Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW3190702_Engineering Calculations_20191021
ENGINEERING CALCULATIONS FOR WEDDINGTON POINTE Union County, North Carolina Century Communities Southeast, LLC 7400 Carmel Executive Park Drive, Suite 205 Charlotte, NC 28226 October, 2019 LandDesign Project #: 1018330 ySEAL .�� 037773 J. r �' 3 Table of Contents • Project Narrative • Soils Map • On Site Storm Drainage • Pipe Node Report • Gutter Spread Calculations • Proposed Wet Pond #1 • Pre -Developed • Water Quality • Permanent Pool Storage • Channel Protection • Post -Developed • Buoyancy Calculations • Proposed Wet Pond #2 • Pre -Developed • Water Quality • Permanent Pool Storage • Channel Protection • Post -Developed • Buoyancy Calculations • Proposed Wet Pond #3 • Pre -Developed • Water Quality • Permanent Pool Storage • Channel Protection • Post -Developed • Buoyancy Calculations • Proposed Wet Pond #4 • Pre -Developed • Water Quality • Permanent Pool Storage • Channel Protection • Post -Developed • Buoyancy Calculations • Rip -Rap Apron Sizing • Off -Site Storm Calculations • Culvert Analysis • Sediment Basin Design • Skimmer Sizing Project Narrative Weddington Pointe LDI Project No. 1018330 Developer: Century Communities Southeast, LLC 7400 Carmel Executive Park Drive, Suite 205 Charlotte, NC 28226 Project Description: The following calculations have been performed in support of the construction of Weddington Pointe. The project is zoned R-6 CZ and will be constructed along Weddington Road in Union County, NC. The construction will include installation of new buildings, associated utilities, storm drainage, wet pond for private drainage, and offsite roadway improvements. Soils Information: The predominant soils for this site are BdB2, CmB (located in most undisturbed wetland area) and TbB2. The site soils map showing detailed locations is included. For design purposes, "C" and "B: was chosen as the hydrologic soil groups. Erosion Control: Silt fence will be used around the site to prevent sediment from entering adjacent properties and the existing creeks. A temporary diversion ditches and a skimmer sediment basins will be installed within the site to prevent sediment from entering the storm drainage system until the areas around them have been stabilized. Storm Water: Pre -Developed Drainage: The existing storm water collection system consists of sheet flow and shallow concentrated flow across the entire site. Post -Developed Drainage: The proposed storm water collection system will consist of drainage swales and multiple wet ponds within the project boundaries. The storm system was designed to detain the 10 and 25 year storm events and to have a minimum of 85% average annual removal for Total Suspended Solids and 40% average annual removal for Total Phosphorus. Proposed water quality/channel protection/detention requirements are being met according to the NCDEQ Requirements. Stormwater Detention Summary: Total Combined Flows for the 4 Proposed Wet Ponds: Qz (Pre -Developed): 33.87 cfs Q,o (Pre -Developed): 68.51 cfs Qzs (Pre -Developed): 92.10 cfs Qz (Post -Developed) Undetained and Detained Detention Release: 13.23 cfs < 33.87 cfs Q,o (Post -Developed) Undetained and Detained Detention Release: 34.68 cfs < 68.51 cfs Qzs (Post -Developed) Undetained and Detained Detention Release: 68.74 cfs < 92.10 cfs Conclusion: The engineering analysis presented herein this document demonstrates the ability of the Wet Ponds to meet the design requirements. The calculations show the Wet Pond has sufficient volume to meet the NCDEQ's requirements for BMPs. Moreover, the routing calculations show the Wet Ponds ability to detain flows to pre -developed rates. Soils Map USDA United States Department of Agriculture N RCS Natural Resources Conservation Service A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local participants Custom Soil Resource Report for Union County, North Carolina April 1, 2019 Preface Soil surveys contain information that affects land use planning in survey areas. They highlight soil limitations that affect various land uses and provide information about the properties of the soils in the survey areas. Soil surveys are designed for many different users, including farmers, ranchers, foresters, agronomists, urban planners, community officials, engineers, developers, builders, and home buyers. Also, conservationists, teachers, students, and specialists in recreation, waste disposal, and pollution control can use the surveys to help them understand, protect, or enhance the environment. Various land use regulations of Federal, State, and local governments may impose special restrictions on land use or land treatment. Soil surveys identify soil properties that are used in making various land use or land treatment decisions. The information is intended to help the land users identify and reduce the effects of soil limitations on various land uses. The landowner or user is responsible for identifying and complying with existing laws and regulations. Although soil survey information can be used for general farm, local, and wider area planning, onsite investigation is needed to supplement this information in some cases. Examples include soil quality assessments (http://www.nres.usda.gov/wps/ portal/nres/main/soils/health/) and certain conservation and engineering applications. For more detailed information, contact your local USDA Service Center (https://offices.sc.egov.usda.gov/locator/app?agency=nres) or your NRCS State Soil Scientist (http://www.nres.usda.gov/wps/portal/nres/detail/soils/contactus/? cid=nres142p2_053951). Great differences in soil properties can occur within short distances. Some soils are seasonally wet or subject to flooding. Some are too unstable to be used as a foundation for buildings or roads. Clayey or wet soils are poorly suited to use as septic tank absorption fields. A high water table makes a soil poorly suited to basements or underground installations. The National Cooperative Soil Survey is a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local agencies. The Natural Resources Conservation Service (NRCS) has leadership for the Federal part of the National Cooperative Soil Survey. Information about soils is updated periodically. Updated information is available through the NRCS Web Soil Survey, the site for official soil survey information. The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require 2 alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. 3 Contents Preface.................................................................................................................... 2 How Soil Surveys Are Made..................................................................................5 SoilMap.................................................................................................................. 8 SoilMap................................................................................................................9 Legend................................................................................................................10 MapUnit Legend................................................................................................ 11 MapUnit Descriptions.........................................................................................11 Union County, North Carolina......................................................................... 13 BdB2—Badin channery silty clay loam, 2 to 8 percent slopes, moderatelyeroded................................................................................13 CmB—Cid channery silt loam, 1 to 5 percent slopes..................................14 ScA—Secrest-Cid complex, 0 to 3 percent slopes......................................15 TbB2—Tarrus gravelly silty clay loam, 2 to 8 percent slopes, moderately eroded................................................................................17 TbC2—Tarrus gravelly silty clay loam, 8 to 15 percent slopes, moderately eroded................................................................................18 References............................................................................................................19 4 How Soil Surveys Are Made Soil surveys are made to provide information about the soils and miscellaneous areas in a specific area. They include a description of the soils and miscellaneous areas and their location on the landscape and tables that show soil properties and limitations affecting various uses. Soil scientists observed the steepness, length, and shape of the slopes; the general pattern of drainage; the kinds of crops and native plants; and the kinds of bedrock. They observed and described many soil profiles. A soil profile is the sequence of natural layers, or horizons, in a soil. The profile extends from the surface down into the unconsolidated material in which the soil formed or from the surface down to bedrock. The unconsolidated material is devoid of roots and other living organisms and has not been changed by other biological activity. Currently, soils are mapped according to the boundaries of major land resource areas (MLRAs). MLRAs are geographically associated land resource units that share common characteristics related to physiography, geology, climate, water resources, soils, biological resources, and land uses (USDA, 2006). Soil survey areas typically consist of parts of one or more MLRA. The soils and miscellaneous areas in a survey area occur in an orderly pattern that is related to the geology, landforms, relief, climate, and natural vegetation of the area. Each kind of soil and miscellaneous area is associated with a particular kind of landform or with a segment of the landform. By observing the soils and miscellaneous areas in the survey area and relating their position to specific segments of the landform, a soil scientist develops a concept, or model, of how they were formed. Thus, during mapping, this model enables the soil scientist to predict with a considerable degree of accuracy the kind of soil or miscellaneous area at a specific location on the landscape. Commonly, individual soils on the landscape merge into one another as their characteristics gradually change. To construct an accurate soil map, however, soil scientists must determine the boundaries between the soils. They can observe only a limited number of soil profiles. Nevertheless, these observations, supplemented by an understanding of the soil -vegetation -landscape relationship, are sufficient to verify predictions of the kinds of soil in an area and to determine the boundaries. Soil scientists recorded the characteristics of the soil profiles that they studied. They noted soil color, texture, size and shape of soil aggregates, kind and amount of rock fragments, distribution of plant roots, reaction, and other features that enable them to identify soils. After describing the soils in the survey area and determining their properties, the soil scientists assigned the soils to taxonomic classes (units). Taxonomic classes are concepts. Each taxonomic class has a set of soil characteristics with precisely defined limits. The classes are used as a basis for comparison to classify soils systematically. Soil taxonomy, the system of taxonomic classification used in the United States, is based mainly on the kind and character of soil properties and the arrangement of horizons within the profile. After the soil 5 Custom Soil Resource Report scientists classified and named the soils in the survey area, they compared the individual soils with similar soils in the same taxonomic class in other areas so that they could confirm data and assemble additional data based on experience and research. The objective of soil mapping is not to delineate pure map unit components; the objective is to separate the landscape into landforms or landform segments that have similar use and management requirements. Each map unit is defined by a unique combination of soil components and/or miscellaneous areas in predictable proportions. Some components may be highly contrasting to the other components of the map unit. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The delineation of such landforms and landform segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, onsite investigation is needed to define and locate the soils and miscellaneous areas. Soil scientists make many field observations in the process of producing a soil map. The frequency of observation is dependent upon several factors, including scale of mapping, intensity of mapping, design of map units, complexity of the landscape, and experience of the soil scientist. Observations are made to test and refine the soil -landscape model and predictions and to verify the classification of the soils at specific locations. Once the soil -landscape model is refined, a significantly smaller number of measurements of individual soil properties are made and recorded. These measurements may include field measurements, such as those for color, depth to bedrock, and texture, and laboratory measurements, such as those for content of sand, silt, clay, salt, and other components. Properties of each soil typically vary from one point to another across the landscape. Observations for map unit components are aggregated to develop ranges of characteristics for the components. The aggregated values are presented. Direct measurements do not exist for every property presented for every map unit component. Values for some properties are estimated from combinations of other properties. While a soil survey is in progress, samples of some of the soils in the area generally are collected for laboratory analyses and for engineering tests. Soil scientists interpret the data from these analyses and tests as well as the field -observed characteristics and the soil properties to determine the expected behavior of the soils under different uses. Interpretations for all of the soils are field tested through observation of the soils in different uses and under different levels of management. Some interpretations are modified to fit local conditions, and some new interpretations are developed to meet local needs. Data are assembled from other sources, such as research information, production records, and field experience of specialists. For example, data on crop yields under defined levels of management are assembled from farm records and from field or plot experiments on the same kinds of soil. Predictions about soil behavior are based not only on soil properties but also on such variables as climate and biological activity. Soil conditions are predictable over long periods of time, but they are not predictable from year to year. For example, soil scientists can predict with a fairly high degree of accuracy that a given soil will have a high water table within certain depths in most years, but they cannot predict that a high water table will always be at a specific level in the soil on a specific date. After soil scientists located and identified the significant natural bodies of soil in the survey area, they drew the boundaries of these bodies on aerial photographs and C� Custom Soil Resource Report identified each as a specific map unit. Aerial photographs show trees, buildings, fields, roads, and rivers, all of which help in locating boundaries accurately. 7 Soil Map The soil map section includes the soil map for the defined area of interest, a list of soil map units on the map and extent of each map unit, and cartographic symbols displayed on the map. Also presented are various metadata about data used to produce the map, and a description of each soil map unit. ED 531400 35° 0' 28" N 9 0 F8 g n 34° 59' 48" N 531400 531600 531800 532000 532200 Map Scale: 1:8,720 if printed on A landscape (11" x 8.5") sheet Meters N 0 100 200 400 600 A Feet D 40D SOD 1600 2400 Map projection: Web Mercator Comer coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 9 Custom Soil Resource Report Soil Map 531600 531800 5320M 532200 532400 5326M 532800 5330M 532400 5326M 532800 533000 533200 35° 0' 28" N P2 A 34° 59' 48" N 533200 3 MAP LEGEND Area of Interest (AOI) 0 Area of Interest (AOI) Soils 0 Soil Map Unit Polygons N.tir Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot 0 Closed Depression Gravel Pit Gravelly Spot 0 Landfill A. Lava Flow 4& Marsh or swamp Mine or Quarry OMiscellaneous Water 0 Perennial Water V Rock Outcrop Saline Spot Sandy Spot 4W Severely Eroded Spot Sinkhole Slide or Slip 0o Sodic Spot Custom Soil Resource Report MAP INFORMATION Spoil Area The soil surveys that comprise your AOI were mapped at 1:24,000. Stony Spot Very Stony Spot Warning: Soil Map may not be valid at this scale. Wet Spot Enlargement of maps beyond the scale of mapping can cause Other misunderstanding of the detail of mapping and accuracy of soil .� Special Line Features line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed Water Features scale. Streams and Canals Transportation Please rely on the bar scale on each map sheet for map +F-r Rails measurements. Interstate Highways Source of Map: Natural Resources Conservation Service py US Routes Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Y- Major Roads -_ Local Roads Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts Background distance and area. A projection that preserves area, such as the . Aerial Photography Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Union County, North Carolina Survey Area Data: Version 18, Sep 10, 2018 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jul 18, 2011—Nov 25, 2017 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. 10 Custom Soil Resource Report Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI BdB2 Badin channery silty clay loam, 29.5 29.5% 2 to 8 percent slopes, moderately eroded CmB Cid channery silt loam, 1 to 5 30.9 30.9% percent slopes ScA Secrest-Cid complex, 0 to 3 8.4 8.4% percent slopes TbB2 Tarrus gravelly silty clay loam, 2 27.4 27.4% to 8 percent slopes, moderately eroded TbC2 Tarrus gravelly silty clay loam, 8 3.8 3.8% to 15 percent slopes, moderately eroded Totals for Area of Interest 100.0 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not 11 Custom Soil Resource Report mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas. An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha -Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha -Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. 12 Custom Soil Resource Report Union County, North Carolina BdB2—Badin channery silty clay loam, 2 to 8 percent slopes, moderately eroded Map Unit Setting National map unit symbol: 2mx85 Elevation: 200 to 650 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost -free period: 200 to 240 days Farmland classification: Farmland of statewide importance Map Unit Composition Badin, moderately eroded, and similar soils: 85 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Badin, Moderately Eroded Setting Landform: I nterfl uves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down -slope shape: Convex Across -slope shape: Convex Parent material: Residuum weathered from metavolcanics and/or argillite Typical profile Ap - 0 to 6 inches: silty clay loam Bt - 6 to 20 inches: silty clay BC - 20 to 28 inches: channery silty clay loam Cr - 28 to 42 inches: weathered bedrock R - 42 to 80 inches: unweathered bedrock Properties and qualities Slope: 2 to 8 percent Depth to restrictive feature: 20 to 40 inches to paralithic bedrock; 40 to 80 inches to lithic bedrock Natural drainage class: Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat) to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Low (about 4.8 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2e Hydrologic Soil Group: C Hydric soil rating: No Very low to high (0.00 13 Custom Soil Resource Report CmB—Cid channery silt loam, 1 to 5 percent slopes Map Unit Setting National map unit symbol: 3wOq Elevation: 200 to 650 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost -free period: 200 to 240 days Farmland classification: Farmland of statewide importance Map Unit Composition Cid and similar soils: 85 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Cid Setting Landform: I nterfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down -slope shape: Convex Across -slope shape: Linear Parent material: Residuum weathered from metavolcanics and/or residuum weathered from argillite Typical profile Ap - 0 to 9 inches: channery silt loam Bt - 9 to 22 inches: silty clay loam BC - 22 to 27 inches: channery silty clay Cr - 27 to 32 inches: weathered bedrock R - 32 to 80 inches: unweathered bedrock Properties and qualities Slope: 2 to 6 percent Depth to restrictive feature: 20 to 40 inches to paralithic bedrock; 20 to 40 inches to lithic bedrock Natural drainage class: Moderately well drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat) high (0.00 to 0.20 in/hr) Depth to water table: About 12 to 30 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Low (about 4.0 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2e Hydrologic Soil Group: D Hydric soil rating: No Very low to moderately 14 Custom Soil Resource Report ScA—Secrest-Cid complex, 0 to 3 percent slopes Map Unit Setting National map unit symbol: 3w1 b Elevation: 200 to 650 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost -free period: 200 to 240 days Farmland classification: Farmland of statewide importance Map Unit Composition Secrest and similar soils: 65 percent Cid and similar soils: 20 percent Minor components: 2 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Secrest Setting Landform: I nterfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down -slope shape: Convex Across -slope shape: Linear Parent material: Residuum weathered from argillite and/or residuum weathered from metavolcanics Typical profile Ap - 0 to 8 inches: silt loam BA - 8 to 11 inches: silt loam Bt - 11 to 43 inches: silty clay loam BCt - 43 to 54 inches: silty clay Cr - 54 to 62 inches: weathered bedrock R - 62 to 80 inches: unweathered bedrock Properties and qualities Slope: 0 to 3 percent Depth to restrictive feature: 40 to 60 inches to paralithic bedrock; 60 to 80 inches to lithic bedrock Natural drainage class: Moderately well drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat): Very low to moderately high (0.00 to 0.20 in/hr) Depth to water table: About 12 to 30 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Moderate (about 8.5 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2w 15 Custom Soil Resource Report Hydrologic Soil Group: C Hydric soil rating: No Description of Cid Setting Landform: I nterfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down -slope shape: Convex Across -slope shape: Linear Parent material: Residuum weathered from argillite and/or residuum weathered from metavolcanics Typical profile Ap - 0 to 9 inches: channery silt loam Bt - 9 to 22 inches: silty clay loam BC - 22 to 27 inches: channery silty clay Cr - 27 to 32 inches: weathered bedrock R - 32 to 80 inches: unweathered bedrock Properties and qualities Slope: 0 to 3 percent Depth to restrictive feature: 20 to 40 inches to paralithic bedrock; 20 to 40 inches to lithic bedrock Natural drainage class: Moderately well drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat): Very low to moderately high (0.00 to 0.20 in/hr) Depth to water table: About 12 to 30 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Low (about 4.0 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2w Hydrologic Soil Group: D Hydric soil rating: No Minor Components Wehadkee, undrained Percent of map unit: 2 percent Landform: Depressions on flood plains Down -slope shape: Concave Across -slope shape: Linear Hydric soil rating: Yes 16 Custom Soil Resource Report TbB2—Tarrus gravelly silty clay loam, 2 to 8 percent slopes, moderately eroded Map Unit Setting National map unit symbol: 2mx8q Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost -free period: 200 to 240 days Farmland classification: All areas are prime farmland Map Unit Composition Tarrus, moderately eroded, and similar soils: 85 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Tarrus, Moderately Eroded Setting Landform: I nterfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down -slope shape: Convex Across -slope shape: Convex Parent material: Residuum weathered from schist and/or other metamorphic rock Typical profile Ap - 0 to 6 inches: gravelly silty clay loam Bt - 6 to 45 inches: silty clay Cr- 45 to 80 inches: weathered bedrock Properties and qualities Slope: 2 to 8 percent Depth to restrictive feature: 40 to 60 inches to paralithic bedrock Natural drainage class: Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Very low to high (0.00 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Low (about 4.5 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2e Hydrologic Soil Group: B Hydric soil rating: No 17 Custom Soil Resource Report TbC2—Tarrus gravelly silty clay loam, 8 to 15 percent slopes, moderately eroded Map Unit Setting National map unit symbol: 2mx8r Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost -free period: 200 to 240 days Farmland classification: Farmland of statewide importance Map Unit Composition Tarrus, moderately eroded, and similar soils. 85 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Tarrus, Moderately Eroded Setting Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down -slope shape: Linear Across -slope shape: Convex Parent material: Residuum weathered from metavolcanics and/or argillite Typical profile Ap - 0 to 6 inches: gravelly silty clay loam Bt - 6 to 45 inches: silty clay Cr - 45 to 80 inches: weathered bedrock Properties and qualities Slope: 8 to 15 percent Depth to restrictive feature: 40 to 60 inches to paralithic bedrock Natural drainage class: Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Very low to high (0.00 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Low (about 4.5 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3e Hydrologic Soil Group: B Hydric soil rating: No 18 References American Association of State Highway and Transportation Officials (AASHTO). 2004. Standard specifications for transportation materials and methods of sampling and testing. 24th edition. American Society for Testing and Materials (ASTM). 2005. Standard classification of soils for engineering purposes. ASTM Standard D2487-00. Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of wetlands and deep -water habitats of the United States. U.S. Fish and Wildlife Service FWS/OBS-79/31. Federal Register. July 13, 1994. Changes in hydric soils of the United States. Federal Register. September 18, 2002. Hydric soils of the United States. Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric soils in the United States. National Research Council. 1995. Wetlands: Characteristics and boundaries. Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. U.S. Department of Agriculture Handbook 18. http://www.nres.usda.gov/wps/portal/ nres/detail/national/soils/?cid=nres142p2_054262 Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for making and interpreting soil surveys. 2nd edition. Natural Resources Conservation Service, U.S. Department of Agriculture Handbook 436. http:// www. nres.usda.gov/wps/portal/nres/detail/national/soils/?cid=nres142p2_053577 Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of Agriculture, Natural Resources Conservation Service. http:// www. nres.usda.gov/wps/portal/nres/detail/national/soils/?cid=nresl42p2_053580 Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and Delaware Department of Natural Resources and Environmental Control, Wetlands Section. United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of Engineers wetlands delineation manual. Waterways Experiment Station Technical Report Y 87-1. United States Department of Agriculture, Natural Resources Conservation Service. National forestry manual. http://www.nres.usda.gov/wps/portal/nres/detail/soils/ home/?cid=n res 142p2_053374 United States Department of Agriculture, Natural Resources Conservation Service. National range and pasture handbook. http://www.nres.usda.gov/wps/portal/nres/ detail/national/landuse/rangepasture/?cid=stelprdb1043084 19 Custom Soil Resource Report United States Department of Agriculture, Natural Resources Conservation Service. National soil survey handbook, title 430-VI. http://www.nres.usda.gov/wps/portal/ nres/detail/soils/scientists/?cid=nres 142p2_054242 United States Department of Agriculture, Natural Resources Conservation Service. 2006. Land resource regions and major land resource areas of the United States, the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 296. http://www.nres.usda.gov/wps/portal/nres/detail/national/soils/? cid =nres 142 p2_053624 United States Department of Agriculture, Soil Conservation Service. 1961. Land capability classification. U.S. Department of Agriculture Handbook 210. http:// www.nrcs.usda.gov/lnternet/FSE—DOCUMENTS/nrcsl 42p2_052290.pdf 20 Pipe Node Report 4/1 /2019 Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name: Monroe, North Carolina, USA*' Latitude: 35.008°, Longitude:-80.6484° Elevation: 637.34 ft** source: ESRI Maps 0�N ^ m yrr ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 5.04 5.95 6.90 7.61 ' 8.40 8.95 9.46 9.90 10.4 10.8 5-min (4.64-5.47) (5.47-6.48) (6.34-7.51) 11 (6.96-8.26) (7.67-9.11) (8.12-9.70) (8.54-10.2) 1 (8.90-10.7) (9.29-11.3) (9.53-11.7) 4.02 4.76 5.53 6.08 6.69 7.13 7.51 7.85 8.24 8.48 10-min (3.71-4.37) (4.37-5.18) (5.08-6.02) (5.57-6.60) (6.11-7.25) (6.47-7.72) (6.79-8.14) 1 (7.06-8.51) (7.34-8.95) (7.51-9.24) 3.35 3.98 4.66 5.13 5.66 6.02 6.33 6.60 6.91 7.10 15-min (3.09-3.64) (3.66-4.34) (4.28-5.08) (4.70-5.56) (5.16-6.13) (5.46-6.52) (5.72-6.86) (5.94-7.16) (6.16-7.51) (6.28-7.73) 2.30 2.75 3.31 3.71 4.19 4.53 4.85 5.14 5.50 5.75 30-min (2.12-2.49) (2.53-3.00) (3.04-3.61) (3.40-4.03) (3.82-4.54) (4.12-4.91) (4.38-5.25) (4.62-5.57) (4.90-5.97) (5.09-6.26) 1.43 1.73 2.12 2.42 2.79 3.07 3.34 3.60 3.94 4.20 60-min (1.32-1.56) (1.59-1.88) (1.95-2.31) (2.22-2.63) (2.55-3.02) 1 (2.79-3.33) 1 (3.02-3.62) 1 (3.24-3.91) 1 (3.52-4.29) 1 (3.71-4.57) 0.827 1.00 1.24 1.42 1.66 1.84 2.02 2.20 2.43 2.61 2-hr (0.758-0.904) (0.916-1.10)1 1 (1.51-1.81) (1.66-2.00) 1 (1.81-2.20) 1 (1.96-2.39) 1 (2.15-2.65) 1 (2.28-2.85) 0.586 0.707 0.882 1.02 1.20 1.35 1.49 1.64 1.85 2.01 3-hr (0.536-0.644) (0.647-0.777) (0.806-0.969) (0.926-1.12) (1.09-1.31) 1 (1.21-1.47) 1 (1.33-1.63) 1 (1.46-1.79) 1 (1.62-2.02) 1 (1.74-2.19) 0.353 0.425 0.531 0.614 0.727 F 0.817 F 0.910 1.00 174 1.24 6-hr (0.323-0.387) (0.390-0.467) (0.486-0.582) (0.560-0.672) (0.659-0.793) (0.736-0.890) (0.813-0.990) (0.890-1.09) (0.993-1.24) (1.07-1.35) 0.207 0.250 0.314 0.365 0.435 0.492 0.551 0.614 0.701 0.772 12-hr (0.190-0.227) (0.230-0.275) (0.287-0.344) (0.333-0.399) (0.394-0.475) (0.442-0.537) (0.491-0.600) (0.540-0.667) (0.607-0.762) (0.659-0.839) 0.123 0.149 0.187 0.217 0.259 0.293 0.329 0.366 0.418 0.459 24-hr (0.114-0.134) (0.138-0.161) (0.173-0.203) (0.200-0.236) (0.238-0.281) (0.268-0.318 ) ( 0.299-0.357 ) ( 0.332-0.397 ) ( 0.376-0.454 ) ( 0.412-0.501 ) 0.073 0.087 0.109 0.126 0.150 0.169 0.189 0.210 0.239 0.263 2-day (0.067-0.079) (0.081-0.095) (0.101-0.118) (0.116-0.137) (0.138-0.163) (0.155-0.184) (0.173-0.205) (0.191-0.228) (0.216-0.261) (0.235-0.287) 0.051 0.062 0.076 0.088 0.105 0.118 0.132 0.146 0.166 0.182 3-day (0.048-0.055) (0.057-0.067) (0.071-0.083) (0.082-0.096) (0.096-0.113) (0.108-0.128) (0.120-0.143) (0.133-0.158) (0.150-0.181) (0.164-0.199) 0.041 0.049 0.060 0.069 0.082 0.092 0.103 0.114 0.129 0.142 4-day (0.038-0.044) (0.045-0.053) (0.056-0.065) (0.064-0.075) (0.076-0.089) (0.085-0.100) (0.094-0.111) (0.104-0.123 ) ( 0.117-0.140 ) ( 0.128-0.154 ) 0.027 0.032 0.039 0.045 0.052 0.059 0.065 0.072 0.081 0.089 7-day (0.025-0.029) (0.030-0.034) (0.037-0.042) (0.042-0.048) (0.049-0.056) (0.054-0.063) (0.060-0.070) (0.066-0.077) (0.074-0.088) (0.081-0.096) 0.022 0.026 0.031 0.035 0.041 0.045 0.050 0.054 0.060 0.066 10-day (0.020-0.023) (0.024-0.027) (0.029-0.033) (0.033-0.037) (0.038-0.043) (0.042-0.048) (0.046-0.053) (0.050-0.058) (0.056-0.065) (0.060-0.071) 0.014 0.017 0.020 0.023 0.026 0.028 0.031 0.034 0.037 0.040 20-day (0.014-0.015) (0.016-0.018) (0.019-0.021) (0.021-0.024 ) ( 0.024-0.028 ) ( 0.027-0.030) (0.029-0.033) (0.031-0.036) (0.035-0.040 ) ( 0.037-0.043 ) 0.012 0.014 0.016 0.018 0.020 0.022 0.024 0.026 0.028 0.030 30-day (0.011-0.012) (0.013-0.015) (0.015-0.017) (0.017-0.019) (0.019-0.021) (0.021-0.023) (0.022-0.025) (0.024-0.027) (0.026-0.030) (0.028-0.032) 0.010 0.012 0.013 0.015 0.016 0.018 0.019 0.020 0.022 0.023 45-day (0.009-0.010) (0.011-0.012) (0.013-0.014) (0.014-0.015) (0.015-0.017) (0.017-0.018) (0.018-0.020) (0.019-0.021) (0.020-0.023) (0.021-0.024) 0.009 0.010 0.012 0.013 0.014 0.015 0.016 0.017 0.018 0.019 60-day (0.008-0.009) (0.010-0.011) (0.011-0.012) (0.012-0.013) (0.013-0.015) (0.014-0.016) (0.015-0.017) (0.016-0.018) (0.017-0.019) (0.018-0.020) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90 % confidence interval. The probability that precipitation frequency estimates (fora given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.0080&Ion=-80.6484&data=intensity&units=english&series=pds 1 /4 STORM CAD ANALYSIS RESULTS (HEC-22 Energy Headloss Method) Project: Weddington Pointe Storm Drainage Improvements Job No.: 1018330 Location: Union County, NC Storm Design: 10 Year Diameter (in) Start Node Invert (Upstream) (ft) Stop Node Invert (Downstream) (ft) Length (Unified) (ft) Material Inlet C Catchment Intensity (in/h) Area (acres) Manning's n Inlet Tc (min) Slope (ft/ft) Velocity (Average) (ft/s) Total Flow (ft3/s) Capacity (Full Flow) (ft-/s) Pipe Size Label RIM (ft) Hydraulic Grade Line (In) (ft) Hydraulic Grade Line (Out) (ft) Headloss for Conduit (ft) 3rd Ed. 3X 4' HW-1 629.41 HW-2 628.55 85.9 RCP 0.7 7.61 8.68 0.013 5 0.005 7.26 43.06 67.89 OK HW-1 N/A 630.73 630.3 (N/A) 42 CB-22 612.78 FES-21 612.5 47.38 RCP 0.7 7.61 0.64 0.013 5 0.006 8.88 60.13 77.34 OK CB-22 621.04 615.1 614.82 (N/A) 15 CB-22A 613.57 CB-22 612.78 131.06 RCP 0.7 7.61 0.12 0.013 5 0.006 2.88 3.53 5.02 OK CB-22A 619.21 616.22 615.83 0.73 15 CB-22B 614.15 CB-22A 613.57 96.8 RCP 0.7 7.61 0.12 0.013 5 0.006 2.48 3.04 5 OK CB-22B 617.8 616.52 616.3 0.08 15 CB-22C 614.35 CB-22B 614.15 34 RCP 0.7 7.61 0.5 0.013 5 0.006 2.02 2.48 4.95 OK CB-22C 617.79 616.68 616.63 0.11 42 CB-23 612.99 CB-22 612.78 34 RCP 0.7 7.61 0.16 0.013 5 0.006 8.85 54.17 79.07 OK CB-23 621.03 615.37 615.37 0.27 42 CB-24 613.55 CB-23 612.99 94.44 RCP 0.7 7.61 0.05 0.013 5 0.006 8.7 53.82 77.47 OK CB-24 622.05 615.89 615.89 0.52 36 CB-24A 614.67 CB-24 614.06 82.58 RCP 0.7 7.61 0.66 0.013 5 0.007 8.69 38.47 57.32 OK CB-24A 622.88 616.47 616.01 0.12 36 CB-25 616.17 CB-24A 614.67 199.4 RCP 0.7 7.61 0.03 0.013 5 0.008 8.63 36.01 57.85 OK CB-25 624.83 617.88 616.52 0.05 36 CB-26 616.46 CB-25 616.17 38.51 RCP 0.7 7.61 0.01 0.013 5 0.008 8.63 35.97 57.88 OK CB-26 625.25 618.41 618.41 0.53 15 CB-26A 619.04 CB-26 618.7 34 RCP 0.7 7.61 0.02 0.013 5 0.01 2.36 0.2 6.46 OK CB-26A 625.25 619.19 618.87 0.45 15 CB-26B 619.43 CB-26A 619.04 38.83 RCP 0.7 7.61 0.02 0.013 5 0.01 1.93 0.1 6.47 OK CB-26B 624.99 619.54 619.21 0.02 30 CB-27 618.3 CB-26 616.96 134.62 RCP 0.7 7.61 0.75 0.013 5 0.01 9.41 36.06 40.92 OK CB-27 624.2 620.12 618.78 0.32 15 DCB-27A 618.64 CB-27 618.3 34 RCP 0.7 7.61 0.82 0.013 5 0.01 3.31 4.07 6.46 OK DCB-27A 624.2 620.85 620.71 0.59 30 CB-28 621.9 CB-27B 619.7 220 RCP 0.7 7.61 0.46 0.013 5 0.01 8.41 21.07 41.01 OK CB-28 627.57 623.17 621.38 0.12 30 CB-27B 619.7 CB-27 618.3 139.57 RCP 0.7 7.61 0.86 0.013 5 0.01 9.08 29.15 41.08 OK CB-27B 625.37 621.26 620.27 0.15 15 CB-27C 620.54 CB-27B 620.2 34 RCP 0.7 7.61 0.96 0.013 5 0.01 5.75 4.76 6.46 OK CB-27C 625.38 621.36 621.36 0.11 15 CB-28A 623.05 CB-28 622.71 34 RCP 0.7 7.61 0.77 0.013 5 0.01 5.48 3.82 6.46 OK CB-28A 627.57 623.74 623.69 0.52 24 CB-28B 623.8 CB-28 622.08 172 RCP 0.7 7.61 0.46 0.013 5 0.01 7.75 15.5 22.62 OK CB-28B 629.29 625.02 623.3 0.12 24 CB-29 625.66 CB-28B 623.8 185.94 RCP 0.7 7.61 0.39 0.013 5 0.01 6.94 9.79 22.62 OK CB-29 631.17 626.58 625.12 0.11 18 CB-29A 626.39 CB-29 626.05 34 RCP 0.7 7.61 0.48 0.013 5 0.01 6.53 7.92 10.5 OK CB-29A 631.17 627.36 627.02 0.28 18 CB-29B 627.11 CB-29A 626.39 72.05 RCP 0.7 7.61 0.41 0.013 5 0.01 6.04 5.62 10.5 OK CB-29B 631.85 627.89 627.59 0.22 15 CB-28C 624.27 CB-28B 623.87 34 RCP 0.7 7.61 0.77 0.013 5 0.012 5.83 3.82 7.01 OK CB-28C 629.29 625.12 625.12 0.1 15 CB-29C 627.64 CB-29B 627.11 52.62 RCP 0.7 7.61 0.73 0.013 5 0.01 5.43 3.62 6.48 OK CB-29C 632.35 628.31 628 0.1 24 CB-30 616.83 CB-24 615.38 46.26 RCP 0.7 7.61 0.21 0.013 5 0.031 12.16 16.63 40.05 OK CB-30 622.65 617.73 616.38 0.5 15 CB-30A 618.45 CB-30 618.21 24 RCP 0.7 7.61 0.36 0.013 5 0.01 4.5 1.79 6.46 OK CB-30A 622.65 618.9 618.74 1.02 24 CB-31 619.25 CB-30 616.82 161.57 RCP 0.7 7.61 0.01 0.013 5 0.015 8.86 14.06 27.74 OK CB-31 624.94 