Loading...
HomeMy WebLinkAbout20140705 Ver 2_Year 2 Monitoring Report_20191018ID#* 20140705 Select Reviewer:* Mac Haupt Initial Review Completed Date 10/21/2019 Mitigation Project Submittal - 10/18/2019 Version* 2 Is this a Prospectus, Technical Proposal or a New Site?* Type of Mitigation Project:* V Stream r Wetlands r Buffer r Nutrient Offset (Select all that apply) Project Contact Information Contact Name:* Kasey Carrere Project Information .................................................................................................................................................................. ID#:* 20140705 Existing IDY Project Type: r DMS r Mitigation Bank Project Name: Selma Mill County: Johnston Document Information r Yes r No Email Address:* kcarrere@res.us Version:*2 Existing Version Mitigation Document Type:* Mitigation Closeout Report File Upload: Selma Mill MY2 Report.pdf 14.73MB Rease upload only one RDF of the conplete file that needs to be subrritted... Signature Print Name:* Ryan Medric Signature:* Ores October 18, 2019 Samantha Dailey U.S. Army Corps of Engineers Regulatory Division 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 RE: Selma Mill Year 2 Monitoring Report (SAW-2015-00710) Ms. Dailey, 302 Jefferson St. Suite 110 Raleigh, NC 27605 Corporate Headquarters 5020 Montrose Blvd. Suite 650 Houston, TX 77006 Main: 713.520.5400 Please find attached the Selma Mill Year 2 Monitoring Report. In Year 2, 23 of the 25 vegetation plots met the 320 stems per acre success criteria. The areas in and around the two plots that did not meet success will be supplemental planted in the end of 2019 or early 2020. The small encroachment area (0.05 ac) that was observed along the road in MY1 was observed again in MY2. RES plans to keep communicating with the landowner as well as adding additional easement markers to this area. The only stream problem area was an eroded cut bank (30 feet) on the downstream section of Reach A. RES is requesting a 10% credit release (730.50 SMU). Thank you, 6W-4�116� Ryan Medric I Ecologist SELMA MILL STREAM MITIGATION SITE JOHNSTON COUNTY, NORTH CAROLINA YEAR 2 MONITORING REPORT Neuse River Basin CU 03020201 Provided by: fires Resource Environmental Solutions, LLC 302 Jefferson Street, Suite 110 Raleigh, NC 27605 919-209-1052 October 2019 Table of Contents 1.0 Project Summary ............................................... 1.1 Project Location and Description ........ 1.2 Project Goals and Objectives .............. 1.3 Pro_ject Success Criteria ....................... Stream Success Criteria ............................. Vegetation Success Criteria ....................... 1.4 Project Components ............................ 1.5 Design/Approach................................. 1.6 Construction and As -Built Conditions 1.7 Year 2 Monitoring Performance.......... Vegetation.................................................. Stream Geomorphology ............................. StreamHydrology ...................................... 2.0 Methods............................................................ 3.0 Reference.......................................................... .................................................................................... 3 .................................................................................... 3 .................................................................................... 4 .................................................................................... 4 .................................................................................... 4 .................................................................................... 5 .................................................................................... 5 .................................................................................... 6 .................................................................................... 6 .................................................................................... 6 .................................................................................... 6 .................................................................................... 7 .................................................................................... 7 .................................................................................... 7 .................................................................................... 8 Appendix A: Background Tables Table 1: Project Mitigation Components Table 2: Project Activity and Reporting History Table 3: Project Contacts Table Table 4: Project Contacts Table Figure 1: Site Location Map Appendix B: Visual Assessment Data Figure 2: Current Conditions Plan View Vegetation Plot Photos Stream and Vegetation Problem Areas Appendix C: Vegetation Plot Data Table 5: Planted Species Summary Table 6: Vegetation Plot Mitigation Success Summary Table 7. Stem Count Total and Planted by Plot Species ADUendix D: Stream Measurement and GeomornholoLyv Data MY2 Overlay Cross -Section Plots Table 8. Baseline Stream Data Summary Table 9. Cross Section Morphology Data Table Table 10. Stream Reach Morphology Data Table Annendix E: HvdroloLyv Data Table 11. 2019 Rainfall Summary Table 12. Documentation of Geomorphically Significant Flow Events Crest Gauge Reading Photos MY2 Headwater Valley Restoration Stream Flow Hydrograph Selma Mill 2 Year 2 Monitoring Report Stream Mitigation Site October 2019 1.0 Proiect Summary 1.1 Project Location and Description The Selma Mill Stream Mitigation Site (the "Site") is located within a watershed dominated by agricultural and residential land use in Johnston County, North Carolina. Prior to construction, the project streams were significantly impacted by channelization and agricultural practices. The project involves the restoration and protection of streams in the Neuse River watershed. The purpose of this mitigation site is to restore and enhance a stream/wetland complex located within the Neuse River Basin. The Site has been designed in concurrence with the Selma Mill Riparian Buffer and Nutrient Offset Mitigation Bank. EBX-Neuse I, LLC ("EBX"), acting as the Bank Sponsor, established a Conservation Easement and will monitor the Site for a minimum of seven years in accordance with the terms and conditions of the Neu -Con Wetland and Stream Umbrella Mitigation Bank. The Site is in Johnston County immediately north of Selma, NC (Figure 1). The latitude and longitude for the site is 35.547353 °N and-78.282503 °W. The site extends approximately 2,300 feet north on the west side of NC HWY 96 beginning immediately north of W Chestnut Street. A tributary crosses NC HWY 96 approximately 1,900 feet north of W Chestnut Street and extends approximately 1,600 feet west. The Site consisted of stream restoration on tributaries that drain directly to Mill Creek. The project presents 6,771 linear feet of Stream Restoration generating 7,305 Stream Mitigation Units (SMU). A combination of Priority 1 and Priority 2 restoration was used on Reaches A and B and Headwater Valley Restoration on Reach C. Benefits include the storage of excess water during flood events, preventing erosion of stream banks, reducing in -stream sedimentation, and nutrient reductions. SMU totals were adjusted using the most recent non-standard buffer width guidance documents. The Site consisted of agricultural fields, cattle pastures and wooded areas. The total easement area is 34.2 acres. The wooded areas along the easement corridor designated for restoration activities are classified as mixed pines and hardwoods. Invasive species are present throughout the wooded areas. Restoration channels were degraded to a point where they could no longer access their floodplain, lack riparian buffers, allow livestock access, and aquatic life was not supported. Little aquatic habitat was available to support aquatic life, and the riparian buffers were not maximizing their potential to filter nutrients. The Site will be monitored on a regular basis and a physical inspection of the site will be conducted at a minimum of twice per year throughout the seven-year post -construction monitoring period, or until performance standards are met. These site inspections will identify site components and features that require routine maintenance. The measure of stream restoration success will be documented by bankfull flows and no change in stream channel classification. Sand bed channels are dynamic and minor adjustments to dimension and profile are expected. The measure of vegetative success for the site will be the survival of at least 210 seven-year old planted trees per acre with an average height of 10 feet at the end of year seven of the monitoring period. Upon approval for closeout by the Interagency Review Team (IRT), the site will be transferred to the North Carolina Wildlife Habitat Foundation (NCWHF). The NCWHF will be responsible for periodic inspection of the site to ensure that restrictions required in the Conservation Easement or the deed restriction document(s) are upheld. Selma Mill 3 Year 2 Monitoring Report Stream Mitigation Site October 2019 1.2 Project Goals and Objectives The 2010 Neuse River Basin River Basin Restoration Priorities (RBRP) identified several restoration needs for the entire Neuse River Basin, as well as for I UC 03020201, specifically. The Site was identified as a stream restoration opportunity to improve water quality, habitat, and hydrology within the Neuse 01 River Basin. The project goals address stressors identified in the TLW and include the following: • Nutrient removal, • Sediment removal, • Invasive species treatment, • Filtration of runoff, and • Improved aquatic and terrestrial habitat. The project goals will be addressed through the following project objectives: • Exclusion of livestock, • Treatment of exotic invasive species, • Restoration of forested riparian stream buffers, • Stabilization of eroding stream banks due to lack of vegetation and livestock hoof shear, • Addition of large woody debris, such as log vanes, log weirs, root wads, • Preservation and enhancement of hydrology in existing riparian wetland seeps, and • Restoration of appropriate pattern, dimension, and profile in stream channels. 