southern Shores Civic Association, Inc.
P
2. LOCATION OF. PROJECT SITE: Southern Shores Civic Association North Marina, Dogwood Trail,
Dare County
Photo Index - 1995:187-1965: R-18;186-1964: P-7 1989: 144-1: H-9; 144-2: 1-10
State Plane Coordinates, North Basin - X: 2961400 Y: 881000
3. INVESTIGATION TYPE: CAMA / D & F
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 12-2-97
Was Applicant Present - no
5. PROCESSING PROCEDURE: Application Received 10-28-97
Application Complete 11--25-97
Office - Elizabeth City
6. SITE DESCRIPTION:
(A) Local Land Use Plan - 1992 Southern Shores Land-Use Plan Sketch Level Update
Land Classification From LUP - Conservation
(B) AEC(s) Involved: Public Trust
(C) Water Dependent: yes
(D) Intended Use: private
(E) Wastewater Treatment: Existing - NA
Planned - NA
(F) Type of Structures: Existing - bulkheaded basin, boat ramp and dock facility
Planned - Enlargement of basin, add 4 new finger piers ( 6 X 3 ft.)
and one 15 X 4 ft. pier which one of the new finger piers
will be attached to.
(G) Estimated Annual Rate of Erosion: NA
Source - NA
7. HABITAT DESCRIPTION: [AREA]
EXCAVATED EILLED SHADED
(A) Vegetated Wetlands
(B) Public Trust Water 132 sf. (0.003 A.)
(C) Upland 1950 sf. (0.045 A.)
(D) Total Area Disturbed: 2082 sf. (0.048 A.)
(E) Primary Nursery Area: Yes
(F) Water Classification: SC Open: NA
8. PROJECT SUMMARY: The applicant proposes to expand the existing " north " marina in Southern
Shores by excavating an adjacent portion of high ground, adding a total of eleven boat slips. This work
includes the removal of 140 ft. of existing bulkhead, the excavation of 630 cubic yards of high ground
adjacent to the existing basin behind this bulkhead (and the replacement of the removed bulkhead), the
placement of 13 new pilings, the construction of 4 finger piers and one 15 ft. long pier.
Southern Shores Civic Association, Inc.
CAMA Major Permit # 98-97 Major Modification Bio Report
Page Two r
Site Description
This review involves a site in Southern Shores, Dare County and is one of two basins which
are owned and managed by the applicant, the Southern Shores Civic Association. The site in
this review is referred to as the north basin and is adjacent to Sassafras Street and South
Dogwood Trail. The Southern Shores Civic Association has recently received CAMA
authorization to add 4 new slips within both basins (CAMA Permit #98-97). This work was
completed during the summer of 1997. The proposed work will be a modification to CAMA
Permit #98-97 .
The waters of this basin connect to a series of man-made canals and Ginguite Creek, just
south of Ginguite Creek' s junction with the Currituck Sound. Existing depths in this basin
and the connecting canals are between four and five feet. This basin has one boat ramp and
approximately 180 feet of existing dock/wharf and 23 slips. No pump-out station is available
at either Association basin. Signs are posted in both basins prohibiting the discharge of waste
into adjacent waters.
Although the waters of Ginguite Creek are classified as Inland Waters by the Division of
Marine Fisheries they provide an Estuarine habitat and are designated as an Inland Primary
Nursery Area (PNA). This PNA has been documented as a highly productive nursery for
many fish species. These waters also are classified by the Division of Coastal Management as
Public Trust Waters and as such, are part of the Estuarine System Area of Environmental
Concern.
No archeological sites, remnant species or geological formations are known to be associated
with this basin.
