HomeMy WebLinkAbout20191427 Ver 1_B-6006_Permit_Plans_11x17_20191021Flighwdy North Carolina Department of Transportation
Stormwater
Highway Stormwater Program
STORMWATER MANAGEMENT PLAN � �=
(Version 2.08; Released April 2018) FOR NCDOT PROJECTS
WBS Element: 48202.3.1 TIP No.: B-6006 County(ies): Columbus Page 1 of 1
General Project Information
WBS Element:
48202.3.1 ITIP Number: B-6006 Project Type: Bridge Replacement Date: 10/17/2019
NCDOT Contact:
David Stark, PE
Contractor I Desi ner:
KCA / The Tara Group of Lumberton
Address:
1020 Birch Ridge Drive
Raleigh, NC 27610
Address:
2700 Hwy, 72 West
Lumberton, INC 28360
Phone:
9197076605
Phone:
910.739.8199
Email:
dstark@ncdot.gov
Email:
City/Town:
Nakina
Count ies :
Columbus
River Basins :
Lumber F
ICAMACounty?
No
Wetlands within Project Limits?
Yes
Project Description
Project Length (lin. miles or feet):
0.10 Surrounding Land Use: I Mainly agricultural and wooded area, few homes located around the project
Proposed Project
Existing Site
Project Built -Upon Area ac.
ac.
ac.
Typical Cross Section Description:
The proposed service road consists of 2 typical cross sections, including one with a
guardrail. Proposed cross sections without a guardrail is made up of 2 11, travel lanes
with 3' unpaved shoulder. Proposed cross section with a guardrail consists of 2 11, travel
lanes with 4'-5" to 5'-6" full depth paved shoulder and a 3' unpaved shoulder.
Existing road conditions consist of 2 10' travel lanes with 3' unpaved shoulder
Annual Avg Daily Traffic (veh/hr/day):
Design/Future: 760 Year: 2016
Existing: Year:
General Project Narrative:
(Description of Minimization of Water
Quality Impacts)
The project consists of improving roadway approaches as well as replacing the existing bridge. Existing drinage systems within the project limits will be analyzed for impacts. All
existing drainage systems impacted by the proposed bridge replacement will be replaced with a proposed drainage system. Proposed drainage will be designed to maintain the
same drianage patterns as the existing condition. An Erosion and Sediment Control Plan will be prepared before construction.
Waterbody Information
Surface Water Body (1): BoqqvBranch
NCDWR Stream Index No.:
15-17-1-12-1-7
NCDWR Surface Water Classification for Water Body
Primary Classification:
Class C
Supplemental Classification:
Swamp Waters Sw
Other Stream Classification:
Impairments:
Aquatic T&E Species?
No Comments:
NRTR Stream ID:
15-17-1-12-1-7
Buffer Rules in Effect: N/A
Project Includes Bridge Spanning Water Body?
Yes
I Deck Drains Discharge Over Buffer? N/A
Dissipator Pads Provided in Buffer? N/A
Deck Drains Discharge Over Water Body?
No
(If yes, provide justification in the General Project Narrative)
(If yes, describe in the General Project Narrative; if no, justify in the
General Project Narrative)
(If yes, provide justification in the General Project Narrative) I
See Sheet 1A For Index of Sheets
V
W
0
w
m
0
H
O
Lo
V11 1159
LO�uN .
ti A�
IS
k
ti
A
DETOUR
VICINITY MAP
THIS PROJECT IS NOT LOCATED WITHIN MUNICIPAL BOUNDARIES.
F TO HWY 905
STATE OF NORTH CAROLINA
DIVISION OF HIGHWAYS
COL UMB US COUNTY
WETLAND & STREAM IMPACTS
LOCATION. BRIDGE NO.230313 ON SR 1159 (OLD TRAM RD) 10 % 17 % 2019
OVER BOGGY BRANCH
TYPE OF WORK: GRADING, DRAINAGE, PAVING AND STRUCTURE
I
� I
-----elm------ / —91M—
PERMIT DRAWING
SHEET 1 OF 7
J=
0
1� It
d
81 a
BEGIM f?I / — WLB — — - — — — — TQ GORES TRAILER RD (SR H57) —0-
GIN
TIP EJ2QgCT B - -� - l f l ✓s \ \
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II MODIFIED.