1.3 Project Success Criteria The Site follows the USACE 2003 Stream Mitigation Guidelines and subsequent guidance. The Mitigation Plan was approved in August 2016 and therefore does not adhere to the 2016 Wilmington District Stream and Wetland Mitigation Update. Cross section data will be reported in Years 0, 1, 2, 3, 5, 7, and vegetation and stream hydrology data will be reported annually. Stream Success Criteria Two bankfull flow events must be documented within the seven-year monitoring period. The two bankfull events must occur in separate years. Otherwise, the stream monitoring will continue until two bankfull events have been documented in separate years. There should be little change in as -built cross -sections. If changes do take place, they should be evaluated to determine if they represent a movement toward a less stable condition (for example down -cutting or erosion), or are minor changes that represent an increase in stability (for example settling, vegetative changes, deposition along the banks, or decrease in width/depth ratio). Cross -sections shall be classified using the Rosgen stream classification method, and all monitored cross -sections should fall within the quantitative parameters defined for channels of the design stream type. Bank height ratio shall not exceed 1.2, and the entrenchment ratio shall be no less than 2.2 within restored reaches. Channel stability should be demonstrated through a minimum of two bankfull events documented in the seven-year monitoring period. Digital images will be used to subjectively evaluate channel aggradation or degradation, bank erosion, success of riparian vegetation, and effectiveness of erosion control measures. Longitudinal images should not indicate the absence of developing bars within the channel or an excessive increase in channel depth. Lateral images should not indicate excessive erosion or continuing degradation of the banks over time. A Selma Mill 4 Year 2 Monitoring Report Stream Mitigation Site October 2019 series of images over time should indicate successional maturation of riparian vegetation. Headwater valley restoration reaches will be monitored to document intermittent or seasonal surface flow. This will be accomplished through direct observation, photo documentation, and the use of stream gauge transducers with data loggers. Reaches must demonstrate a minimum of 30 consecutive days of flow. Vegetation Success Criteria Specific and measurable success criteria for plant density within the riparian buffers on the site will follow IRT Guidance. Vegetation monitoring plots will be a minimum of 0.02 acres in size, and cover a minimum of two percent of the planted area. Vegetation monitoring will take place annually between July 15 and leaf drop. The interim measures of vegetative success for the site will be the survival of at least 320 planted three-year old trees per acre at the end of Year 3, 260 five-year old trees at the end of Year 5, and the final vegetative success criteria will be 210 trees per acre with an average height of 10 feet at the end of Year 7. The site includes 25 monitoring plots to monitor the 29.8 planted acres. Volunteer trees will be counted, identified to species, and included in the yearly monitoring reports, but will not be counted towards the success criteria of total planted stems. 1.4 Project Components The project area is comprised of a single easement area along three tributaries that flow into Mill Creek. The easement is separated by a crossing at NC HWY 96. The western portion of the project originates near the intersection of Hwy 96 and W Chestnut Street and includes Reaches Al, A2, and 133. The eastern portion of the project is located in an agricultural field to the east of NC HWY 96. This area includes Reaches 131, 132, and C. The stream mitigation components are summarized below and in Table 1. Mitigation Stationing Existing ProposedMitigation Base Adjusted Reach Type* (Proposed) Length Length Ratio SMUs** SMUs*** (LF) (LF) A P2 Restoration 0+61 to 19+42 1,514 1,881 1:1 1,881 2,068 A P1/P2 Restoration 19+72 to 27+30 630 758 1:1 758 821 A P1 Restoration 27+60 to 34+45 571 685 1:1 685 801 B P2 Restoration 1+94 to 10+39 741 845 1:1 845 903 B P1/P2 Restoration 10+72 to 22+95 1,062 1,223 1:1 1,223 1,334 B P2 Restoration 23+55 to 28+59 405 504 1:1 504 503 C HWV Restoration 0+96 to 11+31 852 875 1:1 875 875 Total 5,775 6,771 6,771 7,305 *P1 =Priority 1; P2 =Priority 2; HWV- Headwater Valley **Reach C SMUs based on valley length minus 30 feet for the proposed crossing ***See Mitigation Plan for SMU adjustments based on non-standard buffer widths. Selma Mill 5 Year 2 Monitoring Report Stream Mitigation Site October 2019 1.5 Design/Approach The design approach for the Selma Mill Site combined the analog method of natural channel design with analytical methods to evaluate stream flows and hydraulic performance of the channel and floodplain. The analog method involves the use of a "template" stream adjacent to, nearby, or previously in the same location as the design reach. The template parameters of the analog reach are replicated to create the features of the design reach. The analog approach is useful when watershed and boundary conditions are similar between the design and analog reaches (Skidmore, et al., 2001). Hydraulic geometry was developed using analytical methods in an effort to identify the design discharge. Priority Level 2 restoration was done on Reaches Al, A2, B1, B2, and B3. Priority 1 Restoration was done on Reach A2 below the confluence with Reach B. For most of the restoration reaches, the channel was rerouted to adjacent natural valley features. By rerouting the channel and constructing floodplain benches, the design allows the channel frequent access to its floodplain and the opportunity to create small, depressional areas within the buffer to enhance habitat for wildlife and aquatic organisms. The headwater valley restoration approach was done along Reach C. The ditch was plugged and then backfilled to the extent possible such that cut and fill is balanced along the reach. 1.6 Construction and As Built Conditions Stream construction was completed in August 2017. The Site was built to design plans and guidelines. No major changes or modifications were made during construction activities. Final floodplain grading was completed in May 2018 along with planting and fencing. 1.7 Year 2 Monitoring Performance The Selma Mill Year 2 Monitoring (MY2) activities were completed in September 2019. All MY data is present below and in the appendices. The Site is on track to meeting vegetation and stream interim success criteria. Vegetation Monitoring of the 25 permanent vegetation plots was completed during September 2019. Vegetation data are in Appendix C and associated photos are in Appendix B. MY data indicates that 23 of the 25 plots are exceeding the interim success criteria of 320 planted stems per acre. Planted stem densities ranged from 202 to 1,335 planted stems per acre with a mean of 808 planted stems per acre across all plots. Vegetation Plot 10 fell three trees short of the interim success criteria and Vegetation Plot 20 fell two trees short of the interim success criteria. The areas in and around these plots will be supplemental planted in 2019/2020. A total of 25 species were documented within the plots. Volunteer species were noted in 20 of the vegetation plots. The average tree height observed was 3.4 feet. Visual assessment of vegetation outside of the monitoring plots indicates that the herbaceous vegetation is becoming well established throughout the majority of the project. The old road used to haul the excess dirt from the site along the top of Reach B, however, may need to be reseeded in 2019. RES will keep an eye on this area during future monitoring events. Additionally, the lower end of Reach A will be revisited in 2019 to treat any Chinese privet (Ligustmm sinense) that may be re -sprouting. There still is a small (0.05 acre) area of encroachment along Highway 96 that RES will continue to monitor and communicate to the landowner that mowing is prohibited in the easement. Selma Mill 6 Year 2 Monitoring Report Stream Mitigation Site October 2019 Stream Geomorphology Geomorphology data for MY2 was collected during September 2019. Summary tables and cross section/profile plots are in Appendix D. Overall the MY2 cross sections relatively match the as -built conditions. Cross Section 19 showed about one foot of bed scour in MY but has remained stable in MY2. Bank height ratios remain less than 1.2 and entrenchment ratios greater than 2.2. Visual assessment of the stream channel was performed to document signs of instability, such as eroding banks, structural instability, or excessive sedimentation. The channel is transporting sediment as designed and will continue to be monitored for aggradation and degradation. One area of bank erosion was observed on Reach A upstream of Cross Section 11. This area was about 30 feet of bank erosion on the outside of a meander bend. The problem is not systematic and will be revisited next monitoring year to assess severity. Stream Hydrology Crest gauges and flow gauges were installed on Reach A and Reach B and a flow gauge was installed on Reach C. Seventeen total bankfull events were recorded in 2019; 13 on Reach A and four on Reach B. The flow gauge recorded 120 consecutive flow days on the Headwater Valley Restoration Reach C. Gauge locations can be found on Figure 2 and hydrology data is in Appendix E. 2.0 Methods Stream monitoring was conducted using a Topcon GTS-312 Total Station. Three-dimensional coordinates associated with cross-section data was collected in the field (NAD83 State Plane feet FIPS 3200). Morphological data was collected at 28 cross -sections. Survey data was imported into CAD, ArcGIS®, and Microsoft Excel® for data processing and analysis. In April 2018 crest gauges and flow gauges were installed on Reaches A and B and a flow gauge was installed on Reach C. The flow gauges were installed within the channel and will continuously record flow conditions at an hourly interval. The crest gauges were installed on the bank at the bankfull elevation. During quarterly visits to the Site, the height of the corkline will be recorded. HOBO data from the flow gauges will be corrected using bankfull recordings from the crest gauges. If there are no corkline readings, the height of the top of bank and water depth will be recorded and bankfull events will be calculated in Excel. The flow gauge on the headwater valley restoration reach is calibrated to the height of the nearest downstream riffle to document consecutive flow days. Vegetation success is being monitored at 25 permanent monitoring plots. Vegetation plot monitoring follows the CVS-EEP Level 2 Protocol for Recording Vegetation, version 4.2 (Lee et al. 2008) and includes analysis of species composition and density of planted species. Data is processed using the CVS data entry tool. In the field, the four corners of each plot were permanently marked with PVC at the origin and metal conduit at the other corners. Photos of each plot are to be taken from the origin each monitoring year. Selma Mill 7 Year 2 Monitoring Report Stream Mitigation Site October 2019 3.0 Reference Environmental Laboratory. 