Proposed Work
The applicant proposes to expand the north marina by excavating a portion of high ground,
adjacent to the existing basin to a depth of 5 feet below the NWL and adding a total of eleven
new boat slips. This work will include the removal of 140 ft. of existing bulkhead and the
excavation of 630 cubic yards of high ground behind this bulkhead to provide for this
enlargement. This enlargement will include the dock configuration construction of one 15 ft.
long pier and 4 finger piers within the basin enlargement excavation area. Each finger pier will
be a dimension of 6 ft. by 3 ft. One finger pier will extend from the proposed 15 ft. by 4 ft.
pier. This work also includes the placement of 13 new pilings in front of the newly created
slips. Seven of the new slips will accommodate 21 ft. long vessels while four slips will handle
24 ft. long boats.
MOD TO CAMA PLRAIT 98-97 issued July 16,1997
Form DCht-MR1 ,
APPLICATION
(To be completed by all applicants)
1. APPLICANT
a. Landowner:
Southern Shores Givic Assoc.
Name
PO BOX 21.3
Address
CitSouthern Shores State
Zip 27949 Day Phone (919) 261-8617
Fax n/a
b. Authorized Agent:
Name Guy F.. Hellwege
Address 45 Cypress Ln.
City Southern Shores State N-C:?
27949 (919) 255-0368
Zip Day Phone
Fax n/a
c. ppro ect n e ((?f an Southern Shores Civic
t?ss)oC. ?arina l pansion o .
NOTE: Perndt will be issued in name of iw%downer(s), and/or
project name.
2. LOCATION OF PROPOSED
PROJECT
a. County Dare
G? i 2 A 1997
b. City, town, community or landmark
Southern Shores NC.
c. bagsecondary road number
ou owoo and Sassafrass st.
d. Is proposed work within city limits or planning
jurisdiction? xx Yes No
Name of body of water nearest project (e.g. river,
creek, sound, bay) Ginguit e Bay
3. DESCRIPTION AND PLANNED USE
OF PROPOSED PROJECT
a. List all development activities you propose (e.g.
building a home, motel, marina, bulkhead, pier, and
excavation and/or filling activities.
Add 11 additional boat slips to exist
Marina. A_total of 13 pilings,4 finge
piers, one 1,17 TT pier an excavating
cu y as o an ,remove 14u ft u k
lin-m! ea .
b. Is the proposed activity maintenance of an existing
project, new work, or both? Mod to existin,
work
c. Will the pr$' be or public, private or commercial
rava e
use?
d. Give a brief description of purpose, use, methods of
construction and daily operations of proposed
project. If more space is needed, please attach
additional pages. Sue attactled shout
:. wised 03195
Form DCM-,MT-1
4. LAND AND WATER
CHARACTERISTICS
a. Size of entire tract Approx. 2 Acres
b. Size of individual lot(s) 2 Acres
c. Approxirtoelva?n of tract above MHW or
NWL
d. Soil type(s) and texture(s) of tract
sand and sand canal bottom
e. Vegetation on tract
none
f. Man-made features now on tract 23 bulkheaded
boat slips in marina and a launch ramp
g. What is the CAMA Land Use Plan land
classification of the site? (Consult the local land use plan.)
Conservation Transitional
xx Developed Community
Rural Other
h. How is the tract zoned by local government?
Conditional use
i. Is the proposed project consistent with the applicable
zoning? xx Yes No
(Attach Zoning compliance cernficare, if applicable)
j. Has a professicual archaa.)iogical assessment been
done for the tract? Yes xx No
If yes, by whom?
k. Is the project located in a National Registered
Historic District or does it involve a National
Register listed or eligible property?
Yes xx No
1. Are there wetlands on the site? Yes xx No
Coastal (marsh) Other
If yes, has a delineation been conducted?
(Attach docum ienzation, if amilable)
OCT 2 v 19197
m. Describe existing wastewater treatment facilities.
none
n. Describe location and type of discharges to waters
of the state. (For example, surface runoff, sanitary
wastewater, industrial /commercial effluent, "wash
down" and residential discharges.)
none
o. Describe existing drinking water supply source.