620.26 618.13 0.41 15 CB-31A 620.18 CB-31 619.94 24 RCP 0.7 7.61 0.8 0.013 5 0.01 5.53 3.97 6.46 OK CB-31A 624.94 620.89 620.87 0.61 24 CB-32 619.63 CB-31 619.25 38.55 RCP 0.7 7.61 0.22 0.013 5 0.01 6.97 10.14 22.46 OK CB-32 625.53 620.57 620.39 0.14 18 CB-32A 620.38 CB-32 620.13 24.5 RCP 0.7 7.61 0.46 0.013 5 0.01 6.75 9.09 10.61 OK CB-32A 625.56 621.45 621.2 0.09 18 CB-32B 621.03 CB-32A 620.38 65.25 RCP 0.7 7.61 0.67 0.013 5 0.01 6.33 6.87 10.48 OK CB-32B 626.24 621.92 621.88 0.43 15 CB-32C 621.53 CB-32B 621.28 24.97 RCP 0.7 7.61 0.72 0.013 5 0.01 5.4 3.57 6.46 OK CB-32C 626.24 622.26 622.26 0.35 24 SDMH-34 617.5 FES-33 616.67 82.94 RCP (N/A) 7.61 (N/A) 0.013 0 0.01 8.01 18.25 22.63 OK SDMH-34 629 618.86 618.03 (N/A) 24 CB-35 618.78 SDMH-34 617.5 128 RCP 0.7 7.61 0.24 0.013 5 0.01 8.03 18.43 22.62 OK CB-35 628.13 620.15 618.97 0.11 24 DCB-36 621.78 CB-35 618.78 299.5 RCP 0.7 7.61 0.81 0.013 5 0.01 7.98 17.76 22.64 OK DCB-36 627.02 623.11 620.75 0.6 18 DCB-36A 622.09 DCB-36 621.85 24 RCP 0.7 7.61 0.78 0.013 5 0.01 6.12 5.93 10.5 OK DCB-36A 627.02 623.27 623.27 0.16 15 CB-36B 623.22 DCB-36A 622.34 88.22 RCP 0.7 7.61 0.43 0.013 5 0.01 4.72 2.13 6.45 OK CB-36B 627.82 623.71 623.44 0.17 18 CB-37 623.54 DCB-36 622.28 126.78 RCP 0.7 7.61 0.04 0.013 5 0.01 6.59 8.42 10.47 OK CB-37 628.43 624.56 623.3 0.14 15 CB-37A 623.81 CB-37 623.57 24 RCP 1 0.7 1 7.61 0.64 0.013 1 5 1 0.01 5.24 1 3.17 1 6.46 1 OK CB-37A 1 628.43 1 624.69 1 624.69 1 0.13 18 CB-37B 624.24 CB-37 623.54 69.71 RCP 0.7 7.61 0.04 0.013 5 0.01 5.95 5.24 10.53 OK CB-37B 629.63 624.99 624.81 0.25 15 CB-38 625.02 CB-37B 624.24 77.99 RCP 0.7 7.61 0.41 0.013 5 0.01 5.84 5.1 6.46 OK CB-38 631.99 625.86 625.08 0.05 15 CB-39 626.53 CB-38 625.02 150.95 RCP 0.7 7.61 0.03 0.013 5 0.01 5.25 3.19 6.46 OK CB-39 632.78 627.15 626.13 0.27 15 CB-40 628.94 CB-39 628.46 48.25 RCP 0.7 7.61 0.13 0.013 5 0.01 5.19 3.06 6.44 OK CB-40 633.99 629.55 629.07 0.23 15 CB-40A 629.28 CB-40 628.94 34 RCP 0.7 7.61 0.49 0.013 5 0.01 4.89 2.43 6.46 OK CB-40A 633.99 629.81 629.76 0.22 48 CB-2 623.17 FES-1 620 92.28 RCP 0.7 7.61 0.6 0.013 5 0.034 17.97 71.58 266.22 OK CB-2 634.42 624.59 621.42 (N/A) 48 CB-3 625.3 CB-2A 624.27 206.49 RCP 0.7 7.61 0.17 0.013 5 0.005 8.67 68.55 101.45 OK CB-3 636.14 627.71 626.68 0.07 48 CB-2A 624.27 CB-2 623.26 100.54 RCP 0.7 7.61 0.42 0.013 5 0.01 11.35 69.4 143.96 OK CB-2A 635.77 626.23 625.98 1.39 15 CB-3A 631.1 CB-3 630.86 24 RCP 0.7 7.61 0.26 0.013 5 0.01 4.11 1.29 6.46 OK CB-3A 636.14 631.48 631.24 0.59 48 CB-4 626.4 CB-3 625.3 219.84 RCP 0.7 7.61 0.22 0.013 5 0.005 8.66 67.74 101.6 OK CB-4 634.12 628.79 627.82 0.11 48 CB-5 626.52 CB-4 626.4 24 RCP 0.7 7.61 0.47 0.013 5 0.005 8.63 66.89 101.57 OK CB-5 634.12 629.37 629.37 0.58 48 CB-5A 626.73 CB-5 626.52 42.02 RCP 0.7 7.61 0.04 0.013 5 0.005 8.57 65.04 101.54 OK CB-5A 633.68 629.42 629.42 0.05 48 CB-6 626.92 CB-5A 626.73 38.54 RCP 0.7 7.61 0.84 0.013 5 0.005 8.53 65.04 100.85 OK CB-6 633.54 629.45 629.45 0.03 18 DCB-6A 627.34 CB-6 627 34 RCP 0.7 7.61 1.33 0.013 5 0.01 3.73 6.6 10.5 OK DCB-6A 633.54 630.47 630.34 0.89 42 CB-7 628.09 CB-6 626.92 232.59 RCP 0.7 7.61 0.01 0.013 5 0.005 8.22 56.49 71.35 OK CB-7 635.86 630.44 629.59 0.14 36 CB-8 628.29 CB-7 628.09 39.97 RCP 0.7 7.61 0.02 0.013 5 0.005 6.94 27.75 47.18 OK CB-8 636.42 630.76 630.76 0.32 36 DCB-9 628.86 CB-8 628.29 113.19 RCP 0.7 7.61 0.69 0.013 5 0.005 6.97 27.93 47.33 OK DCB-9 634.88 630.89 630.89 0.14 18 DCB-9A 629.52 DCB-9 629.28 24 RCP 0.7 7.61 0.91 0.013 5 0.01 2.55 4.51 10.5 OK DCB-9A 634.88 631.24 631.19 0.3 30 CB-10 630.06 DCB-9 628.86 199.97 RCP 0.7 7.61 0.56 0.013 5 0.006 6.92 21.07 31.77 OK CB-10 636.34 631.55 630.96 0.07 15 CB-10A 631.21 CB-10 630.97 24 RCP 0.7 7.61 0.67 0.013 5 0.01 5.3 3.32 6.46 OK CB-10A 636.34 631.95 631.95 0.4 24 CB-11A 631.32 CB-10 630.06 211.03 RCP 0.7 7.61 0.56 0.013 5 0.006 6.3 15.76 17.48 OK CB-11A 637.96 632.81 631.59 0.04 18 CB-11 B 632.54 CB-11A 632.3 24 RCP 0.7 7.61 0.35 0.013 5 0.01 4.4 1.74 10.5 OK CB-11 B 637.96 633.2 633.2 0.39 24 CB-11 632.51 CB-11A 631.32 198.4 RCP 0.7 7.61 0.03 0.013 5 0.006 5.98 11.73 17.52 OK CB-11 639.5 633.71 632.85 0.05 24 CB-12 632.81 CB-11 632.51 39.43 RCP 0.7 7.61 0.07 0.013 5 0.008 6.54 11.63 19.73 OK CB-12 640.33 633.91 633.88 0.17 24 CB-12A 633.24 CB-12 633 24 RCP 0.7 7.61 0.42 0.013 5 0.01 6.86 9.34 22.62 OK CB-12A 640.33 634.14 634.13 0.22 18 DCB-12B 634.25 CB-12A 633.24 167.69 RCP 0.7 7.61 0.8 0.013 5 0.006 5.23 7.47 8.15 OK DCB-12B 638.93 635.38 634.48 0.34 15 CB-12C 634.49 DCB-12B 634.25 24 RCP 0.7 7.61 0.71 0.013 5 0.01 5.38 3.52 6.46 OK CB-12C 638.93 635.73 635.66 0.28 15 CB-14 635.71 CB-12 634.54 117.32 RCP 0.7 7.61 0.02 0.013 5 0.01 4.64 2.01 6.45 OK CB-14 641.39 636.19 635.02 0.31 15 CB-14A 636.4 CB-14 635.71 69.07 RCP 0.7 7.61 0.39 0.013 5 0.01 4.6 1.93 6.46 OK CB-14A 641.11 636.87 636.29 0.1 15 CB-16A 630.08 CB-16 629.74 34.3 RCP 0.7 7.61 0.84 0.013 5 0.01 3.4 4.17 6.43 OK CB-16A 634.79 631.91 631.77 0.58 36 CB-16 629.46 CB-7 628.09 274.86 RCP 0.7 7.61 0.58 0.013 5 0.005 7.04 29.56 47.09 OK CB-16 634.72 631.18 630.57 0.13 30 CB-17 629.68 CB-16 629.46 44.11 RCP 0.7 7.61 0.3 0.013 5 0.005 6.56 23.18 28.97 OK CB-17 634.94 631.39 631.39 0.21 15 CB-17A 629.96 CB-17 629.72 24.01 RCP 0.7 7.61 0.17 0.013 5 0.01 1.2 1.47 6.46 OK CB-17A 634.94 632.89 632.87 1.48 15 CB-17B 630.33 CB-17A 629.96 36.5 RCP 0.7 7.61 0.14 0.013 5 0.01 0.57 0.69 6.5 OK CB-17B 634.77 632.92 632.92 0.03 30 CB-18 630.45 CB-17 629.68 153.25 RCP 0.7 7.61 0.69 0.013 5 0.005 6.43 20.71 29.07 OK CB-18 636.08 632.01 631.68 0.29 15 CB-18A 631.64 CB-18 631.4 24 RCP 0.7 7.61 0.66 0.013 5 0.01 5.28 3.27 6.46 OK CB-18A 636.08 632.36 632.36 0.35 24 CB-19 632.64 CB-18 630.45 219.46 RCP 0.7 7.61 0.68 0.013 5 0.01 7.66 14.72 22.6 OK CB-19 637.72 633.82 632.06 0.05 18 CB-19A 632.88 CB-19 632.64 24 RCP 0.7 7.61 0.53 0.013 5 0.01 6.31 6.76 10.5 OK CB-19A 637.72 634.01 634.01 0.2 15 CB-19B 633.53 CB-19A 633.13 40.06 RCP 0.7 7.61 0.38 0.013 5 0.01 4.56 1.88 6.45 OK CB-19B 637.37 634.14 634.14 0.12 15 CB-19C 634.27 CB-19A 632.88 138.99 RCP 0.7 7.61 0.48 0.013 5 0.01 4.87 2.38 6.46 OK CB-19C 638.77 634.8 634.09 0.08 18 CB-20 634.75 CB-19 632.64 210.46 RCP 0.7 7.61 0.15 0.013 5 0.01 5.89 5.04 10.52 OK CB-20 639.3 635.48 633.95 0.14 15 CB-20A 634.99 CB-20 634.75 24 RCP 0.7 7.61 0.48 0.013 5 0.01 5.64 4.33 6.46 OK CB-20A 639.3 635.75 635.75 0.27 15 CB-20B 636.39 CB-20A 634.99 140.53 RCP 0.7 7.61 0.41 0.013 5 0.01 4.65 2.03 6.45 OK CB-20B 640.36 636.87 636.04 0.29 15 HW-3 615 HW-4 614.55 90.09 RCP 0.7 7.61 0.55 0.013 5 0.005 3.88 2.73 4.57 OK HW-3 N/A 615.7 615.25 (N/A) 15 HW-5 635 HW-6 634.59 82.44 RCP 0.7 7.61 0.13 0.013 5 0.005 2.63 0.64 4.56 OK HW-5 N/A 635.32 634.91 (N/A) 30 OFFSITE OP-1 633.7 OFFSITE OP-2 632.2 54.18 RCP 0.3 7.61 5.91 0.013 5 0.028 10.6 12.56 68.24 OK OFFSITE OP-1 N/A 634.43 632.93 (N/A) 30 FES-51 629.92 SDMH-52 629.31 61.35 RCP 0.7 7.61 1.62 0.013 5 0.01 8.35 20.6 40.9 OK FES-51 N/A 631.18 630.99 0.42 30 SDMH-52 629.31 SDMH-53 628.15 116.22 RCP (N/A) 7.61 (N/A) 0.013 0 0.01 8.35 20.56 40.98 OK SDMH-52 636.08 630.56 629.58 0.05 36 SDMH-53 628.15 FES-54 627.5 129.24 RCP (N/A) 7.61 (N/A) 0.013 0 0.005 6.45 20.48 47.3 OK SDMH-53 633.45 629.53 628.88 (N/A) 15 CB-50D 634.05 SDMH-50C 633.49 55.68 RCP 0.7 7.61 0.59 0.013 5 0.01 5.15 2.93 6.48 OK CB-50D 639.91 634.64 634.12 0.04 15 SDMH-50C 633.49 CB-50 633.13 36.39 RCP (N/A) 7.61 (N/A) 0.013 0 0.01 5.1 2.91 6.42 OK SDMH-50C 639.01 634.08 633.72 0.06 30 DCB-49 625.05 CB-48 623.74 130.38 RCP 0.7 7.61 0.71 0.013 5 0.01 8.64 23.34 41.11 OK DCB-49 632.39 626.4 625.27 0.07 18 DCB-49A 628 DCB-49 627.76 24 RCP 0.7 7.61 0.67 0.013 5 0.01 5.83 4.85 10.5 OK DCB-49A 632.39 628.72 628.48 0.58 15 CB-49AA 629.25 DCB-49A 628.47 77.77 RCP 0.7 7.61 0.32 0.013 5 0.01 4.36 1.59 6.47 OK CB-49AA 633.24 629.67 628.98 0.26 24 CB-49B 627.33 DCB-49 625.55 178.79 RCP 0.7 7.61 0.63 0.013 5 0.01 7.75 15.55 22.57 OK CB-49B 634.9 628.55 626.77 0.07 15 CB-49C 630.04 CB-49B 629.8 24 RCP 0.7 7.61 0.76 1 0.013 5 0.01 5.47 3.77 6.46 OK CB-49C 634.9 630.73 630.49 0.52 24 CB-50 630.52 CB-49B 628.4 212 RCP 0.7 7.61 0.55 0.013 5 0.01 6.8 9.07 22.62 OK CB-50 638.42 631.4 629.28 0.06 18 CB-50A 633.13 CB-50 632.89 24 RCP 0.7 7.61 0.25 0.013 5 0.01 5.34 3.49 10.5 OK CB-50A 638.42 633.73 633.49 0.33 15 CB-50B 633.94 CB-50A 633.38 56.41 RCP 0.7 7.61 0.46 0.013 5 0.01 4.79 2.28 6.44 OK CB-50B 639.35 634.45 633.9 0.18 30 CB-48 623.74 CB-47 623.24 50.28 RCP 0.7 7.61 0.25 0.013 5 0.01 8.83 26.11 40.9 OK CB-48 633.52 625.19 624.83 0.07 30 CB-47 623.24 SDMH-47A 621.86 137.52 RCP 0.7 7.61 0.42 0.013 5 0.01 9.02 28.21 41.09 OK CB-47 634.07 624.76 623.45 0.07 30 SDMH-47A 621.86 CB-46 1 621.12 1 74.1 RCP (N/A) 7.61 (N/A) 0.013 1 0 1 0.01 8.98 1 27.92 1 40.99 1 OK I SDMH-47A 1 634.79 1 623.37 1 622.77 1 0.07 30 CB-46 621.12 CB-45 619.54 158.33 RCP 0.7 7.61 0.4 0.013 5 0.01 9.09 29.61 40.97 OK CB-46 633.7 622.69 621.34 0.15 30 CB-45 619.54 CB-44 618.51 102.66 RCP 0.7 7.61 0.54 0.013 5 0.01 9.24 31.75 41.08 OK CB-45 631.45 621.19 620.53 0.26 30 CB-44 618.51 CB-43 617.75 76.22 RCP 0.7 7.61 0.33 0.013 5 0.01 9.35 1 34.56 40.96 OK CB-44 630.03 620.27 619.79 0.79 36 CB-43 617.25 SDMH-42 615.58 167.63 RCP 0.7 7.61 0.47 0.013 5 0.01 10 42.79 66.57 OK CB-43 628.99 619 617.46 0.15 36 SDMH-42 615.58 FES-41 615.07 50.57 RCP (N/A) 7.61 (N/A) 0.013 0 0.01 10.02 42.35 66.98 OK SDMH-42 627 617.31 616.8 (N/A) 18 DCB-43A 622.65 CB-43 621.52 112.72 RCP 0.7 7.61 1.4 0.013 5 0.01 6.36 6.94 10.52 OK DCB-43A 627.31 623.54 622.41 0.69 15 CB-44A 624.66 CB-44 624.42 24 RCP 0.7 7.61 0.34 0.013 5 0.01 4.43 1.69 6.46 OK CB-44A 630.02 625.1 624.86 0.81 15 CB-48B 624.99 CB-48A 624.65 33.93 RCP 0.7 7.61 0.13 0.013 5 0.01 3.37 0.64 6.47 OK CB-48B 633.39 625.4 625.4 0.05 15 CB-48A 624.65 CB-48 624.24 41.02 1 RCP 0.7 7.61 0.26 0.013 5 0.01 4.59 1.92 6.46 OK CB-48A 633.39 625.35 625.35 0.16 15 CB-47A 628.7 CB-47 628.46 24 1 RCP 0.7 7.61 0.05 0.013 5 0.01 2.54 0.25 6.46 OK CB-47A 634.07 628.87 628.63 0.69 NOTE * 3' X 4' BOX CULVERT FROM HW-1 TO HW-2 SHALL BE INSTALLED WITH SIX INCH (6") EMBEDMENT. INVERT OF PIPE IS NOTED IN THE PIPE NODE REPORT. REFER TO SHEET C-6.1 FOR ADDITIONAL INFORMATION REFER TO SHEET C-6.1 TO C-6.4 FOR RCP CLASSIFICATOIN REFER TO SHEET C-6.17 FOR NCDOT STRUCTURE INFORMATION STORM CAD ANALYSIS RESULTS (HEC-22 Energy Headloss Method) Project: Weddington Pointe Storm Drainage Improvements Job No.: 1018330 Location: Union County, NC Storm Design: 25 Year Diameter (in) Start Node Invert (Upstream) (ft) Stop Node Invert (Downstream) (ft) Length (Unified) (ft) Material Inlet C Catchment Intensity (inlh) Area (acres) Manning's n Inlet Tc (min) Slope (ftlft) Velocity (Average) (ftls) Total Flow (ft31S) Capacity (Full Flow) (ft31S) Pipe Size Label RIM (ft) Hydraulic Grade Line (In) (ft) Hydraulic Grade Line (Out) (ft) Headloss for Conduit (ft) 3rd Ed. 3X 4' HW-1 629.41 HW-2 628.55 85.9 RCP 0.7 8.4 8.68 0.013 5 0.005 7.77 55.31 67.89 OK HW-1 N/A 631.03 630.6 (N/A) 42 CB-22 612.78 FES-21 612.5 47.38 RCP 0.7 8.4 0.64 0.013 5 0.006 9.16 77.23 77.34 OK CB-22 621.04 615.91 615.63 (N/A) 15 C B-22A 613.57 C B-22 612.78 131.06 RCP 0.7 8.4 0.12 0.013 5 0.006 3.73 4.58 5.02 OK C B-22A 619.21 617.39 1 616.73 0.82 15 CB-22B 614.15 CB-22A 613.57 96.8 RCP 0.7 8.4 0.12 0.013 5 0.006 3.19 3.92 5 OK CB-22B 617.8 617.91 617.55 0.17 15 CB-22C 614.35 CB-22B 614.15 34 RCP 0.7 8.4 0.5 0.013 5 0.006 2.6 3.19 4.95 OK CB-22C 617.79 617.88 617.8 0.25 42 CB-23 612.99 CB-22 612.78 34 RCP 0.7 8.4 0.16 0.013 5 0.006 9.27 69.57 79.07 OK CB-23 621.03 616.21 616.21 0.3 42 CB-24 613.55 CB-23 612.99 94.44 RCP 0.7 8.4 0.05 0.013 5 0.006 7.2 69.23 77.47 OK CB-24 622.05 617.24 616.79 0.58 36 C B-24A 614.67 CB-24 614.06 82.58 RCP 0.7 8.4 0.66 0.013 5 0.007 7.01 49.57 57.32 OK C B-24A 622.88 617.9 617.45 0.21 36 CB-25 616.17 CB-24A 614.67 199.4 RCP 0.7 8.4 0.03 0.013 5 0.008 9.1 46.4 57.85 OK CB-25 624.83 618.45 617.95 0.05 36 CB-26 616.46 CB-25 616.17 38.51 RCP 0.7 8.4 0.01 0.013 5 0.008 9.1 46.35 57.88 OK CB-26 625.25 619 619 0.54 15 C B-26A 619.04 C B-26 618.7 34 RCP 0.7 8.4 0.02 0.013 5 0.01 2.55 0.25 6.46 OK C B-26A 625.25 619.51 619.51 0.52 15 CB-26B 619.43 CB-26A 619.04 38.83 RCP 0.7 8.4 0.02 0.013 5 0.01 2.08 0.13 6.47 OK CB-26B 624.99 619.55 619.51 0 30 CB-27 618.3 CB-26 616.96 134.62 RCP 0.7 8.4 0.75 0.013 5 0.01 9.47 46.47 40.92 UNDERSIZED CB-27 624.2 621.09 619.36 0.36 15 DCB-27A 618.64 CB-27 618.3 34 RCP 0.7 8.4 0.82 0.013 5 0.01 4.26 5.23 6.46 OK DCB-27A 624.2 622.08 621.86 0.77 30 CB-28 621.9 CB-27B 619.7 220 RCP 0.7 8.4 0.46 0.013 5 0.01 8.93 27.17 41.01 OK CB-28 627.57 623.39 622.58 0.12 30 CB-27B 619.7 CB-27 618.3 139.57 RCP 0.7 8.4 0.86 0.013 5 0.01 7.67 37.63 41.08 OK CB-27B 625.37 622.46 621.28 0.19 15 CB-27C 620.54 CB-27B 620.2 34 RCP 0.7 8.4 0.96 0.013 5 0.01 4.98 6.12 6.46 OK CB-27C 625.38 623.6 623.3 0.84 15 C B-28A 623.05 C B-28 622.71 34 RCP 0.7 8.4 0.77 0.013 5 0.01 5.79 4.91 6.46 OK C B-28A 627.57 624.11 624.02 0.64 24 CB-28B 623.8 CB-28 622.08 172 RCP 0.7 8.4 0.46 0.013 5 0.01 8.13 19.97 22.62 OK CB-28B 629.29 625.26 623.54 0.14 24 CB-29 625.66 CB-28B 623.8 185.94 RCP 0.7 8.4 0.39 0.013 5 0.01 7.4 12.6 22.62 OK CB-29 631.17 626.73 625.39 0.13 18 C B-29A 626.39 C B-29 626.05 34 RCP 0.7 8.4 0.48 0.013 5 0.01 6.77 10.19 10.5 OK C B-29A 631.17 627.58 627.24 0.34 18 CB-29B 627.11 CB-29A 626.39 72.05 RCP 0.7 8.4 0.41 0.013 5 0.01 6.4 7.22 10.5 OK CB-29B 631.85 628.02 627.85 0.27 15 CB-28C 624.27 CB-28B 623.87 34 RCP 0.7 8.4 0.77 0.013 5 0.012 4 4.91 7.01 OK CB-28C 629.29 625.58 625.38 0.12 15 CB-29C 627.64 CB-29B 627.11 52.62 RCP 0.7 8.4 0.73 0.013 5 0.01 5.74 4.65 6.48 OK CB-29C 632.35 628.42 628.15 0.13 24 CB-30 616.83 CB-24 615.38 46.26 RCP 0.7 8.4 0.21 0.013 5 0.031 12.95 21.33 40.05 OK CB-30 622.65 617.95 617.78 0.55 15 C B-30A 618.45 CB-30 618.21 24 RCP 0.7 8.4 0.36 0.013 5 0.01 4.81 2.29 6.46 OK C B-30A 622.65 619.04 619.04 1.1 24 CB-31 619.25 CB-30 616.82 161.57 RCP 0.7 8.4 0.01 0.013 5 0.015 9.4 18.01 27.74 OK CB-31 624.94 620.42 618.38 0.44 15 C B-31 A 620.18 C B-31 619.94 24 RCP 0.7 8.4 0.8 0.013 5 0.01 5.83 5.1 6.46 OK C B-31 A 624.94 621.18 621.18 0.75 24 CB-32 619.63 CB-31 619.25 38.55 RCP 0.7 8.4 0.22 0.013 5 0.01 7.41 12.99 22.46 OK CB-32 625.53 620.72 620.59 0.17 18 CB-32A 620.38 CB-32 620.13 24.5 RCP 0.7 8.4 0.46 0.013 5 0.01 6.59 11.64 10.61 UNDERSIZED CB-32A 625.56 621.83 621.53 0.11 18 CB-32B 621.03 CB-32A 620.38 65.25 RCP 0.7 8.4 0.67 0.013 5 0.01 4.99 8.82 10.48 OK CB-32B 626.24 622.79 622.33 0.5 15 CB-32C 621.53 CB-32B 621.28 24.97 RCP 0.7 8.4 0.72 0.013 5 0.01 3.74 4.59 6.46 OK CB-32C 626.24 623.48 623.35 0.56 24 SDMH-34 617.5 FES-33 616.67 82.94 RCP (N/A) 8.4 (N/A) 0.013 0 0.01 8.2 23.04 22.63 UNDERSIZED SDMH-34 629 619.38 618.52 (N/A) 24 CB-35 618.78 SDMH-34 617.5 128 RCP 0.7 8.4 0.24 0.013 5 0.01 8.19 23.27 22.62 UNDERSIZED CB-35 628.13 1 620.85 619.5 0.11 24 DCB-36 621.78 CB-35 618.78 299.5 RCP 0.7 8.4 0.81 0.013 5 0.01 7.15 22.46 22.64 OK DCB-36 627.02 624.46 621.51 0.66 18 DCB-36A 622.09 DCB-36 621.85 24 RCP 0.7 8.4 0.78 0.013 5 0.01 4.25 7.51 10.5 OK DCB-36A 627.02 625.04 624.92 0.45 15 CB-36B 623.22 DCB-36A 622.34 88.22 RCP 0.7 8.4 0.43 0.013 5 0.01 2.23 2.74 6.45 OK CB-36B 627.82 625.77 625.61 0.58 18 CB-37 623.54 DCB-36 622.28 126.78 RCP 0.7 1 8.4 0.04 0.013 1 5 1 0.01 6.04 1 10.67 1 10.47 UNDERSIZED CB-37 628.43 626.19 624.88 1 0.41 15 C B-37A 623.81 C B-37 623.57 24 RCP t 0.7 1 8.4 1 0.64 0.013 1 5 1 0.01 3.32 1 4.08 1 6.46 OK C B-37A 628.43 626.62 1 626.52 1 0.33 18 CB-37B 624.24 CB-37 623.54 69.71 RCP 0.7 8.4 0.04 0.013 5 0.01 3.78 6.67 10.53 OK CB-37B 629.63 626.84 626.56 0.38 15 CB-38 625.02 CB-37B 624.24 77.99 RCP 0.7 8.4 0.41 0.013 5 0.01 5.29 6.49 6.46 UNDERSIZED CB-38 631.99 627.68 626.89 0.04 15 CB-39 626.53 CB-38 625.02 150.95 RCP 0.7 8.4 0.03 0.013 5 0.01 3.34 4.1 6.46 OK CB-39 632.78 628.73 628.12 0.44 15 CB-40 628.94 CB-39 628.46 48.25 RCP 0.7 8.4 0.13 0.013 5 0.01 5.51 3.93 6.44 OK CB-40 633.99 629.65 629.17 0.2 15 C B-40A 629.28 C B-40 628.94 34 RCP 0.7 8.4 0.49 0.013 5 0.01 5.22 3.12 6.46 OK C B-40A 633.99 629.91 629.91 0.27 48 CB-2 623.17 FES-1 620 92.28 RCP 0.7 8.4 0.6 0.013 5 0.034 19.02 88.11 266.22 OK CB-2 634.42 624.79 621.62 (N/A) 48 CB-3 625.3 C B-2A 624.27 206.49 RCP 0.7 8.4 0.17 0.013 5 0.005 9.02 84.09 101.45 OK CB-3 636.14 628.16 627.13 0.08 48 CB-2A 624.27 CB-2 623.26 100.54 RCP 0.7 8.4 0.42 0.013 5 0.01 11.94 85.35 143.96 OK CB-2A 635.77 626.54 626.5 1.72 15 CB-3A 631.1 CB-3 630.86 24 RCP 0.7 8.4 0.26 0.013 5 0.01 4.41 1.66 6.46 OK CB-3A 636.14 631.53 631.29 0.72 48 CB-4 626.4 CB-3 625.3 219.84 RCP 0.7 8.4 0.22 0.013 5 0.005 9.01 82.79 101.6 OK CB-4 634.12 629.23 628.29 0.13 48 CB-5 626.52 CB-4 626.4 24 RCP 0.7 8.4 0.47 0.013 5 0.005 8.99 81.75 101.57 OK CB-5 634.12 629.94 629.94 0.71 48 CB-5A 626.73 CB-5 626.52 42.02 RCP 0.7 8.4 0.04 0.013 5 0.005 8.94 79.46 101.54 OK CB-5A 633.68 630 630 0.06 48 CB-6 626.92 C B-5A 626.73 38.54 RCP 0.7 8.4 0.84 0.013 5 0.005 8.89 79.43 100.85 OK CB-6 633.54 630.04 630.04 0.04 18 DCB-6A 627.34 CB-6 627 34 RCP 0.7 8.4 1.33 0.013 5 0.01 4.8 8.48 10.5 OK DCB-6A 633.54 631.3 631.08 1.04 42 CB-7 628.09 CB-6 626.92 232.59 RCP 0.7 8.4 0.01 0.013 5 0.005 8.45 68.88 71.35 OK CB-7 635.86 631.38 630.19 0.16 36 CB-8 628.29 CB-7 628.09 39.97 RCP 0.7 8.4 0.02 0.013 5 0.005 4.82 34.04 47.18 OK CB-8 636.42 632.02 631.91 0.53 36 DCB-9 628.86 CB-8 628.29 113.19 RCP 0.7 8.4 0.69 0.013 5 0.005 4.87 34.39 47.33 OK DCB-9 634.88 632.56 632.24 0.22 18 DCB-9A 629.52 DCB-9 629.28 24 RCP 0.7 8.4 0.91 0.013 5 0.01 3.28 5.8 10.5 OK DCB-9A 634.88 633 632.92 0.36 30 CB-10 630.06 DCB-9 628.86 199.97 RCP 0.7 8.4 0.56 0.013 5 0.006 5.31 26.05 31.77 OK CB-10 636.34 633.56 632.7 0.14 15 CB-10A 631.21 CB-10 630.97 24 RCP 0.7 8.4 0.67 0.013 5 0.01 3.48 4.27 6.46 OK CB-10A 636.34 636.44 636.34 3.33 24 CB-11A 631.32 CB-10 630.06 211.03 RCP 0.7 8.4 0.56 0.013 5 0.006 6.2 19.47 17.48 UNDERSIZED CB-11A 637.96 635.3 633.64 0.08 18 CB-11 B 632.54 CB-11A 632.3 24 RCP 0.7 8.4 0.35 0.013 5 0.01 1.26 2.23 10.5 OK CB-11 B 637.96 636.04 636.03 0.73 24 CB-11 632.51 CB-11A 631.32 198.4 RCP 0.7 8.4 0.03 0.013 5 0.006 4.64 14.57 17.52 OK CB-11 639.5 636.26 635.39 0.09 24 CB-12 632.81 CB-11 632.51 39.43 RCP 0.7 8.4 0.07 0.013 5 0.008 4.61 14.47 19.73 OK CB-12 640.33 636.66 636.48 0.22 24 CB-12A 633.24 CB-12 633 24 RCP 0.7 8.4 0.42 0.013 5 0.01 3.82 12 22.62 OK CB-12A 640.33 636.97 636.9 0.24 18 DCB-12B 634.25 CB-12A 633.24 167.69 RCP 0.7 8.4 0.8 0.013 5 0.006 5.42 9.58 8.15 UNDERSIZED DCB-12B 638.93 638.95 637.56 0.59 15 CB-12C 634.49 DCB-12B 634.25 24 RCP 0.7 8.4 0.71 0.013 5 0.01 3.69 4.52 6.46 OK CB-12C 638.93 639.05 638.93 1.24 15 CB-14 635.71 CB-12 634.54 117.32 RCP 0.7 8.4 0.02 0.013 5 0.01 2.08 2.55 6.45 OK CB-14 641.39 638.26 638.07 1.42 15 CB-14A 636.4 CB-14 635.71 69.07 RCP 0.7 8.4 0.39 0.013 5 0.01 2.03 2.49 6.46 OK CB-14A 641.11 638.42 638.32 0.06 15 CB-16A 630.08 CB-16 629.74 34.3 RCP 0.7 8.4 0.84 0.013 5 0.01 4.36 5.35 6.43 OK CB-16A 634.79 633.21 632.97 0.48 36 CB-16 629.46 CB-7 628.09 274.86 RCP 0.7 8.4 0.58 0.013 5 0.005 5.13 36.29 47.09 OK CB-16 634.72 632.49 631.59 0.21 30 CB-17 629.68 CB-16 629.46 44.11 RCP 0.7 8.4 0.3 0.013 5 0.005 5.8 28.48 28.97 OK CB-17 634.94 633.02 632.79 0.3 15 CB-17A 629.96 CB-17 629.72 24.01 RCP 0.7 8.4 0.17 0.013 5 0.01 1.56 1.91 6.46 OK CB-17A 634.94 634.96 634.94 1.97 15 CB-17B 630.33 CB-17A 629.96 36.5 RCP 0.7 8.4 0.14 0.013 5 0.01 0.73 0.89 6.5 OK CB-17B 634.77 634.95 634.94 0.06 30 CB-18 630.45 CB-17 629.68 153.25 RCP 0.7 8.4 0.69 0.013 5 0.005 5.19 25.5 29.07 OK CB-18 636.08 634.05 633.4 0.38 15 CB-18A 631.64 CB-18 631.4 24 RCP 0.7 8.4 0.66 0.013 5 0.01 3.43 4.21 6.46 OK CB-18A 636.08 636.18 636.08 3.36 24 CB-19 632.64 CB-18 630.45 219.46 RCP 0.7 8.4 0.68 0.013 5 0.01 5.8 18.21 22.6 OK CB-19 637.72 635.72 634.17 0.12 18 CB-19A 632.88 CB-19 632.64 24 RCP 0.7 8.4 0.53 0.013 5 0.01 4.83 8.54 10.5 OK CB-19A 637.72 636.4 636.23 0.52 15 CB-19B 633.53 CB-19A 633.13 40.06 RCP 0.7 8.4 0.38 0.013 5 0.01 1.97 2.42 6.45 OK CB-19B 637.37 636.92 636.86 0.46 15 CB-19C 634.27 CB-19A 632.88 138.99 RCP 0.7 8.4 0.48 0.013 5 0.01 2.49 3.06 6.46 OK CB-19C 638.77 636.99 636.68 0.28 18 CB-20 634.75 CB-19 632.64 210.46 RCP 0.7 8.4 0.15 0.013 5 0.01 3.58 6.32 10.52 OK CB-20 639.3 636.88 636.08 0.36 15 C B-20A 634.99 C B-20 634.75 24 RCP 0.7 8.4 0.48 0.013 5 0.01 4.42 5.43 6.46 O K C B-20A 639.3 637.41 637.23 0.35 15 CB-20B 636.39 CB-20A 634.99 140.53 RCP 0.7 8.4 0.41 0.013 5 0.01 2.13 2.61 6.45 OK CB-20B 640.36 638.02 637.79 0.39 15 H W-3 615 H W-4 614.55 90.09 RCP 0.7 8.4 0.55 0.013 5 0.005 4.1 3.5 4.57 O K H W-3 N/A 615.82 615.37 (N/A) 15 H W-5 635 H W-6 634.59 82.44 RCP 0.7 8.4 0.13 0.013 5 0.005 2.82 0.83 4.56 O K H W-5 N/A 635.36 634.95 (N/A) 30 OFFSITE OP-1 633.7 OFFSITE OP-2 632.2 54.18 RCP 0.3 8.4 5.91 0.013 5 0.028 11.38 16.14 68.24 OK OFFSITE OP-1 N/A 634.53 633.03 (N/A) 30 FES-51 629.92 SDMH-52 629.31 61.35 RCP 0.7 8.4 1.62 0.013 5 0.01 8.86 26.46 40.9 OK FES-51 N/A 631.38 631.3 0.53 30 SDMH-52 629.31 SDMH-53 628.15 116.22 RCP (N/A) 8.4 (N/A) 0.013 0 0.01 8.87 26.42 40.98 OK SDMH-52 636.08 630.77 629.81 0.06 36 SDMH-53 628.15 FES-54 627.5 129.24 RCP (N/A) 8.4 (N/A) 0.013 0 0.005 6.87 26.33 47.3 OK SDMH-53 633.45 629.75 629.1 (N/A) 15 CB-50D 634.05 SDMH-50C 633.49 55.68 RCP 0.7 8.4 0.59 0.013 5 0.01 5.47 3.76 6.48 OK CB-50D 639.91 634.73 634.22 0.05 15 SDMH-50C 633.49 CB-50 633.13 36.39 RCP (N/A) 8.4 (N/A) 0.013 0 0.01 5.43 3.73 6.42 OK SDMH-50C 639.01 634.17 633.81 0.07 30 DCB-49 625.05 CB-48 623.74 130.38 RCP 0.7 8.4 0.71 0.013 5 0.01 9.15 30.1 41.11 OK DCB-49 632.39 626.64 626.32 0.06 18 DCB-49A 628 DCB-49 627.76 24 RCP 0.7 8.4 0.67 0.013 5 0.01 6.2 6.24 10.5 OK DCB-49A 632.39 628.83 628.59 0.72 15 CB-49AA 629.25 DCB-49A 628.47 77.77 RCP 0.7 8.4 0.32 0.013 5 0.01 4.67 2.04 6.47 OK CB-49AA 633.24 629.73 629.16 0.32 24 CB-49B 627.33 DCB-49 625.55 178.79 RCP 0.7 8.4 0.63 0.013 5 0.01 8.12 20.03 22.57 OK CB-49B 634.9 628.8 627.02 0.08 15 CB-49C 630.04 CB-49B 629.8 24 RCP 0.7 8.4 0.76 0.013 5 0.01 5.77 4.84 6.46 OK CB-49C 634.9 630.85 630.61 0.64 24 CB-50 630.52 CB-49B 628.4 212 RCP 0.7 8.4 0.55 0.013 5 0.01 7.26 11.66 22.62 OK CB-50 638.42 631.54 629.42 0.08 18 C B-50A 633.13 C B-50 632.89 24 RCP 0.7 8.4 0.25 0.013 5 0.01 5.71 4.49 10.5 OK C B-50A 638.42 633.82 633.58 0.41 15 CB-50B 633.94 CB-50A 633.38 56.41 RCP 0.7 8.4 0.46 0.013 5 0.01 5.12 2.93 6.44 OK CB-50B 639.35 634.53 634.04 0.22 30 CB-48 623.74 CB-47 623.24 50.28 RCP 0.7 8.4 0.25 0.013 5 0.01 6.86 33.69 40.9 OK CB-48 633.52 626.25 625.92 0.07 30 C B-47 623.24 SDMH-47A 621.86 137.52 RCP 0.7 8.4 0.42 0.013 5 0.01 7.41 36.35 41.09 OK C B-47 634.07 625.85 624.77 0.07 30 SDMH-47A 621.86 CB-46 621.12 74.1 RCP (N/A) 8.4 (N/A) 0.013 0 0.01 7.32 35.92 40.99 OK SDMH-47A 634.79 624.7 624.13 0.08 30 CB-46 621.12 CB-45 619.54 158.33 RCP 0.7 8.4 0.4 0.013 5 0.01 7.75 38.04 40.97 OK CB-46 633.7 624.05 622.68 0.17 30 CB-45 619.54 CB-44 618.51 102.66 RCP 0.7 8.4 0.54 0.013 5 0.01 8.29 40.7 41.08 OK CB-45 631.45 622.52 621.5 0.32 30 CB-44 618.51 CB-43 617.75 76.22 RCP 0.7 8.4 0.33 0.013 5 0.01 9.02 44.26 40.96 UNDERSIZED CB-44 630.03 621.19 620.3 0.97 36 CB-43 617.25 SDMH-42 615.58 167.63 RCP 0.7 8.4 0.47 0.013 5 0.01 10.51 54.77 66.57 OK CB-43 628.99 619.32 617.81 0.18 36 SDMH-42 615.58 FES-41 615.07 50.57 RCP (N/A) 8.4 (N/A) 0.013 0 0.01 10.55 54.22 66.98 OK SDMH-42 627 617.63 617.12 (N/A) 18 DCB-43A 622.65 CB-43 621.52 112.72 RCP 0.7 8.4 1.4 0.013 5 0.01 6.68 8.92 10.52 OK DCB-43A 627.31 623.71 622.58 0.85 15 C B-44A 624.66 C B-44 624.42 24 RCP 0.7 8.4 0.34 0.013 5 0.01 4.74 2.17 6.46 OK C B-44A 630.02 625.16 624.92 0.96 15 CB-48B 624.99 CB-48A 624.65 33.93 RCP 0.7 8.4 0.13 0.013 5 0.01 0.68 0.83 6.47 OK CB-48B 633.39 627.46 627.45 0.06 15 C B-48A 624.65 C B-48 624.24 41.02 RCP 0.7 8.4 0.26 0.013 5 0.01 1.96 2.4 6.46 OK C B-48A 633.39 627.39 627.33 1.08 15 C B-47A 628.7 C B-47 628.46 24 RCP 0.7 8.4 0.05 0.013 5 0.01 2.73 0.32 6.46 OK C B-47A 634.07 628.89 628.65 0.64 NOTE * Y X 4' BOX CULVERT FROM HW-1 TO HW-2 SHALL BE INSTALLED WITH SIX INCH (6") EMBEDMENT. INVERT OF PIPE IS NOTED IN THE PIPE NODE REPORT. REFER TO SHEET C-6.1 FOR ADDITIONAL INFORMATIOP REFER TO SHEET C-6.1 TO C-6.4 FOR RCP CLASSIFICATOIN REFER TO SHEET C-6.17 FOR NCDOT STRUCTURE INFORMATION Gutter Spread Calculations INLET COMPUTATION SHEET DATE: 10.18.2019 SHEET 1 OF 13 I.D. NO. PROJ. NO.: 1018330 COUNTY: UNION DESIGNED BY: MTG DESCRIPTION: Weddington Pointe Gutter Spread Analaysis CHECKED BY: MLG LOCATION ROADWAY RUNOFF INLET O z z O O p Cna w QQ LLLL v_ OU _j� (D �� Cw7w �O ( Q� p Q aCIO w cn Q Q OO z� 0w Lu Q� zz =2 _} �_ REMARKS Lu CD coU Of �0 0 �0 QH v0 U) of L) U �0 U) a w } m Z U) W 0 � H �' Z 0 Q 0 0 Cl) Z U DES./ CONST. D.A. C Tc QD.A. QC QT-QD.A. QI QB +Q c Penwood Place - Structure in CB-2 5+63.76 634.42 N/A 0.03 0.60 0.70 5.00 4.0 1.68 0.15 1.83 5.67 1.83 0.00 Sag - Maximum allowable Gutter Spread = 6.5' Penwood Place - Overflow to CB-3 2+67.73 636.14 0.009 0.03 0.17 0.70 5.00 4.0 0.48 0.00 0.48 3.70 0.47 0.01 CB-4 - Maximum allowable Gutter Spread = 6.5' Penwood Place - Overflow to CB-2A 4+74.70 635.77 0.009 0.03 0.42 0.70 5.00 4.0 1.18 0.00 1.18 5.34 1.03 0.15 CB-2 - Maximum allowable Gutter Spread = 6.5' Penwood Place - Overflow to CB-3A 2+67.47 636.14 0.009 0.03 0.26 0.70 5.00 4.0 0.73 0.00 0.73 4.41 0.69 0.04 CB-5 - Maximum allowable Gutter Spread = 6.5' Penwood Place - Structure in CB-4 0+48.38 634.12 N/A 0.03 0.22 0.70 5.00 4.0 0.62 0.01 0.63 2.71 0.63 0.00 Sag - Maximum allowable Gutter Spread = 6.5' Penwood Place - Overflow to CB-5 0+47.99 634.12 0.009 0.03 0.47 0.70 5.00 4.0 1.32 0.04 1.36 5.73 1.15 0.21 CB-5A - Maximum allowable Gutter Spread = 6.5' Weddington Pointe Drive - CB-5A 5+89.98 633.68 0.009 0.03 0.04 0.70 5.00 4.0 0.11 0.21 0.32 3.10 0.32 0.00 Overflow to CB-6 - Maximum allowable Gutter Spread = 9.0' Weddington Pointe Drive - CB-6 5+52.37 633.54 N/A 0.03 0.84 0.70 5.00 4.0 2.35 0.00 2.35 6.70 2.35 0.00 Structure in Sag - Maximum allowable Gutter Spread = 9.0' Page 1 INLET COMPUTATION SHEET DATE: 10.18.2019 SHEET 2 OF 13 I.D. NO. PROJ. NO.: 1018330 COUNTY: UNION DESIGNED BY: MTG DESCRIPTION: Weddington Pointe Gutter Spread Analaysis CHECKED BY: MLG LOCATION ROADWAY RUNOFF INLET z LU LLJ LL J i (� Q �� U w �> ( d W O Q 0 Q cn a-U)w op QQ z� zw OU wz Q(q zz =� _� Q� �_ Q (A REMARKS CL 00 Z [!) Lu �Z QLL QU Z DES./ CONST. D.A. C Tc QD.A. Qc QT-QD.A. n Qg +QC Weddington Pointe Drive - DCB-6A 5+51.64 633.54 N/A 0.03 1.33 0.70 5.00 4.0 3.72 0.00 3.72 7.20 3.72 0.00 Structure in Sag - Maximum allowable Gutter Spread = 9.0' Weddington Pointe Drive - CB-7 3+18.98 635.86 0.011 0.03 0.01 0.70 5.00 4.0 0.03 0.00 0.03 1.10 0.03 0.00 Overflow to CB-8 - Maximum allowable Gutter Spread = 9.0' Markfield Lane - Structure in CB-8 7+60.68 636.42 N/A 0.03 0.02 0.70 5.00 4.0 0.06 0.00 0.06 1.00 0.06 0.00 Sag- Maximum allowable Gutter Spread = 6.5' Markfield Lane - Structure in DCB-9 6+47.11 634.88 N/A 0.03 0.69 0.70 5.00 4.0 1.93 0.38 2.31 5.36 2.31 0.00 Sag- Maximum allowable Gutter Spread = 6.5' Markfield Lane - Structure in DCB-9A 6+47.47 634.88 N/A 0.03 0.91 0.70 5.00 4.0 2.55 0.42 2.97 6.26 2.97 0.00 Sag- Maximum allowable Gutter Spread = 6.5' Markfield Lane - Overflow to CB-10 4+47.58 636.34 0.008 0.03 0.56 0.70 5.00 4.0 1.57 0.29 1.86 6.37 1.48 0.38 DCB-9- Maximum allowable Gutter Spread = 6.5' Markfield Lane - Overflow to CB-10A 4+47.44 636.34 0.008 0.03 0.67 0.70 5.00 4.0 1.88 0.10 1.98 6.47 1.56 0.42 DCB-9A- Maximum allowable Gutter Spread = 6.5' Markfield Lane - Overflow to CB-11 0+38.22 639.50 0.008 0.03 0.03 0.70 5.00 4.0 0.08 0.00 0.08 1.81 0.08 0.00 CB-11A- Maximum allowable Gutter Spread = 6.5' Markfield Lane - Overflow to CB-11A 2+36.42 637.96 0.008 0.03 0.56 0.70 5.00 4.0 1.57 0.00 1.57 6.21 1.28 0.29 CB-10- Maximum allowable Gutter Spread = 6.5' Page 2 INLET COMPUTATION SHEET DATE: 10.18.2019 SHEET 3 OF 13 I.D. NO. PROJ. NO.: 1018330 COUNTY: UNION DESIGNED BY: MTG DESCRIPTION: Weddington Pointe Gutter Spread Analaysis CHECKED BY: MLG LOCATION ROADWAY RUNOFF INLET p z O O in U)a w QQ �� � J 0 Q alp 0 w Of p a w Cl) z Q Q O0 z� zw OU wz Q� zz =� _} Q� H= Q Cl) a REMARKS Lu C� Um QQ �0 U 20 QH 60 W U W U) 00 cn a w } m z U) w o � < z W 0 Q [n z U DES./ CONST. D.A. C Tc I QD.A. Qc QT-QD.A. QI QB +Qc Markfield Lane - Overflow to CB-11 B 2+36.41 637.96 0.008 0.03 0.35 0.70 5.00 4.0 0.98 0.00 0.98 5.15 0.88 0.10 CB-10A- Maximum allowable Gutter Spread = 6.5' Foxcroft Drive - Overflow to CB CB-12 3+18.76 640.33 0.008 0.03 0.07 0.70 5.00 4.0 0.20 0.00 0.20 2.64 0.20 0.00 11- Maximum allowable Gutter Spread = 6.5' Foxcroft Drive - Overflow to CB-12A 3+18.77 640.33 0.009 0.03 0.42 0.70 5.00 4.0 1.18 0.00 1.18 5.35 1.03 0.15 DCB-12B- Maximum allowable Gutter Spread = 6.5' Foxcroft Drive - Structure in DCB-12B 1+51.11 638.93 N/A 0.03 0.80 0.70 5.00 4.0 2.24 0.15 2.39 5.48 2.39 0.00 Sag- Maximum allowable Gutter Spread = 6.5' Foxcroft Drive - Structure in CB-12C 1+51.16 638.93 N/A 0.03 0.71 0.70 5.00 4.0 1.99 0.00 1.99 6.00 1.99 0.00 Sag- Maximum allowable Gutter Spread = 6.5' Foxcroft Drive - Overflow to CB CB-14 4+36.39 641.39 0.008 0.03 0.02 0.70 5.00 4.0 0.06 0.00 0.06 1.55 0.06 0.00 12- Maximum allowable Gutter Spread = 6.5' Foxcroft Drive - In Sag- CB-14A 4+92.55 641.11 N/A 0.03 0.39 0.70 5.00 4.0 1.09 0.00 1.09 4.00 1.09 0.00 Maximum allowable Gutter Spread = 6.5' Weddington Pointe Drive - Overflow to DCB-6A- CB-16A 0+44.43 634.79 N/A 0.03 0.84 0.70 5.00 4.0 2.35 0.00 2.35 6.70 2.35 0.00 Maximum allowable Gutter Spread = 9.0' Page 3 INLET COMPUTATION SHEET DATE: 10.18.2019 SHEET 4 OF 13 I.D. NO. PROJ. NO.: 1018330 COUNTY: UNION DESIGNED BY: MTG DESCRIPTION: Weddington Pointe Gutter Spread Analaysis CHECKED BY: MLG LOCATION ROADWAY RUNOFF INLET O z z o O o n� W aQ LL �� LL OC) c� Q �o C7 W �o W Q W Q Q 00 z� IW Wz QF zz =� _� Q� �_Of < REMARKS W Q W � (D � U U) Q Q o� U O U W � Z U O Cn W' U Of Cn O U ~ Cn a W m Z Cn W 0 0 Q 0 0 U Z U DES./ CONST. D.A. C Tc I Qp.A. Qc QT-QD.A. QI QB +Q c Weddington Pointe Drive - CB-16 0+44.14 634.72 N/A 0.03 0.58 0.70 5.00 4.0 1.62 0.00 1.62 5.20 1.62 0.00 Structure in Sag - Maximum allowable Gutter Spread = 9.0' Walkers Run Drive - Structure CB-17 2+13.01 634.94 N/A 0.03 0.30 0.70 5.00 4.0 0.84 0.50 1.34 4.60 0.50 0.00 in Sag- Maximum allowable Gutter Spread = 6.5' Walkers Run Drive - Overflow CB-17A 2+13.58 634.94 0.025 0.03 0.17 0.70 5.00 4.0 0.48 0.31 0.79 3.71 0.76 0.03 to CB-17B - Maximum allowable Gutter Spread = 6.5' Walkers Run Drive - Structure CB-17B 1+77.61 634.77 N/A 0.03 0.14 0.70 5.00 4.0 0.39 0.03 0.42 1.98 0.42 0.00 in Sag- Maximum allowable Gutter Spread = 6.5' Walkers Run Drive - Overflow CB-18 3+66.00 636.08 0.025 0.03 0.69 0.70 5.00 4.0 1.93 0.39 2.32 5.84 1.82 0.50 to CB-17- Maximum allowable Gutter Spread = 6.5' Walkers Run Drive - Overflow CB-18A 3+66.19 636.08 0.025 0.03 0.66 0.70 5.00 4.0 1.85 0.00 1.85 5.24 1.54 0.31 to CB-17A- Maximum allowable Gutter Spread = 6.5' Walkers Run Drive - Overflow CB-19 5+86.18 637.72 0.008 0.03 0.68 0.70 5.00 4.0 1.90 0.00 1.90 6.36 1.51 0.39 to CB-18- Maximum allowable Gutter Spread = 6.5' Page 4 INLET COMPUTATION SHEET DATE: 10.18.2019 SHEET 5 OF 13 I.D. NO. PROJ. NO.: 1018330 COUNTY: UNION DESIGNED BY: MTG DESCRIPTION: Weddington Pointe Gutter Spread Analaysis CHECKED BY: MLG LOCATION ROADWAY RUNOFF INLET O z z O O Cna Q QQ U- a� LL OU J H C� Q �Ci 0 w jr> CD QX p Q aCIO w cn P Q Q OO zO �w wz QF zz =2 _} �_ REMARKS J � Lu CD Ucn Of �O �L) QH ULu O L0f U� UJQ �U U) a w } m z [n w o �U afz 0 0 0 U) Z U DES./ CONST. D.A. C Tc QD.A. QC QT-QD.A. QI QB +Q c Walkers Run Drive - Overflow CB-19A 5+85.49 637.72 0.008 0.03 0.53 0.70 5.00 4.0 1.48 0.26 1.74 6.46 1.39 0.35 to CB-1913- Maximum allowable Gutter Spread = 6.5' Porters Lane - Structure in Sag CB-19B 0+38.97 637.37 N/A 0.03 0.38 0.70 5.00 4.0 1.06 0.35 1.41 4.76 1.41 0.00 Maximum allowable Gutter Spread = 6.5' Walkers Run Drive - Overflow CB-19C 7+24.46 638.77 0.008 0.03 0.48 0.70 5.00 4.0 1.34 0.23 1.57 5.82 1.31 0.26 to CB-19A- Maximum allowable Gutter Spread = 6.5' Walkers Run Drive - Overflow CB-20 7+96.12 639.30 0.008 0.03 0.15 0.70 5.00 4.0 0.42 0.00 0.42 3.70 0.42 0.00 to CB-19- Maximum allowable Gutter Spread = 6.5' Walkers Run Drive - Overflow CB-20A 7+96.11 639.30 0.008 0.03 0.48 0.70 5.00 4.0 1.34 0.13 1.47 5.75 1.24 0.23 to CB-19C- Maximum allowable Gutter Spread = 6.5' Walkers Run Drive - Overflow CB-20B 9+36.98 640.36 0.008 0.03 0.41 0.70 5.00 4.0 1.15 0.00 1.15 5.16 1.02 0.13 to CB-20A- Maximum allowable Gutter Spread = 6.5' Weddington Pointe Drive - Overflow to CB-22A - CB-22 25+38.94 621.040 0.014 0.03 0.64 0.70 5.00 4.00 1.79 0.00 1.79 5.90 1.45 0.34 Maximum allowable Gutter Spread = 9.0' Page 5 INLET COMPUTATION SHEET DATE: 10.18.2019 SHEET 6 OF 13 I.D. NO. PROJ. NO.: 1018330 COUNTY: UNION DESIGNED BY: MTG DESCRIPTION: Weddington Pointe Gutter Spread Analaysis CHECKED BY: MLG LOCATION ROADWAY RUNOFF INLET O z z o O o n� W aQ LL �� LL OC) c� Q �o C7 W �o W Q W Q Q 00 z� IW Wz QF zz =� _� Q� �_Of < REMARKS W Q W � (D of � U U) Q Q o� U O U W � Z U O [n W' U Of CA O U ~ U) a W m Z [n W 0 0 Q 0 0 U Z U DES./ CONST. D.A. C Tc I Qp.A. Qc QT-QD.A. QI QB +Q c Weddington Pointe Drive - Overflow to CB-22B - CB-22A 26+71.51 619.21 0.014 0.03 0.12 0.70 5.00 4.00 0.34 0.34 0.68 4.00 0.65 0.03 Maximum allowable Gutter Spread = 9.0' Weddington Pointe Drive - CB-22B 27+74.54 617.80 0.014 0.03 0.12 0.70 5.00 4.00 0.34 0.03 0.37 3.10 0.37 0.00 Overflow offsite -Maximum allowable Gutter Spread = 9.0' Weddington Pointe Drive - CB-22C 27+74.95 617.79 0.014 0.03 0.50 0.70 5.00 4.00 1.40 0.00 1.40 5.30 1.19 0.21 Overflow Offsite -Maximum allowable Gutter Spread = 9.0' Weddington Pointe Drive - Overflow to CB-22C - CB-23 25+39.69 621.030 0.010 0.03 0.16 0.70 5.00 4.00 0.45 0.00 0.45 3.60 0.45 0.00 Maximum allowable Gutter Spread = 9.0' Weddington Pointe Drive - CB-24 24+41.84 622.050 0.010 0.03 0.05 0.70 5.00 4.00 0.14 0.02 0.16 2.20 0.16 0.00 Overflow to CB-23 - Maximum allowable Gutter Spread = 9.0' Weddington Pointe Drive - Overflow to CB-30A - CB-24A 23+59.96 622.880 0.010 0.03 0.66 0.70 5.00 4.00 1.85 0.00 1.85 6.30 1.47 0.38 Maximum allowable Gutter Spread = 9.0' Weddington Pointe Drive - Overflow to CB-24A - CB-25 21 +60.49 624.830 0.014 0.03 0.03 0.70 5.00 4.00 0.08 0.00 0.08 1.60 0.08 0.00 Maximum allowable Gutter Spread = 9.0' Page 6 INLET COMPUTATION SHEET DATE: 10.18.2019 SHEET 7 OF 13 I.D. NO. PROJ. NO.: 1018330 COUNTY: UNION DESIGNED BY: MTG DESCRIPTION: Weddington Pointe Gutter Spread Analaysis CHECKED BY: MLG LOCATION ROADWAY RUNOFF INLET O z z o O o n� W aQ LL �� LL OC) c� Q �o C7 W �o W Q W Q Q 00 z� IW Wz QF zz =� _� Q� �_Of < REMARKS W Q W � (D of � U U) Q Q o� U O U W � Z U O Cn W' U Of Cn O U ~ Cn a W m Z Cn W 0 0 Q 0 0 U Z U DES./ CONST. D.A. C Tc I Qp.A. Qc QT-QD.A. QI QB +Q c Weddington Pointe Drive - CB-26 20+78.31 625.250 0.010 0.03 0.01 0.70 5.00 4.00 0.03 0.00 0.03 1.20 0.03 0.00 Overflow to CB-27 -Maximum allowable Gutter Spread = 9.0' Weddington Pointe Drive - CB-26A 20+78.39 625.250 N/A 0.03 0.02 0.70 5.00 4.00 0.06 0.00 0.06 1.00 0.06 0.00 Structure in Sag - Maximum allowable Gutter Spread = 9.0' Weddington Pointe Drive - Overflow to CB-26A - CB-26B 21+17.31 624.990 0.010 0.03 0.02 0.70 5.00 4.00 0.06 0.00 0.06 1.50 0.06 0.00 Maximum allowable Gutter Spread = 9.0' Weddington Pointe Drive - CB-27 19+43.76 624.200 N/A 0.03 0.75 0.70 5.00 4.00 2.10 0.75 2.85 7.80 2.85 0.00 Structure in Sag - Maximum allowable Gutter Spread = 9.0' Weddington Pointe Drive - DCB-27A 19+43.75 624.200 N/A 0.03 0.82 0.70 5.00 4.00 2.30 1.17 3.47 7.10 3.47 0.00 Structure in Sag - Maximum allowable Gutter Spread = 9.0' Weddington Pointe Drive - Overflow to CB-27B - CB-28 15+84.18 627.570 0.010 0.03 0.46 0.70 5.00 4.00 1.29 0.23 1.52 5.90 1.26 0.26 Maximum allowable Gutter Spread = 9.0' Weddington Pointe Drive - CB-27B 18+04.07 625.370 0.010 0.03 0.86 0.70 5.00 4.00 2.41 0.26 2.67 7.40 1.92 0.75 Overflow to CB-27 -Maximum allowable Gutter Spread = 9.0' Page 7 INLET COMPUTATION SHEET DATE: 10.18.2019 SHEET 8 OF 13 I.D. NO. PROJ. NO.: 1018330 COUNTY: UNION DESIGNED BY: MTG DESCRIPTION: Weddington Pointe Gutter Spread Analaysis CHECKED BY: MLG LOCATION ROADWAY RUNOFF INLET O z z o O o n� W aQ LL �� LL OC) c� Q �o C7 W �o W Q W Q Q 00 z� IW Wz QF zz =� _� Q� �_Of < REMARKS W Q W � (D � U U) Q Q o� U O U W � Z U O [n W' U Of CA O U ~ U) a W m Z [n W 0 0 Q 0 0 U Z U DES./ CONST. D.A. C Tc I Qp.A. Qc QT-QD.A. QI QB +Q c Weddington Pointe Drive - Overflow to CB-27A - CB-27C 18+04.14 625.380 0.010 0.03 0.96 0.70 5.00 4.00 2.69 0.82 3.51 8.20 2.34 1.17 Maximum allowable Gutter Spread = 9.0' Weddington Pointe Drive - Overflow to CB-27C - CB-28A 15+84.18 627.570 0.010 0.03 0.77 0.70 5.00 4.00 2.16 0.66 2.82 7.50 2.00 0.82 Maximum allowable Gutter Spread = 9.0' Weddington Pointe Drive - CB-28B 14+12.14 629.290 0.010 0.03 0.46 0.70 5.00 4.00 1.29 0.13 1.42 5.70 1.19 0.23 Overflow to CB-28 - Maximum allowable Gutter Spread = 9.0' Weddington Pointe Drive - Overflow to CB-28A - CB-28C 14+12.18 629.290 0.010 0.03 0.77 0.70 5.00 4.00 2.16 0.32 2.48 7.10 1.82 0.66 Maximum allowable Gutter Spread = 9.0' Weddington Pointe Drive - Overflow to CB-28B - CB-29 12+25.10 631.170 0.010 0.03 0.39 0.70 5.00 4.00 1.09 0.00 1.09 5.20 0.96 0.13 Maximum allowable Gutter Spread = 9.0' Weddington Pointe Drive - Overflow to CB-28C - CB-29A 12+25.25 631.170 0.010 0.03 0.48 0.70 5.00 4.00 1.34 0.33 1.67 6.10 1.35 0.32 Maximum allowable Gutter Spread = 9.0' Weddington Pointe Drive - Overflow to CB-29A - CB-29B 11+56.49 631.850 0.010 0.03 0.41 0.70 5.00 4.00 1.15 0.55 1.70 6.20 1.37 0.33 Maximum allowable Gutter Spread = 9.0' Page 8 INLET COMPUTATION SHEET DATE: 10.18.2019 SHEET 9 OF 13 I.D. NO. PROJ. NO.: 1018330 COUNTY: UNION DESIGNED BY: MTG DESCRIPTION: Weddington Pointe Gutter Spread Analaysis CHECKED BY: MLG LOCATION ROADWAY RUNOFF INLET z ui LLJ LL J i (� Q �� U w �> ( d W Q 0 Q cn a-U)w op QQ z� zw OU wz Q(q zz =� _� Q� �_ Q (A REMARKS CL 00 Z [!) Lu �Z QLL QU Z DES./ CONST. D.A. C Tc QD.A. Qc QT-QD.A. n Qg +QC Weddington Pointe Drive - Overflow to CB-29B - CB-29C 11+06.88 632.350 0.010 0.03 0.73 0.70 5.00 4.00 2.04 0.19 2.23 6.90 1.68 0.55 Maximum allowable Gutter Spread = 9.0' Eastcott Avenue - Overflow to CB-30 11+47.96 622.650 0.014 0.03 0.21 0.70 5.00 4.00 0.59 0.00 0.59 3.71 0.57 0.02 CB-24 - Maximum allowable Gutter Spread = 6.5' Eastcott Avenue - Structure in CB-30A 11+47.96 622.650 N/A 0.03 0.36 0.70 5.00 4.00 1.01 0.90 1.91 5.84 1.91 0.00 Sag - Maximum allowable Gutter Spread = 6.5' Eastcott Avenue - Overflow to CB-31 9+86.46 624.940 0.011 0.03 0.01 0.70 5.00 4.00 0.03 0.12 0.15 2.14 0.15 0.00 CB-30 - Maximum allowable Gutter Spread = 6.5' Eastcott Avenue - Overflow to CB-31A 9+86.39 624.940 0.014 0.03 0.80 0.70 5.00 4.00 2.24 0.00 2.24 6.36 1.72 0.52 CB-30A- Maximum allowable Gutter Spread = 6.5' Maylen Trace - Overflow to CB CB-32 0+38.58 625.530 0.011 0.03 0.22 0.70 5.00 4.00 0.62 0.45 1.07 1.07 0.95 0.12 31 - Maximum allowable Gutter Spread = 6.5' Maylen Trace - Structure in CB-32A 0+38.58 625.560 N/A 0.03 0.46 0.70 5.00 4.00 1.29 0.43 1.72 5.38 0.40 0.00 Sag - Maximum allowable Gutter Spread = 6.5' Maylen Trace - Overflow to CB CB-32B 1+03.26 626.240 0.010 0.03 0.67 0.70 5.00 4.00 1.88 0.00 1.88 6.41 1.48 0.40 32A - Maximum allowable Gutter Spread = 6.5' Page 9 INLET COMPUTATION SHEET DATE: 10.18.2019 SHEET 10 OF 13 I.D. NO. PROJ. NO.: 1018330 COUNTY: UNION DESIGNED BY: MTG DESCRIPTION: Weddington Pointe Gutter Spread Analaysis CHECKED BY: MLG LOCATION ROADWAY RUNOFF INLET z uj Lu LL J i (� Q �� U w �> ( d W O Q 0 Q cn a-U)w op QQ z� zw OU wz Q(q zz =� _� Q� �_ Q (A REMARKS CL 00 Z [!) Lu �Z QLL QU Z DES./ CONST. D.A. C Tc QD.A. Qc QT=QD.A. n Qg +QC Maylen Trace - Overflow to CB CB-32C 1+03.79 626.240 0.011 0.03 0.72 0.70 5.00 4.00 2.02 0.00 2.02 6.47 1.57 0.45 32 - Maximum allowable Gutter Spread = 6.5' Eastcott Avenue - Overflow to CB-35 7+60.43 628.130 0.015 0.03 0.24 0.70 5.00 4.00 0.67 0.00 0.67 3.89 0.64 0.03 CB-32A - Maximum allowable Gutter Spread = 6.5' Eastcott Avenue - Structure in DCB-36 4+61.14 627.020 N/A 0.03 0.81 0.70 5.00 4.00 2.27 0.00 2.27 5.48 2.27 0.00 Sag - Maximum allowable Gutter Spread = 6.5" Eastcott Avenue - Structure in DCB-36A 4+60.99 627.020 N/A 0.03 0.78 0.70 5.00 4.00 2.18 0.48 2.66 6.05 2.66 0.00 Sag - Maximum allowable Gutter Spread = 6.5' Eastcott Avenue - Overflow to CB-36B 5+49.43 627.820 0.015 0.03 0.43 0.70 5.00 4.00 1.20 0.00 1.20 4.94 1.06 0.14 DCB-36A - Maximum allowable Gutter Spread = 6.5' Eastcott Avenue - Overflow to CB-37 3+35.26 628.430 0.015 0.03 0.04 0.70 5.00 4.00 0.11 0.00 0.11 1.76 0.11 0.00 CB-D36 - Maximum allowable Gutter Spread = 6.5' Eastcott Avenue - Overflow to CB-37A 3+35.26 628.430 0.015 0.03 0.64 0.70 5.00 4.00 1.79 0.00 1.79 5.80 1.45 0.34 DCB-36A - Maximum allowable Gutter Spread = 6.5' Eastcott Avenue - Overflow to CB-37B 2+68.82 629.630 0.015 0.03 0.04 0.70 5.00 4.00 0.11 0.13 0.24 2.47 0.24 0.00 CB-37 - Maximum allowable Gutter Spread = 6.5' Page 10 INLET COMPUTATION SHEET DATE: 10.18.2019 SHEET 11 OF 13 I.D. NO. PROJ. NO.: 1018330 COUNTY: UNION DESIGNED BY: MTG DESCRIPTION: Weddington Pointe Gutter Spread Analaysis CHECKED BY: MLG LOCATION ROADWAY RUNOFF INLET z ui Lu LL J i (� Q �� U w �> ( d W O Q 0 Q cn a-U)w op QQ z� zw OU wz Q(q zz =� _� Q� �_ Q (A REMARKS J J U UU) ['Q OU �O Q 0d' UJ� 0[/) L CL m Z [!) Lu �Z QLL QU UJ Z DES./ CONST. D.A. C Tc QD.A. Qc QT-QD.A. n Qg +QC Eastcott Avenue - Overflow to CB-38 1+94.54 631.990 0.015 0.03 0.41 0.70 5.00 4.00 1.15 0.00 1.15 4.86 1.02 0.13 CB-37B - Maximum allowable Gutter Spread = 6.5' Eastcott Avenue - Overflow to CB-39 0+44.37 632.780 0.010 0.03 0.03 0.70 5.00 4.00 0.08 0.00 0.08 1.68 0.08 0.00 CB-38 - Maximum allowable Gutter Spread = 6.5' Weddington Pointe Drive - CB-40 9+42.52 633.990 0.010 0.03 0.13 0.70 5.00 4.00 0.36 0.00 0.36 3.25 0.36 0.00 Overflow to CB-39 -Maximum allowable Gutter Spread = 9.0' Weddington Pointe Drive - Overflow to CB-29C - CB-40A 9+42.58 633.990 0.010 0.03 0.49 0.70 5.00 4.00 1.37 0.00 1.37 5.30 1.18 0.19 Maximum allowable Gutter Spread = 9.0' Yearden Lane - Overflow to CB CB-50D 12+82.97 639.910 0.017 0.03 0.59 0.70 5.00 4.000 0.00 0.00 0.00 5.28 1.39 0.26 50 - Maximum allowable Gutter Spread = 6.5' Yearden Lane - Structure in DCB-49 8+04.24 632.390 N/A 0.03 0.71 0.70 5.00 4.000 0.00 0.43 0.43 5.06 2.42 0.00 Sag - Maximum allowable Gutter Spread = 6.5' Yearden Lane - Structure in DCB-49A 8+04.33 632.390 N/A 0.03 0.99 0.70 5.00 4.000 0.00 0.18 0.18 6.02 3.21 0.00 Sag - Maximum allowable Gutter Spread = 6.5' Yearden Lane - Overflow to CB-49B 9+83.12 634.900 0.010 0.03 0.63 0.70 5.00 4.000 0.00 0.33 0.33 6.12 1.64 0.43 DCB-49 - Maximum allowable Gutter Spread = 6.5' Page 11 INLET COMPUTATION SHEET DATE: 10.18.2019 SHEET 12 OF 13 I.D. NO. PROJ. NO.: 1018330 COUNTY: UNION DESIGNED BY: MTG DESCRIPTION: Weddington Pointe Gutter Spread Analaysis CHECKED BY: MLG LOCATION ROADWAY RUNOFF INLET z ui LLJ LL J i (� Q �� U w �> ( d W O Q 0 Q cn a-U)w op QQ z� zw OU wz Q(q zz =� _� Q� �_ Q (A REMARKS J J U UU) ['Q OU �O Q 0d' UJ� 0[/) L CL m Z [!) Lu �Z QLL QU UJ Z DES./ CONST. D.A. C Tc QD.A. Qc QT-QD.A. n Qg +QC Yearden Lane - Overflow to CB CB-49C 9+83.12 634.900 0.017 0.03 0.76 0.70 5.00 4.000 0.00 0.05 0.05 6.20 1.70 0.49 49AA - Maximum allowable Gutter Spread = 6.5' Yearden Lane - Overflow to CB CB-50 11+95.12 638.420 0.017 0.03 0.55 0.70 5.00 4.000 0.00 0.26 0.26 5.58 1.47 0.33 49B - Maximum allowable Gutter Spread = 6.5' Yearden Lane - Overflow to CB CB-50A 11+95.12 638.420 0.017 0.03 0.25 0.70 5.00 4.000 0.00 0.15 0.15 4.13 0.80 0.05 49C - Maximum allowable Gutter Spread = 6.5' Yearden Lane - Overflow to CB CB-50B 12+48.96 639.350 0.016 0.03 0.46 0.70 5.00 4.000 0.00 0.00 0.00 4.79 1.14 0.15 50A - Maximum allowable Gutter Spread = 6.5' Yearden Lane - Overflow to CB CB-48 6+73.95 633.520 0.010 0.03 0.25 0.70 5.00 4.000 0.00 0.15 0.15 4.57 0.79 0.06 47 - Maximum allowable Gutter Spread = 6.5' Yearden Lane - Overflow to CB CB-47 6+23.63 634.070 0.014 0.03 0.42 0.70 5.00 4.000 0.00 0.06 0.06 4.94 1.08 0.15 48 - Maximum allowable Gutter Spread = 6.5' Yearden Lane - Overflow to CB CB-46 4+09.67 633.700 0.014 0.03 0.40 0.70 5.00 4.000 0.00 0.00 0.00 4.76 1.00 0.12 45 - Maximum allowable Gutter Spread = 6.5' Yearden Lane - Overflow to CB CB-45 2+53.80 631.450 0.014 0.03 0.54 0.70 5.00 4.000 0.00 0.12 0.12 5.52 1.36 0.27 44 Yearden Lane - Overflow to CB CB-44 1+53.90 630.030 0.014 0.03 0.33 0.70 5.00 4.000 0.00 0.27 0.27 4.59 1.05 0.12 43 Page 12 INLET COMPUTATION SHEET DATE: 10.18.2019 SHEET 13 OF 13 I.D. NO. PROJ. NO.: 1018330 COUNTY: UNION DESIGNED BY: MTG DESCRIPTION: Weddington Pointe Gutter Spread Analaysis CHECKED BY: MLG LOCATION ROADWAY RUNOFF INLET O Z z 0 0 �a w QQ U- LL J% J w C7 Q �p w W 0 �� w C7 p ~ d w z O Q Q OO Z� zw OC) wZ Q� zz =� _� Q� �_ Q Cl) REMARKS J w CK U Q Q 0 U Q v 0 cn U X u) U cn a w m z cn w o � � < z 0 W Q 0 U) z U DES./ CONST. D.A. C Tc QD.A. Qc QT-QD.A. n Qg +QC Yearden Lane - Overflow to CB-43 0+81.19 628.990 0.014 0.03 0.47 0.70 5.00 4.000 0.00 0.12 0.12 5.26 1.23 0.21 DCB-43A - Maximum allowable Gutter Spread = 6.5' Yearden Lane - Structure in DCB-43A 0+00 627.310 N/A 0.03 1.40 0.70 5.00 4.000 0.00 0.29 0.29 8.06 4.21 0.00 Sag & in Cul-de-Sac Yearden Lane - Overflow to CB-44A 1+53.90 630.020 0.014 0.03 0.34 0.70 5.00 4.000 0.00 0.00 0.00 4.46 0.88 0.08 DCB-43A - Maximum allowable Gutter Spread = 6.5' Glenford Drive - Overflow to CB-48B 1+96.48 633.390 0.022 0.03 0.13 0.70 5.00 4.000 0.00 0.00 0.00 2.69 0.36 0.00 DCB-49 - Maximum allowable Gutter Spread = 6.5' Glenford Drive - Structure in CB-48A 1+96.03 633.390 N/A 0.03 0.26 0.70 5.00 4.000 0.00 0.00 0.00 2.95 0.73 0.00 Sag - Maximum allowable Gutter Spread = 6.5' Yearden Lane - Overflow to CB-47A 6+23.68 634.790 0.010 0.03 0.05 0.70 5.00 4.000 0.00 0.00 0.00 2.10 0.14 0.00 DCB-49A - Maximum allowable Gutter Spread = 6.5' Yearden Lane - Overflow to CB-49AA 13+55.47 634.790 0.010 0.03 0.32 0.70 5.00 4.000 0.00 0.49 0.49 4.87 1.21 0.18 DCB-49A - Maximum allowable Gutter Spread = 6.5' Page 13 Worksheet for CB-2 In Sag - 4inch Storm Event Project Description I Solve For Spread Input Data Discharge 1.83 W/s Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Opening Height 0.50 ft Curb Throat Type Horizontal Throat Incline Angle 90.00 degrees Options Calculation Option Use Both Results Spread 5.67 ft Depth 0.19 ft Gutter Depression 0.02 ft Total Depression 0.19 ft Open Grate Area 2.70 ft2 Active Grate Weir Length 5.00 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:28:49 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-2A On Grade - 4inch Storm Event Project Description I - Solve For Efficiency Input Data I - Discharge 1.18 W/s Slope 0.00900 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 87.32 % Intercepted Flow 1.03 ft3/s Bypass Flow 0.15 ft3/s Spread 5.34 ft Depth 0.18 ft Flow Area 0.46 ft2 Gutter Depression 0.02 ft Total Depression 0.18 ft Velocity 2.55 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.09 Grate Flow Ratio 0.74 Equivalent Cross Slope 0.09897 ft/ft Active Grate Length 1.50 ft Length Factor 0.18 Total Interception Length 8.48 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:28:20 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-3 On Grade - 4inch Storm Event Project Description Solve For Efficiency Input Data Discharge 0.48 W/s Slope 0.00900 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 98.49 % Intercepted Flow 0.47 ft3/s Bypass Flow 0.01 ft3/s Spread 3.70 ft Depth 0.13 ft Flow Area 0.23 ft2 Gutter Depression 0.02 ft Total Depression 0.18 ft Velocity 2.07 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.12 Grate Flow Ratio 0.89 Equivalent Cross Slope 0.11344 ft/ft Active Grate Length 1.50 ft Length Factor 0.28 Total Interception Length 5.34 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:29:25 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-3A On Grade - 4inch Storm Event Project Description Solve For Efficiency Input Data Discharge 0.73 W/s Slope 0.00900 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 94.38 % Intercepted Flow 0.69 ft3/s Bypass Flow 0.04 ft3/s Spread 4.41 ft Depth 0.15 ft Flow Area 0.32 ft2 Gutter Depression 0.02 ft Total Depression 0.18 ft Velocity 2.28 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.11 Grate Flow Ratio 0.82 Equivalent Cross Slope 0.10691 ft/ft Active Grate Length 1.50 ft Length Factor 0.23 Total Interception Length 6.63 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:31:04 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-4 In Sag - 4inch Storm Event Project Description I Solve For Input Data Discharge Gutter Width Gutter Cross Slope Road Cross Slope Local Depression Local Depression Width Grate Width Grate Length Grate Type Clogging Curb Opening Length Opening Height Curb Throat Type Throat Incline Angle Options Calculation Option Results Spread Depth Gutter Depression Total Depression Open Grate Area Active Grate Weir Length Spread P-50 mm (P-1-7/8") Horizontal Use Both 0 0.63 W/s 2.00 ft 0.04 ft/ft 0.03 ft/ft 2.00 in 2.00 ft 2.00 ft 3.00 ft 50.00 % 3.00 ft 0.50 ft 90.00 degrees 2.71 ft 0.10 ft 0.02 ft 0.19 ft 2.70 ft2 5.00 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:32:09 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-5 On Grade - 4inch Storm Event Project Description Solve For Input Data Discharge Slope Gutter Width Gutter Cross Slope Road Cross Slope Roughness Coefficient Local Depression Local Depression Width Grate Width Grate Length Grate Type Clogging Curb Opening Length Options Calculation Option Grate Flow Option Results Efficiency Intercepted Flow Bypass Flow Spread Depth Flow Area Gutter Depression Total Depression Velocity Splash Over Velocity Frontal Flow Factor Side Flow Factor Grate Flow Ratio Equivalent Cross Slope Active Grate Length Length Factor Total Interception Length Efficiency E ■ P-50 mm (P-1-7/8") Use Both Exclude None 1.36 W/s 0.00920 ft/ft 2.00 ft 0.04 ft/ft 0.03 ft/ft 0.013 2.00 in 2.00 ft 2.00 ft 3.00 ft 50.00 % 3.00 ft 84.55 % 1.15 ft3/s 0.21 ft3/s 5.73 ft 0.19 ft 0.51 ft2 0.02 ft 0.19 ft 2.65 ft/s 6.99 ft/s 1.00 0.08 0.71 0.09599 ft/ft 1.50 ft 0.16 9.23 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:32:45 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-5A On Grade - 4inch Storm Event Project Description Solve For Efficiency Input Data Discharge 0.32 cfs Slope 0.009 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.040 ft/ft Road Cross Slope 0.030 ft/ft Roughness Coefficient 0.013 Local Depression 2.0 in Local Depression Width 24.0 in Grate Width 2.00 ft Grate Length 3.0 ft Grate Type Yp P-50 mm (P-1 -7/8 ) Clogging 50.0 % Curb Opening Length 3.0 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 99.94 % Intercepted Flow 0.32 cfs Bypass Flow 0.00 cfs Spread 3.1 ft Depth 1.4 in Flow Area 0.2 ftz Gutter Depression 0.2 in Total Depression 2.2 in Velocity 1.90 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.000 Side Flow Factor 0.138 Grate Flow Ratio 0.947 Equivalent Cross Slope 0.118 ft/ft Active Grate Length 1.5 ft Length Factor 0.338 Total Interception Length 4.4 ft Bentley Systems, Inc. Haestad Methods Solution FlowMaster Gutter Spread - North Site.fm8 Center [10.02.00.01] 10/17/2019 27 Siemon Company Drive Suite 200 W Page 1 of 1 Watertown, CT 06795 USA +1-203-755-1666 Worksheet for C13-6 In Sag - 4inch Storm Event Project Description Solve For Spread Input Data Discharge 2.35 cfs Gutter Width 2.00 ft Gutter Cross Slope 0.040 ft/ft Road Cross Slope 0.030 ft/ft Local Depression 2.0 in Local Depression Width 24.0 in Grate Width 2.00 ft Grate Length 3.0 ft Grate Type YP P-50 mm (P-1 -7/8 ) Clogging 50.0 11/0 Curb Opening Length 3.0 ft Opening Height 0.5 ft Curb Throat Type Horizontal Throat Incline Angle 90.00 degrees Options Calculation Option Use Both Results Spread 6.7 ft Depth 2.7 in Gutter Depression 0.2 in Total Depression 2.2 in Open Grate Area 2.7 ft? Active Grate Weir Length 5.0 ft Bentley Systems, Inc. Haestad Methods Solution FlowMaster Gutter Spread - North Site.fm8 Center [10.02.00.01] 10/17/2019 27 Siemon Company Drive Suite 200 W Page 1 of 1 Watertown, CT 06795 USA +1-203-755-1666 Worksheet for DCB-6A In Sag - 4inch Storm Event Project Description Solve For Spread Input Data Discharge 3.72 cfs Gutter Width 2.00 ft Gutter Cross Slope 0.040 ft/ft Road Cross Slope 0.030 ft/ft Local Depression 2.0 in Local Depression Width 24.0 in Grate Width 2.00 ft Grate Length 6.0 ft Grate Type P-50 mm (P-1 -7/8") Clogging 50.0 % Curb Opening Length 6.0 ft Opening Height 0.5 ft Curb Throat Type Horizontal Throat Incline Angle 90.00 degrees Options Calculation Option Use Both Results Spread 7.2 ft Depth 2.9 In Gutter Depression 0.2 in Total Depression 2.2 in Open Grate Area 5.4 ft? Active Grate Weir Length 8.0 ft Bentley Systems, Inc. Haestad Methods Solution FlowMaster Gutter Spread - North Site.fm8 Center [10.02.00.01] 10/17/2019 27 Siemon Company Drive Suite 200 W Page 1 of 1 Watertown, CT 06795 USA +1-203-755-1666 Worksheet for CB-7 On Grade - 4inch Storm Event Project Description Solve For Efficiency Input Data Discharge 0.03 cfs Slope 0.011 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.040 ft/ft Road Cross Slope 0.030 ft/ft Roughness Coefficient 0.013 Local Depression 2.0 in Local Depression Width 24.0 in Grate Width 2.00 ft Grate Length 3.0 ft Grate Type Yp P-50 mm (P-1 -7/8 ) Clogging 50.0 % Curb Opening Length 3.0 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 100.00 % Intercepted Flow 0.03 cfs Bypass Flow 0.00 cfs Spread 1.1 ft Depth 0.5 in Flow Area 0.0 ftz Gutter Depression 0.2 in Total Depression 2.2 in Velocity 1.14 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.000 Side Flow Factor 0.285 Grate Flow Ratio 1.000 Equivalent Cross Slope 0.123 ft/ft Active Grate Length 1.5 ft Length Factor 0.887 Total Interception Length 1.7 ft Bentley Systems, Inc. Haestad Methods Solution FlowMaster Gutter Spread - North Site.fm8 Center [10.02.00.01] 10/17/2019 27 Siemon Company Drive Suite 200 W Page 1 of 1 Watertown, CT 06795 USA +1-203-755-1666 Worksheet for CB-8 In Sag - 4inch Storm Event Project Description I Solve For Spread Input Data I Discharge 0.06 W/s Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Opening Height 0.50 ft Curb Throat Type Horizontal Throat Incline Angle 90.00 degrees Options Calculation Option Use Both Results Spread 1.00 ft Depth -0.04 ft Gutter Depression 0.02 ft Total Depression 0.19 ft Open Grate Area 2.70 ft2 Active Grate Weir Length 5.00 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:24:15 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for DCB-9 In Sag - 4inch Storm Event Project Description Solve For Spread Input Data Discharge 2.31 W/s Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 6.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 6.00 ft Opening Height 0.50 ft Curb Throat Type Horizontal Throat Incline Angle 90.00 degrees Options Calculation Option Use Both Results Spread 5.36 ft Depth 0.19 ft Gutter Depression 0.02 ft Total Depression 0.18 ft Open Grate Area 5.40 ft2 Active Grate Weir Length 8.00 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:23:07 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for DCB-9A In Sag - 4inch Storm Event Project Description Solve For Input Data Discharge Gutter Width Gutter Cross Slope Road Cross Slope Local Depression Local Depression Width Grate Width Grate Length Grate Type Clogging Curb Opening Length Opening Height Curb Throat Type Throat Incline Angle Options Calculation Option Results Spread Depth Gutter Depression Total Depression Open Grate Area Active Grate Weir Length Spread P-50 mm (P-1-7/8") Horizontal Use Both 2.97 W/s 2.00 ft 0.04 ft/ft 0.03 ft/ft 2.00 in 2.00 ft 2.00 ft 6.00 ft 50.00 % 6.00 ft 0.50 ft 90.00 degrees 6.26 ft 0.21 ft 0.02 ft 0.18 ft 5.40 ft2 8.00 ft ■ Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:22:20 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-10 On Grade - 4inch Storm Event Project Description Solve For Efficiency Input Data Discharge 1.86 W/s Slope 0.00770 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 79.54 Intercepted Flow 1.48 ft3/s Bypass Flow 0.38 W/s Spread 6.37 ft Depth 0.22 ft Flow Area 0.68 ft2 Gutter Depression 0.01 ft Total Depression 0.18 ft Velocity 2.72 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.08 Grate Flow Ratio 0.65 Equivalent Cross Slope 0.09164 ft/ft Active Grate Length 1.50 ft Length Factor 0.15 Total Interception Length 10.27 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:20:45 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-10A On Grade - 4inch Storm Event Project Description Solve For Efficiency Input Data Discharge Slope Gutter Width Gutter Cross Slope Road Cross Slope Roughness Coefficient Local Depression Local Depression Width Grate Width Grate Length Grate Type P-50 mm (P-1-7/8") Clogging Curb Opening Length Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency Intercepted Flow Bypass Flow Spread Depth Flow Area Gutter Depression Total Depression Velocity Splash Over Velocity Frontal Flow Factor Side Flow Factor Grate Flow Ratio Equivalent Cross Slope Active Grate Length Length Factor Total Interception Length 1.98 W/s 0.00770 ft/ft 2.00 ft 0.04 ft/ft 0.03 ft/ft 0.013 2.00 in 2.00 ft 2.00 ft 3.00 ft 50.00 % 3.00 ft 78.59 % 1.56 ft3/s 0.42 ft3/s 6.47 ft 0.23 ft 0.71 ft2 0.01 ft 0.18 ft 2.77 ft/s 6.99 ft/s 1.00 0.08 0.64 0.09105 ft/ft 1.50 ft 0.14 10.59 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:21:29 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-11 On Grade - 4inch Storm Event Project Description Solve For Efficiency Input Data Discharge 0.08 W/s Slope 0.00750 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 100.00 % Intercepted Flow 0.08 ft3/s Bypass Flow 0.00 ft3/s Spread 1.81 ft Depth 0.07 ft Flow Area 0.07 ft2 Gutter Depression 0.02 ft Total Depression 0.18 ft Velocity 1.28 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.25 Grate Flow Ratio 1.00 Equivalent Cross Slope 0.12333 ft/ft Active Grate Length 1.50 ft Length Factor 0.65 Total Interception Length 2.32 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:24:50 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-11 A On Grade - 4inch Storm Event Project Description Solve For Efficiency Input Data Discharge 1.57 W/s Slope 0.00750 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 81.78 % Intercepted Flow 1.28 ft3/s Bypass Flow 0.29 ft3/s Spread 6.21 ft Depth 0.21 ft Flow Area 0.61 ft2 Gutter Depression 0.02 ft Total Depression 0.18 ft Velocity 2.55 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.09 Grate Flow Ratio 0.67 Equivalent Cross Slope 0.09257 ft/ft Active Grate Length 1.50 ft Length Factor 0.16 Total Interception Length 9.43 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:18:12 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-11 B On Grade - 4inch Storm Event Project Description Solve For Efficiency Input Data Discharge Slope Gutter Width Gutter Cross Slope Road Cross Slope Roughness Coefficient Local Depression Local Depression Width Grate Width Grate Length Grate Type P-50 mm (P-1-7/8") Clogging Curb Opening Length Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency Intercepted Flow Bypass Flow Spread Depth Flow Area Gutter Depression Total Depression Velocity Splash Over Velocity Frontal Flow Factor Side Flow Factor Grate Flow Ratio Equivalent Cross Slope Active Grate Length Length Factor Total Interception Length 0.98 W/s 0.00750 ft/ft 2.00 ft 0.04 ft/ft 0.03 ft/ft 0.013 2.00 in 2.00 ft 2.00 ft 3.00 ft 50.00 % 3.00 ft 89.90 % 0.88 ft3/s 0.10 ft3/s 5.15 ft 0.18 ft 0.43 ft2 0.02 ft 0.18 ft 2.28 ft/s 6.99 ft/s 1.00 0.11 0.75 0.10051 ft/ft 1.50 ft 0.20 7.37 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:17:29 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-12 On Grade - 4inch Storm Event Project Description Solve For Efficiency Input Data Discharge 0.20 W/s Slope 0.00750 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 100.00 % Intercepted Flow 0.20 ft3/s Bypass Flow 0.00 ft3/s Spread 2.64 ft Depth 0.10 ft Flow Area 0.13 ft2 Gutter Depression 0.02 ft Total Depression 0.18 ft Velocity 1.58 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.19 Grate Flow Ratio 0.98 Equivalent Cross Slope 0.12172 ft/ft Active Grate Length 1.50 ft Length Factor 0.45 Total Interception Length 3.37 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 3:49:50 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for DCB-12B In Sag - 4inch Storm Event Project Description Solve For Spread Input Data - Discharge 2.39 W/s Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 6.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 6.00 ft Opening Height 0.50 ft Curb Throat Type Horizontal Throat Incline Angle 90.00 degrees Options Calculation Option Use Both Results Spread 5.48 ft Depth 0.19 ft Gutter Depression 0.02 ft Total Depression 0.18 ft Open Grate Area 5.40 ft2 Active Grate Weir Length 8.00 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 3:51:39 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-12C In Sag - 4inch Storm Event Project Description I Solve For Spread Input Data Discharge 1.99 W/s Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Opening Height 0.50 ft Curb Throat Type Horizontal Throat Incline Angle 90.00 degrees Options Calculation Option Use Both Results Spread 6.00 ft Depth 0.20 ft Gutter Depression 0.02 ft Total Depression 0.19 ft Open Grate Area 2.70 ft� Active Grate Weir Length 5.00 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 3:53:24 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-14 On Grade - 4inch Storm Event Project Description I Solve For Efficiency Input Data I Discharge Slope Gutter Width Gutter Cross Slope Road Cross Slope Roughness Coefficient Local Depression Local Depression Width Grate Width Grate Length Grate Type Clogging Curb Opening Length Options Calculation Option Grate Flow Option Results Efficiency Intercepted Flow Bypass Flow Spread Depth Flow Area Gutter Depression Total Depression Velocity Splash Over Velocity Frontal Flow Factor Side Flow Factor Grate Flow Ratio Equivalent Cross Slope Active Grate Length Length Factor Total Interception Length P-50 mm (P-1-7/8") Use Both Exclude None 0.06 W/s 0.00750 ft/ft 2.00 ft 0.04 ft/ft 0.03 ft/ft 0.013 2.00 in 2.00 ft 2.00 ft 3.00 ft 50.00 % 3.00 ft 100.00 % 0.06 ft3/s 0.00 ft3/s 1.55 ft 0.06 ft 0.05 ft2 0.02 ft 0.18 ft 1.16 ft/s 6.99 ft/s 1.00 0.29 1.00 0.12333 ft/ft 1.50 ft 0.77 1.96 ft N Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 3:49:03 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-14A In Sag - 4inch Storm Event Project Description I Solve For Input Data Discharge Gutter Width Gutter Cross Slope Road Cross Slope Local Depression Local Depression Width Grate Width Grate Length Grate Type Clogging Curb Opening Length Opening Height Curb Throat Type Throat Incline Angle Options Calculation Option Results Spread Depth Gutter Depression Total Depression Open Grate Area Active Grate Weir Length Spread P-50 mm (P-1-7/8") Horizontal Use Both 1.09 W/s 2.00 ft 0.04 ft/ft 0.03 ft/ft 2.00 in 2.00 ft 2.00 ft 3.00 ft 50.00 % 3.00 ft 0.50 ft 90.00 degrees 4.00 ft 0.14 ft 0.02 ft 0.19 ft 2.70 ft2 5.00 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 3:48:19 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-16 In Sag - 4inch Storm Event Project Description Solve For Spread Input Data Discharge 1.62 cfs Gutter Width 2.00 ft Gutter Cross Slope 0.040 ft/ft Road Cross Slope 0.030 ft/ft Local Depression 2.0 in Local Depression Width 24.0 in Grate Width 2.00 ft Grate Length 3.0 ft Grate Type YP P-50 mm (P-1 -7/8 ) Clogging 50.0 0/0 Curb Opening Length 3.0 ft Opening Height 0.5 ft Curb Throat Type Horizontal Throat Incline Angle 90.00 degrees Options Calculation Option Use Both Results Spread 5.2 ft Depth 2.1 In Gutter Depression 0.2 in Total Depression 2.2 in Open Grate Area 2.7 ft? Active Grate Weir Length 5.0 ft Bentley Systems, Inc. Haestad Methods Solution FlowMaster Gutter Spread - North Site.fm8 Center [10.02.00.01] 10/17/2019 27 Siemon Company Drive Suite 200 W Page 1 of 1 Watertown, CT 06795 USA +1-203-755-1666 Worksheet for C13-16A In Sag - 4inch Storm Event Project Description Solve For Spread Input Data Discharge 2.35 cfs Gutter Width 2.00 ft Gutter Cross Slope 0.040 ft/ft Road Cross Slope 0.030 ft/ft Local Depression 2.0 in Local Depression Width 24.0 in Grate Width 2.00 ft Grate Length 3.0 ft Grate Type YP P-50 mm (P-1 -7/8 ) Clogging 50.0 11/0 Curb Opening Length 3.0 ft Opening Height 0.5 ft Curb Throat Type Horizontal Throat Incline Angle 90.00 degrees Options Calculation Option Use Both Results Spread 6.7 ft Depth 2.7 in Gutter Depression 0.2 in Total Depression 2.2 in Open Grate Area 2.7 ft? Active Grate Weir Length 5.0 ft Bentley Systems, Inc. Haestad Methods Solution FlowMaster Gutter Spread - North Site.fm8 Center [10.02.00.01] 10/17/2019 27 Siemon Company Drive Suite 200 W Page 1 of 1 Watertown, CT 06795 USA +1-203-755-1666 Worksheet for CB-17 In Sag - 4inch Storm Event Project Description I ■ Solve For Input Data Discharge Gutter Width Gutter Cross Slope Road Cross Slope Local Depression Local Depression Width Grate Width Grate Length Grate Type Clogging Curb Opening Length Opening Height Curb Throat Type Throat Incline Angle Options Calculation Option Results Spread Depth Gutter Depression Total Depression Open Grate Area Active Grate Weir Length Spread I M P-50 mm (P-1-7/8") Horizontal Use Both 1.34 W/s 2.00 ft 0.04 ft/ft 0.03 ft/ft 2.00 in 2.00 ft 2.00 ft 3.00 ft 50.00 % 3.00 ft 0.50 ft 90.00 degrees 4.60 ft 0.16 ft 0.02 ft 0.19 ft 2.70 ft2 5.00 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:26:09 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-17A On Grade - 4inch Storm Event Project Description Solve For Efficiency Input Data Discharge 0.79 W/s Slope 0.02450 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 95.84 Intercepted Flow 0.76 ft3/s Bypass Flow 0.03 ft3/s Spread 3.71 ft Depth 0.13 ft Flow Area 0.23 ft� Gutter Depression 0.02 ft Total Depression 0.18 ft Velocity 3.42 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.05 Grate Flow Ratio 0.89 Equivalent Cross Slope 0.11335 ft/ft Active Grate Length 1.50 ft Length Factor 0.17 Total Interception Length 8.93 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:15:39 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-17B In Sag - 4inch Storm Event Project Description Solve For Spread Input Data Discharge 0.42 W/s Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Opening Height 0.50 ft Curb Throat Type Horizontal Throat Incline Angle 90.00 degrees Options Calculation Option Use Both Results Spread 1.98 ft Depth 0.08 ft Gutter Depression 0.02 ft Total Depression 0.19 ft Open Grate Area 2.70 ft2 Active Grate Weir Length 5.00 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:16:31 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-18 On Grade - 4inch Storm Event Project Description Solve For Efficiency Input Data Discharge 2.32 W/s Slope 0.02450 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 78.48 % Intercepted Flow 1.82 ft3/s Bypass Flow 0.50 ft3/s Spread 5.84 ft Depth 0.20 ft Flow Area 0.53 ft� Gutter Depression 0.02 ft Total Depression 0.19 ft Velocity 4.37 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.03 Grate Flow Ratio 0.70 Equivalent Cross Slope 0.09518 ft/ft Active Grate Length 1.50 ft Length Factor 0.10 Total Interception Length 15.59 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:12:44 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-18A On Grade - 4inch Storm Event Project Description I - Solve For Efficiency Input Data Discharge 1.85 W/s Slope 0.02450 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 83.07 % Intercepted Flow 1.54 ft3/s Bypass Flow 0.31 ft3/s Spread 5.24 ft Depth 0.18 ft Flow Area 0.44 ft2 Gutter Depression 0.02 ft Total Depression 0.18 ft Velocity 4.17 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.04 Grate Flow Ratio 0.74 Equivalent Cross Slope 0.09977 ft/ft Active Grate Length 1.50 ft Length Factor 0.11 Total Interception Length 13.78 ft M Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:14:29 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-19 On Grade - 4inch Storm Event Project Description Solve For Efficiency Input Data Discharge 1.90 W/s Slope 0.00750 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 79.46 % Intercepted Flow 1.51 ft3/s Bypass Flow 0.39 ft3/s Spread 6.36 ft Depth 0.23 ft Flow Area 0.70 ft2 Gutter Depression 0.01 ft Total Depression 0.18 ft Velocity 2.72 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.09 Grate Flow Ratio 0.65 Equivalent Cross Slope 0.09186 ft/ft Active Grate Length 1.50 ft Length Factor 0.15 Total Interception Length 10.28 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:10:49 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-19A On Grade - 4inch Storm Event Project Description I - Solve For Efficiency Input Data Discharge 1.74 W/s Slope 0.00750 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 79.87 % Intercepted Flow 1.39 ft3/s Bypass Flow 0.35 ft3/s Spread 6.46 ft Depth 0.22 ft Flow Area 0.66 ft2 Gutter Depression 0.02 ft Total Depression 0.18 ft Velocity 2.62 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.09 Grate Flow Ratio 0.65 Equivalent Cross Slope 0.09086 ft/ft Active Grate Length 1.50 ft Length Factor 0.15 Total Interception Length 9.96 ft M Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 3:57:32 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-19B In Sag - 4inch Storm Event Project Description Solve For Spread Input Data Discharge 1.41 W/s Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Opening Height 0.50 ft Curb Throat Type Horizontal Throat Incline Angle 90.00 degrees Options Calculation Option Use Both Results Spread 4.76 ft Depth 0.16 ft Gutter Depression 0.02 ft Total Depression 0.19 ft Open Grate Area 2.70 ft� Active Grate Weir Length 5.00 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:08:29 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-19C On Grade - 4inch Storm Event Project Description Solve For Efficiency Input Data Discharge 1.57 W/s Slope 0.00750 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 83.27 Intercepted Flow 1.31 ft3/s Bypass Flow 0.26 ft3/s Spread 5.82 ft Depth 0.21 ft Flow Area 0.60 ft2 Gutter Depression 0.01 ft Total Depression 0.18 ft Velocity 2.61 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.10 Grate Flow Ratio 0.69 Equivalent Cross Slope 0.09556 ft/ft Active Grate Length 1.50 ft Length Factor 0.16 Total Interception Length 9.26 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 3:56:45 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-20 On Grade - 4inch Storm Event Project Description I Solve For Efficiency Input Data I Discharge Slope Gutter Width Gutter Cross Slope Road Cross Slope Roughness Coefficient Local Depression Local Depression Width Grate Width Grate Length Grate Type Clogging Curb Opening Length Options Calculation Option Grate Flow Option Results Efficiency Intercepted Flow Bypass Flow Spread Depth Flow Area Gutter Depression Total Depression Velocity Splash Over Velocity Frontal Flow Factor Side Flow Factor Grate Flow Ratio Equivalent Cross Slope Active Grate Length Length Factor Total Interception Length P-50 mm (P-1-7/8") Use Both Exclude None 0.42 W/s 0.00750 ft/ft 2.00 ft 0.04 ft/ft 0.03 ft/ft 0.013 2.00 in 2.00 ft 2.00 ft 3.00 ft 50.00 % 3.00 ft 99.03 % 0.42 ft3/s 0.00 ft3/s 3.70 ft 0.13 ft 0.22 ft2 0.02 ft 0.19 ft 1.87 ft/s 6.99 ft/s 1.00 0.14 0.90 0.11358 ft/ft 1.50 ft 0.31 4.80 ft M Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:09:51 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-20A On Grade - 4inch Storm Event Project Description Solve For Efficiency Input Data Discharge 1.47 W/s Slope 0.00750 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 84.11 Intercepted Flow 1.24 ft3/s Bypass Flow 0.23 ft'/s Spread 5.75 ft Depth 0.21 ft Flow Area 0.57 ft2 Gutter Depression 0.01 ft Total Depression 0.18 ft Velocity 2.56 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.10 Grate Flow Ratio 0.69 Equivalent Cross Slope 0.09594 ft/ft Active Grate Length 1.50 ft Length Factor 0.17 Total Interception Length 8.98 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 3:55:25 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-20B On Grade - 4inch Storm Event Project Description I - Solve For Efficiency Input Data Discharge 1.15 W/s Slope 0.00750 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 88.47 % Intercepted Flow 1.02 ft3/s Bypass Flow 0.13 ft3/s Spread 5.16 ft Depth 0.19 ft Flow Area 0.48 ft2 Gutter Depression 0.01 ft Total Depression 0.18 ft Velocity 2.42 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.11 Grate Flow Ratio 0.74 Equivalent Cross Slope 0.10043 ft/ft Active Grate Length 1.50 ft Length Factor 0.19 Total Interception Length 7.88 ft M Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 3:54:42 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-22 On Grade - 4 inch Storm Event Project Description Solve For Efficiency Input Data Discharge 1.79 cfs Slope 0.014 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.040 ft/ft Road Cross Slope 0.030 ft/ft Roughness Coefficient 0.013 Local Depression 2.0 in Local Depression Width 24.0 in Grate Width 2.00 ft Grate Length 3.0 ft Grate Type Yp P-50 mm (P-1 -7/8 ) Clogging 50.0 % Curb Opening Length 3.0 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 80.77 % Intercepted Flow 1.45 cfs Bypass Flow 0.34 cfs Spread 5.9 ft Depth 2.4 in Flow Area 0.5 ftz Gutter Depression 0.2 in Total Depression 2.2 in Velocity 3.30 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.000 Side Flow Factor 0.056 Grate Flow Ratio 0.693 Equivalent Cross Slope 0.095 ft/ft Active Grate Length 1.5 ft Length Factor 0.127 Total Interception Length 11.8 ft Bentley Systems, Inc. Haestad Methods Solution FlowMaster Gutter Spread - Middle Site.fm8 Center [10.02.00.01] 10/17/2019 27 Siemon Company Drive Suite 200 W Page 1 of 1 Watertown, CT 06795 USA +1-203-755-1666 Worksheet for CB-22A On Grade - 4 inch Storm Event Project Description Solve For Efficiency Input Data Discharge 0.68 cfs Slope 0.014 