1987. U.S. Army Corps of Engineers Wetlands Delineation Manual, Technical Report Y-87-1. U.S. Army Engineer Waterways Experiment Station, Vicksburg, Mississippi. Harman, W., R. Starr, M. Carter, K. Tweedy, M. Clemmons, K. Suggs, C. Miller. 2012. A Function - Based Framework for Stream Assessment and Restoration Projects. US Environmental Protection Agency, Office of Wetlands, Oceans, and Watersheds, Washington, DC EPA 843-K-12-006. Lee Michael T., Peet Robert K., Roberts Steven D., and Wentworth Thomas R., 2008. CVS-EEP Protocol for Recording Vegetation Level. Version 4.2 North Carolina Division of Mitigation Services (NCDMS). `Broad River Basin Restoration Priorities 2009." (September 2014). Resource Environmental Solutions (2016). Selma Mill Stream Mitigation Site Final Mitigation Plan. Rosgen, D. (1996), Applied River Morphology, 2nd edition, Wildland Hydrology, Pagosa Springs, CO. Schafale, M.P. and A.S. Weakley. 2012. Classification of the Natural Communities of North Carolina, Fourth Approximation. North Carolina Natural Heritage Program, Division of Parks and Recreation, NCDENR, Raleigh, NC. US Army Corps of Engineers (USACE), 2003. April 2008 NC Stream Mitigation Guidelines. U.S. Army Corps of Engineers (USACE). 2010. Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Atlantic and Gulf Coastal Plain Region (Version 2.0), ed. J. S. Wakeley, R. W. Lichvar, and C. V. Noble. ERDC/EL TR-10-20. Vicksburg, MS: U.S. Army Engineer Research and Development Center. Selma Mill 8 Year 2 Monitoring Report Stream Mitigation Site October 2019 Appendix A Background Tables Table 1. Selma Mill Stream Mitigation Site - Mitigation Assets and Components Existing Mitigation Project Wetland Footage Plan Approach Adjusted Component Position and or Footage or Restoration Priority Mitigation Mitigation Mitigation (reach ID, etc.)' HydroType' Acreage Stationing Acreage Level Level Ratio (X:1) Credits Credits° Notes/Comments IV Full Channel Restoration, Channel Relocation, Planted Buffer, Exclusion of Livestock, Permanent Reach A 1,514 0+61 to 19+42 1,881 R P2 1 1,881 2,068 Conservation Easement Fu11 Channel Restoration, Channel Relocation, Planted Buffer, Exclusion of Livestock, Permanent Reach A 630 19+72 to 27+30 758 R P1/P2 1 758 821 Conservation Easement Full Channel Restoration, Channel Relocation, Planted Buffer, Exclusion of Livestock, Permanent Reach A 571 27+60 to 34+45 685 R P1 1 685 801 Conservation Easement Reach B 741 1+94 to 10+39 845 R P2 1 845 903 Full Channel Restoration, Planted Buffer, Permanent Conservation Easement. Reach B 1,062 10+72 to 22+95 1,223 R P1/P2 1 1,223 1,334 Full Channel Restoration, Planted Buffer, Permanent Conservation Easement. Full Channel Restoration, Channel Relocation, Planted Buffer, Exclusion of Livestock, Permanent Reach B 405 23+55 to 28+59 504 R P2 1 504 503 Conservation Easement Reach C 852 0+96 to 11+31 875 R I HWV 1 1 1 875 875 HWV Reetoration, Planted Buffer, Permanent Conservation Easement Length and Area Summations by Mitigation Category Stream (linear feet) Riparian Wetland (acres) on -riparian Wetland (acres) F Riverine Non-Riverine 6,771 Enhancement I Enhancement 11 Creation Preservation High Quality Pres Overall Assets Summary Overall Asset Category Credits Stream RNR Wetland NR Wetland General Note - The above componenttable is intended to be a close complementto the asset map. Each entry in the above table should have clear distinction and appropriate symbology in the asset map. 1- Wetiand Groups represent pooled wetland polygons in the map with the same wetland type and restoration level. If some ofthe wetland polygons within a group are in meaningfully different landscape positions, soil types or have different community targets (as examples), then further segmentation in the table may be warranted. Wetland features impacted by credit modifiers such as utilities shall be listed as a distinct record with the impacted acreage tallied as discreet records in the table (See Wetland 7 above) 2- Wetiand Position and Hydro Type- Indicates Riparian Riverine,(RR), riparinan non-riverine(RNR) or Non-Riverine (NR) 3- Buffer Assets -due to the complex nature of buffer and nutrient offset assets they are not included in this example table. Please see the DMS buffer mitigation plan template for the required asset table information. 4 -Adjusted Mitigation Credits are based on the non-standard buffer widths. Table 2. Project Activity and Reporting History Selma Mill Stream Mitigation Site Elapsed Time Since grading complete: 2 years 2 months Elapsed Time Since planting complete: 1 year 5 months Number of reporting Years : 2 Activity or Deliverable Data Collection Complete Completion or Delivery Restoration Plan NA Aug-16 Final Design — Construction Plans NA Feb-17 Construction NA Aug-17 Containerized, bare root and B&B plantings for reach/segments 1 &2 NA May-18 As -built (Year 0 Monitoring — baseline) May-18 Jun-18 Year 1 Monitoring Nov-18 Dec-18 Year 2 Monitoring Sep-19 Oct-19 Year 3 Monitoring Year 4 Monitoring Year 5 Monitoring Year 6 Monitoring Year 7 Monitoring = The number of reports or data points produced excluding the baseline Table 3. Project Contacts Table Selma Mill Stream Mitigation Site Designer Primary project design POC WK Dickson Frasier Mullen (919) 412-3866 Construction Contractor Construction contractor POC Wright Contracting / PO Box 545, Siler City, NC 273444 Joseph Wright / (919) 663-0810 Survey Contractor Survey contractor POC Matrix East, PLLC / 906 N. Queen St., Suite A, Kinston, NC 28501 James R. Watson, PLS / (252) 522-2500 Planting Contractor Planting contractor POC H&J Forestry Matt Hitch Seeding Contractor Contractor point of contact Wright Contracting / PO Box 545, Siler City, NC 273444 Joseph Wright / (919) 663-0810 Seed Mix Sources Green Resource (336) 855-6363 Nursery Stock Suppliers Arborgen (845) 851-4129 Monitoring Performers RES / 302 Jefferson Street, Suite 110, Raleigh, NC 27605 Stream Monitoring POC Ryan Medric (919) 741-6268 Vegetation Monitoring POC Ryan Medric (919) 741-6268 Wetland Monitoring POC N/A Table 4. Project Background Information Project Name Selma Mill County Johnston Project Area (acres) 34.2 Project Coordinates (latitude and longitude) Latitude: 35.542346 N Longitude:-78.284053 W Planted Acreage (Acres of Woody Stems Planted) 29.8 Project Watershed Summary Information Physiographic Province Coastal Plain River Basin Neuse USGS Hydrologic Unit 8-digit 3020201 USGS Hydrologic Unit 14-digit 3020201100050 DWR Sub -basin 03-04-02 Project Drainage Area (Acres and Square Miles) 583 Project Drainage Area Percentage of Impervious Area 35% CGIA Land Use Classification Agriculture, Residential, Forest, Industrial/Commercial Reach Summary Information Parameters Al A2 131 B2 B3 C Length of reach (linear feet) 938 1625 1396 278 444 921 Valley confinement (Confined, moderately confined, unconfined) X X X X X X Drainage area (Acres and Square Miles) 267 583 138 189 189 42 Perennial, Intermittent, Ephemeral Perennial Perennial Perennial Perennial Perennial Intermittent NCDWR Water Quality Classification N/A N/A N/A N/A N/A N/A Stream Classification (existing) G5c/B5 G5c G5c G5c G5c G5c Stream Classification (proposed) E5 E5 E5 E5 E5 HWV Evolutionary trend (Simon) II / IV II VI II II II FEMA classification N/A N/A N/A N/A N/A N/A Regulatory Considerations Parameters Applicable? Resolved? Supporting Docs? Water of the United States - Section 404 Yes Yes SAW-2015- 00710 Water of the United States - Section 401 Yes Yes DWR # 14- 0705 Endangered Species Act Yes Yes USFWS (Corr. Letter) Historic Preservation Act Yes Yes SHPO (Corr. Letter) Coastal Zone Management Act (CZMA or CAMA) No N/A N/A FEMA Floodplain Compliance Yes Yes Town of Selma (Corr. Letter) Essential Fisheries Habitat No N/A N/A r-� - oao d r pew r��G�G d4 pp i .2 yr� p awn r� s 3i3 0 � I Po- Boykin Ave Or pC p �=1in3 pF' en �ei�iman i.4ve - e I Primrose St Zo' Legend Conservation Easement U 2 "4p A y w waknw sr a s` 10` a V,yc ry g fio z Bennett or r _ •, c s �"" � a4ae y, W Chcsin iil •;r `a3� ti tlP-Can m lya a°vi'rr m49r ` H'E.4r 2�o ai �� spy a Nbnrry y �4 - ti h �a PQ-J9 WQ-d sr n . t+ Sr by Sr � r _ ry, 2 ey lure � Lir L`yi�e Lrh� y sr Z' Si ^I W` y` Safm.a,tv e F ? r riarc F•i y a .� "I". : ? h r "ry,s r St6?F 5 I qr ti aaae�r Sr Fr` y' hti y sr h�aG S'f O y Sourcek,Esri HERE Garmin USGS Interma INCREMENT P NRCan Esri Odin St gE �a � � p, wp� y Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, drp o, OpenStreetMap contributors, and the GIS User Community N Date: 12/11 /2018 Figure 1 - Site Location Map w _ e Drawn by: RTM res Selma Mill Buffer/Nutrient Site n s Checked by: BPB 0 500 1.000 Johnston County, North Carolina 1 inch = 1,000 feet Feet Appendix B Visual Assessment Data fires HWV Restoration 2 N ,r ro W E Reach B P2'Restoration,, ,r 0 150 300 u -w 7t:^ _:. I� - - - -� ✓f Feet v Figure 2 Reach A Q o s Current Conditions P1 Restoration e ` Wilk Overview MY2 2019 21 wR ® Selma Mill Stream $ 17 Mitigation Site - Johnston County, NC � - P1 Restoration � ;a, 'A 15 Date: 10/15/2019 Drawn by: RTM z •� 16 'w `s Lat:35.542346 Long 78.284053 i"' ': n K h LEGEND .' O Conservation Easement • Restoration Reach A `-_ — HWV Restoration 2. _. Restoration Reach B Vegetation Plot .f . s4 P2Restoration. >320 stems/acre <320 stems/acre Existing Wetlands p of Bank j Cross Section ®Flow/Crest Gauge !