City water is available in the
Farina
5. ADDITIONAL INFORMATION
In addition to the completed application form, the
following items must be submitted:
• A copy of the deed (with state application only) or
other instrument under which the applicant claims title
to the affected properties. If the applicant is not
claiming to be the owner of said property, then
forward a copy of the deed or other instrument under
which the owner claims title, plus written permission
from the owner to carry out the project.
• An accurate, dated work plat (including plan view
and cross-sectional drawings) drawn to scab in black
ink on an 8 1/2" by 11" white paper. (Refer to
Coastal Resources Commission Rule 7J.0203 for a
detailed description.)
Please note that original drawings are preferred and
only high quality copies will be accepted. Blue-line
prints or other larger plats are acceptable only if an
adequate number of quality copies are provided by
applicant. (Contact the U.S. Army Corps of
Engineers regarding that agency's use of larger
drawings.) A site or location map is a part of plat
requirements and it must be sufficiently detailed to
guide agency personnel unfamiliar with the area to the
TWA.
MOD TO CAHA PERIKIT 98-97 issued July 16,1997
Form DCM-MP-2
.'EXCAVATION OCR 2 i:9,
FILL
AND
(Except bridges and culverts)
Attach this form to Joint Application for CAMA Major
Permit, Form DCM-MP-1. Be sure to complete all
other sections of the Joint Application that relate to this
proposed project.
Describe below the purpose of proposed excavation or
fill activities. All values to be given in feet.
Average Final
Eidssting Project
Length Width Depth Depth
Access
channel
(MLW) or (NWL)
r
Canal
Boat SLIPS
JJ&btA
Boat
ramp
Rock
groin
Rock
breakwater
Other
(Excluding
shoreline
stabilization)
ft Mot-W
24 f i2 f afar nw,
1. EXCAVATION
a. Amount of material to be excavated from below
MHW or NWL in cubic yards b30
b. Type of material to be excavated Dry Sand
c. Does the area to be excavated include coastal
wetlands (marsh), submerged aquatic vegetation
(SAVs) or other wetlands? Yes XX No
.
d. Highground excavation in cubic yards N/A
2. DISPOSAL OF EXCAVATED
MATERIAL
a. Location of disposal area on property beside
existing- paring area
b. Dimensions of disposal area 55 ft, by 1,20 i
c. Do you claim title to disposal area?
XX Yes No
If no, attach a letter granting permission from the
owner.
d. Will a disposal area be available for future
maintenance? Yes XX No
If yes, where?
Revised 03/95 4
HOD TO CAHk PLRigIT
Form DCM-MP4
98-97 issued July 16,1997
...---STR
UCTLTR
ES
(Construction within Public Trust Areas)
Attach this form to Joint Application for CAMA Major
Permit, Form DCM-MP-1. Be sure to complete all
other sections of the Joint Application which relate to
this proposed project.
a. Dock(s) and/or Pier(s)
(1) _ Commercial _CommunityXX Private
(2) Number 1 1 existingi
(3) Length 15 ft.
(4) Width 4 ft.
XX
e. Mooring buoys
''97?
(1) _ Commercial -Community - Private
(2) Number
(3) Description of buoy
(Color, inscription, size, anchor, etc.)
1 new
(5) Finger Piers Yes No 11 existing
(i) Number 4 new
(ii) Length 6 ft.
(iii) Width 3 ft.
(6) Platform(s) Yes No
(i) Number
(ii) Length
(iii) Width
(7) Number of slips proposed 11
t> (8) Proximity of structure to adjacent riparian
property lines 50 ft.
(9) Width of water body 50 ft.
(10) Water depth at waterward end of pier at
MLW or NWL 5 ft.
b. Boathouse (including covered lifts)
(1) Commercial Private
(2) Length
(3) Width
c. Groin (e.g. wood, sheetpile, etc.)
(1) Number
(2) Length(s)
d. Breakwater (e.g. wood, sheetpile, etc.)