GRAPHIC SCALES
DESIGN
DATA
PROJECT LENGTH
50 25 0 50 100
ADT 2016 =
760
LENGTH ROADWAY TIP PROJECT B-6006 = 0.081 MILES
PLANS
V =
T =
55 MPH
6%
LENGTH STRUCTURES TIP PROJECT B-6006 = 0.018 MILES
50 25 0 50 100
TOTAL LENGTH TIP PROJECT B-6006 = 0.099 MILES
FUNC CLASS
= MINOR
ki
COLLECTOR
PROFILE (HORIZONTAL)
SUB —REGIONAL TIER
10 5 0 10 20
NCDOT CONTACT: VIRGINIA MABRY
PPT PROJECT MANAGER
PROFILE (VERTICAL)
Prepared /n the Office of.
301 Fayett 11, St.,
KCA NC FIRM LICENSE N.: C-1506
Suite N 500
&ISINGER InMEs Raleigh C 27601
(919)662-]639
2018 STANDARD SPECIFICATIONS
JONATHAN LANGSTON, PE
RIGHT OF WAY DATE:
O" 54 9
PROJECT ENGINEER
ALLEN MCSWAIN
LETTING DATE:
0 ^ G ^ 9
PROJECT DESIGN ENGINEER
PRELIMINARY PLANS I DOCUMENT NOT CONSIDERED FINAL
DO NOT USE FOR CONSTRUCTION UNLESS ALL SIGNATURES COMPLETED
HYDRAULICS ENGINEER
ROADWAY DESIGN
ENGINEER
® DENOTES FILL IN
WETLAND STA 12+33 LT STA = 13+69 LT
V10 0.85 fps SOUTHERN DIVERSIFIED. LLC V10 = 0.55 f fs
® DENOTES EXCAVATION p SITE 2 p
IN WETLAND DB II O 22
®DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
® DENOTES HAND
CLEARING SITE / SITE 4
WOODS
,��w000s �r -
v v�
E4* P E 4e � � ``'�j
0 — — — — — — — — — —wkc
-EL L TRAY RD ( // ) TO GORES RAILER RD (SR 1/57)�
—_---------- _----- ' ---- ----
— — — — —1 IN— —
S Niw E
�DE POE e� ' � PD A< �
a
WOODS WOODS
STA - 11 + 50 RT TO 12 + 73 RT
Q10 = 0.27 cfs STA = 13 4 c LT
F rc
V10 = 1.69 fps u' '° = fs
SOUTHERN DIVERSIFIED, VIO IED.LLC V10 = 0.62.62 fps
DB 138 PG422
O
BRIDGE/ROADWAY RELATIONSHIP SKETCH
BM=I
ELEV.=47.44'
N 159750 E 2091157
-BL- STA 9+37 93'RT
RR SPIKE IN 12' OAK
PROJECT REFERENCE NO. SHEET NO.
3 B-6006 4
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
= ,,..un,,,,� ,Tu,,,,,
` o o�l'cnao/ N%. .� o��.cnxo/
m 2 �. 2. •oEESS /p'•.,r •. �. 2. •oEE55 /Q ••.,r ��
. 4 !'.
� ? SEAL SEALS
o045983 2: ?. 043950 '
O
O �29•. NGI NE;;:'�lj`� 'I'GINEF;:'p �.`�
� .....