� _ ■14 ,,' r,. 4 • Rain Gauge/Ambient ' *s . �� `' `„ _ • °.� `' Veaetation Condition Assessment ��.: ' t s m'►/ N Target Community } , _ rp J v Present Marginal Absent . ..t T U Absent w ' �_ .. - E,i ..a..�A'a► ... r No Fill s ' Existing 1,ength Proposed Length ha 5 "Reach Mitigation Type' Ratio BaseSMUs* AsjustedSMUs** R'; �r.. (1 (1 — Present A P2 Restoration 1,514 1,881 I:I 1,881 2,068 j A P1/1`2 Restoration 630 758 1:1 758 821 _ A P1 Restoration 571 685 1:1 685 801 B P2 Restoration 741 845 1.1 845 903 B P1/P2 Restoration 1,062 1,223 1.1 1,223 1,334 REFERENCE Restoration 405 504 1:1 504 503 n- 4 �`+ " •,.,1- '� `� '°�.. kRt „`" IC - ; - ".- • C HWV Restoration 852 875 1:1 875 875 1.)Aerial imagery from NC One Map 2017. TOTAL 5,775 6,771 6,771 7,305 ? ! 2.) Horizontal Datum is NAD83 UTM Z17N. *Reach C SMUs based on valley length ninus 30 feet for the proposed crossing. t' **See Figure 11 for SMU adjustments based on non-standazd buffer widths. M T" 4 } 3.) The parcel data information/property ` t` ;4* �'boundaries depicted on this map is for - a;, ' ` ' prospect assessment purposes only. N CFe tofo Gr ph Inf rm n & A I I It is not to be used as final boundaries. #.. f, 31s 41L k. y� 3 3 - � � . ,� .fib. _ - ; -1 • � 1 f , e r', _ *�• J •... ia�l' fj[C 4 A.� pe� Tom,. ~ `1l +1 ` ,-r - -1 •rf � 1 yy�� ■ Mr + ti'�t. h� F ti IWT N-1 Ma tr�f ... ✓! 1. �} � �jrJ ��' x � - s� iL j � �, s4 rf t ^'rt r �° � +L,k'' �=c i�i�'i • Wr`.�: Y'� ,,r� c -t t a'; �r �, •►�rt'�;.+a, "' R -4 'F _ a R, t. .a r.• - - - ,h i Yiz i i u res �+ N W E S i. 0 50 100 n Feet 1 Figure 2 Current Conditions Plan View Selma Mill Stream Restoration Site MY2 2019 Johnston County, NC Date: 10/15/2019 Drawn by: RTM (Page 1) LEGEND O Conservation Easement Vegetation Plot o >320 stems/acre © <320 stems/acre EZ Existing Wetlands Restoration HWV Restoration Cross Section Top of Bank MY2 SPA ® Flow/Crest Gauge Rain Gauge/Ambient * Vegetation Condition Assessment w Target Community v Present Marginal Absent � U a Absent No Fill .�• N Present > C REFERENCE } 1.) Aerial imagery from NC One Map 2017. 2.) Horizontal Datum is NAD83 UTM Z17N. 3.) The parcel data information/property boundaries depicted on this map is for prospect assessment purposes only. It is not to be used as final boundaries. 7 411171, • %a S ip �;' AN Vir s 4 ly T , Y r ", P i� .. r � •' / 1 L�'�T .;1�•4 h ray ,sdl, - ,�_ __. r -- 4, + s 4 �.;�,. ?��* '� . • ' di ' ' air LJ� 20 ,each B fires N w E S 0 50 100 Feet Figure 2 Current Conditions Plan View Selma Mill Stream Restoration Site MY2 2019 Johnston County, NC Date: 10/15/2019 Drawn by: RTM (Page 2) LEGEND O Conservation Easement Vegetation Plot o >320 stems/acre = <320 stems/acre Existing Wetlands Restoration HWV Restoration Cross Section Top of Bank MY2 SPA �- ® Flow/Crest Gauge Rain Gauge/Ambient Vegetation Condition Assessment f w Target Community T Present Marginal Absent U Q Absent No Fill N _ w y Present REFERENCE 1.)Aerial imagery from NC One Map 2017. 2.) Horizontal Datum is NAD83 UTM Z17N. 3.) The parcel data information/property boundaries depicted on this map is for prospect assessment purposes only. It is not to be used as final boundaries. T � " • �Y1 * Y' �� � .Y" Y+, ':,r�► t i�. �'itx , •''�a ,4 xr:. j�''y, .�,gypq,,,, '4i+ F 'v;_ ; ' 'y F ram' � , . >+.,� ,,. � ,, � . � ►fir„ 1 _ - 4 N. a vk NEEL ILZ e r y CGII ti T ; 4. ' - V •�4 ''•e . ._✓Gr,'s. _ 7- . `-T: . �:. .. ,N rim' ^ •. � ` N IL 17 V. + 17 Ili • 1. ";. - - .. 'j.•._!. 10 'All r. • 21 Ell t 8 fires N w E T S 99 0 50 100 Feet Figure 2 Current Conditions Plan View Selma Mill Stream Restoration Site MY2 2019 Johnston County, NC Date: 10/15/2019 Drawn by: RTM (Page 3) LEGEND O Conservation Easement Vegetation Plot o >320 stems/acre = <320 stems/acre Existing Wetlands Restoration HWV Restoration Cross Section Top of Bank MY2 SPA ® Flow/Crest Gauge Rain Gauge/Ambient Vegetation Condition Assessment rn Target Community w Present Marginal Absent U Q Absent No Fill v NPresent c ' REFERENCE 1.)Aerial imagery from NC One Map 2017. 2.) Horizontal Datum is NAD83 UTM Z17N. 3.) The parcel data information/property boundaries depicted on this map is for prospect assessment purposes only. It is not to be used as final boundaries. oz In 7 11 18 4t fires N W E S 0 50 100 Feet Figure 2 Current Conditions Plan View Selma Mill Stream Restoration Site MY2 2019 Johnston County, NC Date: 10/15/2019 1 Drawn by: RTM (Page 4) LEGEND O Conservation Easement Vegetation Plot = >320 stems/acre = <320 stems/acre EZ Existing Wetlands Restoration HWV Restoration Cross Section Top of Bank MY2 SPA (DFlow/Crest Gauge 0 Rain Gauge/Ambient Vegetation Condition Assessment U) Target Community is L Present Marginal Absent U Absent No Fill Present • > S REFERENCE 1.) Aerial imagery from NC One Map 2017. 2.) Horizontal Datum is NAD83 UTM Z17N. 3.) The parcel data information/property boundaries depicted on this map is for prospect assessment purposes only. It is not to be used as final boundaries. 0 � fires .. �� N i S ' •'S5'§ w �0 50 100 r -5 Feet = Figure 2 - x Current Conditions �.. Plan View F CG3 Selma Mill Stream Restoration Site :r. y MY2 2019 Johnston County, NC iw � •-'�` �• D t 10/15/2019 Drawn by: RTM (Page 5) ANN LEGEND ,r. '{sib`} w• �- - O Conservation Easement t` y Vegetation Plot - >320 stems/acre <3 20 stems/acre EZ Existing Wetlands - a Restoration .. •'*�- , r H WV Restoration = � _ Cross Section Ailz+ _ . ` •�_ _ _ Top of Bank 25 MY2 SPA •. s .a Flow/Crest Gauge IP°1t*..>,. �,': ,t t � Rain Gauge/Ambient Vegetation Condition Assessment Community Target w o unity p� Present Marginal Absent 1W ,� Absent No Fill CG2 tj w N Present > `. Reach C - c co Z3�NREFERENCE 1.)Aerial imagery from NC One Map 2017. Reach g 2.) Horizontal Datum is NAD83 UTM Z17N. Fill3.) The parcel ata tip rty boundaresdepictdonthsmasfor [711� prospect assessment purposes only. Reachg *g . It is not to be used as final boundaries. MU N Cr to fo G o pInform Selma Mill Vegetation Monitoring Plot Photos Vegetation Plot 1 Vegetation Plot 3 Vegetation Plot 5 Vegetation Plot 2 Vegetation Plot 4 Vegetation Plot 6 "I. y h, Pik ,r �svn�iryrthn. - �F TVI? 1 , 09/18/2019 Vegetation Plot 13 Vegetation Plot 15 Vegetation Plot 17 Vegetation Plot 14 Vegetation Plot16 Vegetation Plot 18 '' `� � � a �,. .� � �, :s ,, • �„ � �: �� c'_�� I Vegetation Plot 25 Stream Problem Areas Selma Mill Map Label / Feature Issue / Location Photo SPAT / LB Erosion / Reach A � T Vegetation Problem Areas Selma Mill Map Label / Feature Category / Location / Size Photo VPAI / Encroachment / Reach B / 0.05 acres F! ' VPA2 / Low Stem Density / VP20 / 0.77 acres=..a :. VPA3 / Low Stem Density / VP 10 / 0.17 acres Appendix C Vegetation Plot Data Appendix C. Vegetation Assessment Data Table 5. Planted Species Summary Common Name Scientific Name Total Stems Planted Green Ash Froxinus pennsylvanica 6500 Water Oak Quercus nigra 5500 Sycamore Platanus occidentalis 5000 Willow Oak Quercus phellos 5000 Swamp Chestnut Oak Quercus michauxii 4100 Blackgum Nyssasylvatica 4000 Yellow -Poplar Liriodendron tulipifera 3000 River Birch Betula nigra 2600 Baldcypress Taxodium distichum 1300 Shumard Oak Quercus shumardii 1000 Overcup Oak Quercus lyrata 995 Silky Dogwood Corpus amomum 502 Buttonbush Cephalanthus occidentalis 500 Cherrybark Oak Quercus pagoda 500 Persimmon Diospyros virginiana 500 Water Tupelo Nyssaaquatica 400 Total 41,397 Table 6. Vegetation Plot Mitigation Success Summary Plot # Planted Stems/Acre Volunteer Stems/Acre Total Stems/Acre Success Criteria Met? Average Planted Stem Height (ft) 1 931 243 1174 Yes 3.4 2 1 769 81 850 Yes 2.2 3 728 324 1052 Yes 3.1 4 1012 0 1012 Yes 2.7 5 1295 850 2145 Yes 2.4 6 850 121 971 Yes 4.3 7 1093 324 1416 Yes 4.4 8 890 0 890 Yes 3.8 9 445 121 567 Yes 2.9 10 202 40 243 No 3.9 11 526 162 688 Yes 2.5 12 809 162 971 Yes 2.9 13 688 81 769 Yes 3.6 14 728 81 809 Yes 3.6 15 769 0 769 Yes 2.7 16 1012 121 1133 Yes 2.0 17 850 121 971 Yes 3.8 18 486 0 486 Yes 3.2 19 567 121 688 Yes 2.4 20 243 0 243 No 1.8 21 890 0 890 Yes 2.3 22 1255 486 1740 Yes 4.2 23 931 162 1133 Yes 6.9 24 890 162 1052 Yes 3.9 25 1335 364 1700 Yes 3.4 Project Avg 808 165 974 Yes 3.4 Appendix C. Vegetation Assessment Data Table 7. Stem Count Total and Planted by Plot Species Selma Mill Current Plot Data (MY2 2019) 05232018-01-0001 05232018-01-0002 05232018-01-0003 05232018-01-0004 05232018-01-0005 05232018-01-0006 05232018-01-0007 05232018-01-0008 05232018-01-0009 05232018-01-0010 05232018-01-0011 05232018-01-0012 05232018-01-0013 05232018-01-0014 Scientific Name Common Name Species Type PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T Betulanigra river birch Tree 3 3 3 2 2 2 2 2 2 5 5 5 2 2 4 1 1 1 11 11 11 6 6 6 2 2 2 2 2 2 1 1 1 1 1 1 Carya hickory Tree 2 Cornusamomum silkydogwood Shrub Crataegus aestivalis may hawthorn Shrub Tree Diospyrosvirginiana common persimmon Tree 4 4 4 Fraxinus pennsylvanica green ash Tree 101 101 101 1 1 1 1 2 21 21 71 7 7 6 1 1 1 71 7 7 1 1 1 2 2 2 Liquidambarstyraciflua sweetgum Tree 3 2 1 1 1 3 1 1 4 4 2 2 Liriodendrontulipifera tuliptree Tree 2 2 2 1 1 1 1 6 6 6 11 1 1 Nyssa tupelo Tree Nyssa aquatica watertupelo Tree 6 6 6 1 1 1 1 1 1 Nyssa sylvatica blackgum Tree 1 1 1 1 1 1 3 3 3 2 2 2 2 2 2 2 2 2 4 4 4 1 1 1 4 4 4 9 9 9 Pinustaeda loblolly pine Tree 3 2 1 Platanusoccidentalis American sycamore Tree 2 2 21 1 4 4 9 6 6 61 31 3 18 11 1 1 4 4 4 21 21 2 Quercus oak Tree Quercus falcata southern red oak Tree Quercus lyrata overcup oak Tree 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 Quercus michauxii swamp chestnut oak Tree 10 10 10 7 7 7 1 1 1 1 1 1 12 12 12 5 5 5 2 2 2 1 1 1 2 2 2 3 3 3 13 13 13 Quercus nigra water oak Tree 1 1 1 Quercus pagoda cherrybark oak Tree I I 1 2 2 2 Quercus phellos willow oak Tree 1 11 1 2 21 2 1 1 1 1 1 1 91 9 9 81 8 8 11 11 1 2 2 2 3 3 3 1 1 1 Quercus rubra northern red oak Tree Quercus shumardii Shumard'soak Tree 1 