(1) Length
(2) Average distance from MHW, NWL or
wetlands
(3) Maximum distance beyond MHW, NWL or
wetlands
Width of water body -
Distance buoy(s) to
shoreline
be placed beyond
(4)
(5)
f. Mooring structure (boatlift, mooring pilings, etc.)
(1) _ Commercial -Community _ Private
(2) Number
(3) Length
(4) Width
g. Other (Give complete description)
Southern Shores Civic Assoc. Marina Exp.
Applica4) or Project Name / -11
Signature
21 October, 1997
Date
Ago 'VI&IN
Form DC11-MP-6
f. Describe the special design, if applicable, for
containing industrial type pollutants, such as paint,
sandblasting waste and petroleum products.
NA. No major repairs are available
or allowed in e Marina area.
g. Where will residue from vessel maintenance be
disposed of ? NO major maintenance allowed.
Trash containers available for normal
nn hnarr9 trash
h. Give the number of channel markers and "No
Wake" signs proposed. lZ channel & 3 no wake
existing, no gore planed.
L Give the location of fuel-handling facilities, and
describe the safety measures planned to protect area
water quality. No fuel handling: existing
or planed
j, Describe design measures that promote boat basin
flushing or ircul lion and that reduce water ualit
Existing canal system f?usn s
impacts.
the Marina.
k. What will be the marina policy on overnight and
live-board dockage? None allowed.
1. Is the proposed marina located near any shellfish
leases? Yes XX'_ No
If yes, give the name and address of the leaseholder.
in. If this project is an expansion of an existing marina,
what types of services are currently provided?
Porta-Potty, Trash Gon.tainers,Water,
Ramp for unching and Recovery. No fuel
or ec riai y existing or paned..
n n rt ,C;1,
I C.•
o. Is the marina proposed within a primary or
secondary nursery area? Yes XX No
p. Is the marina proposed within an area open to
shellfish harvesting? Yes X_ No
q. Give the location and number of "Pumpout
Available" signs proposed.C.urrently have 3,
one at ramp and two at entrance/exit
to boat slips,
Southern Shores Civic Assoc. Marina Exp.
or Project
signature
21 Octeber, 1997
Date
n. How many slips are now available? 38
??QYVECIf? n•??Q'S - ?._ . ..WJ:.Plg.r?ti.-p?M _'A1+'
v7
v
y
V
rb
Z
d
r
Q 1
Z
Q
?i
Q
Z
OCT L i
?,?? 36 a7
r
e
1
O
5
1
s,a
e.
N ?
i
P?°P°ss
.
a
4 '1
SASA,?PSS 5T
? I
0
0
CIA
S??t
frM .t w ?^'n[j11rn
?t .
?r,q
All ?
L
h
J
? S 1
"bll " I if
Clf I-
o ?
1
e All: sue
I
e
/
5
?a
?t _1I/7,1 iii
7{kM1•v?1,!
.5 '
rU?yfei_*?+t °??t.,_k?f.saPAL tr, .... x J /'"A'4._7`
_: ? v ) ] A.
?X G ?km
a 171 d x? Q aL 7,F.0 ro prc 1,V a
cz,
?s<
d
n
s
.°.r,.y?'+?.,.r-? .. a+-...?... ..:. ?..?-,i,..,.? ..., ye.
t«:? cam"`: ? ? g ...-
h`
F" T
fY.{K_, ,y,Ft
V/x
-I ?
e
ch
_ z
0
?
Z
X z ??
Lid
.
f.,
BULKHEAD
WASN?R ?d ? _. 'rl?
4 X 6??
FIrr .R CLOTH
--
I,
a?
3.
DOV R D VAI L-9
6 "X 6 'pr I- w&
vv?fL9R
DOUBLE LAY9FP 1" 8 5A-rjN& ?
GA 4 , L?A s H a l?
rl.LT4R CLOTH
J
d ? I / 1 I Y `
2 ??yy?.,v/'ff it F11 t?
L-..,._
I X 8 X t6' SNATII?IG DOUBLED
rt
6X6)( 12 PILINC-
? ,0