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.040 ft/ft Road Cross Slope 0.030 ft/ft Roughness Coefficient 0.013 Local Depression 2.0 in Local Depression Width 24.0 in Grate Width 2.00 ft Grate Length 3.0 ft Grate Type Yp P-50 mm (P-1 -7/8 ) Clogging 50.0 % Curb Opening Length 3.0 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 95.91 % Intercepted Flow 0.65 cfs Bypass Flow 0.03 cfs Spread 4.0 ft Depth 1.7 in Flow Area 0.3 ftz Gutter Depression 0.2 in Total Depression 2.2 in Velocity 2.64 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.000 Side Flow Factor 0.082 Grate Flow Ratio 0.867 Equivalent Cross Slope 0.111 ft/ft Active Grate Length 1.5 ft Length Factor 0.210 Total Interception Length 7.2 ft Bentley Systems, Inc. Haestad Methods Solution FlowMaster Gutter Spread - Middle Site.fm8 Center [10.02.00.01] 10/17/2019 27 Siemon Company Drive Suite 200 W Page 1 of 1 Watertown, CT 06795 USA +1-203-755-1666 Worksheet for CB-22B On Grade - 4 inch Storm Event Project Description Solve For Efficiency Input Data Discharge 0.37 cfs Slope 0.014 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.040 ft/ft Road Cross Slope 0.030 ft/ft Roughness Coefficient 0.013 Local Depression 2.0 in Local Depression Width 24.0 in Grate Width 2.00 ft Grate Length 3.0 ft Grate Type Yp P-50 mm (P-1 -7/8 ) Clogging 50.0 % Curb Opening Length 3.0 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 99.82 % Intercepted Flow 0.37 cfs Bypass Flow 0.00 cfs Spread 3.1 ft Depth 1.3 in Flow Area 0.2 ftz Gutter Depression 0.2 in Total Depression 2.2 in Velocity 2.30 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.000 Side Flow Factor 0.102 Grate Flow Ratio 0.953 Equivalent Cross Slope 0.119 ft/ft Active Grate Length 1.5 ft Length Factor 0.282 Total Interception Length 5.3 ft Bentley Systems, Inc. Haestad Methods Solution FlowMaster Gutter Spread - Middle Site.fm8 Center [10.02.00.01] 10/17/2019 27 Siemon Company Drive Suite 200 W Page 1 of 1 Watertown, CT 06795 USA +1-203-755-1666 Worksheet for CB-23 On Grade - 4 inch Storm Event Project Description Solve For Efficiency Input Data Discharge 0.45 cfs Slope 0.010 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.040 ft/ft Road Cross Slope 0.031 ft/ft Roughness Coefficient 0.013 Local Depression 2.0 in Local Depression Width 24.0 in Grate Width 2.00 ft Grate Length 3.0 ft Grate Type Yp P-50 mm (P-1 -7/8 ) Clogging 50.0 % Curb Opening Length 3.0 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 98.89 % Intercepted Flow 0.45 cfs Bypass Flow 0.00 cfs Spread 3.6 ft Depth 1.5 in Flow Area 0.2 ftz Gutter Depression 0.2 in Total Depression 2.2 in Velocity 2.12 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.000 Side Flow Factor 0.118 Grate Flow Ratio 0.908 Equivalent Cross Slope 0.115 ft/ft Active Grate Length 1.5 ft Length Factor 0.280 Total Interception Length 5.3 ft Bentley Systems, Inc. Haestad Methods Solution FlowMaster Gutter Spread - Middle Site.fm8 Center [10.02.00.01] 10/17/2019 27 Siemon Company Drive Suite 200 W Page 1 of 1 Watertown, CT 06795 USA +1-203-755-1666 Worksheet for CB-24 On Grade - 4 inch Storm Event Project Description Solve For Efficiency Input Data Discharge 0.16 cfs Slope 0.010 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.040 ft/ft Road Cross Slope 0.031 ft/ft Roughness Coefficient 0.013 Local Depression 2.0 in Local Depression Width 24.0 in Grate Width 2.00 ft Grate Length 3.0 ft Grate Type Yp P-50 mm (P-1 -7/8 ) Clogging 50.0 % Curb Opening Length 3.0 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 100.00 % Intercepted Flow 0.16 cfs Bypass Flow 0.00 cfs Spread 2.2 ft Depth 1.0 in Flow Area 0.1 ftz Gutter Depression 0.2 in Total Depression 2.2 in Velocity 1.68 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.000 Side Flow Factor 0.169 Grate Flow Ratio 0.998 Equivalent Cross Slope 0.123 ft/ft Active Grate Length 1.5 ft Length Factor 0.452 Total Interception Length 3.3 ft Bentley Systems, Inc. Haestad Methods Solution FlowMaster Gutter Spread - Middle Site.fm8 Center [10.02.00.01] 10/17/2019 27 Siemon Company Drive Suite 200 W Page 1 of 1 Watertown, CT 06795 USA +1-203-755-1666 Worksheet for CB-24A On Grade - 4 inch Storm Event Project Description Solve For Efficiency Input Data Discharge 1.85 cfs Slope 0.010 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.040 ft/ft Road Cross Slope 0.030 ft/ft Roughness Coefficient 0.013 Local Depression 2.0 in Local Depression Width 24.0 in Grate Width 2.00 ft Grate Length 3.0 ft Grate Type P-50 mm (P-1 -7/8") Clogging 50.0 % Curb Opening Length 3.0 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 79.26 % Intercepted Flow 1.47 cfs Bypass Flow 0.38 cfs Spread 6.3 ft Depth 2.5 in Flow Area 0.6 ftz Gutter Depression 0.2 in Total Depression 2.2 in Velocity 2.95 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.000 Side Flow Factor 0.069 Grate Flow Ratio 0.660 Equivalent Cross Slope 0.092 ft/ft Active Grate Length 1.5 ft Length Factor 0.135 Total Interception Length 11.1 ft Bentley Systems, Inc. Haestad Methods Solution FlowMaster Gutter Spread - Middle Site.fm8 Center [10.02.00.01] 10/17/2019 27 Siemon Company Drive Suite 200 W Page 1 of 1 Watertown, CT 06795 USA +1-203-755-1666 Worksheet for CB-25 On Grade - 4 inch Storm Event Project Description Solve For Efficiency Input Data Discharge 0.08 cfs Slope 0.014 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.040 ft/ft Road Cross Slope 0.030 ft/ft Roughness Coefficient 0.013 Local Depression 2.0 in Local Depression Width 24.0 in Grate Width 2.00 ft Grate Length 3.0 ft Grate Type P-50 mm (P-1 -7/8") Clogging 50.0 % Curb Opening Length 3.0 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 100.00 % Intercepted Flow 0.08 cfs Bypass Flow 0.00 cfs Spread 1.6 ft Depth 0.8 in Flow Area 0.1 ftz Gutter Depression 0.2 in Total Depression 2.2 in Velocity 1.59 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.000 Side Flow Factor 0.183 Grate Flow Ratio 1.000 Equivalent Cross Slope 0.123 ft/ft Active Grate Length 1.5 ft Length Factor 0.549 Total Interception Length 2.7 ft Bentley Systems, Inc. Haestad Methods Solution FlowMaster Gutter Spread - Middle Site.fm8 Center [10.02.00.01] 10/17/2019 27 Siemon Company Drive Suite 200 W Page 1 of 1 Watertown, CT 06795 USA +1-203-755-1666 Worksheet for CB-26B On Grade - 4 inch Storm Event Project Description Solve For Efficiency Input Data Discharge 0.06 cfs Slope 0.010 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.040 ft/ft Road Cross Slope 0.030 ft/ft Roughness Coefficient 0.013 Local Depression 2.0 in Local Depression Width 24.0 in Grate Width 2.00 ft Grate Length 3.0 ft Grate Type P-50 mm (P-1 -7/8") Clogging 50.0 % Curb Opening Length 3.0 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 100.00 % Intercepted Flow 0.06 cfs Bypass Flow 0.00 cfs Spread 1.5 ft Depth 0.7 in Flow Area 0.0 ftz Gutter Depression 0.1 in Total Depression 2.1 in Velocity 1.31 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.000 Side Flow Factor 0.260 Grate Flow Ratio 1.000 Equivalent Cross Slope 0.123 ft/ft Active Grate Length 1.5 ft Length Factor 0.683 Total Interception Length 2.2 ft Bentley Systems, Inc. Haestad Methods Solution FlowMaster Gutter Spread - Middle Site.fm8 Center [10.02.00.01] 10/17/2019 27 Siemon Company Drive Suite 200 W Page 1 of 1 Watertown, CT 06795 USA +1-203-755-1666 Worksheet for CB-27C On Grade - 4 inch Storm Event Project Description Solve For Efficiency Input Data Discharge 3.51 cfs Slope 0.010 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.040 ft/ft Road Cross Slope 0.030 ft/ft Roughness Coefficient 0.013 Local Depression 2.0 in Local Depression Width 24.0 in Grate Width 2.00 ft Grate Length 3.0 ft Grate Type Yp P-50 mm (P-1 -7/8 ) Clogging 50.0 % Curb Opening Length 3.0 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 66.70 % Intercepted Flow 2.34 cfs Bypass Flow 1.17 cfs Spread 8.2 ft Depth 3.2 in Flow Area 1.0 ftz Gutter Depression 0.2 in Total Depression 2.2 in Velocity 3.43 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.000 Side Flow Factor 0.052 Grate Flow Ratio 0.546 Equivalent Cross Slope 0.081 ft/ft Active Grate Length 1.5 ft Length Factor 0.096 Total Interception Length 15.6 ft Bentley Systems, Inc. Haestad Methods Solution FlowMaster Gutter Spread - Middle Site.fm8 Center [10.02.00.01] 10/17/2019 27 Siemon Company Drive Suite 200 W Page 1 of 1 Watertown, CT 06795 USA +1-203-755-1666 Worksheet for CB-28 On Grade - 4 inch Storm Event Project Description Solve For Efficiency Input Data Discharge 1.52 cfs Slope 0.010 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.040 ft/ft Road Cross Slope 0.030 ft/ft Roughness Coefficient 0.013 Local Depression 2.0 in Local Depression Width 24.0 in Grate Width 2.00 ft Grate Length 3.0 ft Grate Type Yp P-50 mm (P-1 -7/8 ) Clogging 50.0 % Curb Opening Length 3.0 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 82.71 % Intercepted Flow 1.26 cfs Bypass Flow 0.26 cfs Spread 5.9 ft Depth 2.4 in Flow Area 0.5 ftz Gutter Depression 0.2 in Total Depression 2.2 in Velocity 2.81 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.000 Side Flow Factor 0.073 Grate Flow Ratio 0.694 Equivalent Cross Slope 0.095 ft/ft Active Grate Length 1.5 ft Length Factor 0.150 Total Interception Length 10.0 ft Bentley Systems, Inc. Haestad Methods Solution FlowMaster Gutter Spread - Middle Site.fm8 Center [10.02.00.01] 10/17/2019 27 Siemon Company Drive Suite 200 W Page 1 of 1 Watertown, CT 06795 USA +1-203-755-1666 Worksheet for CB-28A On Grade - 4 inch Storm Event Project Description Solve For Efficiency Input Data Discharge 2.82 cfs Slope 0.010 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.040 ft/ft Road Cross Slope 0.030 ft/ft Roughness Coefficient 0.013 Local Depression 2.0 in Local Depression Width 24.0 in Grate Width 2.00 ft Grate Length 3.0 ft Grate Type Yp P-50 mm (P-1 -7/8 ) Clogging 50.0 % Curb Opening Length 3.0 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 70.91 % Intercepted Flow 2.00 cfs Bypass Flow 0.82 cfs Spread 7.5 ft Depth 2.9 in Flow Area 0.9 ftz Gutter Depression 0.2 in Total Depression 2.2 in Velocity 3.26 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.000 Side Flow Factor 0.057 Grate Flow Ratio 0.583 Equivalent Cross Slope 0.084 ft/ft Active Grate Length 1.5 ft Length Factor 0.108 Total Interception Length 13.9 ft Bentley Systems, Inc. Haestad Methods Solution FlowMaster Gutter Spread - Middle Site.fm8 Center [10.02.00.01] 10/17/2019 27 Siemon Company Drive Suite 200 W Page 1 of 1 Watertown, CT 06795 USA +1-203-755-1666 Worksheet for CB-28B On Grade - 4 inch Storm Event Project Description Solve For Efficiency Input Data Discharge 1.42 cfs Slope 0.010 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.040 ft/ft Road Cross Slope 0.030 ft/ft Roughness Coefficient 0.013 Local Depression 2.0 in Local Depression Width 24.0 in Grate Width 2.00 ft Grate Length 3.0 ft Grate Type Yp P-50 mm (P-1 -7/8 ) Clogging 50.0 % Curb Opening Length 3.0 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 83.95 % Intercepted Flow 1.19 cfs Bypass Flow 0.23 cfs Spread 5.7 ft Depth 2.3 in Flow Area 0.5 ftz Gutter Depression 0.2 in Total Depression 2.2 in Velocity 2.76 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.000 Side Flow Factor 0.075 Grate Flow Ratio 0.706 Equivalent Cross Slope 0.096 ft/ft Active Grate Length 1.5 ft Length Factor 0.155 Total Interception Length 9.7 ft Bentley Systems, Inc. Haestad Methods Solution FlowMaster Gutter Spread - Middle Site.fm8 Center [10.02.00.01] 10/17/2019 27 Siemon Company Drive Suite 200 W Page 1 of 1 Watertown, CT 06795 USA +1-203-755-1666 Worksheet for CB-28C On Grade - 4 inch Storm Event Project Description Solve For Efficiency Input Data Discharge 2.48 cfs Slope 0.010 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.040 ft/ft Road Cross Slope 0.030 ft/ft Roughness Coefficient 0.013 Local Depression 2.0 in Local Depression Width 24.0 in Grate Width 2.00 ft Grate Length 3.0 ft Grate Type Yp P-50 mm (P-1 -7/8 ) Clogging 50.0 % Curb Opening Length 3.0 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 73.40 % Intercepted Flow 1.82 cfs Bypass Flow 0.66 cfs Spread 7.1 ft Depth 2.8 in Flow Area 0.8 ftz Gutter Depression 0.2 in Total Depression 2.2 in Velocity 3.16 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.000 Side Flow Factor 0.060 Grate Flow Ratio 0.605 Equivalent Cross Slope 0.087 ft/ft Active Grate Length 1.5 ft Length Factor 0.116 Total Interception Length 13.0 ft Bentley Systems, Inc. Haestad Methods Solution FlowMaster Gutter Spread - Middle Site.fm8 Center [10.02.00.01] 10/17/2019 27 Siemon Company Drive Suite 200 W Page 1 of 1 Watertown, CT 06795 USA +1-203-755-1666 Worksheet for CB-29 On Grade - 4 inch Storm Event Project Description Solve For Efficiency Input Data Discharge 1.09 cfs Slope 0.010 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.040 ft/ft Road Cross Slope 0.030 ft/ft Roughness Coefficient 0.013 Local Depression 2.0 in Local Depression Width 24.0 in Grate Width 2.00 ft Grate Length 3.0 ft Grate Type Yp P-50 mm (P-1 -7/8 ) Clogging 50.0 % Curb Opening Length 3.0 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 88.53 % Intercepted Flow 0.96 cfs Bypass Flow 0.13 cfs Spread 5.2 ft Depth 2.1 in Flow Area 0.4 ftz Gutter Depression 0.2 in Total Depression 2.2 in Velocity 2.60 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.000 Side Flow Factor 0.084 Grate Flow Ratio 0.755 Equivalent Cross Slope 0.100 ft/ft Active Grate Length 1.5 ft Length Factor 0.179 Total Interception Length 8.4 ft Bentley Systems, Inc. Haestad Methods Solution FlowMaster Gutter Spread - Middle Site.fm8 Center [10.02.00.01] 10/17/2019 27 Siemon Company Drive Suite 200 W Page 1 of 1 Watertown, CT 06795 USA +1-203-755-1666 Worksheet for CB-29A On Grade - 4 inch Storm Event Project Description Solve For Efficiency Input Data Discharge 1.67 cfs Slope 0.010 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.040 ft/ft Road Cross Slope 0.030 ft/ft Roughness Coefficient 0.013 Local Depression 2.0 in Local Depression Width 24.0 in Grate Width 2.00 ft Grate Length 3.0 ft Grate Type Yp P-50 mm (P-1 -7/8 ) Clogging 50.0 % Curb Opening Length 3.0 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 80.97 % Intercepted Flow 1.35 cfs Bypass Flow 0.32 cfs Spread 6.1 ft Depth 2.4 in Flow Area 0.6 ftz Gutter Depression 0.2 in Total Depression 2.2 in Velocity 2.87 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.000 Side Flow Factor 0.071 Grate Flow Ratio 0.676 Equivalent Cross Slope 0.093 ft/ft Active Grate Length 1.5 ft Length Factor 0.143 Total Interception Length 10.5 ft Bentley Systems, Inc. Haestad Methods Solution FlowMaster Gutter Spread - Middle Site.fm8 Center [10.02.00.01] 10/17/2019 27 Siemon Company Drive Suite 200 W Page 1 of 1 Watertown, CT 06795 USA +1-203-755-1666 Worksheet for CB-29B On Grade - 4 inch Storm Event Project Description Solve For Efficiency Input Data Discharge 1.70 cfs Slope 0.010 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.040 ft/ft Road Cross Slope 0.030 ft/ft Roughness Coefficient 0.013 Local Depression 2.0 in Local Depression Width 24.0 in Grate Width 2.00 ft Grate Length 3.0 ft Grate Type Yp P-50 mm (P-1 -7/8 ) Clogging 50.0 % Curb Opening Length 3.0 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 80.63 % Intercepted Flow 1.37 cfs Bypass Flow 0.33 cfs Spread 6.2 ft Depth 2.5 in Flow Area 0.6 ftz Gutter Depression 0.2 in Total Depression 2.2 in Velocity 2.89 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.000 Side Flow Factor 0.070 Grate Flow Ratio 0.673 Equivalent Cross Slope 0.093 ft/ft Active Grate Length 1.5 ft Length Factor 0.141 Total Interception Length 10.6 ft Bentley Systems, Inc. Haestad Methods Solution FlowMaster Gutter Spread - Middle Site.fm8 Center [10.02.00.01] 10/17/2019 27 Siemon Company Drive Suite 200 W Page 1 of 1 Watertown, CT 06795 USA +1-203-755-1666 Worksheet for CB-29C On Grade - 4 inch Storm Event Project Description Solve For Efficiency Input Data Discharge 2.23 cfs Slope 0.010 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.040 ft/ft Road Cross Slope 0.030 ft/ft Roughness Coefficient 0.013 Local Depression 2.0 in Local Depression Width 24.0 in Grate Width 2.00 ft Grate Length 3.0 ft Grate Type Yp P-50 mm (P-1 -7/8 ) Clogging 50.0 % Curb Opening Length 3.0 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 75.46 % Intercepted Flow 1.68 cfs Bypass Flow 0.55 cfs Spread 6.9 ft Depth 2.7 in Flow Area 0.7 ftz Gutter Depression 0.2 in Total Depression 2.2 in Velocity 3.08 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.000 Side Flow Factor 0.063 Grate Flow Ratio 0.624 Equivalent Cross Slope 0.088 ft/ft Active Grate Length 1.5 ft Length Factor 0.122 Total Interception Length 12.3 ft Bentley Systems, Inc. Haestad Methods Solution FlowMaster Gutter Spread - Middle Site.fm8 Center [10.02.00.01] 10/17/2019 27 Siemon Company Drive Suite 200 W Page 1 of 1 Watertown, CT 06795 USA +1-203-755-1666 Worksheet for CB-30 On Grade - 4 inch Storm Event Project Description Solve For Efficiency Input Data Discharge 0.59 W/s Slope 0.01410 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 97.39 % Intercepted Flow 0.57 ft3/s Bypass Flow 0.02 ft'/s Spread 3.71 ft Depth 0.13 ft Flow Area 0.23 ft2 Gutter Depression 0.02 ft Total Depression 0.19 ft Velocity 2.58 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.09 Grate Flow Ratio 0.89 Equivalent Cross Slope 0.11340 ft/ft Active Grate Length 1.50 ft Length Factor 0.22 Total Interception Length 6.69 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:44:35 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-31 On Grade - 4 inch Storm Event Project Description Solve For Efficiency Input Data Discharge 0.15 W/s Slope 0.01050 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 100.00 % Intercepted Flow 0.15 ft3/s Bypass Flow 0.00 ft3/s Spread 2.14 ft Depth 0.08 ft Flow Area 0.09 ft2 Gutter Depression 0.02 ft Total Depression 0.19 ft Velocity 1.68 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.17 Grate Flow Ratio 1.00 Equivalent Cross Slope 0.12329 ft/ft Active Grate Length 1.50 ft Length Factor 0.46 Total Interception Length 3.28 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:43:59 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-31 A On Grade - 4 inch Storm Event Project Description I - Solve For Efficiency Input Data Discharge 2.24 W/s Slope 0.01410 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 76.84 % Intercepted Flow 1.72 ft3/s Bypass Flow 0.52 ft3/s Spread 6.36 ft Depth 0.21 ft Flow Area 0.64 ft2 Gutter Depression 0.02 ft Total Depression 0.19 ft Velocity 3.52 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.05 Grate Flow Ratio 0.66 Equivalent Cross Slope 0.09149 ft/ft Active Grate Length 1.50 ft Length Factor 0.11 Total Interception Length 13.33 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:48:09 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-32 On Grade - 4 inch Storm Event Project Description Solve For Efficiency Input Data Discharge 1.07 W/s Slope 0.01050 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 89.11 Intercepted Flow 0.95 ft3/s Bypass Flow 0.12 ft3/s Spread 5.03 ft Depth 0.17 ft Flow Area 0.40 ft2 Gutter Depression 0.02 ft Total Depression 0.19 ft Velocity 2.64 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.08 Grate Flow Ratio 0.77 Equivalent Cross Slope 0.10154 ft/ft Active Grate Length 1.50 ft Length Factor 0.18 Total Interception Length 8.40 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:43:33 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-32A In Sag - 4 inch Storm Event Project Description I Solve For Spread Input Data - Discharge 1.72 W/s Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Opening Height 0.50 ft Curb Throat Type Horizontal Throat Incline Angle 90.00 degrees Options Calculation Option Use Both Results Spread 5.44 ft Depth 0.18 ft Gutter Depression 0.02 ft Total Depression 0.19 ft Open Grate Area 2.70 ft� Active Grate Weir Length 5.00 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:47:30 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-32B On Grade - 4 inch Storm Event Project Description - Solve For Efficiency Input Data _ Discharge 1.88 W/s Slope 0.01000 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 78.73 % Intercepted Flow 1.48 ft3/s Bypass Flow 0.40 ft3/s Spread 6.41 ft Depth 0.21 ft Flow Area 0.64 ft2 Gutter Depression 0.02 ft Total Depression 0.19 ft Velocity 2.96 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.07 Grate Flow Ratio 0.65 Equivalent Cross Slope 0.09112 ft/ft Active Grate Length 1.50 ft Length Factor 0.13 Total Interception Length 11.20 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:45:13 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-32C On Grade - 4 inch Storm Event Project Description - Solve For Efficiency Input Data - Discharge 2.02 W/s Slope 0.01050 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 77.78 % Intercepted Flow 1.57 ft3/s Bypass Flow 0.45 ft3/s Spread 6.47 ft Depth 0.22 ft Flow Area 0.66 ft2 Gutter Depression 0.02 ft Total Depression 0.19 ft Velocity 3.07 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.06 Grate Flow Ratio 0.65 Equivalent Cross Slope 0.09079 ft/ft Active Grate Length 1.50 ft Length Factor 0.13 Total Interception Length 11.73 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:42:56 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-35 On Grade - 4 inch Storm Event Project Description _ Solve For Efficiency Input Data Discharge 0.67 W/s Slope 0.01500 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 96.24 % Intercepted Flow 0.64 ft3/s Bypass Flow 0.03 ft3/s Spread 3.89 ft Depth 0.14 ft Flow Area 0.25 ft2 Gutter Depression 0.02 ft Total Depression 0.19 ft Velocity 2.71 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.08 Grate Flow Ratio 0.88 Equivalent Cross Slope 0.11180 ft/ft Active Grate Length 1.50 ft Length Factor 0.21 Total Interception Length 7.25 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:46:51 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for DCB-36 In Sag - 4 inch Storm Event Project Description I Solve For Input Data Discharge Gutter Width Gutter Cross Slope Road Cross Slope Local Depression Local Depression Width Grate Width Grate Length Grate Type Clogging Curb Opening Length Opening Height Curb Throat Type Throat Incline Angle Options Calculation Option Results Spread Depth Gutter Depression Total Depression Open Grate Area Active Grate Weir Length Spread P-50 mm (P-1-7/8") Horizontal Use Both 2.27 W/s 2.00 ft 0.04 ft/ft 0.03 ft/ft 2.00 in 2.00 ft 2.00 ft 6.00 ft 50.00 % 6.00 ft 0.50 ft 90.00 degrees 5.48 ft 0.18 ft 0.02 ft 0.19 ft 5.40 ft2 8.00 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:38:20 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for DCB-36A In Sag - 4 inch Storm Event Project Description Solve For Input Data Discharge Gutter Width Gutter Cross Slope Road Cross Slope Local Depression Local Depression Width Grate Width Grate Length Grate Type Clogging Curb Opening Length Opening Height Curb Throat Type Throat Incline Angle Options Calculation Option Results Spread Depth Gutter Depression Total Depression Open Grate Area Active Grate Weir Length Spread M P-50 mm (P-1-7/8") Horizontal Use Both 2.66 W/s 2.00 ft 0.04 ft/ft 0.03 ft/ft 2.00 in 2.00 ft 2.00 ft 6.00 ft 50.00 % 6.00 ft 0.50 ft 90.00 degrees 6.05 ft 0.20 ft 0.02 ft 0.19 ft 5.40 ft2 8.00 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:40:57 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-36B On Grade - 4 inch Storm Event Project Description Solve For Efficiency Input Data Discharge Slope Gutter Width Gutter Cross Slope Road Cross Slope Roughness Coefficient Local Depression Local Depression Width Grate Width Grate Length Grate Type P-50 mm (P-1-7/8") Clogging Curb Opening Length Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency Intercepted Flow Bypass Flow Spread Depth Flow Area Gutter Depression Total Depression Velocity Splash Over Velocity Frontal Flow Factor Side Flow Factor Grate Flow Ratio Equivalent Cross Slope Active Grate Length Length Factor Total Interception Length 1.20 W/s 0.01500 ft/ft 2.00 ft 0.04 ft/ft 0.03 ft/ft 0.013 2.00 in 2.00 ft 2.00 ft 3.00 ft 50.00 % 3.00 ft 88.19 % 1.06 ft3/s 0.14 ft3/s 4.94 ft 0.17 ft 0.39 ft2 0.02 ft 0.19 ft 3.10 ft/s 6.99 ft/s 1.00 0.06 0.77 0.10230 ft/ft 1.50 ft 0.15 9.77 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:40:14 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-37A On Grade - 4 inch Storm Event Project Description I - Solve For Efficiency Input Data Discharge 1.79 W/s Slope 0.01500 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 81.10 % Intercepted Flow 1.45 ft3/s Bypass Flow 0.34 ft3/s Spread 5.80 ft Depth 0.19 ft Flow Area 0.53 ft2 Gutter Depression 0.02 ft Total Depression 0.19 ft Velocity 3.41 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.05 Grate Flow Ratio 0.70 Equivalent Cross Slope 0.09542 ft/ft Active Grate Length 1.50 ft Length Factor 0.12 Total Interception Length 12.05 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:39:13 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-37B On Grade - 4 inch Storm Event Project Description - Solve For Efficiency Input Data _ Discharge 0.24 W/s Slope 0.01500 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 100.00 % Intercepted Flow 0.24 ft3/s Bypass Flow 0.00 ft3/s Spread 2.47 ft Depth 0.09 ft Flow Area 0.11 ft2 Gutter Depression 0.02 ft Total Depression 0.19 ft Velocity 2.15 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.11 Grate Flow Ratio 0.99 Equivalent Cross Slope 0.12255 ft/ft Active Grate Length 1.50 ft Length Factor 0.34 Total Interception Length 4.46 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:37:05 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-38 On Grade - 4 inch Storm Event Project Description _ Solve For Efficiency Input Data Discharge 1.15 W/s Slope 0.01500 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 88.89 % Intercepted Flow 1.02 ft3/s Bypass Flow 0.13 W/s Spread 4.86 ft Depth 0.17 ft Flow Area 0.37 ft2 Gutter Depression 0.02 ft Total Depression 0.19 ft Velocity 3.07 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.06 Grate Flow Ratio 0.78 Equivalent Cross Slope 0.10302 ft/ft Active Grate Length 1.50 ft Length Factor 0.16 Total Interception Length 9.56 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:36:20 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-39 On Grade - 4 inch Storm Event Project Description _ Solve For Efficiency Input Data Discharge 0.08 W/s Slope 0.01000 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 100.00 % Intercepted Flow 0.08 ft3/s Bypass Flow 0.00 ft3/s Spread 1.68 ft Depth 0.07 ft Flow Area 0.06 ft2 Gutter Depression 0.02 ft Total Depression 0.19 ft Velocity 1.41 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.21 Grate Flow Ratio 1.00 Equivalent Cross Slope 0.12333 ft/ft Active Grate Length 1.50 ft Length Factor 0.60 Total Interception Length 2.48 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:35:52 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-40 On Grade - 4 inch Storm Event Project Description I _ Solve For Efficiency Input Data Discharge 0.36 W/s Slope 0.01000 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 99.76 % Intercepted Flow 0.36 ft3/s Bypass Flow 0.00 ft3/s Spread 3.25 ft Depth 0.12 ft Flow Area 0.18 ft2 Gutter Depression 0.02 ft Total Depression 0.19 ft Velocity 2.02 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.13 Grate Flow Ratio 0.94 Equivalent Cross Slope 0.11750 ft/ft Active Grate Length 1.50 ft Length Factor 0.31 Total Interception Length 4.80 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/16/2019 4:35:11 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-43 On Grade - 4inch Storm Event Project Description Solve For Efficiency Input Data Discharge 1.44 W/s Slope 0.01430 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 85.33 % Intercepted Flow 1.23 ft3/s Bypass Flow 0.21 ft'/s Spread 5.26 ft Depth 0.18 ft Flow Area 0.45 ft2 Gutter Depression 0.02 ft Total Depression 0.18 ft Velocity 3.20 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.06 Grate Flow Ratio 0.74 Equivalent Cross Slope 0.09963 ft/ft Active Grate Length 1.50 ft Length Factor 0.14 Total Interception Length 10.56 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/17/2019 11:53:26 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for DCB-43A In Sag - 4inch Storm Event Project Description Solve For Spread Input Data Discharge 4.21 W/s Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 6.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 6.00 ft Opening Height 0.50 ft Curb Throat Type Horizontal Throat Incline Angle 90.00 degrees Options Calculation Option Use Both Results Spread 8.06 ft Depth 0.26 ft Gutter Depression 0.02 ft Total Depression 0.19 ft Open Grate Area 5.40 ft� Active Grate Weir Length 8.00 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/17/2019 11:55:28 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-44 On Grade - 4inch Storm Event Project Description Solve For Efficiency Input Data Discharge 1.19 W/s Slope 0.01430 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 88.54 Intercepted Flow 1.05 ft3/s Bypass Flow 0.14 ft'/s Spread 4.87 ft Depth 0.17 ft Flow Area 0.39 ft2 Gutter Depression 0.02 ft Total Depression 0.18 ft Velocity 3.06 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.07 Grate Flow Ratio 0.78 Equivalent Cross Slope 0.10282 ft/ft Active Grate Length 1.50 ft Length Factor 0.16 Total Interception Length 9.57 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/17/2019 11:49:58 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-44A On Grade - 4inch Storm Event Project Description Solve For Efficiency Input Data Discharge 0.95 W/s Slope 0.01430 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 91.95 % Intercepted Flow 0.88 ft3/s Bypass Flow 0.08 ft3/s Spread 4.46 ft Depth 0.16 ft Flow Area 0.33 ft2 Gutter Depression 0.02 ft Total Depression 0.18 ft Velocity 2.91 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.07 Grate Flow Ratio 0.82 Equivalent Cross Slope 0.10649 ft/ft Active Grate Length 1.50 ft Length Factor 0.18 Total Interception Length 8.53 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/17/2019 11:53:52 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-45 On Grade - 4inch Storm Event Project Description Solve For Efficiency Input Data Discharge 1.63 W/s Slope 0.01430 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 83.13 % Intercepted Flow 1.36 ft3/s Bypass Flow 0.27 ft'/s Spread 5.52 ft Depth 0.19 ft Flow Area 0.49 ft2 Gutter Depression 0.02 ft Total Depression 0.18 ft Velocity 3.30 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.06 Grate Flow Ratio 0.72 Equivalent Cross Slope 0.09754 ft/ft Active Grate Length 1.50 ft Length Factor 0.13 Total Interception Length 11.27 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/17/2019 11:49:16 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-46 On Grade - 4inch Storm Event Project Description Solve For Efficiency Input Data Discharge 1.12 W/s Slope 0.01430 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 89.50 % Intercepted Flow 1.00 ft3/s Bypass Flow 0.12 ft3/s Spread 4.76 ft Depth 0.17 ft Flow Area 0.37 ft2 Gutter Depression 0.02 ft Total Depression 0.18 ft Velocity 3.02 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.07 Grate Flow Ratio 0.79 Equivalent Cross Slope 0.10383 ft/ft Active Grate Length 1.50 ft Length Factor 0.16 Total Interception Length 9.27 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/17/2019 11:48:45 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-47 On Grade - 4inch Storm Event Project Description Solve For Efficiency Input Data Discharge 1.23 W/s Slope 0.01430 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 88.00 % Intercepted Flow 1.08 ft3/s Bypass Flow 0.15 ft3/s Spread 4.94 ft Depth 0.17 ft Flow Area 0.40 ft2 Gutter Depression 0.02 ft Total Depression 0.18 ft Velocity 3.09 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.07 Grate Flow Ratio 0.77 Equivalent Cross Slope 0.10227 ft/ft Active Grate Length 1.50 ft Length Factor 0.15 Total Interception Length 9.73 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/17/2019 11:47:01 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-47A On Grade - 4inch Storm Event Project Description I Solve For Efficiency Input Data Discharge 0.14 W/s Slope 0.01000 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 100.00 % Intercepted Flow 0.14 ft3/s Bypass Flow 0.00 ft3/s Spread 2.10 ft Depth 0.08 ft Flow Area 0.09 ft2 Gutter Depression 0.02 ft Total Depression 0.18 ft Velocity 1.63 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.18 Grate Flow Ratio 1.00 Equivalent Cross Slope 0.12332 ft/ft Active Grate Length 1.50 ft Length Factor 0.48 Total Interception Length 3.14 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/17/2019 11:07:16 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-48 On Grade - 4inch Storm Event Project Description Solve For Efficiency Input Data Discharge 0.85 W/s Slope 0.01000 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 92.64 Intercepted Flow 0.79 ft3/s Bypass Flow 0.06 ft'/s Spread 4.57 ft Depth 0.16 ft Flow Area 0.34 ft2 Gutter Depression 0.02 ft Total Depression 0.18 ft Velocity 2.47 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.09 Grate Flow Ratio 0.81 Equivalent Cross Slope 0.10542 ft/ft Active Grate Length 1.50 ft Length Factor 0.20 Total Interception Length 7.35 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/17/2019 11:47:32 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-48A In Sag - 4inch Storm Event Project Description I Solve For Input Data Discharge Gutter Width Gutter Cross Slope Road Cross Slope Local Depression Local Depression Width Grate Width Grate Length Grate Type Clogging Curb Opening Length Opening Height Curb Throat Type Throat Incline Angle Options Calculation Option Results Spread Depth Gutter Depression Total Depression Open Grate Area Active Grate Weir Length Spread P-50 mm (P-1-7/8") Horizontal Use Both 0.73 W/s 2.00 ft 0.04 ft/ft 0.03 ft/ft 2.00 in 2.00 ft 2.00 ft 3.00 ft 50.00 % 3.00 ft 0.50 ft 90.00 degrees 2.95 ft 0.11 ft 0.02 ft 0.18 ft 2.70 ft2 5.00 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/17/2019 11:48:12 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-48B On Grade - 4inch Storm Event Project Description I - Solve For Efficiency Input Data Discharge 0.36 W/s Slope 0.02240 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 99.98 % Intercepted Flow 0.36 ft3/s Bypass Flow 0.00 ft3/s Spread 2.69 ft Depth 0.10 ft Flow Area 0.13 ft2 Gutter Depression 0.02 ft Total Depression 0.18 ft Velocity 2.76 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.08 Grate Flow Ratio 0.98 Equivalent Cross Slope 0.12147 ft/ft Active Grate Length 1.50 ft Length Factor 0.25 Total Interception Length 6.00 ft M Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/17/2019 11:45:41 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for DCB-49 In Sag - 4inch Storm Event Project Description I - Solve For Input Data Discharge Gutter Width Gutter Cross Slope Road Cross Slope Local Depression Local Depression Width Grate Width Grate Length Grate Type Clogging Curb Opening Length Opening Height Curb Throat Type Throat Incline Angle Options Calculation Option Results Spread Depth Gutter Depression Total Depression Open Grate Area Active Grate Weir Length Spread P-50 mm (P-1-7/8") Horizontal Use Both 2.42 W/s 2.00 ft 0.04 ft/ft 0.03 ft/ft 2.00 in 2.00 ft 2.00 ft 6.00 ft 50.00 % 6.00 ft 0.50 ft 90.00 degrees 5.70 ft 0.19 ft 0.02 ft 0.19 ft 5.40 ft2 8.00 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/17/2019 11:46:25 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for DCB-49A In Sag - 4inch Storm Event Project Description Solve For Spread Input Data Discharge Gutter Width Gutter Cross Slope Road Cross Slope Local Depression Local Depression Width Grate Width Grate Length Grate Type P-50 mm (P-1-7/8") Clogging Curb Opening Length Opening Height Curb Throat Type Horizontal Throat Incline Angle Options Calculation Option Use Both Results Spread Depth Gutter Depression Total Depression Open Grate Area Active Grate Weir Length 2.95 W/s 2.00 ft 0.04 ft/ft 0.03 ft/ft 2.00 in 2.00 ft 2.00 ft 6.00 ft 50.00 % 6.00 ft 0.50 ft 90.00 degrees 6.28 ft 0.21 ft 0.02 ft 0.18 ft 5.40 ft2 8.00 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/17/2019 11:42:19 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-49AA On Grade - 4 inch Storm Event Project Description Solve For Efficiency Input Data Discharge 1.39 W/s Slope 0.01700 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 87.12 % Intercepted Flow 1.21 ft3/s Bypass Flow 0.18 ft3/s Spread 4.87 ft Depth 0.17 ft Flow Area 0.41 ft2 Gutter Depression 0.01 ft Total Depression 0.18 ft Velocity 3.42 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.06 Grate Flow Ratio 0.77 Equivalent Cross Slope 0.10275 ft/ft Active Grate Length 1.50 ft Length Factor 0.14 Total Interception Length 10.76 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/17/2019 11:41:00 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2 Worksheet for CB-49B On Grade - 4 inch Storm Event Project Description Solve For Input Data Discharge Slope Gutter Width Gutter Cross Slope Road Cross Slope Roughness Coefficient Local Depression Local Depression Width Grate Width Grate Length Grate Type Clogging Curb Opening Length Options Calculation Option Grate Flow Option Results Efficiency Intercepted Flow Bypass Flow Spread Depth Flow Area Gutter Depression Total Depression Velocity Splash Over Velocity Frontal Flow Factor Side Flow Factor Grate Flow Ratio Equivalent Cross Slope Active Grate Length Length Factor Total Interception Length Efficiency P-50 mm (P-1-7/8") Use Both Exclude None 2.09 W/s 0.01000 ft/ft 2.00 ft 0.04 ft/ft 0.03 ft/ft 0.013 2.00 in 2.00 ft 2.00 ft 3.00 ft 50.00 % 3.00 ft 78.06 % 1.63 ft3/s 0.46 ft3/s 6.34 ft 0.22 ft 0.68 ft2 0.01 ft 0.18 ft 3.09 ft/s 6.99 ft/s 1.00 0.07 0.65 0.09186 ft/ft 1.50 ft 0.13 11.65 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/17/2019 11:44:50 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2 Worksheet for CB-49C On Grade - 4 inch Storm Event Project Description Solve For Input Data Discharge Slope Gutter Width Gutter Cross Slope Road Cross Slope Roughness Coefficient Local Depression Local Depression Width Grate Width Grate Length Grate Type Clogging Curb Opening Length Options Calculation Option Grate Flow Option Results Efficiency Intercepted Flow Bypass Flow Spread Depth Flow Area Gutter Depression Total Depression Velocity Splash Over Velocity Frontal Flow Factor Side Flow Factor Grate Flow Ratio Equivalent Cross Slope Active Grate Length Length Factor Total Interception Length Efficiency P-50 mm (P-1-7/8") Use Both Exclude None 2.18 W/s 0.01600 ft/ft 2.00 ft 0.04 ft/ft 0.03 ft/ft 0.013 2.00 in 2.00 ft 2.00 ft 3.00 ft 50.00 % 3.00 ft 79.70 % 1.74 ft3/s 0.44 ft3/s 5.71 ft 0.21 ft 0.58 ft2 0.01 ft 0.18 ft 3.77 ft/s 6.99 ft/s 1.00 0.05 0.69 0.09635 ft/ft 1.50 ft 0.11 13.27 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/17/2019 11:37:46 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2 Worksheet for CB-50 On Grade - 4inch Storm Event Project Description I Solve For Efficiency Input Data I Discharge Slope Gutter Width Gutter Cross Slope Road Cross Slope Roughness Coefficient Local Depression Local Depression Width Grate Width Grate Length Grate Type Clogging Curb Opening Length Options Calculation Option Grate Flow Option Results Efficiency Intercepted Flow Bypass Flow Spread Depth Flow Area Gutter Depression Total Depression Velocity Splash Over Velocity Frontal Flow Factor Side Flow Factor Grate Flow Ratio Equivalent Cross Slope Active Grate Length Length Factor Total Interception Length P-50 mm (P-1-7/8") Use Both Exclude None 1.80 W/s 0.01660 ft/ft 2.00 ft 0.04 ft/ft 0.03 ft/ft 0.013 2.00 in 2.00 ft 2.00 ft 3.00 ft 50.00 % 3.00 ft 81.92 % 1.47 ft3/s 0.33 ft3/s 5.58 ft 0.19 ft 0.50 ft2 0.02 ft 0.18 ft 3.57 ft/s 6.99 ft/s 1.00 0.05 0.72 0.09713 ft/ft 1.50 ft 0.12 12.32 ft M Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/17/2019 11:43:24 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-50A On Grade - 4inch Storm Event Project Description I - Solve For Efficiency Input Data Discharge 0.85 W/s Slope 0.01660 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.04 ft/ft Road Cross Slope 0.03 ft/ft Roughness Coefficient 0.013 Local Depression 2.00 in Local Depression Width 2.