1 1 Rhuscopallinum iflameleafsumac shrub 1 1 Salixnigra Iblackwillow Tree 1 Sambucuscanadensis ICommon Elderberry Shrub 1 Taxodium distichum bald cypress Tree 9 9 9 6 6 6 1 11 1 1 1 1 2 2 2 11 11 11 Stem count 231 231 29 191 191 21 18 18 26 25 25 25 321 321 53 211 211 24 271 271 35 221 221 22 111 111 14 51 51 6 13 13 17 20 20 24 17 17 19 18 181 20 size (arcs) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 size (ACRES) 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 1 0.02 0.02 0.02 0.02 0.02 Species count 6 6 8 7 7 8 6 6 8 6 6 6 9 9 13 8 8 10 3 3 6 6 6 6 4 4 5 4 4 5 7 7 8 6 6 7 4 4 5 5 5 6 Stems per ACRE 931 1174 7691 7691 850 EMIR 7281 10521 1012 ini?l 1012 1295 1295 2145 850 850 971 1093 1093 1416 890 890 NORM 4451 5671 2021 2021 2431 5261 5261 688 8091 8091 9711 6881 6881 769POWM 7281 809 Selma Mill I Current Plot Data (MY22019) Annual Means 05232018-01-0015 05232018-01-0016 05232018-01-0017 05232018-01-0018 05232018-01-0019 05232018-01-0020 05232018-01-0021 05232018-01-0022 05232018-01-0023 05232018-01-0024 05232018-01-0025 MY2(2019) MY1(2018) MYO(2018) Scientific Name Common Name Species Type PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T Betula nigra river birch Tree 3 3 3 5 5 5 1 1 1 4 4 4 1 1 1 52 52 54 60 60 60 74 74 74 Carya hickory Tree 2 Cornusamomum silkydogwood Shrub 2 2 2 1 1 1 3 3 3 3 3 3 4 4 4 Crataegus aestivalis may hawthorn Shrub Tree 1 1 1 1 1 1 1 1 1 1 1 1 Diospyrosvirginiana common persimmon Tree 1 4 4 4 8 8 8 2 2 2 2 2 2 Fraxinus pennsylvanica green ash Tree 21 21 21 17 171 171 4 41 61 4 41 41 21 2 2 1 1 1 1 51 51 5 1 1 8 8 8 3 3 3 75 75 83 77 77 77 79 79 79 Liquidambarstyraciflua sweetgum Tree 3 3 41 1 9 431 4 Liriodendrontulipifera tuliptree Tree 1 1 1 11 11 12 18 18 20 46 46 46 Nyssa tupelo Tree 1 1 1 Nyssa aquatica watertupelo Tree 1 1 1 9 9 9 33 33 33 44 44 44 Nyssa sylvatica blackgum Tree 1 1 1 1 1 1 2 2 2 4 4 4 37 37 37 34 34 34 47 47 47 Pinustaeda loblolly pine Tree 12 3 21 45 Platanusoccidentalis American sycamore Tree 2 21 21 1 11 11 1 1 1 1 11 41 4 41 1 71 71 7 51 51 5 42 42 62 40 40 401 56 56 56 Quercus oak Tree 1 1 1 11 11 1 16 16 16 49 49 49 Quercus falcata southern red oak Tree 5 5 5 3 3 3 51 51 5 7 7 7 20 20 20 12 12 12 18 18 18 Quercus lyrata overcup oak Tree 1 1 1 1 1 1 12 12 12 Quercus michauxii swamp chestnut oak Tree 5 5 5 1 1 1 1 1 1 5 5 5 7 7 7 2 2 2 78 78 78 69 69 69 74 74 74 Quercus nigra water oak Tree 2 2 2 1 1 1 1 1 1 1 1 11 6 6 6 11 11 11 13 13 13 Quercus pagoda cherrybark oak Tree 1 1 2 2 2 Quercus phellos willow oak Tree 1 3 31 3 1 11 11 1 1 2 4 4 41 21 2 2 11 1 1 9 9 9 81 81 8 13 131 13 1 1 1 16 16 16 88 88 89 107 107 1071 114 114 114 Quercus rubra northern red oak Tree 16 16 16 2 2 2 1 6 6 6 24 24 24 23 23 23 23 23 23 Quercus shumardii Shumard'soak Tree 1 1 1 Rhuscopallinum flameleaf sumac shrub 2 Salixnigra blackwillow Tree 1 Sambucuscanadensis Common Elderberry Shrub 1 Taxodium distichum bald cypress Tree 30 30 30 34 34 34 351 351 35 Stem count 191 191 19 2511 1 211 24 12 12 12 14 14 17 6 6 6 221 221 22 311 311 431 241 241 28 22 221 26 33 33 42 500 500 602 541 541 592 6791 6791 679 size (arcs) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 25 1 25 1 25 size (ACRES) 0.02 0.02 0.02 0.02 0.02 0.02 1 0.02 0.02 1 0.02 0.02 0.02 1 0.62 1 0.62 1 0.62 Species count 8 8 8 51 51 6 3 3 3 6 6 6 7 7 8 3 31 31 71 51 51 61 51 51 61 51 51 71 61 61 71 191 191 251 171 171 191 16 16 16 Stems per ACRE 769 769 1012 1012 1133 SSOI 971 486 486 567 688 2431 243M 8901 890 890 12551 12551 1740 9711 11331 8901 8901 10521 13351 13351 1700 8091 974 876 958 10991 30991 Appendix D Stream Measurement and Geomorphology Data Upstream Downstream Selma Mill Reach A Cross Section 1 - Shallow 165 164 163 ° 162 ° w 161 00 160 159 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 Distance (ft) Baseline MY1 MY2 — — -Approx. Bankfull Floodprone Area Cross Section 1 (Shallow) Based on fixed baseline cross sectional area Base MYl MY2 MY3 MY5 MY7 MY+ Record elevation(datum) used 161.8 161.8 162.0 Bankfull Width ft 13.2 13.1 13.7 Floodprone Width ft >50.2 >50.2 >50.2 Bankfull Mean Depth (ft) 1.0 1.0 1.0 Bankfull Max Depth ft 1.8 1.8 1.9 Low Bank Height ft 1.8 1.8 1.8 Bankfull Cross Sectional Area (ft) 13.1 13.1 13.1 Bankfull Width/Depth Ratio 13.3 13.2 14.4 Bankfull Entrenchment Ratio >3.8 >3.8 >3.7 Bankfull Bank Height Ratiol 1.0 1.0 1 1.0 Upstream Downstream Selma Mill Reach A Cross Section 2 - Pool 164 163 162 ° 161 w 160 159 158 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 Distance (ft) Baseline MY1 MY2 — — -Approx. Bankfull Cross Section 2 Pool Based on fixed baseline cross sectional area Base MYl MY2 MY3 MY5 MY7 MY+ Record elevation (datum) used 161.7 161.5 161.4 Bankfull Width (ft) 14.3 12.7 11.5 Floodprone Width (ft) >50.1 >50.0 >50.0 Bankfull Mean Depth (ft) 1.5 1.7 1.9 Bankfull MaxDepth (ft) 2.9 3.2 3.1 Low Bank Height (ft) 2.9 3.4 2.5 Bankfull Cross Sectional Area (ft2) 21.5 21.5 21.5 Bankfull Width/Depth Ratio 9.5 7.5 7.1 Bankfull Entrenchment Ratio N/A N/A N/A Bankfull Bank Height Ratio N/A N/A N/A Upstream Downstream Selma Mill Reach A Cross Section 3 - Shallow 164 163 162 ° 161 w 160 159 158 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 Distance (ft) Baseline —MY1 MY2 — — -Approx. Bankfull Floodprone Area Cross Section 3 Shallow Based on fixed baseline cross sectional area Base MYl MY2 MY3 MY5 MY7 MY+ Record elevation (datum) used 160.1 160.2 160.5 Bankfull Width (ft) 12.1 17.1 9.3 Floodprone Width (ft) >50 >50.0 >50 Bankfull Mean Depth (ft) 0.9 0.6 1.1 Bankfull MaxDe th (ft) 1.4 1.4 1.7 Low Bank Height (ft) 1.4 160.1 1.3 Bankfull Cross Sectional Area (ft2) 10.6 10.6 10.6 Bankfull Width/Depth Ratio 13.8 27.7 8.1 Bankfull Entrenchment Ratio >4.1 >2.9 >5.4 Bankfull Bank Height Ratio 1 1.0 0.9 0.8 Upstream Downstream 162 Selma Mill Reach A Cross Section 4 - Pool 161 160 ° ° w 159 OK 158 157 156 0 3 6 9 12 15 Baseline 18 21 24 27 Distance (ft) MY1 MY2 30 33 36 39 42 45 48 — — -Approx. Bankfull Cross Section 4 (Pool) Based on fixed baseline cross sectional area Base MYl MY2 MY3 MY5 MY7 MY+ Record elevation (datum) used 160.0 160.1 160.2 Bankfull Width (ft) 13.2 20.9 19.9 Floodprone Width (ft) >49.8 >49.9 >49.9 Bankfull Mean Depth (ft) 1.4 0.9 0.9 Bankfull MaxDepth (ft) 2.8 2.9 2.7 Low Bank Height (ft) 2.8 2.8 2.4 Bankfull Cross Sectional Area (ft2) 18.2 18.2 18.2 Bankfull Width/Depth Ratio 9.6 24.0 21.7 Bankfull Entrenchment Ratio N/A N/A N/A Bankfull Bank Height Ratio N/A N/A N/A Upstream Downstream Selma Mill Reach A Cross Section 5 - Pool 162 161 160 0 159 w 158 157 OP 156 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 Distance (ft) Baseline MY1 MY2 — — -Approx. Bankfull Cross Section 5(Pool) Based on fixed base ross sectional area Base MYl MY2 MY3 MY5 MY7 MY+ Record elevation (datum) used 158.8 158.7 158.8 Bankfull Width (ft) 12.0 11.7 12.2 Floodprone Width (ft) >50 >50.3 >50.3 Bankfull Mean Depth (ft) 1.3 1.3 1.3 Bankfull MaxDepth (ft) 2.1 2.0 2.1 Low Bank Height (ft) 2.1 2.2 2.2 Bankfull Cross Sectional Area (ft2) 15.3 15.3 15.3 Bankfull Width/Depth Ratio 1 9.4 8.9 9.7 Bankfull Entrenchment Ratio N/A N/A N/A Bankfull Bank Height Ratio N/A N/A N/A Upstream Downstream 162 Selma Mill Reach A Cross Section 6 - Shallow 161 ° a)w 160 159 _ 158 157 156 0 3 6 9 12 15 18 21 Baseline MY1 24 27 30 33 36 39 42 45 48 Distance (ft) MY2 — — -Approx. Bankfull Floodprone Area Cross Section 6 (Shallow) ased on fixedbaseline cross sectional area Base MYl MY3 MY5 MY7 MY+ Record elevation (datum) used 158.7 158.8 Bankfull Width (ft) 13.4 12.7Floodprone P58. Width (ft) >50.2 >50.1 Bankfull Mean Depth (ft) 1.0 1.0Bankfull MaxDepth (ft) 1.6 1.7 . Low Bank Height (ft) 1.6 1.7 1.7 Bankfull Cross Sectional Area (ft2) 12.8 12.8 12.8 Bankfull Width/Depth Ratio 14.0 12.6 12.0 Bankfull Entrenchment Ratio I >3.8 >3.9 >4.0 Bankfull Bank Height Ratio 1 1.0 1.0 1.0 Upstream Downstream Selma Mill Reach A Cross Section 7 - Shallow 162 161 160 ° Ov 159 w —100000 00 158 157 156 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 51 Distance (ft) Baseline MY1 MY2 — — -Approx. Bankfull Floodprone Area Cross Section 7 Shallow Based on fixed baseline cross sectional area Base MYl MY2 MY3 MY5 MY7 MY+ Record elevation (datum) used 158.2 158.3 158.5 Bankfu11 Width (ft) 13.2 13.6 14.5 Floodprone Width (ft) >52.8 >52.9 >52.9 Bankfull Mean Depth (ft) 0.8 0.8 0.7 Bankfull MaxDepth (ft) 1.4 1.4 1.3 Low Bank Height (ft) 1.4 1.4 1.2 Bankfull Cross Sectional Area (ft2) 10.5 10.5 10.5 Bankfull Width/Depth Ratio 16.5 17.6 19.6 Bankfull Entrenchment Ratio >4.0 >3.9 >3.6 Bankfu11 Bank Height Ratiol 1.0 1.0 0.9 Upstream Downstream 161 Selma Mill Reach A Cross Section 8- Pool 160 ° ° w 159 158 �� cr� ��T� 157 155 Na156 0 3 6 9 12 15 Baseline 18 21 24 27 Distance (ft) MY1 MY2 30 33 36 39 42 45 48 — — -Approx. Bankfull Cross Section 8(Pool) Based on fixed baseline bankfiillelevation Base MYl MY2 MY3 MY5 MY7 MY+ Record elevation (datum) used 158.1 158.2 158.2 Bankfull Width (ft) 11.3 12.2 11.7 Floodprone Width (ft) >48.1 >48.2 >48.2 Bankfull Mean Depth (ft) 1.5 1.4 1.4 Bankfull MaxDepth (ft) 2.5 2.9 2.6 Low Bank Height (ft) 2.5 3.0 2.7 Bankfull Cross Sectional Area (ft2) 16.5 16.5 16.5 Bankfull Width/Depth Ratio 7.7 9.0 8.3 Bankfull Entrenchment Ratio N/A N/A N/A Bankfull Bank Height Ratio N/A N/A N/A Upstream Downstream Selma Mill Reach A Cross Section 9 - Shallow 160 159 158 ° — — 157 w 156 155 154 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 Distance (ft) Baseline MY1 MY2 — — -Approx. Bankfull Floodprone Area Cross Section 9 Shallow Based on fixed baseline cross sectional area Base MYl MY2 MY3 MY5 MY7 MY+ Record elevation (datum) used 157.2 157.3 157.3 Bankfull Width (ft) 13.9 18.9 14.2 Floodprone Width (ft) >50.1 >50.1 >50.1 Bankfull Mean Depth (ft) 1.2 0.9 1.1 Bankfull MaxDepth (ft) 2.0 1.9 1.9 Low Bank Height (it) 2.0 1.8 1.7 Bankfull Cross Sectional Area (ft2) 16.3 16.3 16.3 Bankfull Width/Depth Ratio 11.8 22.0 12.5 Bankfull Entrenchment Ratio >3.6 >2.6 >3.5 Bankfull Bank Height Ratiol 1.0 1.0 0.9 Upstream Downstream 160 Selma Mill Reach A Cross Section 10 - Pool 159 158 ° w 157 156 155 154 0 3 6 9 12 15 Baseline 18 21 24 27 Distance (ft) MY1 MY2 30 33 36 39 42 45 48 — — -Approx. Bankfull Cross Section 10 (Pool) Based