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
PNEPANEl IN 11 FINN LICENSE No: C-150
TXE OFFICE OF: KCA 301 Fayetteville St.,
v Suite 1500
KISINGER CAMEO RaleiOh, XC 27601
& ASSOCI s fwlNleez-Teas
PERMIT DRAWING
SHEET 2 OF 7
CONC GRID 313 \
44
70
—L—
SR 1159 (OLD TRAM
ROAD)
_ _70
P1 = 13+04D0
EL = 5070'
VC = 234'
K = 114
— DS = 55 MPH
BM#1
ELEV.=47.44'
N 159750 E 2091157
-BL- STA 9+37 93' RT
-L- STA 12+41 80' RT
RR SPIKE IN 12" OAK
P1 = 14+80DO
K = ll560
S =
M H
Pl = l/+1750
EL = 4875'
VC = 122
K = 116
DS = 55 MPH
—
—
I-IHEN
BRIDGE
____
---
--
---
--
---
--
EGI
STA.
BRIDGE
2+58.70
ST
.13+
1.16
--
-
--
--
--
Hill
41
(+X
Dm
X(+
ITT
07.BENC
_
-a�w
EL.
6.0'
hill
mill
milln
-
-
EGIN
GRAD
-
E
-
n i
N
M�
ND G
AD
S
A.15+37.5
30
LL-BRIDGE
-
-
-
— -
-
-
-
-
-
-
-.
-
-
HYDRAULIC
DESIGN DISCHARGE
DESIGN FREOUENCY
DESIGN HW ELEVATION
BASE DISCHARGE
BASE FREOUENCY
BASE HW ELEVATION
OVERTOPPING DISCHARGE
OVERTOPPING FREOUENCY
OVERTOPP/NG ELEVATION
DATA
= 850
= 25
= 485
= 1300
= 100
= 49D
= 950
= 25+
= 48J
CFS
YRS
FT
CFS
YRS
FT
CFS
YRS
FT
-
-
-
-
-
-
-
-
-
-
DATE OF SURVEY = 06-2018
W. S.ELEVATION = 45.4 FT
-
-
-
-
-
- -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
10+00
11+00
12+00 13+00 14+00
15+00
16+00
17+00
18+00
® DENOTES FILL IN
WETLAND STA 12+33 LT
V10 0.85 fps SOUTHERN DIVERSIFIED. LLC
® DENOTES EXCAVATION p SITE 2 DB II O 22
IN WETLAND
®DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
® DENOTES HAND
CLEARING WOODS SITE l I. \
w,
✓
A< PDE 1 ✓ P
-----
Fo— I w _ _
'�PDE—PDE-11"e
B \ SITE 3
WOODS
�S\
STA = 11 + 50 RT TO 12 + 73 RT
Q10 = 0.27 cfs
vlo= 2fps uk" '—
SOUTHERN DIVERSIFIED, LLC
4
pg E}g PG22
O
BRIDGE/ROADWAY RELATIONSHIP SKETCH
BM=I
ELEV.=47.44'
N 159750 E 2091157
-BL- STA 9+37 93'RT
\!S RR SPIKE IN 12' OAK
STA = 13+69 LT
V10 = 0.55 f fs
p
SITE 4
WOODS
4c i /
71 — _ — _ — _
TO GORES RAILER RD (SR /157J-
_ =—*i F� -
WOODS
STA = 13+77 LT
QIO = 0.14 cfs
V10 = 0.62 fps
PROJECT REFERENCE NO. SHEET NO.
3 B-6006 4
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
= „pun,,,, ,Ru,,,,,
` o o�l'cnao/ N%. o o��'cnxo/
m 2 �. 2. •oEESS /p'•.,r •. �. 2. •oEE55 /Q ••.,r ��
. 4 !'.
� ? SEAL SEALS
o045983 2: ?. 043950 '
O
O �29•. NGI NE;;:' �j`� 'I'GINEF;:'p �.`�
� .. n,n
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
FIRM LICENSE N,:
INEFOFFICEROF: KCA NG 301 F S it ill. St.,
vNGER Raleigh NG 27601
&ISASSOC—ES (919)882-7839
PERMIT DRAM�IING]
SHEET 3 OF 7
—
— — —'
--
70
—L—
SR 1159 (OLD TRAM
ROAD)
_ _70
P1 = 13+04D0
EL = 5070'
VC = 234'
K = 114
— DS = 55 MPH
BM#1
ELEV.=47.44'
N 159750 E 2091157
-BL- STA 9+37 93' RT
-L- STA 12+41 80' RT
RR SPIKE IN 12" OAK
Pl = 14+80°00
EL = 48.94'
VC = ll5'
K = ll560
S =
M H
_
P/ = l/+J7.50
EL = 4875'
VC = J22'
K = 116
DS = 55 MPH
—
—
EN
BRIDGE
----
---
qTF
--
---
--
---
--
EGI
STA.