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 50.00 % Curb Opening Length 3.00 ft Options Calculation Option Use Both Grate Flow Option Exclude None Results Efficiency 93.91 % Intercepted Flow 0.80 ft3/s Bypass Flow 0.05 ft3/s Spread 4.13 ft Depth 0.15 ft Flow Area 0.28 ft2 Gutter Depression 0.02 ft Total Depression 0.18 ft Velocity 3.00 ft/s Splash Over Velocity 6.99 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.07 Grate Flow Ratio 0.85 Equivalent Cross Slope 0.10947 ft/ft Active Grate Length 1.50 ft Length Factor 0.18 Total Interception Length 8.37 ft M Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/17/2019 11:36:57 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for CB-50B On Grade - 4 inch Storm Event Project Description Solve For Input Data Discharge Slope Gutter Width Gutter Cross Slope Road Cross Slope Roughness Coefficient Local Depression Local Depression Width Grate Width Grate Length Grate Type Clogging Curb Opening Length Options Calculation Option Grate Flow Option Results Efficiency Intercepted Flow Bypass Flow Spread Depth Flow Area Gutter Depression Total Depression Velocity Splash Over Velocity Frontal Flow Factor Side Flow Factor Grate Flow Ratio Equivalent Cross Slope Active Grate Length Length Factor Total Interception Length Efficiency P-50 mm (P-1-7/8") Use Both Exclude None 1.29 W/s 0.01600 ft/ft 2.00 ft 0.04 ft/ft 0.03 ft/ft 0.013 2.00 in 2.00 ft 2.00 ft 3.00 ft 50.00 % 3.00 ft 88.11 1.14 ft3/s 0.15 ft3/s 4.79 ft 0.17 ft 0.39 ft2 0.01 ft 0.18 ft 3.29 ft/s 6.99 ft/s 1.00 0.06 0.78 0.10347 ft/ft 1.50 ft 0.15 10.20 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/17/2019 11:14:40 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2 Worksheet for CB-50D On Grade - 4 inch Storm Event Project Description Solve For Input Data Discharge Slope Gutter Width Gutter Cross Slope Road Cross Slope Roughness Coefficient Local Depression Local Depression Width Grate Width Grate Length Grate Type Clogging Curb Opening Length Options Calculation Option Grate Flow Option Results Efficiency Intercepted Flow Bypass Flow Spread Depth Flow Area Gutter Depression Total Depression Velocity Splash Over Velocity Frontal Flow Factor Side Flow Factor Grate Flow Ratio Equivalent Cross Slope Active Grate Length Length Factor Total Interception Length Efficiency M P-50 mm (P-1-7/8") Use Both Exclude None 1.65 W/s 0.01600 ft/ft 2.00 ft 0.04 ft/ft 0.03 ft/ft 0.013 2.00 in 2.00 ft 2.00 ft 3.00 ft 50.00 % 3.00 ft 83.97 % 1.39 ft3/s 0.26 ft3/s 5.28 ft 0.19 ft 0.47 ft2 0.01 ft 0.18 ft 3.49 ft/s 6.99 ft/s 1.00 0.06 0.74 0.09949 ft/ft 1.50 ft 0.13 11.58 ft Bentley Systems, Inc. Haestad Methods SolN' '19�eFtewMaster V8i (SELECTseries 1) [08.11.01.03] 10/17/2019 11:42:50 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2 Proposed Wet Pond #1 Pre -Developed WEDDINGTON POINTE DA#1 PRE TIME OF CONCENTRATION CALCULATIONS Sheet Flow LDI PN# 1018330 *T=[0.07(nL)0.8/(P2)0.5(S)0.4] Max. Elevation: 638 Min. Elevation: 634.75 Flow Length (ft): 100 Slope: 3.25% Mannings (grass): 0.24 Precipitation (2yr, 24 hr): 3.6 Travel Time (hr)*: 0.18 Channel Flow V=(1.49/n)R"'s'" Max. Elevation 634.75 Min. Elevation 614.5 Flow Length (ft): 1,117.0 A=Cross sectional flow area (ft2) 8.33 P=Wetted perimeter (ft) 10.11 A/P= Hydraulic radius (ft) 0.82 Slope (ft/ft): 0.018 Manning's 0.025 Velocity (fps) 7.05 Tt = L/3600V (hr) 0.044 TIME OF CONCENTRATION (hr): 0.23 TIME OF CONCENTRATION (min): 13.72 4/25/2019 Job File: N:\ 2018\1018330\Docs\Calcs\Stormwater\Pond 1\PRE-DEVELOPED RUNOFF.PPW Rain Dir: N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 1\ -------------------------- JOB TITLE -------------------------- Project Date: 4/1/2019 Project Engineer: ATB Project Title: Weddington Pointe Project Comments: SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 11:03 AM 4/25/2019 Table of Contents Table of Contents i ********************** MASTER SUMMARY ********************** Watershed....... Master Network Summary ............. 1.01 ****************** DESIGN STORMS SUMMARY ******************* Union County.... Design Storms ...................... 2.01 ********************** TC CALCULATIONS ********************* PRE -DEVELOPED... Tc Calcs ........................... 3.01 ********************** CN CALCULATIONS ********************* PRE -DEVELOPED... Runoff CN-Area ..................... 4.01 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 11:03 AM 4/25/2019 Type.... Master Network Summary Page 1.01 Name.... Watershed File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 1\Pre-Developed Runoff.ppw MASTER DESIGN STORM SUMMARY Network Storm Collection: Union County Total Depth Return Event in Pre 2 3.6000 Pre 10 5.2000 Pre 25 6.2000 Pre 50 7.0000 Pre100 7.9000 Rainfall Type ---------------- Synthetic Curve Synthetic Curve Synthetic Curve Synthetic Curve Synthetic Curve RNF ID TypeII 24hr TypeII 24hr TypeII 24hr TypeII 24hr TypeII 24hr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Return HYG Vol Qpeak Node ID Type Event cu.ft Trun hrs PRE -DEVELOPED AREA 2 42010 12.0500 PRE -DEVELOPED AREA 10 81001 12.0200 PRE -DEVELOPED AREA 25 107596 12.0200 PRE -DEVELOPED AREA 50 129677 12.0200 PRE -DEVELOPED AREA 100 155158 12.0200 Max Qpeak Max WSEL Pond Storage cfs ft cu.ft 14.19 27.81 37.03 44.58 53.20 *PRE -OUT JCT 2 37982 R 12.0500 14.19 *PRE -OUT JCT 10 74256 R 12.0200 27.81 *PRE -OUT JCT 25 99138 R 12.0200 37.03 *PRE -OUT JCT 50 119850 R 12.0200 44.58 *PRE -OUT JCT 100 143795 R 12.0200 53.20 S/N: Bentley PondPack (10.01.04.00) 11:03 AM Bentley Systems, Inc. 4/25/2019 Type.... Design Storms Name.... Union County Page 2.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 1\Pre-Developed Runoff.ppw Title... Project Date: 4/1/2019 Project Engineer: ATB Project Title: Weddington Pointe Project Comments: DESIGN STORMS SUMMARY Design Storm File,ID = Union County Storm Tag Name = Pre 2 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 2 yr Total Rainfall Depth= 3.6000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Pre 10 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 10 yr Total Rainfall Depth= 5.2000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Pre 25 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 25 yr Total Rainfall Depth= 6.2000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Pre 50 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 50 yr Total Rainfall Depth= 7.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Pre100 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 100 yr Total Rainfall Depth= 7.9000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs S/N: Bentley PondPack (10.01.04.00) 11:03 AM Bentley Systems, Inc. 4/25/2019 Type.... Tc Calcs Name.... PRE -DEVELOPED Page 3.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 1\Pre-Developed Runoff.ppw ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: User Defined Segment #1 Time: .2300 hrs ------------------------------------------------------------------------ ------------------------- Total Tc: .2300 hrs ------------------------- S/N: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 11:03 AM 4/25/2019 Type.... Tc Calcs Name.... PRE -DEVELOPED Page 3.02 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 1\Pre-Developed Runoff.ppw ------------------------------------------------------------------------ Tc Equations used... ___= User Defined ______________________________________________________ Tc = Value entered by user Where: Tc = Time of concentration SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 11:03 AM 4/25/2019 Type.... Runoff CN-Area Name.... PRE -DEVELOPED Page 4.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 1\Pre-Developed Runoff.ppw RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... Impervious Area Adjustment Adjusted Soil/Surface Description CN acres oC oUC CN Pasture, grassland, or range - good 74 8.840 74.00 COMPOSITE AREA & WEIGHTED CN ---> 8.840 74.00 (74) ........................................................................... ........................................................................... SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 11:03 AM 4/25/2019 Appendix A A-1 Index of Starting Page Numbers for ID Names ----- P ----- PRE-DEVELOPED... 3.01, 4.01 ----- U ----- Union County... 2.01 ----- W ----- Watershed... 1.01 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 11:03 AM 4/25/2019 Water Quality Wet Pond Design (NCDENR - 2007) Project Name: Weddington Pointe Job Number: 1018330 Step 1: Compute the water quality volume (WQV). WQv (Ft3) = (3630) X (RD) X (Rv) X (AD) Where: WQV = Water Quality Volume (Ft) AD = Drainage Area to Wet Pond (acres). Rv = Volumetric Runoff Coefficient = 0.05 + 0.9 (% Impervious) Rp = Design Storm Rainfall Depth (in). Typically 1.0". Percent Impervious = 76% AD = 16.95 acres Rp = 1.0 in Rv = 0.73 WQv = 45,123 Ft" Step 2: Determine Surface Area Requirements. Average Permanent Pool Depth = 4.4 Feet Percent Impervious = 76% SA / DA Ratio = 2.09 Required Surface Area = 15,431 Ft2 Step 3: Preliminary Temporary Water Quality Drawdown Calculations Pond Height above Orifice = 2.9 feet Orifice Invert Elevation = 0.0 feet Pond Surface Area at Height Above Orifice = 15,431 square feet Pond Surface Area at Orifice Invert Elevation = 15,431 square feet Orifice Diameter (D) = 2.50 inches = 0.21 feet Orifice Area (a) = 0.0341 square feet Average Surface Area (A) = 15,431 square feet Gravitational Constatnt (g) = 32.2 ft/sec2 Head (H) = 2.80 feet Discharge Coefficient (C) = 0.6 Time (t) = 181,517 seconds = 2.10 days Note: The above calculation is based on the Bernoulli Equation where: t : x a x (2g)° x (0 - H/3°.5) Step 4: Compute Site Hydraulic Input Parameters. Condition Area (Ac) CN Tc (hours) Pre -developed 16.95 70 0.4 Post -developed 16.95 92 0.0833 Results Condition Q2-year Q10-year Q25-year Q50-year Pre -developed 14.19 27.81 37.03 44.58 Post -developed 7.58 17.49 29.68 36.17 Permanent Pool Storage Wet Pond#1 Stage Storage Pond -Main Pool Elev Area (so Inc Storage (cf) Total Storage (cf) 611 11041 0 0 615 14704 51,490 51,490 616 15692 15,198 66,688 616.5 16985 8,169 74,857 0 0 0 0 Pond - Forebay Elev Area (so Inc Storage c 614 4361 0 615 4948 4,655616 N4,655 5564 5,256616.5 6,294 2,96500 Total Volume (cf) = 74,857 Total Surface Area (so = 16,985 Average Depth (ft) = 4.4 Forbay Volume Req. (15%) = 11,229 Forbay Provided (cf) = 12,875 Channel Protection Job File: N:\ 2018\1018330\Docs\Calcs\Stormwater\Pond 1\POST-DEVELOPED CP - WET POND.PPW Rain Dir: N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 1\ -------------------------- JOB TITLE -------------------------- Project Date: 4/2/2019 Project Engineer: ATB Project Title: Weddington Poitne Project Comments: SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:06 PM 10/8/2019 Table of Contents Table of Contents i ********************** MASTER SUMMARY ********************** Watershed....... Master Network Summary ............. 1.01 ****************** DESIGN STORMS SUMMARY ******************* Union County.... Design Storms ...................... 2.01 ********************** TC CALCULATIONS ********************* ON -SITE DET..... Tc Calcs ........................... 3.01 ********************** CN CALCULATIONS ********************* ON -SITE DET..... Runoff CN-Area ..................... 4.01 *********************** POND VOLUMES *********************** WET POND #1..... Vol: Elev-Area ..................... 5.01 ******************** OUTLET STRUCTURES ********************* Pond #1......... Outlet Input Data .................. 6.01 S/N: Bentley PondPack (10.01.04.00) 3:06 PM Bentley Systems, Inc. 10/8/2019 Type.... Master Network Summary Page 1.01 Name.... Watershed File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 1\Post-Developed CP - Wet Pond.ppw MASTER DESIGN STORM SUMMARY Network Storm Collection: Union County Total Depth Rainfall Return Event in Type Dev 1 3.0000 Synthetic Curve --------------------------- ICPM CALCULATION TOLERANCES Target Convergence= .000 cfs +/- Max. Iterations = 35 loops ICPM Time Step = .0100 hrs Output Time Step = .0100 hrs ICPM Ending Time = ------------------------------- 120.0000 hrs RNF ID ---------------- TypeII 24hr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Return HYG Vol Node ID Type Event cu.ft Trun ON -SITE DET AREA 1 132967 *POST -OUT T-E 1 101962 R WET POND #1 POND 1 132967 WET POND #1 OUT POND 1 101962 R S/N: Bentley PondPack (10.01.04.00) Max Qpeak Qpeak Max WSEL Pond Storage hrs cfs ft cu.ft 11.9200 56.04 23.5000 .33 616.50 11.9200 56.04 23.5000 .33 620.63 118148 3:06 PM Bentley Systems, Inc. 10/8/2019 Type.... Design Storms Name.... Union County Page 2.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 1\Post-Developed CP - Wet Pond.ppw Title... Project Date: 4/2/2019 Project Engineer: ATB Project Title: Weddington Poitne Project Comments: DESIGN STORMS SUMMARY Design Storm File,ID = Storm Tag Name = Dev 1 Union County Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 1 yr Total Rainfall Depth= 3.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:06 PM 10/8/2019 Type.... Tc Calcs Name.... ON -SITE DET Page 3.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 1\Post-Developed CP - Wet Pond.ppw ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: User Defined Segment #1 Time: .0833 hrs ------------------------------------------------------------------------ ------------------------ Total Tc: .0833 hrs Calculated Tc G Min.Tc: Use Minimum Tc... Use Tc = .0833 hrs ------------------------- S/N: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:06 PM 10/8/2019 Type.... Tc Calcs Name.... ON -SITE DET Page 3.02 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 1\Post-Developed CP - Wet Pond.ppw ------------------------------------------------------------------------ Tc Equations used... ___= User Defined ______________________________________________________ Tc = Value entered by user Where: Tc = Time of concentration SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:06 PM 10/8/2019 Type.... Runoff CN-Area Name.... ON -SITE DET Page 4.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 1\Post-Developed CP - Wet Pond.ppw RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... Impervious Area Adjustment Adjusted Soil/Surface Description CN acres oC oUC CN Impervious Areas - Paved parking to 98 12.870 98.00 Open space (Lawns,parks etc.) - Goo 74 4.080 74.00 COMPOSITE AREA & WEIGHTED CN ---> 16.950 92.22 (92) ........................................................................... ........................................................................... SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:06 PM 10/8/2019 Type.... Vol: Elev-Area Name.... WET POND #1 Page 5.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 1\Post-Developed CP - Wet Pond.ppw Elevation Planimeter Area Al+A2+sgr(A1*A2) Volume Volume Sum (ft) ------------------------------------------------------------------------ (sq.in) (sq.ft) (sq.ft) (cu.ft) (cu.ft) 616.50 23278 0 0 0 617.00 25381 72966 12161 12161 618.00 27565 79396 26465 38626 619.00 29548 85652 28551 67177 620.00 31587 91685 30562 97739 621.00 33683 97888 32629 130368 622.00 35835 104260 34753 165122 623.00 38044 110802 36934 202056 624.00 40309 117513 39171 241227 625.00 42631 124394 41465 282692 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.(Area1*Area2)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1. EL2, respectively Volume = Incremental volume between EL1 and EL2 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:06 PM 10/8/2019 Type.... Outlet Input Data Name.... Pond #1 Page 6.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 1\Post-Developed CP - Wet Pond.ppw REQUESTED POND WS ELEVATIONS: Min. Elev.= 616.50 ft Increment = .10 ft Max. Elev.= 625.00 ft ********************************************** OUTLET CONNECTIVITY ********************************************** ---> Forward Flow Only (UpStream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) < --- > Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft ----------------- ----------------------------- Orifice-Circular WQ ---> TW 616.500 625.000 TW SETUP, DS Channel SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:06 PM 10/8/2019 Type.... Outlet Input Data Name.... Pond #1 Page 6.02 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 1\Post-Developed CP - Wet Pond.ppw OUTLET STRUCTURE INPUT DATA Structure ID = WQ Structure Type = Orifice -Circular ------------------------------------ # of Openings = 1 Invert Elev. = 616.50 ft Diameter = 2.50 in Orifice Coeff. _ .600 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:06 PM 10/8/2019 Appendix A A-1 Index of Starting Page Numbers for ID Names ----- O ----- ON-SITE DET... 3.01, 4.01 ----- P ----- Pond #1... 6.01 ----- U ----- Union County... 2.01 ----- W ----- Watershed... 1.01 WET POND #1... 5.01 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:06 PM 10/8/2019 Volume vs. Time WET POND #1 Dev 1 120000 100000 80000 U 60000 0 40000 20000 0k===+-' 0 10 20 30 40 50 60 70 80 90 100 110 120 Time (hrs) Post -Developed Job File: N:\ 2018\1018330\Docs\Calcs\Stormwater\Pond 1\POST-DEVELOPED DETENTION - WET PON] Rain Dir: N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 1\ -------------------------- JOB TITLE -------------------------- Project Date: 4/2/2019 Project Engineer: ATB Project Title: Weddington Pointe Project Comments: SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:09 PM 10/8/2019 Table of Contents Table of Contents i ********************** MASTER SUMMARY ********************** Watershed....... Master Network Summary ............. 1.01 ****************** DESIGN STORMS SUMMARY ******************* Union County.... Design Storms ...................... 2.01 ********************** TC CALCULATIONS ********************* ON -SITE DET..... Tc Calcs ........................... 3.01 ON -SITE UNDET... Tc Calcs ........................... 3.03 ********************** CN CALCULATIONS ********************* ON -SITE DET..... Runoff CN-Area ..................... 4.01 ON -SITE UNDET... Runoff CN-Area ..................... 4.02 *********************** POND VOLUMES *********************** WET POND #1..... Vol: Elev-Area ..................... 5.01 ******************** OUTLET STRUCTURES ********************* Pond #1......... Outlet Input Data .................. 6.01 S/N: Bentley PondPack (10.01.04.00) 3:09 PM Bentley Systems, Inc. 10/8/2019 Type.... Master Network Summary Page 1.01 Name.... Watershed File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 1\Post-Developed Detention - Wet Pond MASTER DESIGN STORM SUMMARY Network Storm Collection: Union County Total Depth Return Event in Dev 2 3.6000 Dev 10 5.2000 Dev 25 6.2000 Dev 50 7.0000 Dev100 7.9000 Rainfall Type ---------------- Synthetic Curve Synthetic Curve Synthetic Curve Synthetic Curve Synthetic Curve RNF ID TypeII 24hr TypeII 24hr TypeII 24hr TypeII 24hr TypeII 24hr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Max Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ID Type Event cu.ft Trun hrs cfs ft cu.ft ON -SITE DET AREA 2 168089 11.9160 70.14 ON -SITE DET AREA 10 263564 11.9160 107.25 ON -SITE DET AREA 25 323940 11.9160 130.21 ON -SITE DET AREA 50 372448 11.9160 148.48 ON -SITE DET AREA 100 427176 11.9160 168.95 ON -SITE UNDET AREA 2 21290 12.0490 7.19 ON -SITE UNDET AREA 10 41050 12.0200 14.09 ON -SITE UNDET AREA 25 54528 12.0200 18.77 ON -SITE UNDET AREA 50 65718 12.0200 22.59 ON -SITE UNDET AREA 100 78632 12.0200 26.96 *POST -OUT JCT 2 34633 R 12.0490 7.48 *POST -OUT JCT 10 141732 R 12.0810 17.49 *POST -OUT JCT 25 210651 R 12.0510 29.68 *POST -OUT JCT 50 266391 R 12.0500 36.17 *POST -OUT JCT 100 329596 R 12.0440 49.24 S/N: Bentley PondPack (10.01.04.00) 3:09 PM Bentley Systems, Inc. 10/8/2019 Type.... Master Network Summary Page 1.02 Name.... Watershed File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 1\Post-Developed Detention - Wet Pond MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Max Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ID Type Event cu.ft Trun hrs cfs ft cu.ft WET POND #1 IN POND 2 157719 R 11.9160 70.14 WET POND #1 IN POND 10 248280 R 11.9160 107.25 WET POND #1 IN POND 25 305595 R 11.9160 130.21 WET POND #1 IN POND 50 351669 R 11.9160 148.48 WET POND #1 IN POND 100 403663 R 11.9160 168.95 WET POND #1 OUT POND 2 36870 R 19.1170 .88 621.35 142447 WET POND #1 OUT POND 10 125530 R 12.5890 7.44 622.04 166405 WET POND #1 OUT POND 25 182106 R 12.4200 12.38 622.86 196852 WET POND #1 OUT POND 50 227706 R 12.3380 16.14 623.57 224132 WET POND #1 OUT POND 100 279250 R 12.1960 22.96 624.25 251488 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:09 PM 10/8/2019 Type.... Design Storms Name.... Union County Page 2.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 1\Post-Developed Detention - Wet Pond Title... Project Date: 4/2/2019 Project Engineer: ATB Project Title: Weddington Pointe Project Comments: DESIGN STORMS SUMMARY Design Storm File,ID = Union County Storm Tag Name = Dev 2 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 2 yr Total Rainfall Depth= 3.6000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Dev 10 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 10 yr Total Rainfall Depth= 5.2000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Dev 25 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 25 yr Total Rainfall Depth= 6.2000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Dev 50 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 50 yr Total Rainfall Depth= 7.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Dev100 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 100 yr Total Rainfall Depth= 7.9000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:09 PM 10/8/2019 Type.... Tc Calcs Name.... ON -SITE DET Page 3.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 1\Post-Developed Detention - Wet Pond ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: User Defined Segment #1 Time: .0833 hrs ------------------------------------------------------------------------ ------------------------ Total Tc: .0833 hrs Calculated Tc G Min.Tc: Use Minimum Tc... Use Tc = .0833 hrs ------------------------- S/N: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:09 PM 10/8/2019 Type.... Tc Calcs Name.... ON -SITE DET Page 3.02 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 1\Post-Developed Detention - Wet Pond ------------------------------------------------------------------------ Tc Equations used... ___= User Defined ______________________________________________________ Tc = Value entered by user Where: Tc = Time of concentration SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:09 PM 10/8/2019 Type.... Tc Calcs Name.... ON -SITE UNDET Page 3.03 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 1\Post-Developed Detention - Wet Pond ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: User Defined Segment #1 Time: .2300 hrs ------------------------------------------------------------------------ ------------------------- Total Tc: .2300 hrs ------------------------- S/N: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:09 PM 10/8/2019 Type.... Tc Calcs Name.... ON -SITE UNDET Page 3.04 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 1\Post-Developed Detention - Wet Pond ------------------------------------------------------------------------ Tc Equations used... ___= User Defined ______________________________________________________ Tc = Value entered by user Where: Tc = Time of concentration SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:09 PM 10/8/2019 Type.... Runoff CN-Area Name.... ON -SITE DET Page 4.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 1\Post-Developed Detention - Wet Pond RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... Impervious Area Adjustment Adjusted Soil/Surface Description CN acres oC oUC CN Impervious Areas - Paved parking to 98 12.870 98.00 Open space (Lawns,parks etc.) - Goo 74 4.080 74.00 COMPOSITE AREA & WEIGHTED CN ---> 16.950 92.22 (92) ........................................................................... ........................................................................... SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:09 PM 10/8/2019 Type.... Runoff CN-Area Name.... ON -SITE UNDET Page 4.02 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 1\Post-Developed Detention - Wet Pond RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... Impervious Area Adjustment Adjusted Soil/Surface Description CN acres oC oUC CN Open space (Lawns,parks etc.) - Goo 74 4.480 74.00 COMPOSITE AREA & WEIGHTED CN ---> 4.480 74.00 (74) ........................................................................... ........................................................................... SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:09 PM 10/8/2019 Type.... Vol: Elev-Area Name.... WET POND #1 Page 5.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 1\Post-Developed Detention - Wet Pond Elevation Planimeter Area Al+A2+sgr(A1*A2) Volume Volume Sum (ft) ------------------------------------------------------------------------ (sq.in) (sq.ft) (sq.ft) (cu.ft) (cu.ft) 616.50 23278 0 0 0 617.00 25381 72966 12161 12161 618.00 27565 79396 26465 38626 619.00 29548 85652 28551 67177 620.00 31587 91685 30562 97739 621.00 33683 97888 32629 130368 622.00 35835 104260 34753 165122 623.00 38044 110802 36934 202056 624.00 40309 117513 39171 241227 625.00 42631 124394 41465 282692 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.(Area1*Area2)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1. EL2, respectively Volume = Incremental volume between EL1 and EL2 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:09 PM 10/8/2019 Type.... Outlet Input Data Name.... Pond #1 Page 6.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 1\Post-Developed Detention - Wet Pond REQUESTED POND WS ELEVATIONS: Min. Elev.= 616.50 ft Increment = .10 ft Max. Elev.= 625.00 ft ********************************************** OUTLET CONNECTIVITY ********************************************** ---> Forward Flow Only (UpStream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) < --- > Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft ----------------- Orifice-Area ---- DT ---> ------- CO --------- 621.300 --------- 625.000 Inlet Box RO ---> CO 623.500 625.000 Orifice -Circular WQ ---> CO 616.500 625.000 Culvert -Circular CO ---> TW 615.310 625.000 TW SETUP, DS Channel SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:09 PM 10/8/2019 Type.... Outlet Input Data Name.... Pond #1 Page 6.02 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 1\Post-Developed Detention - Wet Pond OUTLET STRUCTURE INPUT DATA Structure ID = DT Structure Type = Orifice -Area ------------------------------------ # of Openings = 1 Invert Elev. = 621.30 ft Area = 2.0000 sq.ft Top of Orifice = 622.30 ft Datum Elev. = 621.30 ft Orifice Coeff. _ .600 Structure ID = RO Structure Type ------------------------------------ = Inlet Box # of Openings = 1 Invert Elev. = 623.50 ft Orifice Area = 25.0000 sq.ft Orifice Coeff. _ .600 Weir Length = 20.00 ft Weir Coeff. = 3.000 K, Reverse = 1.000 Mannings n = .0000 Kev,Charged Riser = .000 Weir Submergence = No Structure ID = WQ Structure Type = Orifice -Circular ------------------------------------ # of Openings = 1 Invert Elev. = 616.50 ft Diameter = 2.50 in Orifice Coeff. _ .600 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:09 PM 10/8/2019 Type.... Outlet Input Data Name.... Pond #1 Page 6.03 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 1\Post-Developed Detention - Wet Pond OUTLET STRUCTURE INPUT DATA Structure ID = CO Structure Type = Culvert -Circular ------------------------------------ No. Barrels = 1 Barrel Diameter = 18.00 in Upstream Invert = 615.31 ft Dnstream Invert = 614.50 ft Horiz. Length = 90.49 ft Barrel Length = 90.49 ft Barrel Slope = .00895 ft/ft OUTLET CONTROL DATA... Mannings n = .0130 Ke = .5000 Kb = .018213 Kr = .5000 HW Convergence = .001 INLET CONTROL DATA... Equation form = 1 Inlet Control K = .0098 Inlet Control M = 2.0000 Inlet Control c = .03980 Inlet Control Y = .6700 T1 ratio (HW/D) _ .000 T2 ratio (HW/D) = 1.302 Slope Factor = -.500 (forward entrance loss) (per ft of full flow) (reverse entrance loss) +/- ft Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 615.31 ft ---> Flow = 7.58 cfs At T2 Elev = 617.26 ft ---> Flow = 8.66 cfs Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES... Maximum Iterations= 40 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. Q tolerance = .00 cfs Max. Q tolerance = .00 cfs SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:09 PM 10/8/2019 Appendix A A-1 Index of Starting Page Numbers for ID Names ----- O ----- ON-SITE DET... 3.01, 4.01 ON -SITE UNDET... 3.03, 4.02 ----- P ----- Pond #1... 6.01 ----- U ----- Union County... 2.01 ----- W ----- Watershed... 1.01 WET POND #1... 5.01 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:09 PM 10/8/2019 Buoyancy Calculations Bouyancy Calculations Volume of Water Displaced (Structure) Structure Dimensions: Inner Length = 5 Feet Inner Width = 5 Feet Thickness = 0.5 Feet Height = 10.5 Feet Volume = 378 Cubic Feet Specific Weight of Water = 62.4 Pounds per Cubic Foot Weight of Displaced Volume = 23,587 Pounds Volume of Water Displaced (Base): Structure Dimensions: Flange = 1 Feet Length = 8 Feet Width = 8 Feet Height = 2 Feet Volume = 128 Cubic Feet Specific Weight of Water = 62.4 Pounds per Cubic Foot Weight of Displaced Volume = 7,987 Pounds Total Weight of Displaced Volume = 31,574 Pounds Concrete Volume of Structure Concrete Volume: Inner Length = 5 Feet Inner Width = 5 Feet Thickness = 0.5 Feet Height = 10.5 Feet Volume = 116 Cubic Feet Specific Weight of Concrete = 150 Pounds per Cubic Foot Weight of Concrete = 17,325 Pounds Volume of Concrete Required (Base): Concrete Volume: Flange = 1 Feet Length = 8 Feet Width = 8 Feet Height = 2 Feet Volume = 128 Cubic Feet Specific Weight of Concrete = 150 Pounds per Cubic Foot Weight of Concrete = 19,200 Pounds Total Weight of Concrete = 36,525 Pounds Factor of Safety (Minimum = 1) = 1.2 8ft Pond Section Ballast Pad Schematic 8ft 5' x 5' Riser Ballast Pad 2ft Proposed Wet Pond #2 Pre -Developed WEDDINGTON POINTE DA#2 PRE TIME OF CONCENTRATION CALCULATIONS Sheet Flow LDI PN# 1018330 *T=[0.07(nL)0.8/(P2)0.5(S)0.4] Max. Elevation: 643.75 Min. Elevation: 642.25 Flow Length (ft): 100 Slope: 1.50% Mannings (grass): 0.24 Precipitation (2yr, 24 hr): 3.6 Travel Time (hr)*: 0.25 Shallow Concentrated **UnPaved: V=16.1345(S)0.5 Max. Elevation: 642.25 Min. Elevation: 614 Flow Length (ft): 1276 Slope: 2.21 % Velocity (fps)**: 2.40 Travel Time (hr): 0.15 TIME OF CONCENTRATION (hr): 0.40 TIME OF CONCENTRATION (min): 23.95 4/25/2019 Job File: N:\ 2018\1018330\Docs\Calcs\Stormwater\Pond 2\PRE-DEVELOPED RUNOFF.PPW Rain Dir: N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 2\ -------------------------- JOB TITLE -------------------------- Project Date: 4/1/2019 Project Engineer: ATB Project Title: Weddington Pointe Project Comments: SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 12:52 PM 4/25/2019 Table of Contents Table of Contents i ********************** MASTER SUMMARY ********************** Watershed....... Master Network Summary ............. 1.01 ****************** DESIGN STORMS SUMMARY ******************* Union County.... Design Storms ...................... 2.01 ********************** TC CALCULATIONS ********************* PRE -DEVELOPED #2 Tc Calcs ........................... 3.01 ********************** CN CALCULATIONS ********************* PRE -DEVELOPED #2 Runoff CN-Area ..................... 4.01 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 12:52 PM 4/25/2019 Type.... Master Network Summary Page 1.01 Name.... Watershed File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 2\Pre-Developed Runoff.ppw MASTER DESIGN STORM SUMMARY Network Storm Collection: Union County Total Depth Return Event in Pre 2 3.6000 Pre 10 5.2000 Pre 25 6.2000 Pre 50 7.0000 Pre100 7.9000 Rainfall Type ---------------- Synthetic Curve Synthetic Curve Synthetic Curve Synthetic Curve Synthetic Curve RNF ID TypeII 24hr TypeII 24hr TypeII 24hr TypeII 24hr TypeII 24hr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Return HYG Vol Qpeak Node ID Type Event cu.ft Trun hrs PRE -DEVELOPED #2 AREA 2 49518 12.1580 PRE -DEVELOPED #2 AREA 10 95480 12.1060 PRE -DEVELOPED #2 AREA 25 126828 12.1060 PRE -DEVELOPED #2 AREA 50 152855 12.1060 PRE -DEVELOPED #2 AREA 100 182890 12.1060 Max Qpeak Max WSEL Pond Storage cfs ft cu.ft 12.73 25.35 33.90 40.93 48.97 *PRE -OUT JCT 2 44598 R 12.1580 12.73 *PRE -OUT JCT 10 87237 R 12.1060 25.35 *PRE -OUT JCT 25 116492 R 12.1060 33.90 *PRE -OUT JCT 50 140846 R 12.1060 40.93 *PRE -OUT JCT 100 169004 R 12.1060 48.97 S/N: Bentley PondPack (10.01.04.00) 12:52 PM Bentley Systems, Inc. 4/25/2019 Type.... Design Storms Name.... Union County Page 2.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 2\Pre-Developed Runoff.ppw Title... Project Date: 4/1/2019 Project Engineer: ATB Project Title: Weddington Pointe Project Comments: DESIGN STORMS SUMMARY Design Storm File,ID = Union County Storm Tag Name = Pre 2 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 2 yr Total Rainfall Depth= 3.6000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Pre 10 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 10 yr Total Rainfall Depth= 5.2000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Pre 25 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 25 yr Total Rainfall Depth= 6.2000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Pre 50 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 50 yr Total Rainfall Depth= 7.