on fixed baseline cross sectional area Base MYl MY2 MY3 MY5 MY7 MY+ Record elevation (datum) used 156.7 156.7 156.7 Bankfull Width (ft) 13.4 13.4 13.3 Floodprone Width (ft) >50.6 >55.2 >55.2 Bankfull Mean Depth (11) 1.2 1.2 1.3 Bankfull MaxDepth (ft) 2.4 2.5 2.4 Low Bank Height (ft) 2.4 2.6 2.3 Bankfull Cross Sectional Area (ft2) 16.7 16.7 16.7 Bankfull Width/Depth Ratio 10.8 10.7 10.6 Bankfull Entrenchment Ratio N/A N/A N/A Bankfull Bank Height Ratio N/A N/A N/A Upstream Downstream 159 Selma Mill Reach A Cross Section 11 - Pool 158 ° 157 156 w _ 155 154 153 0 3 6 9 12 15 Baseline 18 21 24 27 30 33 36 39 42 45 48 Distance (ft) MY1 MY2 — — -Approx. Bankfull Cross Section 11 Pool Based on fixed baseline cross sectional area Base MYl MY2 MY3 MY5 MY7 MY+ Record elevation (datum) used 155.6 155.6 155.8 Bankfull Width (ft) 13.0 14.2 15.4 Floodprone Width (ft) >50.1 >50.1 >50.1 Bankfull Mean Depth (ft) 1.2 1.1 1.0 Bankfull MaxDepth (ft) 2.2 2.2 2.2 Low Bank Height (ft) 2.2 2.4 2.1 Bankfull Cross Sectional Area (ft2) 15.7 15.7 15.7 Bankfull Width/Depth Ratio 10.8 12.8 15.0 Bankfull Entrenchment Ratio I N/A N/A N/A Bankfull Bank Height Ratio N/A N/A N/A w- f. s°-.' Upstream J � �! a• � � , ram. .. ��_ Downstream Selma Mill Reach A Cross Section 12 - Shallow 159 158 157 ° 156 w 155 154 153 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 Distance (ft) Baseline MY1 MY2 — — -Approx. Bankfull FloodproneArea Cross Section 12 Shallow Based on fixed baseline cross sectional area Base MYl MY2 MY3 MY5 MY7 MY+ Record elevation (datum) used 155.9 155.9 156.2 Bankfull Width (ft) 13.3 13.9 13.7 Floodprone Width (ft) >50 >50.1 >50.1 Bankfull Mean Depth (ft) 1.2 1.1 1.1 Bankfull MaxDepth (ft) 2.1 2.1 2.0 Low Bank Height (ft) 2.1 2.1 1.8 Bankfull Cross Sectional Area (ft2) 15.6 15.6 15.6 Bankfull Width/Depth Ratio 11.4 12.4 12.1 Bankfull Entrenchment Ratio >3.7 >3.6 >3.6 Bankfull Bank Height Ratio 1 1.0 1.0 0.9 Upstream Downstream 158 Selma Mill Reach A Cross Section 13 - Pool 157 156 ° w 155 154 153 152 0 3 6 9 12 15 Baseline 18 21 24 27 Distance (ft) MY1 MY2 30 33 36 39 42 45 48 — — -Approx. Bankfull Cross Section 13(Pool) Based on fixed baseline cross sectional area Base MYl MY2 MY3 MY5 MY7 MY+ Record elevation (datum) used 155.4 155.5 155.3 Bankfull Width (ft) 13.4 14.0 13.6 Floodprone Width (ft) >50 >50.0 >50.0 Bankfull Mean Depth (ft) 1.5 1.4 1.4 Bankfull MaxDepth (ft) 2.7 2.8 2.7 Low Bank Height (ft) 2.7 2.8 2.7 Bankfull Cross Sectional Area (ft2) 19.7 19.7 19.7 Bankfull Width/Depth Ratio 9.2 9.9 9.4 Bankfull Entrenchment Ratio N/A N/A N/A Bankfull Bank Height Ratio I N/A N/A N/A Upstream Downstream Selma Mill Reach B Cross Section 14 - Pool 171 170 169 "00,e ° 168 w 167 166 165 0 3 6 9 12 15 Baseline 18 21 24 27 30 33 36 39 42 45 48 51 Distance (ft) MY1 MY2 — — -Approx. Bankfull Cross Section 14(Pool) Based on fixed baseline bankfiillelevation Base MYl MY2 MY3 MY5 MY7 MY+ Record elevation (datum) used 167.9 167.9 168.1 Bankfull Width (ft) 12.2 17.5 10.3 Floodprone Width (ft) >42.7 >43.4 >43.4 Bankfull Mean Depth (ft) 1.1 0.7 1.3 Bankfull MaxDepth (ft) 2.0 1.9 2.0 Low Bank Height (ft) 2.0 1.7 1.6 Bankfull Cross Sectional Area (ft2) 13.0 13.0 13.0 Bankfull Width/Depth Ratio 11.4 23.7 8.2 Bankfull Entrenchment Ratio N/A N/A N/A Bankfull Bank Height Ratio N/A N/A N/A Upstream Downstream Selma Mill Reach B Cross Section 15 -Shallow 171 170 169 w 167 166 165 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 Distance (ft) Baseline MY1 MY2 — — -Approx. Bankfull Floodprone Area Cross Section 15 Shallow Based on fixed baseline cross sectional area Base MYl MY2 MY3 MY5 MY7 MY+ Record elevation (datum) used 167.8 167.8 167.8 Bankfull Width (ft) 10.5 15.9 20.0 Floodprone Width (ft) >50.4 >50.4 >50.4 Bankfull Mean Depth (ft) 0.8 0.5 0.4 Bankfull MaxDepth (ft) 1.6 1.4 1.4 Low Bank Height (ft) 1.6 1.4 1.3 Bankfull Cross Sectional Area (ft2) 8.6 8.6 8.6 Bankfull Width/Depth Ratio 12.9 29.4 19.0 Bankfull Entrenchment Ratio >4.8 >3.2 >3.9 Bankfull Bank Height Ratiol 1.0 1.0 0.9 Upstream Downstream Selma Mill Reach B Cross Section 16 - Shallow 171 170 169 ° 168 w 167 166 165 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 Distance (ft) Baseline MY1 MY2 — — -Approx. Bankfull Floodprone Area Cross Section 16 1 Shallow Based on fixed baseline bankfiill elevation Base MYl MY2 MY3 MY5 MY7 MY+ Record elevation (datum) used 166.9 167.1 167.2 Bankfull Width (ft) 10.0 13.4 13.2 Floodprone Width (it) >49.8 >50.1 >50.1 Bankfull Mean Depth (it) 0.8 0.6 0.6 Bankfull MaxDepth (ft) 1.4 1.2 1.1 Low Bank Height (ft) 1.4 1.1 0.9 Bankfull Cross Sectional Area (ft2) 8.2 8.2 8.2 Bankfull Width/Depth Ratio 12.3 22.0 21.1 Bankfull Entrenchment Ratio >5.0 >3.7 >3.8 Bankfull Bank Height Ratiol 1.0 1 0.9 1 0.8 Upstream Downstream Selma Mill Reach B Cross Section 17 - Pool 170 169 168 ° 167 ° w 166 165 164 717-1 1 1 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 Distance (ft) Baseline MY1 MY2 — — -Approx. Bankfull Cross Section 17(Pool) Based on fixed baseline cross sectional area Base MYl MY2 MY3 MY5 MY7 MY+ Record elevation (datum) used 166.7 166.9 166.9 Bankfull Width (ft) 10.7 13.1 12.0 Floodprone Width (it) >49.7 >50.0 >50.0 Bankfull Mean Depth (ft) 1.2 1.0 1.0 Bankfull MaxDepth (it) 2.2 2.2 2.2 Low Bank Height (ft) 2.2 1.9 1.9 Bankfull Cross Sectional Area (ft2) 12.6 12.6 12.6 Bankfull Width/Depth Ratio 9.0 13.7 21.1 Banktull Entrenchment Ratio I N/A N/A N/A Bankfull Bank Height Ratio N/A N/A N/A Upstream Downstream Selma Mill Reach B Cross Section 18 - Shallow 169 168 167 ° 166 ° w 165 164 163 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 Distance (ft) —Baseline MY1 — MY2 — — -Approx. Bankfull Floodprone Area Cross Section 18 Shallow Based on fixed baseline bankfiill elevation Base MYl MY2 MY3 MY5 MY7 MY+ Record elevation (datum) used 164.9 165.1 165.1 Bankfull Width (ft) 10.6 12.4 11.3 Floodprone Width (ft) >56 >56.4 >56.4 Bankfull Mean Depth (ft) 0.9 0.8 0.8 Bankfull MaxDepth (ft) 1.5 1.7 1.7 Low Bank Height (ft) 1.5 1.7 1.7 Bankfull Cross Sectional Area (ft2) 9.4 9.4 9.4 Bankfull Width/Depth Ratio 11.8 16.4 14.2 Bankfull Entrenchment Ratiol >5.3 >4.5 >4.9 Bankfull Bank Height Ratiol 1.0 1.0 1.0 Upstream Downstream Selma Mill Reach B Cross Section 19 - Pool 167 166 165 ° 164 6 w 163 162 161 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 Distance (ft) Baseline MY1 MY2 — — -Approx. Bankfull Cross Section 19(Pool) Based on fixed baseline cross sectional area Base MYl MY2 MY3 MY5 MY7 MY+ Record elevation (datum) used 164.9 164.8 164.7 Bankfull Width (ft) 11.1 9.8 9.6 Floodprone Width (ft) >61.1 >61.1 >61.1 Bankfull Mean Depth (ft) 1.2 1.4 1.4 Bankfull MaxDepth (ft) 2.6 3.4 3.1 Low Bank Height (ft) 2.6 3.7 3.5 Bankfull Cross Sectional Area (ft2) 13.5 13.5 13.5 Bankfull Width/Depth Ratio 9.1 7.1 6.8 Bankfull Entrenchment Ratio N/A N/A N/A Bankfull Bank Height Ratio I N/A I N/A I N/A Upstream Downstream Selma Mill Reach B Cross Section 20 - Pool 167 166 165 ° 164 w 163 162 161 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 Distance (ft) Baseline MY1 MY2 — — -Approx. Bankfull Cross Section 20(Pool) Based on fixed baseline cross sectional area Base MYl MY2 MY3 MY5 MY7 MY+ Record elevation (datum) used 163.7 163.7 163.8 Bankfull Width (ft) 7.4 8.1 8.8 Floodprone Width (ft) >50.1 >50.1 >50.1 Bankfull Mean Depth (ft) 0.9 0.8 0.8 Bankfull MaxDe th (ft) 1.5 1.7 1.8 Low Bank Height (ft) 1.5 1.6 1.6 Bankfull Cross Sectional Area (ft2) 6.7 6.7 6.7 Bankfull Width/Depth Ratio 8.2 9.9 11.6 Bankfull Entrenchment Ratio N/A N/A N/A Bankfull Bank Height Ratio N/A I N/A I N/A Upstream Downstream Selma Mill Reach B Cross Section 21 - Shallow 168 167 166 ° 165 ID w 164 163 _ _ _ _ _ _ _ _ _ _ 162 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 Distance (ft) Baseline MY1 MY2 — — -Approx. Bankfull Floodprone Area Cross Section 21 1 Shallow Based on fixed baseline cross sectional area Base MYl MY2 MY3 MY5 MY7 MY+ Record elevation (datum) used 163.9 163.9 163.9 Bankfull Width (ft) 10.1 11.0 10.6 Floodprone Width (ft) >50.3 >50.2 >50.2 Bankfull Mean Depth (ft) 0.7 0.6 0.6 Bankfull MaxDepth (ft) 1.0 1.0 0.9 Low Bank Height (ft) 1.0 0.8 1.1 Bankfull Cross Sectional Area (ft2) 6.6 6.6 6.6 Bankfull Width/Depth Ratio 15.4 18.3 17.0 Bankfull Entrenchment Ratio >5.0 >4.6 >4.7 Bankfull Bank Height Ratio 1.0 0.8 1.2 Upstream Downstream Selma Mill Reach B Cross Section 22 - Shallow 166 165 164 ° 163 m ID w _ _ _ _ 162 161 160 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 Distance (ft) Baseline MY1 MY2 — — -Approx. Bankfull Floodprone Area Cross Section22 1 Shallow Based on fixed baseline cross sectional area Base MYl MY2 MY3 MY5 MY7 MY+ Record elevafion (datum) used 162.6 162.7 162.7 Bankfull Width (ft) 11.7 14.6 13.7 Floodprone Width (ft) >50.4 >50.2 >50.2 Bankfull Mean Depth (ft) 0.8 0.7 0.7 Bankfull MaxDepth (ft) 1.3 1.2 1.3 Low Bank Height (ft) 1.3 1.1 1.1 Bankfull Cross Sectional Area (ft2) 9.7 9.7 9.7 Bankfull Width/Depth Ratio 14.1 22.1 19.3 Bankfull Entrenchment Ratio 1 >4.3 >3.4 >3.7 Bankfull Bank Height Ratiol 1.0 0.9 0.9 Upstream Downstream Selma Mill Reach B Cross Section 23 - Pool 165 164 163 ° 162 w 161 160 159 0 3 6 9 12 15 Baseline 18 21 24 27 30 33 36 39 42 45 48 Distance (ft) MY1 MY2 — — -Approx. Bankfull Cross Section 23(Pool) Based on fixed baseline cross sectional area Base MYl MY2 MY3 MY5 MY7 MY+ Record elevation (datum) used 162.0 162.1 162.1 Bankfull Width (ft) 11.0 12.4 11.3 Floodprone Width (ft) >48 >50.3 >50.3 Bankfull Mean Depth (ft) 1.1 1.0 1.1 Bankfull MaxDepth (ft) 2.0 2.4 2.2 Low Bank Height (ft) 2.0 2.3 2.0 Bankfull Cross Sectional Area (ft2) 12.5 12.5 12.5 Bankfull Width/Depth Ratio 9.8 12.4 10.2 Bankfull Entrenchment Ratio I N/A N/A N/A Bankfull Bank Height Ratio N/A I N/A N/A Upstream Downstream Selma Mill Reach B Cross Section 24 - Pool 162 161 160 ° 159 w 158 157 156 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 Distance (ft) Baseline MY1 MY2 — — -Approx. Bankfull Cross Section 24 Pool Based on fixed baseline cross sectional area Base MYl MY2 MY3 MY5 MY7 MY+ Record elevation (datum) used 158.4 158.5 158.5 Bankfull Width (ft) 11.3 12.8 13.4 Floodprone Width (ft) >44.4 >44.4 >44.4 Bankfull Mean Depth (ft) 1.0 0.8 0.8 Bankfull MaxDe th (ft) 