BRIDGE
2+58.70
ST
.13+
1.16
--
-
--
--
--
(+
(+
_
-aypw
BENC
EL.
6.0'
EGIN
GRADE
o'40
n i
N
M�
ND G
AD
40
S
A.151-37.5
-
-
-
-
-
-
-
-
-
-
L
-.
-
-
BRIDGE HYDRAULIC
DESIGN DISCHARGE
DESIGN FREQUENCY
DESIGN HW ELEVATION
BASE DISCHARGE
BASE FREOUENCY
BASE HW ELEVATION
OVERTOPPING DISCHARGE
OVERTOPPING FREOUENCY
OVERTOPPING ELEVATION
DATA
= 850
= 25
= 485
= 1300
= 100
= 49D
= 950
= 25+
= 487
CFS
YRS
FT
CFS
YRS
FT
CFS
YRS
FT
-
-
mill
-
-
-
-
20
-
-
-
-
DATE OF SURVEY = 08-2018
W. S.ELEVATION = 45.4 FT
-
-
-
-
-
- -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
10+00
11+00
12+00 13+00
14+00
15+00
16+00
17+00
18+00
ve auiieeiuos"� '
0
5 10 PROD. REFERENCE NO.
SHEET NO.
N
_ —
vmvasm cx me ounce ov:
a wssocl'Es
'
u
_
—
Mill
1
0
1
0Hd
1,
0
1
0 90
80
0
6
0
0
30
20
1
1
20
30
0
5
60
0
0
90
1
0
1 0 - 0
1
0 1
0
150
--
-
-
-
-
-
-
-�w
-
€T
O
4WP
-++
-
--
48
84
0
N
V
91)
.025
0.02
31
3:
ET
v
ND%
Q�
4
-
-
0,
o o
-o
r
-
-
- -
m
N
+H
—
U
—
§
—
— —
X
I
Tj
E
i
11
Hill
___
6
—
— —
#L
— _
1111111
#
CD
U
n
_
— _
_ —
— _
C
/
-
-
-
-
-
— —
-
-
-
-
-
-
-
y
4rj11
mill
ET
NDS
E—
C
O
—
—
—
—
—
— —
— —
—
—
—
— —
C
HILL
N
W
d
/
U
q__
WMItW
— —
—
—
+
11 1 50.
0
—
OHill
U
—14
-
-
___
__
___
___
___
___—___
_
t
—
— —
+H
-----
--------------
----
---
J
O
U
M
M
B
N
U
B
m
Ln
>oJ
r
O]0
OQ
___
_
In >r
—0Q
a�
RELIMINARY
PLANS
IN
OM
LE
E
LAISTS
Noozu±l
I
1±
DO
NOT US
FOR CONSTRUCTION
DO
OT US
FOR R/W A
OUISIT
ON
UN �
20
1
5
60
0
0
90
1
0 110
120
1
0 1
0
1110
ve auiiee�iuos"� �'
0
5 10
PROD. REFERENCE NO.
SHEET NO.