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Pre100 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 100 yr Total Rainfall Depth= 7.9000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs S/N: Bentley PondPack (10.01.04.00) 12:52 PM Bentley Systems, Inc. 4/25/2019 Type.... Tc Calcs Name.... PRE -DEVELOPED #2 Page 3.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 2\Pre-Developed Runoff.ppw ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: User Defined Segment #1 Time: .4000 hrs ------------------------------------------------------------------------ ------------------------- Total Tc: .4000 hrs ------------------------- S/N: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 12:52 PM 4/25/2019 Type.... Tc Calcs Name.... PRE -DEVELOPED #2 Page 3.02 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 2\Pre-Developed Runoff.ppw ------------------------------------------------------------------------ Tc Equations used... ___= User Defined ______________________________________________________ Tc = Value entered by user Where: Tc = Time of concentration SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 12:52 PM 4/25/2019 Type.... Runoff CN-Area Name.... PRE -DEVELOPED #2 Page 4.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 2\Pre-Developed Runoff.ppw RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... Impervious Area Adjustment Adjusted Soil/Surface Description CN acres oC oUC CN Pasture, grassland, or range - good 74 10.420 74.00 COMPOSITE AREA & WEIGHTED CN ---> 10.420 74.00 (74) ........................................................................... ........................................................................... SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 12:52 PM 4/25/2019 Appendix A A-1 Index of Starting Page Numbers for ID Names ----- P ----- PRE-DEVELOPED #2... 3.01, 4.01 ----- U ----- Union County... 2.01 ----- W ----- Watershed... 1.01 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 12:52 PM 4/25/2019 Water Quality Wet Pond Design (NCDENR - 2007) Project Name: Weddington Pointe Job Number: 1018330 Step 1: Compute the water quality volume (WQV). WQv (Ft3) = (3630) X (RD) X (Rv) X (AD) Where: WQV = Water Quality Volume (Ft) AD = Drainage Area to Wet Pond (acres). Rv = Volumetric Runoff Coefficient = 0.05 + 0.9 (% Impervious) Rp = Design Storm Rainfall Depth (in). Typically 1.0". Percent Impervious = 66% AD = 4.23 acres Rp = 1.0 in Rv = 0.65 WQv = 9,948 Ft" Step 2: Determine Surface Area Requirements. Average Permanent Pool Depth = 3.8 Feet Percent Impervious = 66% SA / DA Ratio = 2.09 Required Surface Area = 3,851 Ft Step 3: Preliminary Temporary Water Quality Drawdown Calculations Pond Height above Orifice = 2.6 feet Orifice Invert Elevation = 0.0 feet Pond Surface Area at Height Above Orifice = 3,851 square feet Pond Surface Area at Orifice Invert Elevation = 3,851 square feet Orifice Diameter (D) = 1.00 inches = 0.08 feet Orifice Area (a) = 0.0055 square feet Average Surface Area (A) = 3,851 square feet Gravitational Constatnt (g) = 32.2 ft/sec2 Head (H) = 2.56 feet Discharge Coefficient (C) = 0.6 Time (t) = 270,832 seconds = 3.13 days Note: The above calculation is based on the Bernoulli Equation where: t : x a x (2g)° x (0 - H/3°.5) Step 4: Compute Site Hydraulic Input Parameters. Condition Area (Ac) CN Tc (hours) Pre -developed 4.23 70 0.4 Post -developed 4.23 85 0.0833 Results Condition Q2-year Q10-year Q25-year Q50-year Pre -developed 12.73 25.35 33.90 40.93 Post -developed 3.92 7.66 23.29 27.39 Permanent Pool Storage Wet Pond#2 Stage Storage Pond -Main Pool Elev Area (so Inc Storage (cf) Total Storage (cf) 610 1198 0 0 615 3014 10,530 10,530 616 3469 3,242 13,772 616.5 4096 1,891 15,663 0 0 0 0 Pond - Forebay Elev Area (so Inc Storage c Total Storage c 612 142 0 0 615 735 1,316 1,316 616 993 864 2,180 616.5 1,224 554 2,734 0 0 0 0 Total Volume (cf) = 15,663 Total Surface Area (so = 4,096 Average Depth (ft) = 3.8 Forbay Volume Req. (15%) = 2,349 Forbay Provided (cf) = 2,734 Channel Protection Job File: N:\ 2018\1018330\Docs\Calcs\Stormwater\Pond 2\POST-DEVELOPED CP - WET POND.PPW Rain Dir: N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 2\ -------------------------- JOB TITLE -------------------------- Project Date: 4/2/2019 Project Engineer: ATB Project Title: Weddington Pointe Project Comments: SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:15 PM 10/8/2019 Table of Contents Table of Contents i ********************** MASTER SUMMARY ********************** Watershed....... Master Network Summary ............. 1.01 ****************** DESIGN STORMS SUMMARY ******************* Union County.... Design Storms ...................... 2.01 ********************** TC CALCULATIONS ********************* ON -SITE DET..... Tc Calcs ........................... 3.01 ********************** CN CALCULATIONS ********************* ON -SITE DET..... Runoff CN-Area ..................... 4.01 *********************** POND VOLUMES *********************** WET POND #2..... Vol: Elev-Area ..................... 5.01 ******************** OUTLET STRUCTURES ********************* Pond #2......... Outlet Input Data .................. 6.01 S/N: Bentley PondPack (10.01.04.00) 3:15 PM Bentley Systems, Inc. 10/8/2019 Type.... Master Network Summary Page 1.01 Name.... Watershed File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 2\Post-Developed CP - Wet Pond.ppw MASTER DESIGN STORM SUMMARY Network Storm Collection: Union County Total Depth Rainfall Return Event in Type Dev 1 3.0000 Synthetic Curve --------------------------- ICPM CALCULATION TOLERANCES Target Convergence= .000 cfs +/- Max. Iterations = 35 loops ICPM Time Step = .0100 hrs Output Time Step = .0100 hrs ICPM Ending Time = ------------------------------- 120.0000 hrs RNF ID ---------------- TypeII 24hr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Return HYG Vol Node ID Type Event cu.ft Trun ON -SITE DET AREA 1 30465 *POST -OUT T-E 1 17115 WET POND #2 POND 1 30465 WET POND #2 OUT POND 1 17115 S/N: Bentley PondPack (10.01.04.00) Max Qpeak Qpeak Max WSEL Pond Storage hrs cfs ft cu.ft 11.9200 13.01 20.5900 .05 616.50 11.9200 13.01 20.5900 .05 620.14 28237 3:15 PM Bentley Systems, Inc. 10/8/2019 Type.... Design Storms Name.... Union County Page 2.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 2\Post-Developed CP - Wet Pond.ppw Title... Project Date: 4/2/2019 Project Engineer: ATB Project Title: Weddington Pointe Project Comments: DESIGN STORMS SUMMARY Design Storm File,ID = Storm Tag Name = Dev 1 Union County Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 1 yr Total Rainfall Depth= 3.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:15 PM 10/8/2019 Type.... Tc Calcs Name.... ON -SITE DET Page 3.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 2\Post-Developed CP - Wet Pond.ppw ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: User Defined Segment #1 Time: .0833 hrs ------------------------------------------------------------------------ ------------------------ Total Tc: .0833 hrs Calculated Tc G Min.Tc: Use Minimum Tc... Use Tc = .0833 hrs ------------------------- S/N: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:15 PM 10/8/2019 Type.... Tc Calcs Name.... ON -SITE DET Page 3.02 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 2\Post-Developed CP - Wet Pond.ppw ------------------------------------------------------------------------ Tc Equations used... ___= User Defined ______________________________________________________ Tc = Value entered by user Where: Tc = Time of concentration SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:15 PM 10/8/2019 Type.... Runoff CN-Area Name.... ON -SITE DET Page 4.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 2\Post-Developed CP - Wet Pond.ppw RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... Impervious Area Adjustment Adjusted Soil/Surface Description CN acres oC oUC CN Impervious Areas - Paved parking to 98 2.810 98.00 Open space (Lawns,parks etc.) - Goo 74 1.420 74.00 COMPOSITE AREA & WEIGHTED CN ---> 4.230 89.94 (90) ........................................................................... ........................................................................... SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:15 PM 10/8/2019 Type.... Vol: Elev-Area Name.... WET POND #2 Page 5.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 2\Post-Developed CP - Wet Pond.ppw Elevation Planimeter Area Al+A2+sgr(A1*A2) Volume Volume Sum (ft) ------------------------------------------------------------------------ (sq.in) (sq.ft) (sq.ft) (cu.ft) (cu.ft) 616.50 5320 0 0 0 617.00 6344 17473 2912 2912 618.00 7448 20666 6889 9801 619.00 8488 23887 7962 17763 620.00 9585 27093 9031 26794 621.00 10738 30468 10156 36950 622.00 11948 34013 11338 48288 623.00 13214 37727 12576 60864 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.(Area1*Area2)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1. EL2, respectively Volume = Incremental volume between EL1 and EL2 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:15 PM 10/8/2019 Type.... Outlet Input Data Name.... Pond #2 Page 6.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 2\Post-Developed CP - Wet Pond.ppw REQUESTED POND WS ELEVATIONS: Min. Elev.= 616.50 ft Increment = .10 ft Max. Elev.= 623.00 ft ********************************************** OUTLET CONNECTIVITY ********************************************** ---> Forward Flow Only (UpStream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) < --- > Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft ----------------- ----------------------------- Orifice-Circular WQ ---> TW 616.500 623.000 TW SETUP, DS Channel SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:15 PM 10/8/2019 Type.... Outlet Input Data Name.... Pond #2 Page 6.02 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 2\Post-Developed CP - Wet Pond.ppw OUTLET STRUCTURE INPUT DATA Structure ID = WQ Structure Type = Orifice -Circular ------------------------------------ # of Openings = 1 Invert Elev. = 616.50 ft Diameter = 1.00 in Orifice Coeff. _ .600 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:15 PM 10/8/2019 Appendix A A-1 Index of Starting Page Numbers for ID Names ----- O ----- ON-SITE DET... 3.01, 4.01 ----- P ----- Pond #2... 6.01 ----- U ----- Union County... 2.01 ----- W ----- Watershed... 1.01 WET POND #2... 5.01 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:15 PM 10/8/2019 Volume vs. Time WET POND #2 Dev 1 20000 10000 A 0 10 20 30 40 50 60 70 80 90 100 110 120 Time (hrs) Post -Developed Job File: N:\ 2018\1018330\Docs\Calcs\Stormwater\Pond 2\POST-DEVELOPED DETENTION - WET PON] Rain Dir: N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 2\ -------------------------- JOB TITLE -------------------------- Project Date: 4/2/2019 Project Engineer: ATB Project Title: Weddington Pointe Project Comments: SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:18 PM 10/8/2019 Table of Contents Table of Contents i ********************** MASTER SUMMARY ********************** Watershed....... Master Network Summary ............. 1.01 ****************** DESIGN STORMS SUMMARY ******************* Union County.... Design Storms ...................... 2.01 ********************** TC CALCULATIONS ********************* ON -SITE DET..... Tc Calcs ........................... 3.01 ON -SITE UNDET... Tc Calcs ........................... 3.03 ********************** CN CALCULATIONS ********************* ON -SITE DET..... Runoff CN-Area ..................... 4.01 ON -SITE UNDET... Runoff CN-Area ..................... 4.02 *********************** POND VOLUMES *********************** WET POND #2..... Vol: Elev-Area ..................... 5.01 ******************** OUTLET STRUCTURES ********************* Pond #2......... Outlet Input Data .................. 6.01 S/N: Bentley PondPack (10.01.04.00) 3:18 PM Bentley Systems, Inc. 10/8/2019 Type.... Master Network Summary Page 1.01 Name.... Watershed File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 2\Post-Developed Detention - Wet Pond MASTER DESIGN STORM SUMMARY Network Storm Collection: Union County Total Depth Return Event in Dev 2 3.6000 Dev 10 5.2000 Dev 25 6.2000 Dev 50 7.0000 Dev100 7.9000 Rainfall Type ---------------- Synthetic Curve Synthetic Curve Synthetic Curve Synthetic Curve Synthetic Curve RNF ID TypeII 24hr TypeII 24hr TypeII 24hr TypeII 24hr TypeII 24hr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Max Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ID Type Event cu.ft Trun hrs cfs ft cu.ft ON -SITE DET AREA 2 32295 11.9170 13.94 ON -SITE DET AREA 10 54548 11.9160 23.23 ON -SITE DET AREA 25 68949 11.9160 29.07 ON -SITE DET AREA 50 80633 11.9160 33.74 ON -SITE DET AREA 100 93900 11.9160 38.98 ON -SITE UNDET AREA 2 9171 11.9270 3.89 ON -SITE UNDET AREA 10 17685 11.9270 7.66 ON -SITE UNDET AREA 25 23491 11.9250 10.16 ON -SITE UNDET AREA 50 28312 11.9170 12.23 ON -SITE UNDET AREA 100 33875 11.9170 14.59 *POST -OUT JCT 2 9805 R 11.9270 3.92 *POST -OUT JCT 10 38404 R 11.9270 7.70 *POST -OUT JCT 25 57456 R 12.0260 23.29 *POST -OUT JCT 50 73041 R 11.9460 27.39 *POST -OUT JCT 100 90839 R 11.9270 30.71 S/N: Bentley PondPack (10.01.04.00) 3:18 PM Bentley Systems, Inc. 10/8/2019 Type.... Master Network Summary Page 1.02 Name.... Watershed File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 2\Post-Developed Detention - Wet Pond MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Max Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ID Type Event cu.ft Trun hrs cfs ft cu.ft WET POND #2 IN POND 2 29939 R 11.9170 13.94 WET POND #2 IN POND 10 50933 R 11.9160 23.23 WET POND #2 IN POND 25 64554 R 11.9160 29.07 WET POND #2 IN POND 50 75618 R 11.9160 33.74 WET POND #2 IN POND 100 88190 R 11.9160 38.98 WET POND #2 OUT POND 2 4953 17.4010 .05 620.17 28449 WET POND #2 OUT POND 10 25383 12.1270 4.58 620.30 29766 WET POND #2 OUT POND 25 38860 12.0470 15.71 620.62 32927 WET POND #2 OUT POND 50 49846 12.0550 16.40 620.97 36660 WET POND #2 OUT POND 100 62345 12.0560 17.39 621.44 41817 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:18 PM 10/8/2019 Type.... Design Storms Name.... Union County Page 2.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 2\Post-Developed Detention - Wet Pond Title... Project Date: 4/2/2019 Project Engineer: ATB Project Title: Weddington Pointe Project Comments: DESIGN STORMS SUMMARY Design Storm File,ID = Union County Storm Tag Name = Dev 2 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 2 yr Total Rainfall Depth= 3.6000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Dev 10 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 10 yr Total Rainfall Depth= 5.2000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Dev 25 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 25 yr Total Rainfall Depth= 6.2000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Dev 50 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 50 yr Total Rainfall Depth= 7.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Dev100 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 100 yr Total Rainfall Depth= 7.9000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:18 PM 10/8/2019 Type.... Tc Calcs Name.... ON -SITE DET Page 3.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 2\Post-Developed Detention - Wet Pond ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: User Defined Segment #1 Time: .0833 hrs ------------------------------------------------------------------------ ------------------------ Total Tc: .0833 hrs Calculated Tc G Min.Tc: Use Minimum Tc... Use Tc = .0833 hrs ------------------------- S/N: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:18 PM 10/8/2019 Type.... Tc Calcs Name.... ON -SITE DET Page 3.02 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 2\Post-Developed Detention - Wet Pond ------------------------------------------------------------------------ Tc Equations used... ___= User Defined ______________________________________________________ Tc = Value entered by user Where: Tc = Time of concentration SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:18 PM 10/8/2019 Type.... Tc Calcs Name.... ON -SITE UNDET Page 3.03 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 2\Post-Developed Detention - Wet Pond ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: User Defined Segment #1 Time: .0833 hrs ------------------------------------------------------------------------ ------------------------ Total Tc: .0833 hrs Calculated Tc G Min.Tc: Use Minimum Tc... Use Tc = .0833 hrs ------------------------- S/N: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:18 PM 10/8/2019 Type.... Tc Calcs Name.... ON -SITE UNDET Page 3.04 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 2\Post-Developed Detention - Wet Pond ------------------------------------------------------------------------ Tc Equations used... ___= User Defined ______________________________________________________ Tc = Value entered by user Where: Tc = Time of concentration SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:18 PM 10/8/2019 Type.... Runoff CN-Area Name.... ON -SITE DET Page 4.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 2\Post-Developed Detention - Wet Pond RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... Impervious Area Adjustment Adjusted Soil/Surface Description CN acres oC oUC CN Impervious Areas - Paved parking to 98 1.860 98.00 Open space (Lawns,parks etc.) - Goo 74 2.370 74.00 COMPOSITE AREA & WEIGHTED CN ---> 4.230 84.55 (85) ........................................................................... ........................................................................... SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:18 PM 10/8/2019 Type.... Runoff CN-Area Name.... ON -SITE UNDET Page 4.02 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 2\Post-Developed Detention - Wet Pond RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... Impervious Area Adjustment Adjusted Soil/Surface Description CN acres oC oUC CN Open space (Lawns,parks etc.) - Goo 74 1.930 74.00 COMPOSITE AREA & WEIGHTED CN ---> 1.930 74.00 (74) ........................................................................... ........................................................................... SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:18 PM 10/8/2019 Type.... Vol: Elev-Area Name.... WET POND #2 Page 5.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 2\Post-Developed Detention - Wet Pond Elevation Planimeter Area Al+A2+sgr(A1*A2) Volume Volume Sum (ft) ------------------------------------------------------------------------ (sq.in) (sq.ft) (sq.ft) (cu.ft) (cu.ft) 616.50 5320 0 0 0 617.00 6344 17473 2912 2912 618.00 7448 20666 6889 9801 619.00 8488 23887 7962 17763 620.00 9585 27093 9031 26794 621.00 10738 30468 10156 36950 622.00 11948 34013 11338 48288 623.00 13214 37727 12576 60864 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.(Area1*Area2)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1. EL2, respectively Volume = Incremental volume between EL1 and EL2 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:18 PM 10/8/2019 Type.... Outlet Input Data Name.... Pond #2 Page 6.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 2\Post-Developed Detention - Wet Pond REQUESTED POND WS ELEVATIONS: Min. Elev.= 616.50 ft Increment = .10 ft Max. Elev.= 623.00 ft ********************************************** OUTLET CONNECTIVITY ********************************************** ---> Forward Flow Only (UpStream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) < --- > Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft ----------------- Orifice-Area ---- DT ---> ------- CO --------- 620.200 --------- 623.000 Inlet Box RO ---> CO 621.250 623.000 Orifice -Circular WQ ---> CO 616.500 623.000 Culvert -Circular CO ---> TW 615.320 623.000 TW SETUP, DS Channel SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:18 PM 10/8/2019 Type.... Outlet Input Data Name.... Pond #2 Page 6.02 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 2\Post-Developed Detention - Wet Pond OUTLET STRUCTURE INPUT DATA Structure ID = DT Structure Type = Orifice -Area ------------------------------------ # of Openings = 3 Invert Elev. = 620.20 ft Area = 3.0000 sq.ft Top of Orifice = 621.20 ft Datum Elev. = 620.20 ft Orifice Coeff. _ .600 Structure ID = RO Structure Type ------------------------------------ = Inlet Box # of Openings = 1 Invert Elev. = 621.25 ft Orifice Area = 25.0000 sq.ft Orifice Coeff. _ .600 Weir Length = 20.00 ft Weir Coeff. = 3.000 K, Reverse = 1.000 Mannings n = .0000 Kev,Charged Riser = .000 Weir Submergence = No Structure ID = WQ Structure Type = Orifice -Circular ------------------------------------ # of Openings = 1 Invert Elev. = 616.50 ft Diameter = 1.00 in Orifice Coeff. _ .600 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:18 PM 10/8/2019 Type.... Outlet Input Data Name.... Pond #2 Page 6.03 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 2\Post-Developed Detention - Wet Pond OUTLET STRUCTURE INPUT DATA Structure ID = CO Structure Type = Culvert -Circular ------------------------------------ No. Barrels = 1 Barrel Diameter = 18.00 in Upstream Invert = 615.32 ft Dnstream Invert = 614.00 ft Horiz. Length = 132.03 ft Barrel Length = 132.04 ft Barrel Slope = .01000 ft/ft OUTLET CONTROL DATA... Mannings n = .0130 Ke = .5000 Kb = .018213 Kr = .5000 HW Convergence = .001 INLET CONTROL DATA... Equation form = 1 Inlet Control K = .0098 Inlet Control M = 2.0000 Inlet Control c = .03980 Inlet Control Y = .6700 T1 ratio (HW/D) _ .000 T2 ratio (HW/D) = 1.302 Slope Factor = -.500 (forward entrance loss) (per ft of full flow) (reverse entrance loss) +/- ft Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 615.32 ft ---> Flow = 7.58 cfs At T2 Elev = 617.27 ft ---> Flow = 8.66 cfs Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES... Maximum Iterations= 40 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. Q tolerance = .00 cfs Max. Q tolerance = .00 cfs SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:18 PM 10/8/2019 Appendix A A-1 Index of Starting Page Numbers for ID Names ----- O ----- ON-SITE DET... 3.01, 4.01 ON -SITE UNDET... 3.03, 4.02 ----- P ----- Pond #2... 6.01 ----- U ----- Union County... 2.01 ----- W ----- Watershed... 1.01 WET POND #2... 5.01 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:18 PM 10/8/2019 Buoyancy Calculations Bouyancy Calculations Volume of Water Displaced (Structure) Structure Dimensions: Inner Length = 5 Feet Inner Width = 5 Feet Thickness = 0.5 Feet Height = 7.75 Feet Volume = 279 Cubic Feet Specific Weight of Water = 62.4 Pounds per Cubic Foot Weight of Displaced Volume = 17,410 Pounds Volume of Water Displaced (Base): Structure Dimensions: Flange = 1 Feet Length = 8 Feet Width = 8 Feet Height = 2 Feet Volume = 128 Cubic Feet Specific Weight of Water = 62.4 Pounds per Cubic Foot Weight of Displaced Volume = 7,987 Pounds Total Weight of Displaced Volume = 25,397 Pounds Concrete Volume of Structure Concrete Volume: Inner Length = 5 Feet Inner Width = 5 Feet Thickness = 0.5 Feet Height = 7.75 Feet Volume = 85 Cubic Feet Specific Weight of Concrete = 150 Pounds per Cubic Foot Weight of Concrete = 12,788 Pounds Volume of Concrete Required (Base): Concrete Volume: Flange = 1 Feet Length = 8 Feet Width = 8 Feet Height = 2 Feet Volume = 128 Cubic Feet Specific Weight of Concrete = 150 Pounds per Cubic Foot Weight of Concrete = 19,200 Pounds Total Weight of Concrete = 31,988 Pounds Factor of Safety (Minimum = 1) = 1.3 8ft Pond Section Ballast Pad Schematic 8ft 5' x 5' Riser Ballast Pad 2ft Proposed Wet Pond #3 Pre -Developed Job File: N:\ 2018\1018330\Docs\Calcs\Stormwater\Pond 3\PRE-DEVELOPED RUNOFF.PPW Rain Dir: N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 3\ -------------------------- JOB TITLE -------------------------- Project Date: 4/1/2019 Project Engineer: ATB Project Title: Weddington Pointe Project Comments: SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 1:14 PM 4/25/2019 Table of Contents Table of Contents i ********************** MASTER SUMMARY ********************** Watershed....... Master Network Summary ............. 1.01 ****************** DESIGN STORMS SUMMARY ******************* Union County.... Design Storms ...................... 2.01 ********************** TC CALCULATIONS ********************* PRE -DEVELOPED #3 Tc Calcs ........................... 3.01 ********************** CN CALCULATIONS ********************* PRE -DEVELOPED #3 Runoff CN-Area ..................... 4.01 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 1:14 PM 4/25/2019 Type.... Master Network Summary Page 1.01 Name.... Watershed File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 3\Pre-Developed Runoff.ppw MASTER DESIGN STORM SUMMARY Network Storm Collection: Union County Total Depth Return Event in Pre 2 3.6000 Pre 10 5.2000 Pre 25 6.2000 Pre 50 7.0000 Pre100 7.9000 Rainfall Type ---------------- Synthetic Curve Synthetic Curve Synthetic Curve Synthetic Curve Synthetic Curve RNF ID TypeII 24hr TypeII 24hr TypeII 24hr TypeII 24hr TypeII 24hr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Return HYG Vol Qpeak Node ID Type Event cu.ft Trun hrs PRE -DEVELOPED #3 AREA 2 16052 12.0990 PRE -DEVELOPED #3 AREA 10 33292 12.0990 PRE -DEVELOPED #3 AREA 25 45407 12.0980 PRE -DEVELOPED #3 AREA 50 55603 12.0980 PRE -DEVELOPED #3 AREA 100 67483 12.0980 Max Qpeak Max WSEL Pond Storage cfs ft cu.ft 4.39 9.69 13.36 16.41 19.93 *PRE -OUT JCT 2 14291 R 12.0990 4.39 *PRE -OUT JCT 10 30192 R 12.0990 9.69 *PRE -OUT JCT 25 41449 R 12.0980 13.36 *PRE -OUT JCT 50 50955 R 12.0980 16.41 *PRE -OUT JCT 100 62058 R 12.0980 19.93 S/N: Bentley PondPack (10.01.04.00) 1:14 PM Bentley Systems, Inc. 4/25/2019 Type.... Design Storms Name.... Union County Page 2.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 3\Pre-Developed Runoff.ppw Title... Project Date: 4/1/2019 Project Engineer: ATB Project Title: Weddington Pointe Project Comments: DESIGN STORMS SUMMARY Design Storm File,ID = Union County Storm Tag Name = Pre 2 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 2 yr Total Rainfall Depth= 3.6000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Pre 10 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 10 yr Total Rainfall Depth= 5.2000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Pre 25 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 25 yr Total Rainfall Depth= 6.2000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Pre 50 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 50 yr Total Rainfall Depth= 7.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Pre100 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 100 yr Total Rainfall Depth= 7.9000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs S/N: Bentley PondPack (10.01.04.00) 1:14 PM Bentley Systems, Inc. 4/25/2019 Type.... Tc Calcs Name.... PRE -DEVELOPED #3 Page 3.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 3\Pre-Developed Runoff.ppw ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: User Defined Segment #1 Time: .3300 hrs ------------------------------------------------------------------------ ------------------------- Total Tc: .3300 hrs ------------------------- S/N: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 1:14 PM 4/25/2019 Type.... Tc Calcs Name.... PRE -DEVELOPED #3 Page 3.02 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 3\Pre-Developed Runoff.ppw ------------------------------------------------------------------------ Tc Equations used... ___= User Defined ______________________________________________________ Tc = Value entered by user Where: Tc = Time of concentration SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 1:14 PM 4/25/2019 Type.... Runoff CN-Area Name.... PRE -DEVELOPED #3 Page 4.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 3\Pre-Developed Runoff.ppw RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... Impervious Area Adjustment Adjusted Soil/Surface Description CN acres oC oUC CN Pasture, grassland, or range - fair 69 4.360 69.00 COMPOSITE AREA & WEIGHTED CN ---> 4.360 69.00 (69) ........................................................................... ........................................................................... SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 1:14 PM 4/25/2019 Appendix A A-1 Index of Starting Page Numbers for ID Names ----- P ----- PRE-DEVELOPED #3... 3.01, 4.01 ----- U ----- Union County... 2.01 ----- W ----- Watershed... 1.01 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 1:14 PM 4/25/2019 Water Quality Wet Pond Design (NCDENR - 2007) Project Name: Weddington Pointe Job Number: 1018330 Step 1: Compute the water quality volume (WQV). WQv (Ft3) = (3630) X (RD) X (Rv) X (AD) Where: WQV = Water Quality Volume (Ft) AD = Drainage Area to Wet Pond (acres). Rv = Volumetric Runoff Coefficient = 0.05 + 0.9 (% Impervious) Rp = Design Storm Rainfall Depth (in). Typically 1.0". Percent Impervious = 63% AD = 13.67 acres Rp = 1.0 in Rv = 0.62 WQv = 30,577 Ft" Step 2: Determine Surface Area Requirements. Average Permanent Pool Depth =®Feet Percent Impervious = 63% SA / DA Ratio = 1.77 Required Surface Area = 10,540 Ft2 Step 3: Preliminary Temporary Water Quality Drawdown Calculations Pond Height above Orifice = 2.9 feet Orifice Invert Elevation = 0.0 feet Pond Surface Area at Height Above Orifice = 10,540 square feet Pond Surface Area at Orifice Invert Elevation = 10,540 square feet Orifice Diameter (D) = 2.00 inches = 0.17 feet Orifice Area (a) = 0.0218 square feet Average Surface Area (A) = 10,540 square feet Gravitational Constatnt (g) = 32.2 ft/sec2 Head (H) = 2.82 feet Discharge Coefficient (C) = 0.6 Time (t) = 194,445 seconds = 2.25 days Note: The above calculation is based on the Bernoulli Equation where: t : x a x (2g)° x (0 - H/3°.5) Step 4: Compute Site Hydraulic Input Parameters. Condition Area (Ac) CN Tc (hours) Pre -developed 13.67 70 0.4 Post -developed 13.67 84 0.0833 Results Condition Q2-year Q10-year Q25-year Q50-year Pre -developed 4.39 9.69 13.36 16.41 Post -developed 1.10 5.77 9.89 21.74 Permanent Pool Storage Wet Pond#3 Stage Storage Pond -Main Pool Elev Area (so Inc Storage (cf) Total Storage (cf) 607 5895 0 0 611 9297 30,384 30,384 612 10220 9,759 40,143 612.5 11423 5,411 45,553 0 0 0 0 Pond - Forebay Elev Area (so Inc Storage c Total Storage c 609 1345 0 0 611 2049 3,394 3,394 612 2446 2,248 5,642 612.5 2,870 1,329 6,971 0 0 0 0 Total Volume (cf) = 45,553 Total Surface Area (so = 11,423 Average Depth (ft) = 4.0 Forbay Volume Req. (15%) = 6,833 Forbay Provided (cf) = 6,971 Channel Protection Job File: N:\ 2018\1018330\Docs\Calcs\Stormwater\Pond 3\POST-DEVELOPED CP - WET POND.PPW Rain Dir: N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 3\ -------------------------- JOB TITLE -------------------------- Project Date: 4/2/2019 Project Engineer: ATB Project Title: Weddington Pointe Project Comments: SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:07 PM 10/11/2019 Table of Contents Table of Contents i ********************** MASTER SUMMARY ********************** Watershed....... Master Network Summary ............. 1.01 ****************** DESIGN STORMS SUMMARY ******************* Union County.... Design Storms ...................... 2.01 ********************** TC CALCULATIONS ********************* ON -SITE DET..... Tc Calcs ........................... 3.01 ********************** CN CALCULATIONS ********************* ON -SITE DET..... Runoff CN-Area ..................... 4.01 *********************** POND VOLUMES *********************** WET POND #3..... Vol: Elev-Area ..................... 5.01 ******************** OUTLET STRUCTURES ********************* Pond #2......... Outlet Input Data .................. 6.01 S/N: Bentley PondPack (10.01.04.00) 3:07 PM Bentley Systems, Inc. 10/11/2019 Type.... Master Network Summary Page 1.01 Name.... Watershed File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 3\Post-Developed CP - Wet Pond.ppw MASTER DESIGN STORM SUMMARY Network Storm Collection: Union County Total Depth Rainfall Return Event in Type Dev 1 3.0000 Synthetic Curve --------------------------- ICPM CALCULATION TOLERANCES Target Convergence= .000 cfs +/- Max. Iterations = 35 loops ICPM Time Step = .0100 hrs Output Time Step = .0100 hrs ICPM Ending Time = ------------------------------- 120.0000 hrs RNF ID ---------------- TypeII 24hr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Return HYG Vol Node ID Type Event cu.ft Trun ON -SITE DET AREA 1 75240 *POST -OUT T-E 1 60434 R WET POND #3 POND 1 75240 WET POND #3 OUT POND 1 60434 R S/N: Bentley PondPack (10.01.04.00) Max Qpeak Qpeak Max WSEL Pond Storage hrs cfs ft cu.ft 11.9200 32.52 23.0400 .20 612.50 11.9200 32.52 23.0400 .20 616.16 66802 3:07 PM Bentley Systems, Inc. 10/11/2019 Type.... Design Storms Name.... Union County Page 2.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 3\Post-Developed CP - Wet Pond.ppw Title... Project Date: 4/2/2019 Project Engineer: ATB Project Title: Weddington Pointe Project Comments: DESIGN STORMS SUMMARY Design Storm File,ID = Storm Tag Name = Dev 1 Union County Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 1 yr Total Rainfall Depth= 3.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:07 PM 10/11/2019 Type.... Tc Calcs Name.... ON -SITE DET Page 3.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 3\Post-Developed CP - Wet Pond.ppw ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: User Defined Segment #1 Time: .0833 hrs ------------------------------------------------------------------------ ------------------------ Total Tc: .0833 hrs Calculated Tc G Min.Tc: Use Minimum Tc... Use Tc = .0833 hrs ------------------------- S/N: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:07 PM 10/11/2019 Type.... Tc Calcs Name.... ON -SITE DET Page 3.02 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 3\Post-Developed CP - Wet Pond.ppw ------------------------------------------------------------------------ Tc Equations used... ___= User Defined ______________________________________________________ Tc = Value entered by user Where: Tc = Time of concentration SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:07 PM 10/11/2019 Type.... Runoff CN-Area Name.... ON -SITE DET Page 4.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 3\Post-Developed CP - Wet Pond.ppw RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... Impervious Area Adjustment Adjusted Soil/Surface Description CN acres oC oUC CN Impervious Areas - Paved parking to 98 8.600 98.00 Open space (Lawns,parks etc.) - Goo 61 5.070 61.00 COMPOSITE AREA & WEIGHTED CN ---> 13.670 84.28 (84) ........................................................................... ........................................................................... SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:07 PM 10/11/2019 Type.... Vol: Elev-Area Name.... WET POND #3 Page 5.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 3\Post-Developed CP - Wet Pond.ppw Elevation Planimeter Area Al+A2+sgr(A1*A2) Volume Volume Sum (ft) ------------------------------------------------------------------------ (sq.in) (sq.ft) (sq.ft) (cu.ft) (cu.ft) 612.50 14292 0 0 0 613.00 15996 45408 7568 7568 614.00 17801 50671 16890 24458 615.00 19402 55787 18596 43054 616.00 21060 60676 20225 63280 617.00 22774 65734 21911 85191 618.00 24544 70960 23653 108845 619.00 26371 76356 25452 134297 620.00 28255 81923 27308 161604 621.00 30195 87659 29220 190824 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.(Area1*Area2)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1. EL2, respectively Volume = Incremental volume between EL1 and EL2 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:07 PM 10/11/2019 Type.... Outlet Input Data Name.... Pond #2 Page 6.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 3\Post-Developed CP - Wet Pond.ppw REQUESTED POND WS ELEVATIONS: Min. Elev.= 612.50 ft Increment = .10 ft Max. Elev.= 621.00 ft ********************************************** OUTLET CONNECTIVITY ********************************************** ---> Forward Flow Only (UpStream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) < --- > Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft ----------------- ----------------------------- Orifice-Circular WQ ---> TW 612.500 621.000 TW SETUP, DS Channel SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:07 PM 10/11/2019 Type.... Outlet Input Data Name.... Pond #2 Page 6.02 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 3\Post-Developed CP - Wet Pond.ppw OUTLET STRUCTURE INPUT DATA Structure ID = WQ Structure Type = Orifice -Circular ------------------------------------ # of Openings = 1 Invert Elev. = 612.50 ft Diameter = 2.00 in Orifice Coeff. _ .600 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:07 PM 10/11/2019 Appendix A A-1 Index of Starting Page Numbers for ID Names ----- O ----- ON-SITE DET... 3.01, 4.01 ----- P ----- Pond #2... 