1.7 1.8 1.8 Low Bank Height (ft) 1.7 1.8 1.7 Bankfull Cross Sectional Area (ft2) 10.7 10.7 10.7 Bankfull Width/Depth Ratio 11.8 15.4 16.7 Bankfull Entrenchment Ratio N/A N/A N/A Bankfull Bank Height Ratio I N/A N/A I N/A Upstream Downstream Selma Mill Reach B Cross Section 25 - Shallow 162 161 160 ° 159 w __ 158 157 156 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 Distance (ft) Baseline MY1 MY2 — — -Approx. Bankfull Floodprone Area Cross Section 25 Shallow Based on fixed baseline cross sectional area Base MYl MY2 MY3 MY5 MY7 MY+ Record elevation (datum) used 158.4 158.4 158.4 Bankfull Width (ft) 10.3 10.3 10.5 Floodprone Width (it) >50 >50.1 >50.1 Bankfull Mean Depth (ft) 0.7 0.7 0.7 Bankfull MaxDepth (it) 1.3 1.2 1.3 Low Bank Height (ft) 1.3 1.3 1.3 Bankfull Cross Sectional Area (ft2) 7.0 7.0 7.0 Bankfull Width/Depth Ratio 15.1 15.3 15.8 Bankfull Entrenchment Ratio >4.8 >4.8 >4.8 Bankfull Bank Height Ratiol 1.0 1.0 1.0 Upstream Downstream Selma Mill Reach B Cross Section 26 -Shallow 161 160 159 ° 158 w 157 156 155 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 Distance (ft) Baseline MY1 MY2 — — -Approx. Bankfull Floodprone Area Cross Section 26 Shallow Based on fixed baseline cross sectional area Base MYl MY2 MY3 MY5 MY7 MY+ Record elevation (datum) used 157.8 157.8 157.9 Bankfull Width (ft) 9.2 10.0 10.5 Floodprone Width (ft) >50.3 >50.3 >50.3 Bankfull Mean Depth (ft) 0.8 0.7 0.7 Bankfull MaxDe th (ft) 1.3 1.3 1.3 Low Bank Height (ft) 1.3 1.3 1.2 Bankfull Cross Sectional Area (ft2) 7.1 7.1 7.1 Bankfull Width/Depth Ratio 11.9 14.0 15.5 Bankfull Entrenchment Ratio >5.5 >5.0 >4.8 Bankfull Bank Height Ratio 1 1.0 1.0 1 0.9 Upstream w� Downstream Selma Mill Reach C Cross Section 27 - Run (HWV) 172 171 170 ° 169 w 168 167 166 5 8 11 14 17 20 Baseline 23 26 29 32 35 38 41 44 47 50 53 Distance (ft) MY1 MY2 — — -Approx. Bankfull Cross Section 27 Based on fixed baseline cross sectional area Base I MYl I M7 MY3 I MY5 MY7 MY+ Record elevation (datum) use (Headwater Valley Restoration) No Morphological Parameters were determined for HW V Reach C Bankfull Width (ft) Floodprone Width (ft) Bankfull Mean Depth (ft) Bankfull MaxDe th (ft) Low Bank Height (ft) Bankfull Cross Sectional Area (ft2) Bankfull Width/Depth Ratio Bankfull Entrenchment Ratio Bankfull Bank Height Ratio 11 ngfranm nnw n s4 rpa m 167 Selma Mill Reach C Cross Section 28 - Run (HWV) 166 165 ° 164 w 163 _ _ _ _ _ _ _ _ _ _ _ WON 162 161 5 8 11 14 17 20 Baseline 23 26 29 32 35 38 41 44 47 50 53 Distance (ft) MY1 MY2 — — -Approx. Bankfull Cross Section 28 (HWV) Based on fixed baseline cross sectional area Base I MYl I MY2 I MY3 I MYS I MY7 MY+ Record elevation (datum) used (Headwater Valley Restoration) No Morphological Parameters were determined for HW V Reach C Bankfull Width (ft) Floodprone Width (ft) Bankfull Mean Depth (ft) Bankfull MaxDe th (ft) Low Bank Height (ft) Bankfull Cross Sectional Area (ft2) Bankfull Width/Depth Ratio Bankfull Entrenchment Ratio Bankfull Bank Height Ratio Table 8. Baseline Stream Data Summary Selma Mill Mitigation Site - Reach A: 3,324 feet Parameter Gauge Regional Curve Pre -Existing Condition* Reference Reach(es) Data Design Monitoring Baseline Dimension and Substrate - Shallow Only LL UL Eq. Min Mean Med Max SD n Min Mean Med Max SD n Min Med Max Min Mean Med Max SD n Bankfull Width (ft) --- --- --- 267.0 --- 425.0 583.0 --- 2 --- --- 10.9 --- --- --- --- 13.0 --- 12.1 13.2 13.3 13.9 0.6 6 Floodprone Width (ft) 32.0 --- 36.0 40.0 --- 2 --- --- 50.0 --- --- --- --- >50 --- 50.0 50.6 50.2 52.8 1.1 6 Bankfull Mean Depth (ft) --- --- --- 1.6 --- 2.0 2.4 --- 2 --- --- 1.0 --- --- --- --- 1.3 --- 0.8 1.0 1.0 1.2 0.2 6 'Bankfull Max Depth ft 2.5 --- 3.0 3.5 --- 2 --- --- 1.7 --- --- --- --- 1.7 --- 1.4 1.7 1.7 2.1 0.3 6 Bankfull Cross Sectional Area ftZ -- -- --- 20.2 128.5 1 36.8 1 1 2 11.0 1 --- I --- 16.5 --- 10.5 113.2 113.0 16.3 2.4 6 Width/Depth Ratio 6.4 7.0 7.6 2 11.9 10.2 11.4 13.5 13.6 16.5 1.8 6 Entrenchment Ratio 2.1 >2.2 2 >2.2 >2.2 3.6 3.8 3.8 4.1 0.2 6 'Bank Height Rati1 1.0 1 1.0 1 1.0 1 1.0 1 0.0 6 Profile Shallow Length (ft) --- --- --- --- --- --- 4 --- 11.5 19.9 --- --- 13 30.5 48 4.0 22.2 15.3 71.1 16.1 43 Shallow Slope (ft/ft) --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- -0.02151 0.00759 0.00652 0.05285 0.01491 43 Pool Length (ft) --- --- --- --- --- --- 6.9 --- 17.1 21.6 --- --- 13 21 29 8.8 26.8 26.7 55.8 11.3 43 Pool Max depth (ft) --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- 2.1 2.6 2.6 4.0 0.4 43 Pool Spacing (ft) --- --- --- --- --- --- 40.3 --- 63.1 109.8 --- --- 48 103.5 159 27.6 80.6 60.1 170.2 37.8 42 Pattern Channel Beltwidth (ft) --- --- --- --- --- --- 41.2 --- 42.3 43.5 --- --- 46 52 58 46 --- 52 58 --- --- Radius of Curvature (ft) --- --- --- --- --- --- 13.1 --- 18.4 24.6 --- --- 27 36.5 46 27 --- 36.5 46 --- Rc:Bankfull width (ft/ft) --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- -- --- Meander Wavelength (ft) --- --- --- --- --- --- 49.4 --- 50.7 64.9 --- --- 89 120.5 152 89 --- 120.5 152 --- --- Meander Width Ratio --- --- --- --- --- --- 3.8 3.9 4 --- --- 3.5 4 4.5 3.5 --- 4 4.5 --- --- Transport parameters Reach Shear Stress (competency) Ib/f2 --- --- Max part size (mm) mobilized at bankfull -- Stream Power (transport capacity) W/mZ Additional Reach Parameters Rosgen Classification G5c/B5 / B5 E5 E5 E5 Bankfull Velocity (fps) --- --- Bankfull Discharge (cfs) --- --- --- 27 Valley length (ft) 1137 / 1545 285 2674 Channel Thalweg length (ft) 1146 / 1584 375 3342 3419 Sinuosity (ft) 1.01 / 1.03 1.32 1.25 1.25 Water Surface Slope (Channel) (ft/ft) -- 0.0023 --- --- Channel slope (ft/ft) 0.0004 / 0.0021 0.0025 0.002 0.0022 3Bankfull Flood lain Area acres --- --- --- --- 4% of Reach with Eroding Bank --- --- Channel Stability or Habitat Metric Biological or Othe Shaded cells indicate that these will typically not be filled in. * -Reach was split into 2 segments for the purpose of pre-existing data collection. 1 - The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2 -For projects with a proximal USGS gauge in -line with the project reach (added bankfull verification -rue). 3. Utilizing XS measurement data produce an estimate of the bankfull floodplain area in acres, which should be the area from the top of bank to the toe of the terrace riser/slope. 4 -Proportion of reach exhibiting banks that are eroding based on the visual survey for comparison to monitoring data; 5. Of value/needed only if the n exceeds 3 Table 8. Baseline Stream Data Summary Selma Mill Mitigation Site - Reach B: 2,572 feet Parameter Gauge Regional Curve Pre -Existing Condition** Reference Reach(es) Data Design Monitoring Baseline Dimension and Substrate - Shallow Only LL UL Eq. Min Mean Med Max SD n Min Mean Med Max SD n Min Med Max Min Mean Med Max SD n Bankfull Width (ft) --- --- --- 7.3 8.6 9.2 9.4 1.2 3 --- --- 10.9 --- --- --- --- 10.0 --- 9.2 10.3 10.3 11.7 0.8 7.0 Floodprone Width (ft) 8.0 11.7 13.2 14.0 3.3 3 --- --- 50.0 --- --- --- --- >50 --- 49.8 51.0 50.3 56.0 2.2 7.0 Bankfull Mean Depth (ft) --- --- --- 0.9 1.1 1.2 1.2 0.2 3 --- --- 1.0 --- --- --- --- 0.9 --- 0.7 0.8 0.8 0.9 0.1 7.0 'Bankfull Max Depth ft 1.1 1.5 1.7 1.8 0.4 3 --- --- 1.7 --- --- --- --- 1.3 --- 1.0 1.3 1.3 1.6 0.2 7.0 Bankfull Cross Sectional Area ftZ -- -- --- 8.7 9.6 18.7 1 11.4 1 1.6 1 3 11.0 9.4 --- 6.6 18.1 18.2 9.7 1.2 7.0 Width/Depth Ratio 6.2 8.0 7.8 9.9 1.9 3 11.9 10.7 11.8 13.4 12.9 15.4 1.5 7.0 Ratio EntrenEHeh 1.1 1.3 1.4 1.5 0.2 3 >2.2 >2.2 4.3 5.0 5.0 5.5 0.4 7.0 'Bank Rati 1.0 1.0 1.0 1.0 0.0 7.0 Profile Shallow Length (ft) --- --- --- --- --- --- 4 --- 11.5 19.9 --- --- 8 18.5 29 4.0 15.8 14.7 41.1 9.9 50 Shallow Slope (ft/ft) --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- -0.01354 0.00909 0.00443 0.04809 0.01066 50 Pool Length (ft) --- --- --- --- --- --- 6.9 --- 17.1 21.6 --- --- 5 14.5 24 4.7 17.5 15.7 35.6 6.3 43 Pool Max depth (ft) --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- 0.6 1.7 1.8 2.8 0.7 40 Pool Spacing (ft) --- --- --- --- --- --- 40.3 --- 63.1 109.8 --- --- 43 91 139 14.4 60.7 51.8 119.1 26.7 42 Pattern Channel Beltwidth (ft) --- --- --- --- --- --- 41.2 --- 42.3 43.5 --- --- 26 36.5 47 26 --- 36.5 47 --- Radius of Curvature (ft) --- --- --- --- --- --- 13.1 --- 18.4 24.6 --- --- 19 27.5 36 19 --- 27.5 36 --- Rc:Bankfull width (ft/ft) --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- Meander Wavelength (ft) --- --- --- --- --- --- 49.4 --- 50.7 64.9 --- --- 70 90.5 111 70 --- 90.5 111 --- --- Meander Width Ratio --- --- --- --- --- --- 3.8 3.9 4 --- --- 2.6 3.7 4.7 2.6 --- 3.65 4.7 --- --- Transport parameters Reach Shear Stress (competency) Ib/f2 --- --- Max part size (mm) mobilized at bankfull -- Stream Power (transport capacity) W/mZ Additional Reach Parameters Rosgen Classification G5 E5 E5 E5 Bankfull Velocity (fps) --- --- Bankfull Discharge (cfs) --- --- --- 15 Valley length (ft) 1392 / 352 / 394 285 2204 Channel Thalweg length (ft) 1414 / 382 / 405 375 2619 2695 Sinuosity (ft) 1.02 / 1.09 / 1.03 1.32 1.19 1.19 Water Surface Slope (Channel) (ft/ft) -- 0.0023 --- --- Channel slope (ft/ft) 0.0036 / 0.0030 / 0.003 0.0025 0.003 0.0045 3Bankfull Flood lain Area acres --- --- --- --- 4% of Reach with Eroding Bank --- --- Channel Stability or Habitat Metric Biological or Othe Shaded cells indicate that these will typically not be filled in. ** -Reach was split into 3 segments for the purpose of pre-existing data collection. 1 - The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2 -For projects with a proximal USGS gauge in -line with the project reach (added bankfull verification -rue). 3. Utilizing XS measurement data produce an estimate of the bankfull floodplain area in acres, which should be the area from the top of bank to the toe of the terrace riser/slope. 