N
_ -
vmvasm cx me ounce ov:
a wssoci'Es
'
u
_
-
1 0
130
1,11)
1
0 90
80
0
6
0
0
30
20
1
1
20
30
A
0
50
60
70
80
90
1
0
1 0
'r, 0
1111110 110
150
-
-REIRVEAVAIT-
-
-
-
-
I ELF
44-
0.025
0.02
--
-
0
r
m
N
!n
X
E
i
N
!L
=
CD
CD-
-
-
rL-Lo
-
-
-
-
-
-
-
--
--
--
=_44T
T
I
I
-
0.025
.02
P1
m
m
---
---
-
—
—
48
82
J_
\
rn
—
WETLA
IDS
0
i
m
C
O
w
N
w
d
U
Bit
Hill
-
-
-
- -
-
-41
-
O
U
_
N
N
U
---
- _
---
- -
- _
---
-
---
---
-
--
---
---
---
---
--
-
-
---
---
-------
--
_
-
Ij
-
-------
---
---
---
-
--
- -
---
-
-
---
_
---
--- ----
-
-
--
-
---
- _
- -
— -
-
-
- _
-
_
- _
- _
-
_
_ _
- _
- _
_
-
- _
-
- - - -
- -
- -
- -
- -
_
-
N
co—
O
Lo
N
V
M
m
�
-
Q8
&025
0.025
qlani
+___J+4tttI
—
— —
34
m
m
48
85
—
HIM
m
>ro
WETLA
DS
mm
oa
In >r
-0Q
aoo
12+
RELIMINARY
LANS
IN
OM
LE
E
LA
S
N OJy
DO
NOT USE
FOR CONST
UMON
DO NUL
US
FORHH R/W A
OUISIT
ON
—
— -
- -
_
—
— —
- _
— _
— _
UN �
�E
-1
0
1
0
cl
0
0-
3
20
1D
50
60
0
0
90
1
0 1
0
1 0
1
0 1,0
1
0
CD
ve auiieeos"
KWS
0
5 10
PROD. REFERENCE NO.
SHEET NO.
N
--
vmvasm cx me ounce ov: v
a wssocl'Es
u
—
—
ML
1
0
130
1
0
100
90
80
0
6
0
0
30
20
1
1
20
30
A
0
50
60
70
80
90
100
110 'r,0
130
1
0 150
-
-
-
-
lit
-
-
-
-
-
-
-
-
-
-
--
-
-
-
-
-
-
-
-
c
r
m
N
U
!n
E
N
!L
_
CD
-
-
-
-
-
-
-
I
-
-
-
-
-
I
Hill
...
N
...
_
___—__
O
__
___
_
--- —___
___—__
-
_
.025
0.02
Ll
m
m
—
—
—
—
48.93
—
m
-
-
-
—
_
-
---------------
m
0
WETLAND
/
m
C
O
o
w
N
w
/
U
U
_
N1H
--
:
i
�
13 +
0.
0
—
—
—
—_
-------
—_
—
—
—_
- —
—_
--
_
—
—
--
—
—
—
—
— —
—
—_
E
O
U
M
M
B
U
B
m
�^
lc]
OQ
—_
—_
—_
—_
--
—_
— -----
----
—_
—_
___
___—___
---
n >r
III
F=FT
—0Q
L"�
a�
RELIMINARY
LANS
IN
OM
LE
E LA
S
NV 2
-
DO NOT US
FOR CONST
UMON
DO
OT US
FOR R/ W A OUISIT
ON
HB—_
—_
_—
—_
—_
—
—
—
-
—
—_
—_
_—
—_
-- —_
—_
--
UN �
E
90
1
0 1
0 1
0
1
0 10
150
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Site
No.
Station
(From/To)
Structure
Size / Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
(ft)
1
-L- 10+74 / 12+68
Fill Slope / Pipe Outlet Rip Rap -LT-
0.003
0.015
2
-L- 12+58 / 12+83
Proposed Bridge End Bent
0.000
0.009
72
3
-L- 13+35 / 13+50
Proposed Bridge End Bent / Pipe
Outlet Rip Rap
0.003
0.000
0.013
0.009
62
4
-L- 13+50 / 14+56
Fill Slope/ Pipe Outlet Rip Rap -LT-
0.003
0.008
TOTALS*:
< 0.01
< 0.01
0.04
0.02
134
*Rounded totals are sum of actual impacts
NOTES:
Permanent Fill in Wetlands Amount (ac): 0.0088
Excavation in Wetlands Amount (ac): 0.0003
Revised 2018 Feb