6.01 ----- U ----- Union County... 2.01 ----- W ----- Watershed... 1.01 WET POND #3... 5.01 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:07 PM 10/11/2019 Volume vs. Time WET POND #3 Dev 1 70000 60000 50000 40000 a� E 0 30000 20000 10000 0' 0 10 20 30 40 50 60 70 80 90 100 110 120 Time (hrs) Post -Developed Job File: N:\ 2018\1018330\Docs\Calcs\Stormwater\Pond 3\POST-DEVELOPED DETENTION - WET PON] Rain Dir: N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 3\ -------------------------- JOB TITLE -------------------------- Project Date: 4/2/2019 Project Engineer: ATB Project Title: Weddington Pointe Project Comments: SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:09 PM 10/11/2019 Table of Contents Table of Contents i ********************** MASTER SUMMARY ********************** Watershed....... Master Network Summary ............. 1.01 ****************** DESIGN STORMS SUMMARY ******************* Union County.... Design Storms ...................... 2.01 ********************** TC CALCULATIONS ********************* ON -SITE DET..... Tc Calcs ........................... 3.01 ON -SITE UNDET... Tc Calcs ........................... 3.03 ********************** CN CALCULATIONS ********************* ON -SITE DET..... Runoff CN-Area ..................... 4.01 ON -SITE UNDET... Runoff CN-Area ..................... 4.02 *********************** POND VOLUMES *********************** WET POND #3..... Vol: Elev-Area ..................... 5.01 ******************** OUTLET STRUCTURES ********************* Pond #2......... Outlet Input Data .................. 6.01 S/N: Bentley PondPack (10.01.04.00) 3:09 PM Bentley Systems, Inc. 10/11/2019 Type.... Master Network Summary Page 1.01 Name.... Watershed File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 3\Post-Developed Detention - Wet Pond MASTER DESIGN STORM SUMMARY Network Storm Collection: Union County Total Depth Return Event in Dev 2 3.6000 Dev 10 5.2000 Dev 25 6.2000 Dev 50 7.0000 Dev100 7.9000 Rainfall Type ---------------- Synthetic Curve Synthetic Curve Synthetic Curve Synthetic Curve Synthetic Curve RNF ID TypeII 24hr TypeII 24hr TypeII 24hr TypeII 24hr TypeII 24hr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Max Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ID Type Event cu.ft Trun hrs cfs ft cu.ft ON -SITE DET AREA 2 100332 11.9170 43.36 ON -SITE DET AREA 10 171348 11.9170 73.23 ON -SITE DET AREA 25 217491 11.9160 92.11 ON -SITE DET AREA 50 254991 11.9160 107.22 ON -SITE DET AREA 100 297626 11.9160 124.18 ON -SITE UNDET AREA 2 853 12.0000 .31 ON -SITE UNDET AREA 10 2056 11.9260 .84 ON -SITE UNDET AREA 25 2952 11.9260 1.24 ON -SITE UNDET AREA 50 3726 11.9260 1.59 ON -SITE UNDET AREA 100 4645 11.9270 2.00 *POST -OUT JCT 2 22802 R 15.4170 1.10 *POST -OUT JCT 10 88968 R 12.5120 5.77 *POST -OUT JCT 25 132094 R 12.3790 9.89 *POST -OUT JCT 50 167371 R 12.0650 21.74 *POST -OUT JCT 100 207526 R 12.0270 23.53 S/N: Bentley PondPack (10.01.04.00) 3:09 PM Bentley Systems, Inc. 10/11/2019 Type.... Master Network Summary Page 1.02 Name.... Watershed File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 3\Post-Developed Detention - Wet Pond MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Max Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ID Type Event cu.ft Trun hrs cfs ft cu.ft WET POND #3 IN POND 2 92846 R 11.9170 43.36 WET POND #3 IN POND 10 159782 R 11.9170 73.23 WET POND #3 IN POND 25 203399 R 11.9160 92.11 WET POND #3 IN POND 50 238890 R 11.9160 107.22 WET POND #3 IN POND 100 279271 R 11.9160 124.18 WET POND #3 OUT POND 2 37039 R 15.4750 1.09 616.44 72630 WET POND #3 OUT POND 10 102437 R 12.5390 5.68 617.55 97940 WET POND #3 OUT POND 25 145376 R 12.3800 9.72 618.55 122740 WET POND #3 OUT POND 50 180441 R 12.1140 21.10 619.07 136180 WET POND #3 OUT POND 100 220414 R 12.1310 22.51 619.88 158181 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:09 PM 10/11/2019 Type.... Design Storms Name.... Union County Page 2.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 3\Post-Developed Detention - Wet Pond Title... Project Date: 4/2/2019 Project Engineer: ATB Project Title: Weddington Pointe Project Comments: DESIGN STORMS SUMMARY Design Storm File,ID = Union County Storm Tag Name = Dev 2 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 2 yr Total Rainfall Depth= 3.6000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Dev 10 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 10 yr Total Rainfall Depth= 5.2000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Dev 25 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 25 yr Total Rainfall Depth= 6.2000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Dev 50 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 50 yr Total Rainfall Depth= 7.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Dev100 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 100 yr Total Rainfall Depth= 7.9000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:09 PM 10/11/2019 Type.... Tc Calcs Name.... ON -SITE DET Page 3.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 3\Post-Developed Detention - Wet Pond ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: User Defined Segment #1 Time: .0833 hrs ------------------------------------------------------------------------ ------------------------ Total Tc: .0833 hrs Calculated Tc G Min.Tc: Use Minimum Tc... Use Tc = .0833 hrs ------------------------- S/N: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:09 PM 10/11/2019 Type.... Tc Calcs Name.... ON -SITE DET Page 3.02 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 3\Post-Developed Detention - Wet Pond ------------------------------------------------------------------------ Tc Equations used... ___= User Defined ______________________________________________________ Tc = Value entered by user Where: Tc = Time of concentration SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:09 PM 10/11/2019 Type.... Tc Calcs Name.... ON -SITE UNDET Page 3.03 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 3\Post-Developed Detention - Wet Pond ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: User Defined Segment #1 Time: .0833 hrs ------------------------------------------------------------------------ ------------------------ Total Tc: .0833 hrs Calculated Tc G Min.Tc: Use Minimum Tc... Use Tc = .0833 hrs ------------------------- S/N: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:09 PM 10/11/2019 Type.... Tc Calcs Name.... ON -SITE UNDET Page 3.04 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 3\Post-Developed Detention - Wet Pond ------------------------------------------------------------------------ Tc Equations used... ___= User Defined ______________________________________________________ Tc = Value entered by user Where: Tc = Time of concentration SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:09 PM 10/11/2019 Type.... Runoff CN-Area Name.... ON -SITE DET Page 4.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 3\Post-Developed Detention - Wet Pond RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... Impervious Area Adjustment Adjusted Soil/Surface Description CN acres oC oUC CN Impervious Areas - Paved parking to 98 8.600 98.00 Open space (Lawns,parks etc.) - Goo 61 5.070 61.00 COMPOSITE AREA & WEIGHTED CN ---> 13.670 84.28 (84) ........................................................................... ........................................................................... SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:09 PM 10/11/2019 Type.... Runoff CN-Area Name.... ON -SITE UNDET Page 4.02 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 3\Post-Developed Detention - Wet Pond RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... Impervious Area Adjustment Adjusted Soil/Surface Description CN acres oC oUC CN Open space (Lawns,parks etc.) - Goo 61 .380 61.00 COMPOSITE AREA & WEIGHTED CN ---> .380 61.00 (61) ........................................................................... ........................................................................... SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:09 PM 10/11/2019 Type.... Vol: Elev-Area Name.... WET POND #3 Page 5.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 3\Post-Developed Detention - Wet Pond Elevation Planimeter Area Al+A2+sgr(A1*A2) Volume Volume Sum (ft) ------------------------------------------------------------------------ (sq.in) (sq.ft) (sq.ft) (cu.ft) (cu.ft) 612.50 14292 0 0 0 613.00 15996 45408 7568 7568 614.00 17801 50671 16890 24458 615.00 19402 55787 18596 43054 616.00 21060 60676 20225 63280 617.00 22774 65734 21911 85191 618.00 24544 70960 23653 108845 619.00 26371 76356 25452 134297 620.00 28255 81923 27308 161604 621.00 30195 87659 29220 190824 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.(Area1*Area2)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1. EL2, respectively Volume = Incremental volume between EL1 and EL2 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:09 PM 10/11/2019 Type.... Outlet Input Data Name.... Pond #2 Page 6.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 3\Post-Developed Detention - Wet Pond REQUESTED POND WS ELEVATIONS: Min. Elev.= 612.50 ft Increment = .10 ft Max. Elev.= 621.00 ft ********************************************** OUTLET CONNECTIVITY ********************************************** ---> Forward Flow Only (UpStream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) < --- > Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft ----------------- Orifice-Area ---- DT ---> ------- CO --------- 616.250 --------- 621.000 Inlet Box RO ---> CO 618.450 621.000 Orifice -Circular WQ ---> CO 612.500 621.000 Culvert -Circular CO ---> TW 612.370 621.000 TW SETUP, DS Channel SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:09 PM 10/11/2019 Type.... Outlet Input Data Name.... Pond #2 Page 6.02 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 3\Post-Developed Detention - Wet Pond OUTLET STRUCTURE INPUT DATA Structure ID = DT Structure Type = Orifice -Area ------------------------------------ # of Openings = 1 Invert Elev. = 616.25 ft Area = 1.0000 sq.ft Top of Orifice = 617.25 ft Datum Elev. = 616.25 ft Orifice Coeff. _ .600 Structure ID = RO Structure Type ------------------------------------ = Inlet Box # of Openings = 1 Invert Elev. = 618.45 ft Orifice Area = 25.0000 sq.ft Orifice Coeff. _ .600 Weir Length = 20.00 ft Weir Coeff. = 3.000 K, Reverse = 1.000 Mannings n = .0000 Kev,Charged Riser = .000 Weir Submergence = No Structure ID = WQ Structure Type = Orifice -Circular ------------------------------------ # of Openings = 1 Invert Elev. = 612.50 ft Diameter = 2.00 in Orifice Coeff. _ .600 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:09 PM 10/11/2019 Type.... Outlet Input Data Name.... Pond #2 Page 6.03 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 3\Post-Developed Detention - Wet Pond OUTLET STRUCTURE INPUT DATA Structure ID = CO Structure Type = Culvert -Circular ------------------------------------ No. Barrels = 1 Barrel Diameter = 18.00 in Upstream Invert = 612.37 ft Dnstream Invert = 611.75 ft Horiz. Length = 62.10 ft Barrel Length = 62.10 ft Barrel Slope = .00998 ft/ft OUTLET CONTROL DATA... Mannings n = .0130 Ke = .5000 Kb = .018213 Kr = .5000 HW Convergence = .001 INLET CONTROL DATA... Equation form = 1 Inlet Control K = .0098 Inlet Control M = 2.0000 Inlet Control c = .03980 Inlet Control Y = .6700 T1 ratio (HW/D) _ .000 T2 ratio (HW/D) = 1.302 Slope Factor = -.500 (forward entrance loss) (per ft of full flow) (reverse entrance loss) +/- ft Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 612.37 ft ---> Flow = 7.58 cfs At T2 Elev = 614.32 ft ---> Flow = 8.66 cfs Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES... Maximum Iterations= 40 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. Q tolerance = .00 cfs Max. Q tolerance = .00 cfs SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:09 PM 10/11/2019 Appendix A A-1 Index of Starting Page Numbers for ID Names ----- O ----- ON-SITE DET... 3.01, 4.01 ON -SITE UNDET... 3.03, 4.02 ----- P ----- Pond #2... 6.01 ----- U ----- Union County... 2.01 ----- W ----- Watershed... 1.01 WET POND #3... 5.01 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:09 PM 10/11/2019 Buoyancy Calculations Bouyancy Calculations Volume of Water Displaced (Structure) Structure Dimensions: Inner Length = 5 Feet Inner Width = 5 Feet Thickness = 0.5 Feet Height = 8.95 Feet Volume = 322 Cubic Feet Specific Weight of Water = 62.4 Pounds per Cubic Foot Weight of Displaced Volume = 20,105 Pounds Volume of Water Displaced (Base): Structure Dimensions: Flange = 1 Feet Length = 8 Feet Width = 8 Feet Height = 2 Feet Volume = 128 Cubic Feet Specific Weight of Water = 62.4 Pounds per Cubic Foot Weight of Displaced Volume = 7,987 Pounds Total Weight of Displaced Volume = 28,092 Pounds Concrete Volume of Structure Concrete Volume: Inner Length = 5 Feet Inner Width = 5 Feet Thickness = 0.5 Feet Height = 8.95 Feet Volume = 98 Cubic Feet Specific Weight of Concrete = 150 Pounds per Cubic Foot Weight of Concrete = 14,768 Pounds Volume of Concrete Required (Base): Concrete Volume: Flange = 1 Feet Length = 8 Feet Width = 8 Feet Height = 2 Feet Volume = 128 Cubic Feet Specific Weight of Concrete = 150 Pounds per Cubic Foot Weight of Concrete = 19,200 Pounds Total Weight of Concrete = 33,968 Pounds Factor of Safety (Minimum = 1) = 1.2 8ft Pond Section Ballast Pad Schematic 8ft 5' x 5' Riser Ballast Pad 2ft Proposed Wet Pond #4 Pre -Developed Job File: N:\ 2018\1018330\Docs\Calcs\Stormwater\Pond 4\PRE-DEVELOPED RUNOFF.PPW Rain Dir: N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 4\ -------------------------- JOB TITLE -------------------------- Project Date: 4/1/2019 Project Engineer: ATB Project Title: Weddington Pointe Project Comments: SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:16 PM 7/12/2019 Table of Contents Table of Contents i ********************** MASTER SUMMARY ********************** Watershed....... Master Network Summary ............. 1.01 ****************** DESIGN STORMS SUMMARY ******************* Union County.... Design Storms ...................... 2.01 ********************** TC CALCULATIONS ********************* PRE -DEVELOPED #4 Tc Calcs ........................... 3.01 ********************** CN CALCULATIONS ********************* PRE -DEVELOPED #4 Runoff CN-Area ..................... 4.01 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:16 PM 7/12/2019 Type.... Master Network Summary Page 1.01 Name.... Watershed File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 4\Pre-Developed Runoff.ppw MASTER DESIGN STORM SUMMARY Network Storm Collection: Union County Total Depth Return Event in Pre 2 3.6000 Pre 10 5.2000 Pre 25 6.2000 Pre 50 7.0000 Pre100 7.9000 Rainfall Type ---------------- Synthetic Curve Synthetic Curve Synthetic Curve Synthetic Curve Synthetic Curve RNF ID TypeII 24hr TypeII 24hr TypeII 24hr TypeII 24hr TypeII 24hr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Return HYG Vol Qpeak Node ID Type Event cu.ft Trun hrs PRE -DEVELOPED #4 AREA 2 8026 12.1020 PRE -DEVELOPED #4 AREA 10 16646 12.1020 PRE -DEVELOPED #4 AREA 25 22703 12.1020 PRE -DEVELOPED #4 AREA 50 27801 12.1020 PRE -DEVELOPED #4 AREA 100 33741 12.1020 Max Qpeak Max WSEL Pond Storage cfs ft cu.ft 2.15 4.77 6.57 8.08 9.82 *PRE -OUT JCT 2 7143 R 12.1020 2.15 *PRE -OUT JCT 10 15092 R 12.1020 4.77 *PRE -OUT JCT 25 20720 R 12.1020 6.57 *PRE -OUT JCT 50 25472 R 12.1020 8.08 *PRE -OUT JCT 100 31023 R 12.1020 9.82 S/N: Bentley PondPack (10.01.04.00) 3:16 PM Bentley Systems, Inc. 7/12/2019 Type.... Design Storms Name.... Union County Page 2.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 4\Pre-Developed Runoff.ppw Title... Project Date: 4/1/2019 Project Engineer: ATB Project Title: Weddington Pointe Project Comments: DESIGN STORMS SUMMARY Design Storm File,ID = Union County Storm Tag Name = Pre 2 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 2 yr Total Rainfall Depth= 3.6000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Pre 10 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 10 yr Total Rainfall Depth= 5.2000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Pre 25 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 25 yr Total Rainfall Depth= 6.2000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Pre 50 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 50 yr Total Rainfall Depth= 7.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Pre100 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 100 yr Total Rainfall Depth= 7.9000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs S/N: Bentley PondPack (10.01.04.00) 3:16 PM Bentley Systems, Inc. 7/12/2019 Type.... Tc Calcs Name.... PRE -DEVELOPED #4 Page 3.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 4\Pre-Developed Runoff.ppw ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: User Defined Segment #1 Time: .3400 hrs ------------------------------------------------------------------------ ------------------------- Total Tc: .3400 hrs ------------------------- S/N: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:16 PM 7/12/2019 Type.... Tc Calcs Name.... PRE -DEVELOPED #4 Page 3.02 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 4\Pre-Developed Runoff.ppw ------------------------------------------------------------------------ Tc Equations used... ___= User Defined ______________________________________________________ Tc = Value entered by user Where: Tc = Time of concentration SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:16 PM 7/12/2019 Type.... Runoff CN-Area Name.... PRE -DEVELOPED #4 Page 4.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 4\Pre-Developed Runoff.ppw RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... Impervious Area Adjustment Adjusted Soil/Surface Description CN acres oC oUC CN Pasture, grassland, or range - fair 69 2.180 69.00 COMPOSITE AREA & WEIGHTED CN ---> 2.180 69.00 (69) ........................................................................... ........................................................................... SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:16 PM 7/12/2019 Appendix A A-1 Index of Starting Page Numbers for ID Names ----- P ----- PRE-DEVELOPED #4... 3.01, 4.01 ----- U ----- Union County... 2.01 ----- W ----- Watershed... 1.01 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:16 PM 7/12/2019 Water Quality Wet Pond Design (NCDENR - 2007) Project Name: Weddington Pointe Job Number: 1018330 Step 1: Compute the water quality volume (WQV). WQv (Ft3) = (3630) X (RD) X (Rv) X (AD) Where: WQV = Water Quality Volume (Ft) AD = Drainage Area to Wet Pond (acres). Rv = Volumetric Runoff Coefficient = 0.05 + 0.9 (% Impervious) Rp = Design Storm Rainfall Depth (in). Typically 1.0". Percent Impervious = 76% AD = 9.84 acres Rp = 1.0 in Rv = 0.74 WQv = 26,321 Ft" Step 2: Determine Surface Area Requirements. Average Permanent Pool Depth = 4.1 Feet Percent Impervious = 76% SA / DA Ratio = 2.09 Required Surface Area = 8,958 Ft2 Step 3: Preliminary Temporary Water Quality Drawdown Calculations Pond Height above Orifice = 2.9 feet Orifice Invert Elevation = 0.0 feet Pond Surface Area at Height Above Orifice = 8,958 square feet Pond Surface Area at Orifice Invert Elevation = 8,958 square feet Orifice Diameter (D) = 1.75 inches = 0.15 feet Orifice Area (a) = 0.0167 square feet Average Surface Area (A) = 8,958 square feet Gravitational Constatnt (g) = 32.2 ft/sec2 Head (H) = 2.83 feet Discharge Coefficient (C) = 0.6 Time (t) = 216,248 seconds = 2.50 days Note: The above calculation is based on the Bernoulli Equation where: t : x a x (2g)° x (0 - H/3°.5) Step 4: Compute Site Hydraulic Input Parameters. Condition Area (Ac) CN Tc (hours) Pre -developed 9.84 70 0.4 Post -developed 9.84 89 0.0833 Results Condition Q2-year Q10-year Q25-year Q50-year Pre -developed 2.15 4.77 6.57 8.08 Post -developed 0.73 3.76 5.78 19.51 Permanent Pool Storage Wet Pond#4 Stage Storage Pond -Main Pool Elev Area (so Inc Storage (cf) Total Storage (cf) 609 5784 0 0 613 8674 28,916 28,916 614 9474 9,074 37,990 614.5 10607 5,020 43,010 0 0 0 0 Pond - Forebay Elev Area (so Inc Storage c 610 766 0 613 1718 3,726 N82 614 2106 1,912 614.5 2,630 1,184 00 Total Volume (cf) = 43,010 Total Surface Area (so = 10,607 Average Depth (ft) = 4.1 Forbay Volume Req. (15%) = 6,452 Forbay Provided (cf) = 6,822 Channel Protection Job File: N:\ 2018\1018330\Docs\Calcs\Stormwater\Pond 4\POST-DEVELOPED CP - WET POND.PPW Rain Dir: N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 4\ -------------------------- JOB TITLE -------------------------- Project Date: 4/2/2019 Project Engineer: ATB Project Title: Weddington Pointe Project Comments: SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:30 PM 10/8/2019 Table of Contents Table of Contents i ********************** MASTER SUMMARY ********************** Watershed....... Master Network Summary ............. 1.01 ****************** DESIGN STORMS SUMMARY ******************* Union County.... Design Storms ...................... 2.01 ********************** TC CALCULATIONS ********************* ON -SITE DET..... Tc Calcs ........................... 3.01 ********************** CN CALCULATIONS ********************* ON -SITE DET..... Runoff CN-Area ..................... 4.01 *********************** POND VOLUMES *********************** WET POND #4..... Vol: Elev-Area ..................... 5.01 ******************** OUTLET STRUCTURES ********************* Pond #2......... Outlet Input Data .................. 6.01 S/N: Bentley PondPack (10.01.04.00) 3:30 PM Bentley Systems, Inc. 10/8/2019 Type.... Master Network Summary Page 1.01 Name.... Watershed File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 4\Post-Developed CP - Wet Pond.ppw MASTER DESIGN STORM SUMMARY Network Storm Collection: Union County Total Depth Rainfall Return Event in Type Dev 1 3.0000 Synthetic Curve --------------------------- ICPM CALCULATION TOLERANCES Target Convergence= .000 cfs +/- Max. Iterations = 35 loops ICPM Time Step = .0100 hrs Output Time Step = .0100 hrs ICPM Ending Time = ------------------------------- 120.0000 hrs RNF ID ---------------- TypeII 24hr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Return HYG Vol Node ID Type Event cu.ft Trun ON -SITE DET AREA 1 67858 *POST -OUT T-E 1 48472 R WET POND #4 POND 1 67858 WET POND #4 OUT POND 1 48472 R S/N: Bentley PondPack (10.01.04.00) Max Qpeak Qpeak Max WSEL Pond Storage hrs cfs ft cu.ft 11.9200 29.12 21.0400 .15 614.50 11.9200 29.12 21.0400 .15 618.06 61276 3:30 PM Bentley Systems, Inc. 10/8/2019 Type.... Design Storms Name.... Union County Page 2.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 4\Post-Developed CP - Wet Pond.ppw Title... Project Date: 4/2/2019 Project Engineer: ATB Project Title: Weddington Pointe Project Comments: DESIGN STORMS SUMMARY Design Storm File,ID = Storm Tag Name = Dev 1 Union County Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 1 yr Total Rainfall Depth= 3.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:30 PM 10/8/2019 Type.... Tc Calcs Name.... ON -SITE DET Page 3.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 4\Post-Developed CP - Wet Pond.ppw ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: User Defined Segment #1 Time: .0833 hrs ------------------------------------------------------------------------ ------------------------ Total Tc: .0833 hrs Calculated Tc G Min.Tc: Use Minimum Tc... Use Tc = .0833 hrs ------------------------- S/N: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:30 PM 10/8/2019 Type.... Tc Calcs Name.... ON -SITE DET Page 3.02 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 4\Post-Developed CP - Wet Pond.ppw ------------------------------------------------------------------------ Tc Equations used... ___= User Defined ______________________________________________________ Tc = Value entered by user Where: Tc = Time of concentration SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:30 PM 10/8/2019 Type.... Runoff CN-Area Name.... ON -SITE DET Page 4.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 4\Post-Developed CP - Wet Pond.ppw RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... Impervious Area Adjustment Adjusted Soil/Surface Description CN acres oC oUC CN Impervious Areas - Paved parking to 98 7.510 98.00 Open space (Lawns,parks etc.) - Goo 61 2.330 61.00 COMPOSITE AREA & WEIGHTED CN ---> 9.840 89.24 (89) ........................................................................... ........................................................................... SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:30 PM 10/8/2019 Type.... Vol: Elev-Area Name.... WET POND #4 Page 5.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 4\Post-Developed CP - Wet Pond.ppw Elevation Planimeter Area Al+A2+sgr(A1*A2) Volume Volume Sum (ft) ------------------------------------------------------------------------ (sq.in) (sq.ft) (sq.ft) (cu.ft) (cu.ft) 614.50 13237 0 0 0 615.00 14980 42299 7050 7050 616.00 16811 47660 15887 22936 617.00 18558 53032 17677 40614 618.00 20361 58358 19453 60066 619.00 22221 63853 21284 81351 620.00 24137 69517 23172 104523 621.00 26110 75351 25117 129640 622.00 26110 78330 26110 155750 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.(Area1*Area2)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1. EL2, respectively Volume = Incremental volume between EL1 and EL2 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:30 PM 10/8/2019 Type.... Outlet Input Data Name.... Pond #2 Page 6.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 4\Post-Developed CP - Wet Pond.ppw REQUESTED POND WS ELEVATIONS: Min. Elev.= 614.50 ft Increment = .10 ft Max. Elev.= 622.00 ft ********************************************** OUTLET CONNECTIVITY ********************************************** ---> Forward Flow Only (UpStream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) < --- > Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft ----------------- ----------------------------- Orifice-Circular WQ ---> TW 614.500 622.000 TW SETUP, DS Channel SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:30 PM 10/8/2019 Type.... Outlet Input Data Name.... Pond #2 Page 6.02 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 4\Post-Developed CP - Wet Pond.ppw OUTLET STRUCTURE INPUT DATA Structure ID = WQ Structure Type = Orifice -Circular ------------------------------------ # of Openings = 1 Invert Elev. = 614.50 ft Diameter = 1.75 in Orifice Coeff. _ .600 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:30 PM 10/8/2019 Appendix A A-1 Index of Starting Page Numbers for ID Names ----- O ----- ON-SITE DET... 3.01, 4.01 ----- P ----- Pond #2... 6.01 ----- U ----- Union County... 2.01 ----- W ----- Watershed... 1.01 WET POND #4... 5.01 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:30 PM 10/8/2019 Volume vs. Time WET POND #4 Dev 1 70000 60000 50000 40000 a� E 0 30000 20000 10000 0 k==� '' 0 10 20 30 40 50 60 70 80 90 100 110 120 Time (hrs) Post -Developed Job File: N:\ 2018\1018330\Docs\Calcs\Stormwater\Pond 4\POST-DEVELOPED DETENTION - WET PON] Rain Dir: N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 4\ -------------------------- JOB TITLE -------------------------- Project Date: 4/2/2019 Project Engineer: ATB Project Title: Weddington Pointe Project Comments: SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:32 PM 10/8/2019 Table of Contents Table of Contents i ********************** MASTER SUMMARY ********************** Watershed....... Master Network Summary ............. 1.01 ****************** DESIGN STORMS SUMMARY ******************* Union County.... Design Storms ...................... 2.01 ********************** TC CALCULATIONS ********************* ON -SITE DET..... Tc Calcs ........................... 3.01 ********************** CN CALCULATIONS ********************* ON -SITE DET..... Runoff CN-Area ..................... 4.01 *********************** POND VOLUMES *********************** WET POND #4..... Vol: Elev-Area ..................... 5.01 ******************** OUTLET STRUCTURES ********************* Pond #2......... Outlet Input Data .................. 6.01 S/N: Bentley PondPack (10.01.04.00) 3:32 PM Bentley Systems, Inc. 10/8/2019 Type.... Master Network Summary Page 1.01 Name.... Watershed File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 4\Post-Developed Detention - Wet Pond MASTER DESIGN STORM SUMMARY Network Storm Collection: Union County Total Depth Return Event in Dev 2 3.6000 Dev 10 5.2000 Dev 25 6.2000 Dev 50 7.0000 Dev100 7.9000 Rainfall Type ---------------- Synthetic Curve Synthetic Curve Synthetic Curve Synthetic Curve Synthetic Curve RNF ID TypeII 24hr TypeII 24hr TypeII 24hr TypeII 24hr TypeII 24hr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Max Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ID Type Event cu.ft Trun hrs cfs ft cu.ft ON -SITE DET AREA 2 87482 11.9160 37.27 ON -SITE DET AREA 10 141546 11.9160 59.00 ON -SITE DET AREA 25 176029 11.9160 72.51 ON -SITE DET AREA 50 203836 11.9160 83.26 ON -SITE DET AREA 100 235284 11.9160 95.29 *POST -OUT JCT 2 15243 R 16.0160 .73 *POST -OUT JCT 10 64895 R 12.6810 3.76 *POST -OUT JCT 25 96564 R 12.5170 5.78 *POST -OUT JCT 50 122277 R 12.1030 19.51 *POST -OUT JCT 100 151349 R 12.0890 25.67 WET POND #4 IN POND 2 81668 R 11.9160 37.27 WET POND #4 IN POND 10 132840 R 11.9160 59.00 WET POND #4 IN POND 25 165534 R 11.9160 72.51 WET POND #4 IN POND 50 191916 R 11.9160 83.26 WET POND #4 IN POND 100 221765 R 11.9160 95.29 S/N: Bentley PondPack (10.01.04.00) 3:32 PM Bentley Systems, Inc. 10/8/2019 Type.... Master Network Summary Page 1.02 Name.... Watershed File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 4\Post-Developed Detention - Wet Pond MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Max Return HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node ID Type Event cu.ft Trun hrs cfs ft cu.ft WET POND #4 OUT POND 2 26700 R 16.1890 .73 618.35 67405 WET POND #4 OUT POND 10 76827 R 12.6810 3.76 619.25 86952 WET POND #4 OUT POND 25 109070 R 12.5170 5.78 620.09 106809 WET POND #4 OUT POND 50 135175 R 12.1030 19.51 620.43 114999 WET POND #4 OUT POND 100 164787 R 12.0890 25.67 620.93 127945 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:32 PM 10/8/2019 Type.... Design Storms Name.... Union County Page 2.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 4\Post-Developed Detention - Wet Pond Title... Project Date: 4/2/2019 Project Engineer: ATB Project Title: Weddington Pointe Project Comments: DESIGN STORMS SUMMARY Design Storm File,ID = Union County Storm Tag Name = Dev 2 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 2 yr Total Rainfall Depth= 3.6000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Dev 10 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 10 yr Total Rainfall Depth= 5.2000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Dev 25 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 25 yr Total Rainfall Depth= 6.2000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Dev 50 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 50 yr Total Rainfall Depth= 7.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Dev100 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 100 yr Total Rainfall Depth= 7.9000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:32 PM 10/8/2019 Type.... Tc Calcs Name.... ON -SITE DET Page 3.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 4\Post-Developed Detention - Wet Pond ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: User Defined Segment #1 Time: .0833 hrs ------------------------------------------------------------------------ ------------------------ Total Tc: .0833 hrs Calculated Tc G Min.Tc: Use Minimum Tc... Use Tc = .0833 hrs ------------------------- S/N: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:32 PM 10/8/2019 Type.... Tc Calcs Name.... ON -SITE DET Page 3.02 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 4\Post-Developed Detention - Wet Pond ------------------------------------------------------------------------ Tc Equations used... ___= User Defined ______________________________________________________ Tc = Value entered by user Where: Tc = Time of concentration SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:32 PM 10/8/2019 Type.... Runoff CN-Area Name.... ON -SITE DET Page 4.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 4\Post-Developed Detention - Wet Pond RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... Impervious Area Adjustment Adjusted Soil/Surface Description CN acres oC oUC CN Impervious Areas - Paved parking to 98 7.510 98.00 Open space (Lawns,parks etc.) - Goo 61 2.330 61.00 COMPOSITE AREA & WEIGHTED CN ---> 9.840 89.24 (89) ........................................................................... ........................................................................... SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:32 PM 10/8/2019 Type.... Vol: Elev-Area Name.... WET POND #4 Page 5.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 4\Post-Developed Detention - Wet Pond Elevation Planimeter Area Al+A2+sgr(A1*A2) Volume Volume Sum (ft) ------------------------------------------------------------------------ (sq.in) (sq.ft) (sq.ft) (cu.ft) (cu.ft) 614.50 13237 0 0 0 615.00 14980 42299 7050 7050 616.00 16811 47660 15887 22936 617.00 18558 53032 17677 40614 618.00 20361 58358 19453 60066 619.00 22221 63853 21284 81351 620.00 24137 69517 23172 104523 621.00 26110 75351 25117 129640 622.00 26110 78330 26110 155750 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.(Area1*Area2)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1. EL2, respectively Volume = Incremental volume between EL1 and EL2 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:32 PM 10/8/2019 Type.... Outlet Input Data Name.... Pond #2 Page 6.01 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 4\Post-Developed Detention - Wet Pond REQUESTED POND WS ELEVATIONS: Min. Elev.= 614.50 ft Increment = .10 ft Max. Elev.= 622.00 ft ********************************************** OUTLET CONNECTIVITY ********************************************** ---> Forward Flow Only (UpStream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) < --- > Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft ----------------- Inlet Box ---- RO ---> ------- CO --------- 620.050 --------- 622.000 Orifice -Circular WQ ---> CO 614.500 622.000 Culvert -Circular CO ---> TW 614.020 622.000 Orifice -Circular 01 ---> TW 618.100 622.000 TW SETUP, DS Channel SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:32 PM 10/8/2019 Type.... Outlet Input Data Name.... Pond #2 Page 6.02 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 4\Post-Developed Detention - Wet Pond OUTLET STRUCTURE INPUT DATA Structure ID = RO Structure Type = Inlet Box ------------------------------------ # of Openings = 1 Invert Elev. = 620.05 ft Orifice Area = 25.0000 sq.ft Orifice Coeff. _ .600 Weir Length = 20.00 ft Weir Coeff. = 3.000 K, Reverse = 1.000 Mannings n = .0000 Kev,Charged Riser = .000 Weir Submergence = No Structure ID = WQ Structure Type = Orifice -Circular ------------------------------------ # of Openings = 1 Invert Elev. = 614.50 ft Diameter = 1.75 in Orifice Coeff. _ .600 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:32 PM 10/8/2019 Type.... Outlet Input Data Name.... Pond #2 Page 6.03 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 4\Post-Developed Detention - Wet Pond OUTLET STRUCTURE INPUT DATA Structure ID = CO Structure Type ------------------------------------ = Culvert -Circular No. Barrels = 1 Barrel Diameter = 18.00 in Upstream Invert = 614.02 ft Dnstream Invert = 613.00 ft Horiz. Length = 102.85 ft Barrel Length = 102.86 ft Barrel Slope = .00992 ft/ft OUTLET CONTROL DATA... Mannings n = .0130 Ke = .5000 Kb = .018213 Kr = .5000 HW Convergence = .001 INLET CONTROL DATA... Equation form = 1 Inlet Control K = .0098 Inlet Control M = 2.0000 Inlet Control c = .03980 Inlet Control Y = .6700 T1 ratio (HW/D) _ .000 T2 ratio (HW/D) = 1.302 Slope Factor = -.500 (forward entrance loss) (per ft of full flow) (reverse entrance loss) +/- ft Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 614.02 ft ---> Flow = 7.58 cfs At T2 Elev = 615.97 ft ---> Flow = 8.66 cfs SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:32 PM 10/8/2019 Type.... Outlet Input Data Name.... Pond #2 Page 6.04 File.... N:\-2018\1018330\Docs\Calcs\Stormwater\Pond 4\Post-Developed Detention - Wet Pond OUTLET STRUCTURE INPUT DATA Structure ID = 01 Structure Type = Orifice -Circular ------------------------------------ # of Openings = 4 Invert Elev. = 618.10 ft Diameter = 6.00 in Orifice Coeff. _ .600 Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES... Maximum Iterations= 40 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. Q tolerance = .00 cfs Max. Q tolerance = .00 cfs SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:32 PM 10/8/2019 Appendix A A-1 Index of Starting Page Numbers for ID Names ----- O ----- ON-SITE DET... 3.01, 4.01 ----- P ----- Pond #2... 