4 -Proportion of reach exhibiting banks that are eroding based on the visual survey for comparison to monitoring data; 5. Of value/needed only if the n exceeds 3 Table 9. Cross Section Morphology Data Table Selma Mill - Reach A (3,324 feet) Cross Section 1 (Shallow) Cross Section 2 (Pool) Cross Section 3 (Shallow) Cross Section 4 (Pool) Cross Section 5 (Pool) Based on fixed baseline cross sectional area* Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Record elevation (datum) used 161.8 161.8 162.0 161.7 161.5 161.4 160.1 160.2 160.5 160.0 160.1 160.2 158.8 158.7 158.8 Bankfull Width (ft) 13.2 13.1 13.7 14.3 12.7 11.5 12.1 17.1 9.3 13.2 20.9 19.9 12.0 11.7 12.2 Floodprone Width (ft) >50.2 >50.2 >50.2 >50.1 >50.0 >50.0 >50 >50.0 >50 >49.8 >49.9 >49.9 >50 >50.3 >50.3 Bankfull Mean Depth (ft) 1.0 1.0 1.0 1.5 1.7 1.9 0.9 0.6 1.1 1.4 0.9 0.9 1.3 1.3 1.3 Bankfull Max Depth (ft) 1.8 1.8 1.9 2.9 3.2 3.1 1.4 1.4 1.7 2.8 2.9 2.7 2.1 2.0 2.1 Low Bank Height (ft) 1.8 1.8 1.8 2.9 3.4 2.5 1.4 160.1 1.3 2.8 2.8 2.4 2.1 2.2 2.2 Bankfull Cross Sectional Area(ft) 13.1 13.1 13.1 21.5 21.5 21.5 10.6 10.6 10.6 18.2 18.2 18.2 15.3 15.3 15.3 Bankfull Width/Depth Ratio 13.3 13.2 14.4 9.5 7.5 7.1 13.8 27.7 8.1 9.6 24.0 21.7 9.4 8.9 9.7 Bankfull Entrenchment Ratio >3.8 >3.8 >3.7 N/A N/A N/A >4.1 >2.9 >5.4 N/A N/A N/A N/A N/A N/A Bankfull Bank Height Ratio 1.0 1.0 1.0 N/A N/A N/A 1.0 0.9 0.8 N/A N/A N/A N/A N/A N/A d50 (mm) Cross Section 6 (Shallow) Cross Section 7 (Shallow) Cross Section 8 (Pool) Cross Section 9 (Shallow) Cross Section 10 (Pool) Based on fixed baseline cross sectional area* Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Record elevation (datum) used 158.7 158.8 158.8 158.2 158.3 158.5 158.1 158.2 158.2 157.2 157.3 157.3 156.7 156.7 156.7 Bankfull Width (ft) 13.4 12.7 12.4 13.2 13.6 14.5 11.3 12.2 11.7 13.9 18.9 14.2 13.4 13.4 13.3 Floodprone Width (ft) >50.2 >50.1 >50.1 >52.8 >52.9 >52.9 >48.1 >48.2 >48.2 >50.1 >50.1 >50.1 >50.6 >55.2 >55.2 Bankfull Mean Depth (ft) 1.0 1.0 1.0 0.8 0.8 0.7 1.5 1.4 1.4 1.2 0.9 1.1 1.2 1.2 1.3 Bankfull Max Depth (ft) 1.6 1.7 1.7 1.4 1.4 1.3 2.5 2.9 2.6 2.0 1.9 1.9 2.4 2.5 2.4 Low Bank Height (ft) 1.6 1.7 1.7 1.4 1.4 1.2 2.5 3.0 2.7 2.0 1.8 1.7 2.4 2.6 2.3 Bankfull Cross Sectional Area (ft) 12.8 12.8 12.8 10.5 10.5 10.5 16.5 16.5 16.5 16.3 16.3 16.3 16.7 16.7 16.7 Bankfull Width/Depth Ratio 14.0 12.6 12.0 16.5 17.6 19.6 7.7 9.0 8.3 11.8 22.0 12.5 10.8 10.7 10.6 Bankfull Entrenchment Ratio >3.8 >3.9 >4.0 >4.0 >3.9 >3.6 N/A N/A N/A >3.6 >2.6 >3.5 N/A N/A N/A Bankfull Bank Height Ratio 1.0 1.0 1.0 1.0 1.0 0.9 N/A N/A N/A 1.0 1.0 0.9 N/A N/A N/A d50 mm Cross Section 11 (Pool) Cross Section 12 (Shallow) Cross Section 13 (Pool) Based on fixed baseline cross sectional area* Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Record elevation (datum) used 155.6 155.6 155.8 155.9 155.9 156.2 155.4 155.5 155.3 Bankfull Width ft 13.0 14.2 15.4 13.3 13.9 13.7 13.4 14.0 13.6 Floodprone Width ft >50.1 >50.1 >50.1 >50 >50.1 >50.1 >50 >50.0 >50.0 Bankfull Mean Depth ft 1.2 1 1.1 1.0 1.2 1.1 1.1 1.5 1.4 1.4 Bankfull Max Depth ft 2.2 1 2.2 2.2 2.1 2.1 2.0 2.7 2.8 2.7 Low Bank Height ft 2.2 2.4 2.1 2.1 2.1 1.8 2.7 2.8 2.7 Bankfull Cross Sectional Area(ft) 15.7 15.7 15.7 15.6 15.6 15.6 19.7 19.7 19.7 Bankfull Width/Depth Ratio 10.8 12.8 15.0 11.4 12.4 12.1 9.2 9.9 9.4 Bankfull Entrenchment Ratio N/A N/A N/A >3.7 >3.6 >3.6 N/A N/A N/A Bankfull Bank Height Ratio N/A N/A N/A 1.0 PT 0.9 N/A N/A N/A d50 mm * Annual measurements are based on fixed baseline cross sectional area. Table 9. Cross Section Morphology Data Table Selma Mill - Reach B (2,572 feet) Reach C (875 Feet) Cross Section 14 (Pool) Cross Section 15 (Shallow) Cross Section 16 (Shallow) Cross Section 17 (Pool) Cross Section 18 (Shallow) Based on fixed baseline cross sectional area* Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Record elevation (datum) used 167.9 167.9 168.1 167.8 167.8 167.8 166.9 167.1 167.2 166.7 166.9 166.9 164.9 165.1 165.1 Bankfull Width (ft) 12.2 17.5 10.3 10.5 15.9 20.0 10.0 13.4 13.2 10.7 13.1 12.0 10.6 12.4 11.3 Floodprone Width (ft) >42.7 >43.4 >43.4 >50.4 >50.4 >50.4 >49.8 >50.1 >50.1 >49.7 >50.0 >50.0 >56 >56.4 >56.4 Bankfull Mean Depth (ft) 1.1 0.7 1.3 0.8 0.5 0.4 0.8 0.6 0.6 1.2 1.0 1.0 1 0.9 0.8 0.8 Bankfull Max Depth (ft) 2.0 1.9 2.0 1.6 1.4 1.4 1.4 1.2 1.1 2.2 2.2 2.2 1.5 1.7 1.7 Low Bank Height (ft) 2.0 1.7 1.6 1.6 1.4 1.3 1.4 1.1 0.9 2.2 1.9 1.9 1.5 1.7 1.7 Bankfull Cross Sectional Area (ft) 13.0 13.0 13.0 8.6 8.6 8.6 8.2 8.2 8.2 12.6 12.6 12.6 9.4 9.4 9.4 Bankfull Width/Depth Ratio 11.4 23.7 8.2 12.9 29.4 19.0 12.3 22.0 21.1 9.0 13.7 21.1 11.8 16.4 14.2 M Bankfull Entrenchment Ratio N/A N/A N/A >4.8 >3.2 >3.9 >5.0 >3.7 1 >3.8 N/A N/A N/A >5.3 >4.5 1 >4.9 Bankfull Bank Height Ratio N/A N/A N/A 1.0 1.0 0.9 1.0 0.9 0.8 N/A N/A N/A 1.0 d50 (mm) T I -I I Cross Section 19 (Pool) Cross Section 20 (Pool) Cross Section 21 (Shallow) Cross Section 22 (Shallow) Cross Section 23 (Pool) Based on fixed baseline cross sectional area* Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Record elevation (datum) used 164.9 164.8 164.7 163.7 163.7 163.8 163.9 163.9 163.9 162.6 162.7 162.7 162.0 162.1 162.1 Bankfull Width (ft) 11.1 9.8 9.6 7.4 8.1 8.8 10.1 11.0 10.6 11.7 14.6 13.7 11.0 12.4 11.3 Floodprone Width (ft) >61.1 >61.1 >61.1 >50.1 >50.1 >50.1 >50.3 >50.2 >50.2 >50.4 >50.2 >50.2 >48 >50.3 >50.3 Bankfull Mean Depth (ft) 1.2 1.4 1.4 0.9 0.8 0.8 0.7 0.6 0.6 0.8 0.7 0.7 1.1 1.0 1.1 Bankfull Max Depth (ft) 2.6 3.4 3.1 1.5 1.7 1.8 1.0 1.0 0.9 1.3 1.2 1.3 2.0 2.4 2.2 Low Bank Height (ft) 2.6 3.7 3.5 1.5 1.6 1.6 1.0 0.8 1.1 1.3 1.1 1.1 2.0 2.3 2.0 Bankfull Cross Sectional Area (ft) 13.5 13.5 13.5 6.7 6.7 6.7 6.6 6.6 6.6 9.7 9.7 9.7 12.5 12.5 12.5 Bankfull Width/Depth Ratio 9.1 7.1 6.8 8.2 9.9 11.6 15.4 18.3 17.0 14.1 22.1 19.3 9.8 12.4 10.2 Bankfull Entrenchment Ratio N/A N/A N/A N/A N/A N/A >5.0 >4.6 >4.7 >4.3 >3.4 >3.7 N/A N/A N/A Bankfull Bank Height Ratio N/A N/A N/A N/A N/A N/A LL 1.0 0.8 1.2 1.0 0.9 0.9 N/A N/A N/A d50 mm Cross Section 24 (Pool) Cross Section 25 (Shallow) Cross Section 26 (Shallow) Cross Section 27 (HWV) Cross Section 28 (HWV) Based on fixed baseline cross sectional area* Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Record elevation (datum) used 158.4 158.5 158.5 158.4 158.4 158.4 157.8 157.8 157.9 (Headwater Valley Restoration) No Morphological Parameters were determined for HWV Reach C (Headwater Valley Restoration) No Morphological Parameters were determined for HWV Reach C Bankfull Width ft 11.3 12.8 13.4 10.3 10.3 10.5 9.2 10.0 10.5 Floodprone Width ft >44.4 >44.4 >44.4 >50 >50.1 >50.1 >50.3 >50.3 >50.3 Bankfull Mean Depth ft 1.0 0.8 0.8 1 1 0.7 0.7 0.7 0.8 0.7 0.7 Bankfull Max Depth ft 1.7 1.8 1.8 1.3 1.2 1.3 1.3 1.3 1.3 Low Bank Height ft 1.7 1.8 1.7 1.3 1.3 1.3 1.3 1.3 1.2 Bankfull Cross Sectional Area(ft) 10.7 10.7 10.7 7.0 7.0 7.0 7.1 7.1 7.1 Bankfull Width/Depth Ratio 11.8 15.4 16.7 15.1 15.3 15.8 11.9 14.0 15.5 Bankfull Entrenchment Ratio N/A N/A N/A >4.8 >4.8 >4.8 >5.5 >5.0 >4.8 Bankfull Bank Height Ratio N/A N/A N/A 1.0 1.0 1.0 1.0 1 1.0 0.9 d50 mm * Annual measurements are based on fixed baseline cross sectional area. ReachTable 10. Stream Reach Data Summary Selma Mill - Dimension and Substrate -Shallow only Bank -full Width (ft) Floodprone Width Bankfull Mean Depth 'Bank -full Max Depth Low Bank Height Width/Depth Ratio Entrenchment 'Bank Height Ratis Shallow Length ShallowSlope Pool Length®m Pool Maxclepth Pool Spacing - - - - - - - - - - - - - - - - - - - - - - - - Radius of Curvature (ft) • ®®®®®® Meander Wavelength (ft) Width Ratio AdditionalMeander Reach Parameters Rosgen Classification Channel Thalweg length (ft) WaterSinuosity - Slope Channel ..- of Reach with Eroding Bankn Channel2% Habitat - Biological Other Shaded cells indicate that these will typically not be filled in. 1 = The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2 = Proportion of reach exhibiting banks that are eroding based on the visual survey from visual assessment table 3 = Riffle, Run, Pool, Glide, Step; Silt/Clay, Sand, Gravel, Cobble, Boulder, Bedrock; dip = max pave, disp = max subpave 4. = Of value/needed only if the n exceeds 3 Table 10. Stream Reach Data Summary Selma Mill - Reach B (2,572 feet) Dimension and Substrate -Shallow only Bank -full Width (ft) Floodprone Width Bankfull Mean Depth 'Bank -full Max Depth Low Bank Height Bank -full Cross Sectional Area (ft2) Width/Depth Ratio Entrenchment Ratio 'Bank Height Ratio Shallow Length (ft) Shallow Slope (ft/ft) Pool LengthPool Max depth (ft) Pool Spacing (ft) - - - - - - - - - - - - - - - - - - - - - - - - Radius of Curvature (ft) • ®®®®®® Meander Wavelength (ft) Width Ratio AdditionalMeander Reach Parameters Rosgen Classification Channel Thalweg length (ft) WaterSinuosity - Slope Channel ..- ��- of Reach with Eroding Bankn Channel2% Habitat - Biological Other Shaded cells indicate that these will typically not be filled in. 1 = The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2 = Proportion of reach exhibiting banks that are eroding based on the visual survey from visual assessment table 3 = Riffle, Run, Pool, Glide, Step; Silt/Clay, Sand, Gravel, Cobble, Boulder, Bedrock; dip = max pave, disp = max subpave 4. = Of value/needed only if the n exceeds 3 Appendix E Hydrology Data Table 11. 2019 Rainfall Summary Month Average Normal Limits Johnston County Airport Station Precipitation 30 Percent 70 Percent January 4.24 3.18 4.95 2.35 February 3.66 2.46 4.37 4.07 March 4.57 3.38 5.36 3.05 April 3.24 1.93 3.93 5.52 May 4.16 2.83 4.97 2.52 June 4.14 2.63 5.00 6.17 July 5.14 3.37 6.17 11.31 August 4.58 2.97 5.51 1.64 September 4.54 2.15 5.54 5.34 October 3.16 1.75 3.89 --- November 2.95 1.81 3.57 --- December 3.05 1.96 3.67 --- Total 47.43 30.42 56.93 41.97 Table 12. Documentation of Significant Flow Events kfull umbumber of Year aNEvents Maximum Bankfull Height (ft) Estimated Date of Highest Event Crest Gauge 1 (Reach A) M Y12018 12 0.90 9/ 17/2018 MY2 2019 13 2.12 7/ 12/2019 Crest Gauge 2 (Reach B) MY12018 3 0.35 11/13/2018 Y22019 4 1.75 8/14/2019 iik Max Consecutive Flow Days Number MowEvents Crest Gauge 3 (Reach C - Headwater Valley Restoration) MYl 2018* 38 12 MY2 2019 120 10 *MY1 data (April 5 - Nov 29, 2018) was updated to incorporate elevation of downstream riffle to calculate stream flow Crest Gauge Reading Photos Crest Gauge 1 (Reach A) — Wrack Line Crest Gauge 2 (Reach B) — 1.75 feet MY2 2019 Selma Mill Crest Gauge 3 (HWV Reach C) 14 12 10 t CL (D $ L 6 4 2 -- — . . J n Jul n-- 0 n LIn I I nnE, 0 I J F M A M J J A S Months Rainfall CG3 Bed — — — — IDS Riffle Elevation