HomeMy WebLinkAbout20191368 Ver 1_DWR staff hold_20191021From:Scarbraugh, Anthony
To:will.vesely@terracon.com
Cc:Emily.B.Thompson@usace.army.mil
Subject:PCN application review for US-NC-5096-Hobucken (DWR Project No. 19-1368)
Date:Monday, October 21, 2019 3:51:00 PM
Mr. Vesley,
After completing a preliminary review of the subject project, the Division of Water Resources has
determined that your application is incomplete and cannot be processed. The application is on-
hold until all of the following information is received:
1. Access Road and Cell Tower Site Design Specification
The application for the proposed road impacts to waters and wetlands lacked engineered
design specification detail. This design should include cross-sectional detail including fill
slopes and culvert placement to maintain wetland and water connectivity. (15A NCAC 02H
.0502(g))
If all of the requested information is not received in writing within 30 calendar days of receipt of this
letter, the Division will be unable to approve the application and project may be denied.
Regards,
Anthony Scarbraugh