6.01 ----- U ----- Union County... 2.01 ----- W ----- Watershed... 1.01 WET POND #4... 5.01 SIN: Bentley Systems, Inc. Bentley PondPack (10.01.04.00) 3:32 PM 10/8/2019 Buoyancy Calculations Bouyancy Calculations Volume of Water Displaced (Structure) Structure Dimensions: Inner Length = 5 Feet Inner Width = 5 Feet Thickness = 0.5 Feet Height = 8.55 Feet Volume = 308 Cubic Feet Specific Weight of Water = 62.4 Pounds per Cubic Foot Weight of Displaced Volume = 19,207 Pounds Volume of Water Displaced (Base): Structure Dimensions: Flange = 1 Feet Length = 8 Feet Width = 8 Feet Height = 2 Feet Volume = 128 Cubic Feet Specific Weight of Water = 62.4 Pounds per Cubic Foot Weight of Displaced Volume = 7,987 Pounds Total Weight of Displaced Volume = 27,194 Pounds Concrete Volume of Structure Concrete Volume: Inner Length = 5 Feet Inner Width = 5 Feet Thickness = 0.5 Feet Height = 8.55 Feet Volume = 94 Cubic Feet Specific Weight of Concrete = 150 Pounds per Cubic Foot Weight of Concrete = 14,108 Pounds Volume of Concrete Required (Base): Concrete Volume: Flange = 1 Feet Length = 8 Feet Width = 8 Feet Height = 2 Feet Volume = 128 Cubic Feet Specific Weight of Concrete = 150 Pounds per Cubic Foot Weight of Concrete = 19,200 Pounds Total Weight of Concrete = 33,308 Pounds Factor of Safety (Minimum = 1) = 1.2 8ft Pond Section Ballast Pad Schematic 8ft 5' x 5' Riser Ballast Pad 2ft Rip -Rap Apron Sizing Rip Rap Apron POND 1 OUTFALL Calculations 3 1 3 5 10 20 s0 100 200 s00 Discharge (ft3lsec) Curves may not be extrapolated. Design Of Riprap Apron Under Minimum Tailwater Conditions Do= Pipe Diameter=18" RCP Q10=7.44 cfs W=DO+La=1.5'+ 10'=11.5' Figure 8-1 d50=4" CIi ."SIW TN7i$:1 s-5 Apron Thickness=1.5 x dmax=9" 4 3 1000 Rip Rap Apron POND #2 OUTFALL Calculations 3 5 10 20 s0 100 200 S00 Discharge (it3lsec) Curves may not be extrapolated. Design Of Riprap Apron Under Minimum Tailwater Conditions Do= Pipe Diameter=18" RCP Q 10=4.58 cfs W=DO+La=1.5'+ 10'=11.5' Figure 8-1 d50=4" dmax= 1.5 x d50= 6" s-s Apron Thickness=1.5 x dmax=9" 4 3 c� 2 0 1000 Rip Rap Apron POND #3 OUTFALL Calculations � sr •.._all 1IMEil� NEIMINIMUM 1111, @!"L111111 Igl>AI 11 law ®�i10 j �if•IOF� #� slal>s��r1111 unnlipu •Ism nue1���11u1 1lnwuwv��r�r .m 1 rsu�wrt.� �,r�uKt im�av�f.vJYrd ■�i� Wllfrdllm m1111111i1if � 1• msmns■>amr�gpt��lla� moIARIRI["iC11! 1111 111111111ni ® � t �.l�A■ m �IIIIIIn1111�Ri1 C� `� ..nrari�QJr '- 11m!liR t1111 1112LEuuT11111211 �E Aso . �s�rarro�r 111i1nm,W�1 Sli[lan l _ . i11I1>v��11, 1m m>�i1i�oaultsO 10 u�ID>= � = Curves may not be extrapolated. Design Of Riprap Apron Under Minimum Tailwater Conditions Do= Pipe Diameter=18" RCP Q10=5.68 cfs W=DO+La=1.5'+ 10'=11.5' Figure 8-1 d50=4" dmax= 1.5 x d50= 6" s-s Apron Thickness=1.5 x dmax=9" Rip Rap Apron POND #4 OUTFALL Calculations 1 3 5 10 20 s0 100 200 S00 Discharge (it3lsec) Curves may not be extrapolated. Design Of Riprap Apron Under Minimum Tailwater Conditions Do= Pipe Diameter=18" RCP Q10=3.76 cfs W=DO+La=1.5'+ 10'=11.5' Figure 8-1 d50=4" dmax= 1.5 x d50= 6" s-s Apron Thickness=1.5 x dmax=9" 4 3 c� 2 0 1000 Rip Rap Apron STORM OUTFALL 1 Calculations 10 0 30 Outlet k = Dp + 'a pipe diameter (Do) �a �a T iiwater < 0.5Da J' ; o �` rot p'P� 60.,. Leo 1 m 44 50.. 3 5 10 20 50 100 200 500 Discharge (it3lsec) Curves may not be extrapolated. Design Of Riprap Apron Under Minimum Tailwater Conditions 4 3 c� 2 '__._' 0 1000 Do= Pipe Diameter=48" RCP W=DO+La=4'+26'=30' Q10=71.58 cfs Figure 8-1 d50=10" dmax= 1.5 x d50= 15" s-s Apron Thickness=1.5 x dmax=22.5" Rip Rap Apron STORM OUTFALL 21 Calculations 20 10 0 30 Outlet k = Dp + 'a pipe diameter (Do) �a �a T iiwater < 0.5Da J' k�l r 60.. veo .71 4 r { 3 5 10 20 50 100 200 500 Discharge (it3lsec) Curves may not be extrapolated. Design Of Riprap Apron Under Minimum Tailwater Conditions 4 3 c� 2 '__._' 0 1000 Do= Pipe Diameter=42" RCP W=DO+La=3.5'+22'=25.5' Q10=60.13 cfs Figure 8-1 d50=9" dmax= 1.5 x d50= 13.5" s-s Apron Thickness=1.5 x dmax=20.25" Rip Rap Apron STORM OUTFALL 33 Calculations 10 0 3 5 10 20 s0 100 200 S00 Discharge (it3lsec) Curves may not be extrapolated. Design Of Riprap Apron Under Minimum Tailwater Conditions 2 0 1000 Do= Pipe Diameter=24" RCP W=DO+La=2'+14'=16' Q10=18.25 cfs Figure 8-1 d50=5" dmax= 1.5 x d50= 7.5" s-s Apron Thickness=1.5 x dmax=11.25" Rip Rap Apron STORM OUTFALL 41 Calculations 30 Outlet k = Op + 'a pipe diameter (Do) �a �a T ilwater � O.5I)a J' ,tor o1 eogtrp.Q 61 v. 171I1�d3lm1'!�lIIIIIIIIq - - ��� nusrusrt �uumuunalpp® i mliliaSQI[Ym��lR11[Illllli[illi[C� �lli�lmlulnklllllka M31ll1R�fRlplullQ�llm>! omms>.I[eal,�wnmlu�kulan salmi E1la��llB![IIA{ Rf71��lOt�l t31I 1[ �! [ffi�kk�i I mum, ii l[k>slmE1 IIIOt� 1tEl�# a>iilmlRl[IeAI miqI{{ �muas[��lM_ _fi4p�w�ielm�� 3 5 10 20 50 100 200 S00 Discharge (it3lsec) Curves may not be extrapolated. Design Of Riprap Apron Under Minimum Tailwater Conditions MR '_.._' 0 1000 Do= Pipe Diameter=36" RCP W=DO+La=3'+20'=23' Q10=42.35 cfs Figure 8-1 d50=7" dmax= 1.5 x d50= 10.5" s-s Apron Thickness=1.5 x dmax=15.75" Off -Site Storm Calculations OFFSITE STORM DRAINAGE CALCULATIONS NARRATIVE The bypass storm drainage systems (FES-51 to FES-54, HW-1 to HW-2, HW-3 to HW-4, and HW-5 to HW-6) are sized using the 25 year storm intensity, rational method, and HY-8 culvert modeling. Referencing sheets C-6.5, C-6.7, and sheet C-6.9, the drainage area for the aforementioned culverts are calculated. The runoff coefficient for the storm drainage system is 0.7 and the rainfall intensity is 7.61 in/hr. Additional onsite drainage areas have been included for design flows for FES-51 to FES-54 and HW-1 to HW-2. The bypass storm drainage system meets minimum flow requirements for the 25-year storm event. Based on the Culvert Analysis report and HY-8 modeling software, the minimum design flow through proposed bypass systems (FES-51 to FES-54, HW-1 to HW-2, HW-3 to HW-4, and HW-5 to HW-6) utilized a 7.61 in/hr rainfall intensity. The design flows utilized 8.4 in/hr and the maximum flows utilized 9.46 in/hr. Based on the HY-8 results, the HW/D does not exceed 1.2 in any instance and the headwater elevation does not exceed the maximum elevation of the proposed roadways. STORM CAD ANALYSIS RESULTS (HEC-22 Energy Headloss Method) Project: Weddington Pointe Storm Drainage Improvements Job No.: 1018330 Location: Union County, NC Storm Design: 25 Year Diameter (in) Start Node Invert (Upstream) (ft) Stop Node Invert (Downstream) (ft) Length (Unified) (ft) Material Inlet C Catchment Intensity (inlh) Area (acres) Manning's n Inlet Tc (min) Slope (ftlft) Velocity (Average) (ftls) Total Flow (ft31S) Capacity (Full Flow) (ft31S) Pipe Size Label RIM (ft) Hydraulic Grade Line (In) (ft) Hydraulic Grade Line (Out) (ft) Headloss for Conduit (ft) 3rd Ed. 3X 4' HW-1 629.41 HW-2 628.55 85.9 RCP 0.7 8.4 8.68 0.013 5 0.005 7.77 55.31 67.89 OK HW-1 N/A 631.03 630.6 (N/A) 42 CB-22 612.78 FES-21 612.5 47.38 RCP 0.7 8.4 0.64 0.013 5 0.006 9.16 77.23 77.34 OK CB-22 621.04 615.91 615.63 (N/A) 15 C B-22A 613.57 C B-22 612.78 131.06 RCP 0.7 8.4 0.12 0.013 5 0.006 3.73 4.58 5.02 OK C B-22A 619.21 617.39 616.73 0.82 15 CB-22B 614.15 CB-22A 613.57 96.8 RCP 0.7 8.4 0.12 0.013 5 0.006 3.19 3.92 5 OK CB-22B 617.8 617.91 617.55 0.17 15 CB-22C 614.35 CB-22B 614.15 34 RCP 0.7 8.4 0.5 0.013 5 0.006 2.6 3.19 4.95 OK CB-22C 617.79 617.88 617.8 0.25 42 CB-23 612.99 CB-22 612.78 34 RCP 0.7 8.4 0.16 0.013 5 0.006 9.27 69.57 79.07 OK CB-23 621.03 616.21 616.21 0.3 42 CB-24 613.55 CB-23 612.99 94.44 RCP 0.7 8.4 0.05 0.013 5 0.006 7.2 69.23 77.47 OK CB-24 622.05 617.24 616.79 0.58 36 C B-24A 614.67 CB-24 614.06 82.58 RCP 0.7 8.4 0.66 0.013 5 0.007 7.01 49.57 57.32 OK C B-24A 622.88 617.9 617.45 0.21 36 CB-25 616.17 CB-24A 614.67 199.4 RCP 0.7 8.4 0.03 0.013 5 0.008 9.1 46.4 57.85 OK CB-25 624.83 618.45 617.95 0.05 36 CB-26 616.46 CB-25 616.17 38.51 RCP 0.7 8.4 0.01 0.013 5 0.008 9.1 46.35 57.88 OK CB-26 625.25 619 619 0.54 15 C B-26A 619.04 C B-26 618.7 34 RCP 0.7 8.4 0.02 0.013 5 0.01 2.55 0.25 6.46 OK C B-26A 625.25 619.51 619.51 0.52 15 CB-26B 619.43 CB-26A 619.04 38.83 RCP 0.7 8.4 0.02 0.013 5 0.01 2.08 0.13 6.47 OK CB-26B 624.99 619.55 619.51 0 30 CB-27 618.3 CB-26 616.96 134.62 RCP 0.7 8.4 0.75 0.013 5 0.01 9.47 46.47 40.92 UNDERSIZED CB-27 624.2 621.09 619.36 0.36 15 DCB-27A 618.64 CB-27 618.3 34 RCP 0.7 8.4 0.82 0.013 5 0.01 4.26 5.23 6.46 OK DCB-27A 624.2 622.08 621.86 0.77 30 CB-28 621.9 CB-27B 619.7 220 RCP 0.7 8.4 0.46 0.013 5 0.01 8.93 27.17 41.01 OK CB-28 627.57 623.39 622.58 0.12 30 CB-27B 619.7 CB-27 618.3 139.57 RCP 0.7 8.4 0.86 0.013 5 0.01 7.67 37.63 41.08 OK CB-27B 625.37 622.46 621.28 0.19 15 CB-27C 620.54 CB-27B 620.2 34 RCP 0.7 8.4 0.96 0.013 5 0.01 4.98 6.12 6.46 OK CB-27C 625.38 623.6 623.3 0.84 15 C B-28A 623.05 C B-28 622.71 34 RCP 0.7 8.4 0.77 0.013 5 0.01 5.79 4.91 6.46 OK C B-28A 627.57 624.11 624.02 0.64 24 CB-28B 623.8 CB-28 622.08 172 RCP 0.7 8.4 0.46 0.013 5 0.01 8.13 19.97 22.62 OK CB-28B 629.29 625.26 623.54 0.14 24 CB-29 625.66 CB-28B 623.8 185.94 RCP 0.7 8.4 0.39 0.013 5 0.01 7.4 12.6 22.62 OK CB-29 631.17 626.73 625.39 0.13 18 C B-29A 626.39 C B-29 626.05 34 RCP 0.7 8.4 0.48 0.013 5 0.01 6.77 10.19 10.5 OK C B-29A 631.17 627.58 627.24 0.34 18 CB-29B 627.11 CB-29A 626.39 72.05 RCP 0.7 8.4 0.41 0.013 5 0.01 6.4 7.22 10.5 OK CB-29B 631.85 628.02 627.85 0.27 15 CB-28C 624.27 CB-28B 623.87 34 RCP 0.7 8.4 0.77 0.013 5 0.012 4 4.91 7.01 OK CB-28C 629.29 625.58 625.38 0.12 15 CB-29C 627.64 CB-29B 627.11 52.62 RCP 0.7 8.4 0.73 0.013 5 0.01 5.74 4.65 6.48 OK CB-29C 632.35 628.42 628.15 0.13 24 CB-30 616.83 CB-24 615.38 46.26 RCP 0.7 8.4 0.21 0.013 5 0.031 12.95 21.33 40.05 OK CB-30 622.65 617.95 617.78 0.55 15 C B-30A 618.45 CB-30 618.21 24 RCP 0.7 8.4 0.36 0.013 5 0.01 4.81 2.29 6.46 OK C B-30A 622.65 619.04 619.04 1.1 24 CB-31 619.25 CB-30 616.82 161.57 RCP 0.7 8.4 0.01 0.013 5 0.015 9.4 18.01 27.74 OK CB-31 624.94 620.42 618.38 0.44 15 C B-31 A 620.18 C B-31 619.94 24 RCP 0.7 8.4 0.8 0.013 5 0.01 5.83 5.1 6.46 OK C B-31 A 624.94 621.18 621.18 0.75 24 CB-32 619.63 CB-31 619.25 38.55 RCP 0.7 8.4 0.22 0.013 5 0.01 7.41 12.99 22.46 OK CB-32 625.53 620.72 620.59 0.17 18 CB-32A 620.38 CB-32 620.13 24.5 RCP 0.7 8.4 0.46 0.013 5 0.01 6.59 11.64 10.61 UNDERSIZED CB-32A 625.56 621.83 621.53 0.11 18 CB-32B 621.03 CB-32A 620.38 65.25 RCP 0.7 8.4 0.67 0.013 5 0.01 4.99 8.82 10.48 OK CB-32B 626.24 622.79 622.33 0.5 15 CB-32C 621.53 CB-32B 621.28 24.97 RCP 0.7 8.4 0.72 0.013 5 0.01 3.74 4.59 6.46 OK CB-32C 626.24 623.48 623.35 0.56 24 SDMH-34 617.5 FES-33 616.67 82.94 RCP (N/A) 8.4 (N/A) 0.013 0 0.01 8.2 23.04 22.63 UNDERSIZED SDMH-34 629 619.38 618.52 (N/A) 24 CB-35 618.78 SDMH-34 617.5 128 RCP 0.7 8.4 0.24 0.013 5 0.01 8.19 23.27 22.62 UNDERSIZED CB-35 628.13 1 620.85 619.5 0.11 24 DCB-36 621.78 CB-35 618.78 299.5 RCP 0.7 8.4 0.81 0.013 5 0.01 7.15 22.46 22.64 OK DCB-36 627.02 624.46 621.51 0.66 18 DCB-36A 622.09 DCB-36 621.85 24 RCP 0.7 8.4 0.78 0.013 5 0.01 4.25 7.51 10.5 OK DCB-36A 627.02 625.04 624.92 0.45 15 CB-36B 623.22 DCB-36A 622.34 88.22 RCP 0.7 8.4 0.43 0.013 5 0.01 2.23 2.74 6.45 OK CB-36B 627.82 625.77 625.61 0.58 18 CB-37 623.54 DCB-36 622.28 126.78 RCP 0.7 1 8.4 0.04 0.013 1 5 1 0.01 6.04 1 10.67 1 10.47 UNDERSIZED CB-37 628.43 626.19 624.88 1 0.41 15 C B-37A 623.81 C B-37 623.57 24 RCP t 0.7 1 8.4 1 0.64 0.013 1 5 1 0.01 3.32 1 4.08 1 6.46 OK C B-37A 628.43 626.62 1 626.52 1 0.33 18 CB-37B 624.24 CB-37 623.54 69.71 RCP 0.7 8.4 0.04 0.013 5 0.01 3.78 6.67 10.53 OK CB-37B 629.63 626.84 626.56 0.38 15 CB-38 625.02 CB-37B 624.24 77.99 RCP 0.7 8.4 0.41 0.013 5 0.01 5.29 6.49 6.46 UNDERSIZED CB-38 631.99 627.68 626.89 0.04 15 CB-39 626.53 CB-38 625.02 150.95 RCP 0.7 8.4 0.03 0.013 5 0.01 3.34 4.1 6.46 OK CB-39 632.78 628.73 628.12 0.44 15 CB-40 628.94 CB-39 628.46 48.25 RCP 0.7 8.4 0.13 0.013 5 0.01 5.51 3.93 6.44 OK CB-40 633.99 629.65 629.17 0.2 15 C B-40A 629.28 C B-40 628.94 34 RCP 0.7 8.4 0.49 0.013 5 0.01 5.22 3.12 6.46 OK C B-40A 633.99 629.91 629.91 0.27 48 CB-2 623.17 FES-1 620 92.28 RCP 0.7 8.4 0.6 0.013 5 0.034 19.02 88.11 266.22 OK CB-2 634.42 624.79 621.62 (N/A) 48 CB-3 625.3 C B-2A 624.27 206.49 RCP 0.7 8.4 0.17 0.013 5 0.005 9.02 84.09 101.45 OK CB-3 636.14 628.16 627.13 0.08 48 CB-2A 624.27 CB-2 623.26 100.54 RCP 0.7 8.4 0.42 0.013 5 0.01 11.94 85.35 143.96 OK CB-2A 635.77 626.54 626.5 1.72 15 CB-3A 631.1 CB-3 630.86 24 RCP 0.7 8.4 0.26 0.013 5 0.01 4.41 1.66 6.46 OK CB-3A 636.14 631.53 631.29 0.72 48 CB-4 626.4 CB-3 625.3 219.84 RCP 0.7 8.4 0.22 0.013 5 0.005 9.01 82.79 101.6 OK CB-4 634.12 629.23 628.29 0.13 48 CB-5 626.52 CB-4 626.4 24 RCP 0.7 8.4 0.47 0.013 5 0.005 8.99 81.75 101.57 OK CB-5 634.12 629.94 629.94 0.71 48 CB-5A 626.73 CB-5 626.52 42.02 RCP 0.7 8.4 0.04 0.013 5 0.005 8.94 79.46 101.54 OK CB-5A 633.68 630 630 0.06 48 CB-6 626.92 C B-5A 626.73 38.54 RCP 0.7 8.4 0.84 0.013 5 0.005 8.89 79.43 100.85 OK CB-6 633.54 630.04 630.04 0.04 18 DCB-6A 627.34 CB-6 627 34 RCP 0.7 8.4 1.33 0.013 5 0.01 4.8 8.48 10.5 OK DCB-6A 633.54 631.3 631.08 1.04 42 CB-7 628.09 CB-6 626.92 232.59 RCP 0.7 8.4 0.01 0.013 5 0.005 8.45 68.88 71.35 OK CB-7 635.86 631.38 630.19 0.16 36 CB-8 628.29 CB-7 628.09 39.97 RCP 0.7 8.4 0.02 0.013 5 0.005 4.82 34.04 47.18 OK CB-8 636.42 632.02 631.91 0.53 36 DCB-9 628.86 CB-8 628.29 113.19 RCP 0.7 8.4 0.69 0.013 5 0.005 4.87 34.39 47.33 OK DCB-9 634.88 632.56 632.24 0.22 18 DCB-9A 629.52 DCB-9 629.28 24 RCP 0.7 8.4 0.91 0.013 5 0.01 3.28 5.8 10.5 OK DCB-9A 634.88 633 632.92 0.36 30 CB-10 630.06 DCB-9 628.86 199.97 RCP 0.7 8.4 0.56 0.013 5 0.006 5.31 26.05 31.77 OK CB-10 636.34 633.56 632.7 0.14 15 CB-10A 631.21 CB-10 630.97 24 RCP 0.7 8.4 0.67 0.013 5 0.01 3.48 4.27 6.46 OK CB-10A 636.34 636.44 636.34 3.33 24 CB-11A 631.32 CB-10 630.06 211.03 RCP 0.7 8.4 0.56 0.013 5 0.006 6.2 19.47 17.48 UNDERSIZED CB-11A 637.96 635.3 633.64 0.08 18 CB-11 B 632.54 CB-11A 632.3 24 RCP 0.7 8.4 0.35 0.013 5 0.01 1.26 2.23 10.5 OK CB-11 B 637.96 636.04 636.03 0.73 24 CB-11 632.51 CB-11A 631.32 198.4 RCP 0.7 8.4 0.03 0.013 5 0.006 4.64 14.57 17.52 OK CB-11 639.5 636.26 635.39 0.09 24 CB-12 632.81 CB-11 632.51 39.43 RCP 0.7 8.4 0.07 0.013 5 0.008 4.61 14.47 19.73 OK CB-12 640.33 636.66 636.48 0.22 24 CB-12A 633.24 CB-12 633 24 RCP 0.7 8.4 0.42 0.013 5 0.01 3.82 12 22.62 OK CB-12A 640.33 636.97 636.9 0.24 18 DCB-12B 634.25 CB-12A 633.24 167.69 RCP 0.7 8.4 0.8 0.013 5 0.006 5.42 9.58 8.15 UNDERSIZED DCB-12B 638.93 638.95 637.56 0.59 15 CB-12C 634.49 DCB-12B 634.25 24 RCP 0.7 8.4 0.71 0.013 5 0.01 3.69 4.52 6.46 OK CB-12C 638.93 639.05 638.93 1.24 15 CB-14 635.71 CB-12 634.54 117.32 RCP 0.7 8.4 0.02 0.013 5 0.01 2.08 2.55 6.45 OK CB-14 641.39 638.26 638.07 1.42 15 CB-14A 636.4 CB-14 635.71 69.07 RCP 0.7 8.4 0.39 0.013 5 0.01 2.03 2.49 6.46 OK CB-14A 641.11 638.42 638.32 0.06 15 CB-16A 630.08 CB-16 629.74 34.3 RCP 0.7 8.4 0.84 0.013 5 0.01 4.36 5.35 6.43 OK CB-16A 634.79 633.21 632.97 0.48 36 CB-16 629.46 CB-7 628.09 274.86 RCP 0.7 8.4 0.58 0.013 5 0.005 5.13 36.29 47.09 OK CB-16 634.72 632.49 631.59 0.21 30 CB-17 629.68 CB-16 629.46 44.11 RCP 0.7 8.4 0.3 0.013 5 0.005 5.8 28.48 28.97 OK CB-17 634.94 633.02 632.79 0.3 15 CB-17A 629.96 CB-17 629.72 24.01 RCP 0.7 8.4 0.17 0.013 5 0.01 1.56 1.91 6.46 OK CB-17A 634.94 634.96 634.94 1.97 15 CB-17B 630.33 CB-17A 629.96 36.5 RCP 0.7 8.4 0.14 0.013 5 0.01 0.73 0.89 6.5 OK CB-17B 634.77 634.95 634.94 0.06 30 CB-18 630.45 CB-17 629.68 153.25 RCP 0.7 8.4 0.69 0.013 5 0.005 5.19 25.5 29.07 OK CB-18 636.08 634.05 633.4 0.38 15 CB-18A 631.64 CB-18 631.4 24 RCP 0.7 8.4 0.66 0.013 5 0.01 3.43 4.21 6.46 OK CB-18A 636.08 636.18 636.08 3.36 24 CB-19 632.64 CB-18 630.45 219.46 RCP 0.7 8.4 0.68 0.013 5 0.01 5.8 18.21 22.6 OK CB-19 637.72 635.72 634.17 0.12 18 CB-19A 632.88 CB-19 632.64 24 RCP 0.7 8.4 0.53 0.013 5 0.01 4.83 8.54 10.5 OK CB-19A 637.72 636.4 636.23 0.52 15 CB-19B 633.53 CB-19A 633.13 40.06 RCP 0.7 8.4 0.38 0.013 5 0.01 1.97 2.42 6.45 OK CB-19B 637.37 636.92 636.86 0.46 15 CB-19C 634.27 CB-19A 632.88 138.99 RCP 0.7 8.4 0.48 0.013 5 0.01 2.49 3.06 6.46 OK CB-19C 638.77 636.99 636.68 0.28 18 CB-20 634.75 CB-19 632.64 210.46 RCP 0.7 8.4 0.15 0.013 5 0.01 3.58 6.32 10.52 OK CB-20 639.3 636.88 636.08 0.36 15 C B-20A 634.99 C B-20 634.75 24 RCP 0.7 8.4 0.48 0.013 5 0.01 4.42 5.43 6.46 O K C B-20A 639.3 637.41 637.23 0.35 15 CB-20B 636.39 CB-20A 634.99 140.53 RCP 0.7 8.4 0.41 0.013 5 0.01 2.13 2.61 6.45 OK CB-20B 640.36 638.02 637.79 0.39 15 H W-3 615 H W-4 614.55 90.09 RCP 0.7 8.4 0.55 0.013 5 0.005 4.1 3.5 4.57 O K H W-3 N/A 615.82 615.37 (N/A) 15 H W-5 635 H W-6 634.59 82.44 RCP 0.7 8.4 0.13 0.013 5 0.005 2.82 0.83 4.56 O K H W-5 N/A 635.36 634.95 (N/A) 30 OFFSITE OP-1 633.7 OFFSITE OP-2 632.2 54.18 RCP 0.3 8.4 5.91 0.013 5 0.028 11.38 16.14 68.24 OK OFFSITE OP-1 N/A 634.53 633.03 (N/A) 30 FES-51 629.92 SDMH-52 629.31 61.35 RCP 0.7 8.4 1.62 0.013 5 0.01 8.86 26.46 40.9 OK FES-51 N/A 631.38 631.3 0.53 30 SDMH-52 629.31 SDMH-53 628.15 116.22 RCP (N/A) 8.4 (N/A) 0.013 0 0.01 8.87 26.42 40.98 OK SDMH-52 636.08 630.77 629.81 0.06 36 SDMH-53 628.15 FES-54 627.5 129.24 RCP (N/A) 8.4 (N/A) 0.013 0 0.005 6.87 26.33 47.3 OK SDMH-53 633.45 629.75 629.1 (N/A) 15 CB-50D 634.05 SDMH-50C 633.49 55.68 RCP 0.7 8.4 0.59 0.013 5 0.01 5.47 3.76 6.48 OK CB-50D 639.91 634.73 634.22 0.05 15 SDMH-50C 633.49 CB-50 633.13 36.39 RCP (N/A) 8.4 (N/A) 0.013 0 0.01 5.43 3.73 6.42 OK SDMH-50C 639.01 634.17 633.81 0.07 30 DCB-49 625.05 CB-48 623.74 130.38 RCP 0.7 8.4 0.71 0.013 5 0.01 9.15 30.1 41.11 OK DCB-49 632.39 626.64 626.32 0.06 18 DCB-49A 628 DCB-49 627.76 24 RCP 0.7 8.4 0.67 0.013 5 0.01 6.2 6.24 10.5 OK DCB-49A 632.39 628.83 628.59 0.72 15 CB-49AA 629.25 DCB-49A 628.47 77.77 RCP 0.7 8.4 0.32 0.013 5 0.01 4.67 2.04 6.47 OK CB-49AA 633.24 629.73 629.16 0.32 24 CB-49B 627.33 DCB-49 625.55 178.79 RCP 0.7 8.4 0.63 0.013 5 0.01 8.12 20.03 22.57 OK CB-49B 634.9 628.8 627.02 0.08 15 CB-49C 630.04 CB-49B 629.8 24 RCP 0.7 8.4 0.76 0.013 5 0.01 5.77 4.84 6.46 OK CB-49C 634.9 630.85 630.61 0.64 24 CB-50 630.52 CB-49B 628.4 212 RCP 0.7 8.4 0.55 0.013 5 0.01 7.26 11.66 22.62 OK CB-50 638.42 631.54 629.42 0.08 18 C B-50A 633.13 C B-50 632.89 24 RCP 0.7 8.4 0.25 0.013 5 0.01 5.71 4.49 10.5 OK C B-50A 638.42 633.82 633.58 0.41 15 CB-50B 633.94 CB-50A 633.38 56.41 RCP 0.7 8.4 0.46 0.013 5 0.01 5.12 2.93 6.44 OK CB-50B 639.35 634.53 634.04 0.22 30 CB-48 623.74 CB-47 623.24 50.28 RCP 0.7 8.4 0.25 0.013 5 0.01 6.86 33.69 40.9 OK CB-48 633.52 626.25 625.92 0.07 30 C B-47 623.24 SDMH-47A 621.86 137.52 RCP 0.7 8.4 0.42 0.013 5 0.01 7.41 36.35 41.09 OK C B-47 634.07 625.85 624.77 0.07 30 SDMH-47A 621.86 CB-46 621.12 74.1 RCP (N/A) 8.4 (N/A) 0.013 0 0.01 7.32 35.92 40.99 OK SDMH-47A 634.79 624.7 624.13 0.08 30 CB-46 621.12 CB-45 619.54 158.33 RCP 0.7 8.4 0.4 0.013 5 0.01 7.75 38.04 40.97 OK CB-46 633.7 624.05 622.68 0.17 30 CB-45 619.54 CB-44 618.51 102.66 RCP 0.7 8.4 0.54 0.013 5 0.01 8.29 40.7 41.08 OK CB-45 631.45 622.52 621.5 0.32 30 CB-44 618.51 CB-43 617.75 76.22 RCP 0.7 8.4 0.33 0.013 5 0.01 9.02 44.26 40.96 UNDERSIZED CB-44 630.03 621.19 620.3 0.97 36 CB-43 617.25 SDMH-42 615.58 167.63 RCP 0.7 8.4 0.47 0.013 5 0.01 10.51 54.77 66.57 OK CB-43 628.99 619.32 617.81 0.18 36 SDMH-42 615.58 FES-41 615.07 50.57 RCP (N/A) 8.4 (N/A) 0.013 0 0.01 10.55 54.22 66.98 OK SDMH-42 627 617.63 617.12 (N/A) Culvert Analysis HY-8 Culvert Analysis Report Table 1 - Summary of Culvert Flows at Crossing: HW-1 To HW-2 Headwater Elevation (ft) Total Discharge (cfs) HW-1 TO HW-2 Discharge (cfs) Roadway Discharge (cfs) Iterations 632.14 43.06 43.06 0.00 1 632.26 46.35 46.35 0.00 1 632.40 49.64 49.64 0.00 1 632.56 52.93 52.93 0.00 1 632.67 55.31 55.31 0.00 1 632.87 59.51 59.51 0.00 1 633.03 62.79 62.79 0.00 1 633.20 66.08 66.08 0.00 1 633.37 69.37 69.37 0.00 1 633-54 72.66 72.66 0.00 1 633-71 75.95 75.95 0.00 1 635.26 99.14 99.14 0.00 Overtopping Table 2 - Culvert Summary Table: HW-1 TO HW-2 Total Discharge (cfs) Culvert Discharge (cfs) Headwater Elevation (ft) Inlet Control Depth (ft) Outlet Control Depth (ft) Flow Type Normal Depth (ft) critical Depth (ft) Outlet Depth (ft) Tailwater Depth (ft) Outlet Velocity (f fs) Tailwater Velocity iftls) 43-06 43.06 632.14 2.228 1.270 1-S2n 1.103 1.526 1.162 OMO 9.026 0.000 46.35 46.35 632.26 2.348 1.440 1-S2n 1.154 1.601 1.219 0.000 9.258 0.000 49.64 49.64 632.40 2.492 1.621 1-S2n 1.202 1.679 1.277 1 0.000 9.470 0.000 52.93 52.93 632.56 2.648 1.803 5-S2n 1.249 1.751 1.335 0.000 9.655P0.000 55.31 55.31 632.67 2.761 1.939 5-S2n 1.283 1.802 1.373 0.000 9.813 59.51 59.51 632.87 2.960 2.491 5-S2n 1.340 1.896 1.440 0.000 10.068 62.79 62.79 633.03 3.116 2.656 5-52n 384 1.964 1.494 0.000 10.241 66.08 66 08 633.20 3.286 2.828 5-S2n 1.427 2.032 1 543 0.000 10.432 69.37 69.37 633.37 3.457 3.006 5-S2n 1.469 2.098 1.594 0.000 10.604 72.66 72.66 633.54 1 3.629 3.191 5-S2n 1.510 2.163 1 1.646 1 0.000 10.763 1 0.000 75.95 75.95 633.71 3.800 3.385 5-S2n 1.551 2.232 1 1.695 1 0.000 10.917 1 0.000 100 YEAR STORM EVENT IS DENOTED BY BLUE ARROW. THE 100 YEAR ELEVATION FOR HW-1 TO HW-2 IS 633.71 �wwwwwwwwww�wwwwwwwwyewwwwwwwwwwwwwwwwwwwwwwwwww�wwww:�ww:�wwwwwww:�wwwwwwwwwwwwwwww Straight Culvert Inlet Elevation (invert): 629.91 ft, Outlet Elevation (invert): 629.05 ft Culvert Length: 85.90 ft, Culvert Slope, 0.0100 xwxwwxwxwwx■wxrxwwxrxwwxxrexwxw+�xw+�wxxwxerwaYwwwwxrwxww+�wwrxxwwwrewwxwrewxxwxwwwwxxww HW / D = (632.67 - 629.91) / (2.5) = 1.10 < 1.20 Water Surface Profile Plot for Culvert: HW-1 TO HW-2 `rossu' lz - HW-1 TO HW- ., Design Discharge - 55.3 efs 11W-1 TO H-NV-2, uh-ert Discharge - 5 5 - 3 cfs 63E 64 — 63, "D 632 aD w 631 63C 62� -LU U LU 1tv UU UU 1 UU Stati an (ft) Site Data - HW-1 TO HW-2 Site Data Option: Culvert Invert Data Inlet Station: 0.00 ft Inlet Elevation: 629.41 ft Outlet Station: 85.90 ft Outlet Elevation: 628.55 ft Number of Barrels: 1 Culvert Data Summary - HW-1 TO HW-2 Barrel Shape: Concrete Box Barrel Span: 4.00 ft Barrel Rise: 3.00 ft Barrel Material: Concrete Embedment: 6.00 in Barrel Manning's n: 0.0130 (top and sides) Manning's n: 0.0130 (bottom) Culvert Type: Straight Inlet Configuration: Square Edge with Headwall Inlet Depression: None Table 3 - Downstream Channel Rating Curve (Crossing: HW-1 TO HW-2) Flow (cfs) Water Surface Elev (ft) Depth (ft) 43.06 628.55 0.00 46.35 628.55 0.00 49.64 628.55 0.00 52.93 628.55 0.00 55.31 628.55 0.00 59.51 628.55 0.00 62.79 628.55 0.00 66.08 628.55 0.00 69.37 628.55 0.00 72.66 1 628.55 1 0.00 75.95 1 628.55 1 0.00 Tailwater Channel Data - HW-1 TO HW-2 Tailwater Channel Option: Enter Constant Tailwater Elevation Constant Tailwater Elevation: 628.55 ft Roadway Data for Crossing: HW-1 TO HW-2 Roadway Profile Shape: Constant Roadway Elevation Crest Length: 85.90 ft Crest Elevation: 635.26 ft Roadway Surface: Paved Roadway Top Width: 56.88 ft HY-8 Culvert Analysis Report Table 1 - Summary of Culvert Flows at Crossing: HW-3 TO HW-4 Headwater Elevation (ft) Total Discharge (cfs) HVV-3 to HW-4 Discharge (efs) Roadway Discharge (cfs) Iterations 616.05 2.73 2.73 0.00 1 616-10 2.94 2.94 0_00 1 616.14 3.15 3.15 0.00 1 616,19 3,35 3.35 0,00 1 616.22 3.50 3.50 0.00 1 616.27 3,77 3.77 0.00 1 616.31 3,98 3,98 0.00 1 616.36 4,19 4,19 0.00 1 616.40 4.39 4.39 0.00 1 616.45 4,60 4.60 0.00 1 616.50 4.81 4.81 0.00 1 618.00 7.83 7.83 0.00 Overtopping Table 2 - Culvert Summary Table: HW to HWA Total Discharge (00 Culvert Discharge {0!s) Neadwatar Elevation {FC) I niat Control depth (Ft) Outlet Control Depth (ft) Flow Type Normal Depth eft} Cntleal Depth �Ft) Outlet Depth (ft) Tatwater Depih (n) Outlet velocity I @+twofer vedocily kfr,t;. 2.73 2.73 616A5 0.9B5 1.054 2-M2c 0.87E O-E62 0.M2 0.000 4.138 11.0110 2 94 294 616.10 1.031 1.099 2-M2c 0.710 0 6V O.687 0 400 4.254 0.000 3.15 3.15 516.14 1.076 1.142 2-M2c 0.742 0.710 0.710 0.000 4.3TO 0.000 3.35 3 35 616.19 1.121 1.136 2-M2o 0.775 O.-M 0.731, 0 W 4 485 0,000 3.54 3.50 616.22 1.152 1.215 2-Mk 0.798 b_T52 0.752 4_t}00 4.535 0.004 3 T7 377 616,27 11211 1270 7-M2c 0,843 0781 O 70 0000 4.673 0.000 3.9E 1 3.9E 516.31 1.257 1.313 7-Mk 0.878 0.642 1 0.602 4_t}40 4.779 4.044 4.19 4-19 6}16,36 1.304 1356 7-M2a 4,91f+ O,E23 J423 0-0p4 4.38a O,000 4.39 4.39 616.40 1.352 1.400 7-M2c 0.559 0.847 0-847 10-M 1 4.964 0.000 4.fi0 4.60 616.45 1.401 1.4a9 7-M2p 1.250 0,N7 0-867 0-0p0 5.066 1}-= 4 01 4.61 516.5d 1.452 1.499 7-M2c 1.25Q O.E85 0.9E6 0.400 5.1fii9 4.000 Straight Culvert Inlet Elevation (invert): 615.00 ft, Outlet Elevation (invert): 614.55 ft Culvert Length: 90.09 ft, Culvert Slope: 0.0050 HW / D = (616.22 - 615.00) / (1.25) = .98 < 1.2 Water Surface Profile Plot for Culvert: HW-3 to HW-4 Crossing - HW-3 TO HW-4, Design Discharge - 3.5 cfs - HW- - 3 to HW- -4. uh-ert Discharge - 3. 5 c fs l 1 8 C 17 r 617 616_t 0 616_C w ell r, _ 61 5_C 614_t Station (ft) Site Data - HW-3 to HW-4 Site Data Option: Culvert Invert Data Inlet Station: 0.00 ft Inlet Elevation: 615.00 ft Outlet Station: 90.09 ft Outlet Elevation: 614.55 ft Number of Barrels: 1 Culvert Data Summary - HW-3 to HW-4 Barrel Shape: Circular Barrel Diameter: 1.25 ft Barrel Material: Concrete Embedment: 0.00 in Barrel Manning's n: 0.0130 Culvert Type: Straight Inlet Configuration: Square Edge with Headwall Inlet Depression: None Table 3 - Downstream Channel Rating Curve (Crossing: HW-3 TO HW-4) Flow (cfs) Water Surface Elev (ft) Depth (ft) 2.73 614.55 0.00 2.94 614.55 0.00 3.15 614.55 0.00 3.35 614.55 0.00 3.50 614.55 0.00 3.77 614.55 0.00 3.98 614.55 0.00 4.19 614.55 0.00 4.39 614.55 0.00 4.60 614.55 0.00 4.81 1 614.55 1 0.00 Tailwater Channel Data - HW-3 TO HW-4 Tailwater Channel Option: Enter Constant Tailwater Elevation Constant Tailwater Elevation: 614.55 ft Roadway Data for Crossing: HW-3 TO HW-4 Roadway Profile Shape: Constant Roadway Elevation Crest Length: 90.09 ft Crest Elevation: 618.00 ft Roadway Surface: Paved Roadway Tap Width: 47.47 ft HY-8 Culvert Analysis Report Table 1 - Summary of Culvert Flows at Crossing: HW-5 to HW-6 Headwater Elevation (ft) Total Discharge (cfs) HW-5 to HW-6 Discharge (cfs) Roadway Discharge (cfs) I Iterations 635.43 0.64 0,64 0.00 1 635.44 0.69 0.69 0.00 1 635.46 0.74 0.74 0.00 1 635.48 0.79 0.79 0.00 1 635.49 0.83 0.83 0.00 1 635.51 0.89 0,89 0.00 1 636.52 0.94 0.94 0.00 1 635.54 0.99 0.99 0.00 1 635.55 1.04 1.04 0.00 1 635.56 1.eq 1.09 0.00 1 635, 58 1.14 1.14 0.00 1 637.00 6.09 6.09 0.00 Overtopping Table 2 - Culvert Summary Table: HW-5 to H -6 Total Discharge (ofs) Culvert Discharge (afs) Headwater Elevation (ft) Inlet Control Depth (ft) Outlet Control Depth (ft) Flog, Type Normal Depth (ft) Critical Depth (ft) Outlet Depth (ft) Tailwater Depth (ft) Outlet Velocity (fus) Tailwater Velocity (flts) 0.64 0.64 635.43 8.426 0.0' 1S2n 0.308 0.309 0.308 0.000 2.635 0.000 0.69 0.59 635-44 0-444 0.01 152n 0-320 0-322g32 0-000 2.695 0-000 0.74 0.74 635.46 0.461 0.0' iS2n 0.331 0.334 0.000 2.760 0.000 0.79 0.79 635-48 0_476 0.0" 1S2n 0-343 0-346 0-000 2.797 0-000 0.83 0,83 635.49 0.489 0,0" iS2n 0.352 0.355 0,000 2.838 0,000 0.89 0.09 635.51 MID8 0.0" 1S2n 0.364 0.365 0.000 2.904 0.000 0.94 0.94 63562 D522 0.0' 1S2n 0375 0376 0.000 2.936 0.000 0.99 0.99 635.54 6.537 0.011 1-32n 0.385 0.386 0.385 0.000 2.981 0.000 1.04 1.04 635.55 0_552 0.025 1S2n 0.395 0.397 0.395 0.000 3.028 C.000 1.09 1.09 635.56 0.565 0.039 1S2n 0.405 0.407 0,405 0,000 3.059 0.000 1.14 1.14 635.58 0.579 0.053 1S2n o.d15 4.417 4.d15 4.000 3.098 0.000 Straight Culvert Inlet Elevation (invert): 635.00 ft, Outlet Elevation (invert): 634.59 ft Culvert Length: 82.44 ft, Culvert Slope: 0.0050 HW / D = (635.49 - 635.00) / (1.25) = 0.39 < 1.20 Water Surface Profile Plot for Culvert: HW-5 to HW-6 ros0 111a - HW-5 to HW- , Design Discharge - 0.8 ofs Ct�1-. rt - HW--5 to HW--6. uh-ert Discharge - 0-8 cfs 6,237 C 112-, r 66.( 0 4- aD w 635-t 635-C 6 4-i Station (ft) Site Data - HW-5 to HW-6 Site Data Option: Culvert Invert Data Inlet Station: 0.00 ft Inlet Elevation: 635.00 ft Outlet Station: 82.44 ft Outlet Elevation: 634.59 ft Number of Barrels: 1 Culvert Data Summary - HW-5 to HW-6 Barrel Shape: Circular Barrel Diameter: 1.25 ft Barrel Material: Embedment: 0.00 in Barrel Manning's n: 0.0130 Culvert Type: Straight Inlet Configuration: Square Edge with Headwall Inlet Depression: None Table 3 - Downstream Channel Rating Curve (Crossing: HW-5 to HW-6) Flow (cfs) Water Surface Elev (ft) Depth (ft) 0.64 634.59 0.00 0.69 634.59 0.00 0.74 634.59 0.00 0.79 634.59 0.00 0.83 634.59 0.00 0.89 634.59 0.00 0.94 634.59 0.00 0.99 634.59 0.00 1.04 634.59 0.00 1.09 1 634.59 1 0.00 1.14 1 634.59 1 0.00 Tailwater Channel Data - HW-5 to HW-6 Tailwater Channel Option: Enter Constant Tailwater Elevation Constant Tailwater Elevation: 634.59 ft Roadway Data for Crossing: HW-5 to HW-6 Roadway Profile Shape: Constant Roadway Elevation Crest Length: 82.44 ft Crest Elevation: 637.00 ft Roadway Surface: Paved Roadway Top Width: 47.29 ft HY-8 Culvert Analysis Report Table 1 - Summary of Culvert Flows at Crossing: FES-51 TO FES-54 Headwater Elevation (ft) Total Discharge (cfs) FES 51 TO FES 54 Discharge (cfs) Roadway Discharge (cfs) Iterations 632.37 20.97 20.97 0.00 1 632.51 22.51 22.51 0.00 1 632.66 24.04 24.04 0.00 1 632.82 25.58 25.58 0.00 1 632,92 26.46 26.46 0.00 1 633.17 28.65 28.65 0.00 1 633.36 30.19 30.19 0.00 1 633.56 31.72 31.72 0.00 1 633.78 33.26 33.26 0.00 1 634,00 34.79 34.79 0.00 1 634.23 36.33 36.33 0.00 1 636.00 45.73 45.73 0.00 Overtopping Table 2 - Culvert Summary Table: FES 51 TO FES 54 Total Discharge (cfs) Culvert Discharge (cfs) Headwater Elevation (ft) Inlet Control Depth (ft) Outlet Control Depth (ft) Flow Type Normal Depth (ft) Critical Depth (ft) Outlet Depth (ft) Tailwaler Depth (ft) Outlet Velocity (ftls) Tailwater Velocity (ftls) 20.97 20.97 632.37 2.449 0.0* 1-JSit 1.324 1.553 2.400 2.400 4.278 0.000 22.51 22.51 632.51 2.590 1.453 5-J51t 1,383 1.611 2.400 2.400 4.592 0.000 24.04 24.04 632.66 2.741 1.661 5-JSit 1.443 1.686 2.400 2.400 4.905 0.000 25.58 25.58 632.82 2.901 1.883 5-J8it 1.503 1.719 2.400 2.400 5.218 0.000 26.46 26.46 632.92 2.997 2.017 5-JSit 1.538 1.748 2.400 2.400 5.398 0.000 28.65 28.65 633,17 3.252 2,368 5-J51t 1,626 1.823 2,400 2.400 5.845 0.000 30.19 30.19 633.36 3.443 2.631 5-J51t 1.690 1.870 2 400 2.400 6.159 O.000 31.72 31.72 633.56 3.645 2.907 5-Jsit 1.756 1.916 2.400 2.400 6.472 OM 33.26 33.26 633.78 3.857 3.198 5-JS1t 1.826 1.960 2.400 2.400 6.785 0.000 34.79 34.79 634.00 4.080 3.502 5-JSit 1.902 2.002 2.400 2.400 7.099 0.000 36.33 36.33 634.23 4.313 3.819 5-JSit 1.986 2.041 2.400 2.400 7.412 0.000 Straight Culvert Inlet Elevation (invert): 629.92 ft, Outlet Elevation (invert): 627.50 ft Culvert Length: 306.82 ft. Culvert Slope: 0.0079 HW / D = (632.92 - 629.92) / 2.5 = 1.2 (FOR 30" PORTION - FES 51 TO SDMH 53) HW / D = (632.92 - 629.92) / 3 = 1.0 (FOR 36" PORTION - SDMH 53 TO FES 54) Water Surface Profile Plot for Culvert: FES 51 TO FES 54 ros�in2 - FES-51 TO FES- 4, Design Discharge - 26.5 cfs C t�1-.rz - FES 51 TO FES 54, uh-ert Discharge - 2 6- 5 cts 3C ,2,r 62� 62� iuu zuu _nm 14uu tatl an (ft) Site Data - FES 51 TO FES 54 Site Data Option: Culvert Invert Data Inlet Station: 0.00 ft Inlet Elevation: 629.92 ft Outlet Station: 306.81 ft Outlet Elevation: 627.50 ft Number of Barrels: 1 Culvert Data Summary - FES 51 TO FES 54 Barrel Shape: Circular Barrel Diameter: 2.50 ft Barrel Material: Embedment: 0.00 in Barrel Manning's n: 0.0130 Culvert Type: Straight Inlet Configuration: Mitered to Conform to Slope Inlet Depression: None Table 3 - Downstream Channel Rating Curve (Crossing: FES-51 TO FES-54) Flow (cfs) Water Surface Elev (ft) Depth (ft) 20.97 629.90 2.40 22.51 629.90 2.40 24.04 629.90 2.40 25.58 629.90 2.40 26.46 629.90 2.40 28.65 629.90 2.40 30.19 629.90 2.40 31.72 629.90 2.40 33.26 629.90 2.40 34.79 1 629.90 1 2.40 36.33 1 629.90 1 2.40 Tailwater Channel Data - FES-51 TO FES-54 Tailwater Channel Option: Enter Constant Tailwater Elevation Constant Tailwater Elevation: 629.90 ft Roadway Data for Crossing: FES-51 TO FES-54 Roadway Profile Shape: Constant Roadway Elevation Crest Length: 306.81 ft Crest Elevation: 636.00 ft Roadway Surface: Paved Roadway Top Width: 193.00 ft Sediment Basin Design Sediment Basin Desio - Phase 1 Project: Weddington Pointe Residential Computed By: DJB Location: Union County, North Carolina Checked By: ARW Developer: Century Communities Southeast, LLC Design Criteria: Design Storm Rational Runoff Coeff. Intensity 10 yr 7.03 in/hr (Tc= 5 mina Settling Efficiency Criteria: Design Storm Rational Runoff Coeff. Intensity Date: 4.23.2019 Revised: 7.24.2019 2 yr 5.03 in/hr (Tc= 5 mina Basin Number Drainage Area (Acres) Denuded Area (Acres) Sediment Basin Volume Required Provided Bottom Area Sq ft Depth ft. Top Area Sq ft Surface Area Required Sq ft Side- slope Skimmer Size (inches) Orifice Diameter (inches) Dewatering Time (days) 10-yr Flow cfs SB #1 11.18 62.52 20,124 77,098 16,838 4 24,189 23,382 3 5.0 4.50 3.30 55.02 SSB #21 5.63 62.52 10,134 29,561 6,380 4 9,4531 9,004 3 1 4.0 2.80 3.26 27.71 SSB #3 3.12 62.52 5,616 152,347 35,836 4 42,632 4,990 3 6.0 6.00 3.66 15.35 SSB #4 3.65 62.52 6,570 29,079 6,178 4 9,496 5,838 3 3.0 3.00 2.80 17.96 SSB #5 7.28 62.52 13,104 42,585 9,298 4 13,385 11,643 3 4.0 3.40 3.19 35.82 SSB #6 1.56 62.52 2,808 40,530 8,968 4 12,504 2,495 3 4.0 3.30 3.22 7.68 SSB #7 1.36 62.52 2,448 7,305 1,240 4 3,040 2,175 3 2.0 1.70 2.19 6.69 SSB #8 2.82 62.52 5,076 17,293 3,469 4 6,074 4,510 3 2.5 2.40 2.60 13.88 SSB #9 3.92 62.52 7,056 100,458 23,296 4 28,794 6,269 3 6.0 4.80 3.78 19.29 SSB #10 3.52 62.52 6,336 87,034 19,890 4 25,540 5,630 3 5.0 4.70 3.41 17.32 SSB #11 1.72 62.52 3,096 13,934 2,692 4 5,109 2,751 3 2.5 2.20 2.49 8.46 SSB #12 1.83 62.52 3,294 9,202 1,3151 4 1 4,313 2,927 3 2.0 1.90 1 2.21 1 9.01 SSB #131 1.89 62.52 3,402 9,145 1,7191 4 1 3,4621 3,023 3 2.0 1.90 1 2.19 9.30 SSB #141 5.06 62.52 9,108 29,361 6,0371 4 1 9,9891 8,0931 3 1 4.0 2.80 1 3.24 1 24.90 Volume Surface Area Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Good Skimmer Sizing Calculate Skimmer Size Basin Volume in Cubic Feet Days to Drain* NC assume 3 days to drain 77 098 Cu. Ft 3 Days SIB #1 Skimmer Size Orifice Radius Orifice Diameter 5.0 Inch 2.2 Inch[es] 4.5 Inch[es] Calculate Skimmer Size Basin Volume in Cubic Feet Days to Drain* NC assume 3 days to drain 29 561 Cu. Ft 3 Days SSB #2 Skimmer Size Orifice Radius Orifice Diameter 4.0 Inch 1.4 Inch[es] 2.8 Inch[es] Calculate Skimmer Size Basin Volume in Cubic Feet Days to Drain* NC assume 3 days to drain 152 347 Cu. Ft 3 Days SSB #3 Skimmer Size Orifice Radius Orifice Diameter 6.0 Inch 3.0 Inch[es] 6.0 Inch[es] Calculate Skimmer Size Basin Volume in Cubic Feet Days to Drain* NC assume 3 days to drain 29 079 Cu. Ft 3 Days SSB #4 Skimmer Size Orifice Radius Orifice Diameter 3.0 Inch 1.5 Inch[es] 3.0 Inch[es] Calculate Skimmer Size Basin Volume in Cubic Feet Days to Drain* NC assume 3 days to drain 42 585 Cu. Ft 3 Days SSB #5 Skimmer Size Orifice Radius Orifice Diameter 4.0 Inch 1.7 Inch[es] 3.4 Inch[es] Calculate Skimmer Size Basin Volume in Cubic Feet Days to Drain* NC assume 3 days to drain 40 530 Cu. Ft 3 Days SSB #6 Skimmer Size Orifice Radius Orifice Diameter 4.0 Inch 1.6 Inch[es] 3.3 Inch[es] Calculate Skimmer Size Basin Volume in Cubic Feet Days to Drain* NC assume 3 days to drain 7 305 Cu. Ft 3 Days SSB #7 Skimmer Size Orifice Radius Orifice Diameter 2.0 Inch 0.8 Inch[es] 1.7 Inch[es] Calculate Skimmer Size Basin Volume in Cubic Feet Days to Drain* NC assume 3 days to drain 17 293 Cu. Ft 3 Days SSB #8 Skimmer Size Orifice Radius Orifice Diameter 2.5 Inch 1.2 Inch[es] 2.4 Inch[es] Calculate Skimmer Size Basin Volume in Cubic Feet Days to Drain* NC assume 3 days to drain 100 458 Cu. Ft 3 Days SSB #9 Skimmer Size Orifice Radius Orifice Diameter 6.0 Inch 2.4 Inch[es] 4.8 Inch[es] Calculate Skimmer Size Basin Volume in Cubic Feet Days to Drain* NC assume 3 days to drain 87 034 Cu. Ft 3 Days SSB #10 Skimmer Size Orifice Radius Orifice Diameter 5.0 Inch 2.4 Inch[es] 4.7 Inch[es] Calculate Skimmer Size Basin Volume in Cubic Feet Days to Drain* NC assume 3 days to drain 13 934 Cu. Ft 3 Days SSB #11 Skimmer Size Orifice Radius Orifice Diameter 2.5 Inch 1.1 Inch[es] 2.2 Inch[es] Calculate Skimmer Size Basin Volume in Cubic Feet Days to Drain* NC assume 3 days to drain 9 202 Cu. Ft 3 Days SSB #12 Skimmer Size Orifice Radius Orifice Diameter 2.0 Inch 0.9 Inch[es] 1.9 Inch[es] Calculate Skimmer Size Basin Volume in Cubic Feet Days to Drain* NC assume 3 days to drain 9 145 Cu. Ft 3 Days SSB #13 Skimmer Size Orifice Radius Orifice Diameter 2.0 Inch 0.9 Inch[es] 1.9 Inch[es] Calculate Skimmer Size Basin Volume in Cubic Feet Days to Drain* NC assume 3 days to drain 29 361 Cu. Ft 3 Days SSB #14 Skimmer Size Orifice Radius Orifice Diameter 4.0 Inch 1.4 Inch[es] 2.8 Inch[es]