Loading...
HomeMy WebLinkAboutWQ0040918_Site Plans/Maps_20191021co 0 0 0 W .91 0, L L.L 0 0 Q / 0 Q U U U L.� U C O L c 0 n Q / U W O IY n / OWNER: MURPHY-BROWN LLC PO BOX 856 WARSAW NC 28398 (910) 293-3434 / (910) 293-3138 (FAX) DESIGN ENGINEER: JOSHUA OUTLAW AG PROTEIN TRAILER WASH SITE PLANS PROJECT LOCATION: MAGNOLIA, DUPLIN COUNTY, NC SHEET INDEX: 1 COVER SHEET 2 OVERALL SITE/UTILITIES PLAN 3 SHOP GRADING PLAN 4 LAGOON AND WASH BAY GRADING PLAN 5 DETAILS SITE DATA OWNER: MURPHY FARMS, INC (MURPHY FARMS, INC IS A WHOLLY OWNED SUBSIDIARY OF MURPHY-BROWN LLC) SITE ADDRESS: 420 BONHAM RD MAGNOLIA, NC 28453 PARCEL # : 12-970 0 SITE o o • z z o z o SONNgM Co RD Ix WAYCROSS RD VICINITY MAP (NOT TO SCALE) 12 q � o N w F- w Z O N w � wLLJ O V ry U O O p Q Lo V I I • 0 AG PROTEIN COVER SHEET m 12 co N 0 U ,o cn cn c 0 L n a / 0 Q U a a a� c 0 L 0 n Q cn U W D O Ir n / �F �F �F �F �F �F �F I � I �F �F I�F �F I�F �F �F I DRIVEWAY APRON TO BE PAVED TO BACK OF DITCH SLOPE GATE 1 1 1 PARKING --��� 1 STAGING/ � / — — — AREA (90 x50)oo _ — / u ,5 \ EXISTING ANIMAL \ WASTE LAGOON 0 �I►` I --I --I --I --I --I --I --I --I --I --I --� �!—�I —I --I --I --I SHOP PAD ELEV=105.30 DISPATCH OFFICE LEV= LL IJLnlNu PAD 103.00 V� X—x—X—k—x—X—X—x—X—x—X—X_y^ / < ' jr A fi is _ _ ss — ss- 100' WELL SETBA cn --—� il WASH W BAY I EXISTING ANIMAL WASTE LAGOON � I w I I I / JA 1BPR TB \ PRIMARY / STAGE / (90 DAYS / STORAGE) 2ND STAGE / \ \(90 DAYS STORAGE) / I SURFACE WATER DITCH AND 100' \ §ETBACK \ kXX.IL X1 k kX y 40 20 0 40 iiiia SCALE: 1 INCH=40 FEET O O 00 Ln w � O O cv E~ W q � � w � \ N Z w N ~ W \� w � moo O LLI C3 W J cy N d w °' °' M w Q cq Lo rn O AG PROTEIN OVERALL SITE PLAN m 0 12 n rn 0 N rn 0 ,o 3 cn c cn c 0 L n Q / Q U _a v a L� N c 0 L O Q / cn U w D 0 ril / GATE DRIVEWAY APRON TO BE PAVED TO BACK OF DITCH SLOPE 60 LF 18" CPP INV IN=112.80 \ INV OUT=112.65 SLOPE © 0.25% J � J 101 4Lo I I I w I I I I cp X S J or — — SWALE ® 1.69% 1 � - t ir SHOP /P/4D ELEV=105 Oj /1oR /DISPATCH OFFICE I U L L I .i L/�\ I V LJ PAD ELEV=103.00 i f i 6" DRAIN TILE @ 0.25% START INV=89.00 IVIG I nuu IJJGU: I IIN CUT FILL SHOP BUILDING PAD 840 1440 WASH BAY BUILDING PAD 0 330 LAGOON 3965 3220 FILL NEEDED 185 1. ALL QUANTITIES ARE IN CUBIC YARDS, AND FILL VOLUMES HAVE BEEN ADJUSTED BY 15%. 2. NO TOPSOIL IS ACCOUNTED FOR IN THESE VOLUMES. 3. FINISHED GRADE BACKFILL INCLUDES MATERIAL USED TO CREATE PROPER DRAINAGE, WALKWAY ELEVATIONS, AND FEEDPAD GRADES AFTER FOUNDATION WORK IS COMPLETE. N I 30 15 0 30 iiiia SCALE: 1 INCH=30 FEET - od Lsl) od �c> AG PROTEIN SHOP GRADING m n rn 0 N rn O U) .o 0) E L LL C O c O n Q Q U U O L.� C O C O n Q U Ld 0 ry n / w ' � � I LLJ I .. IJ 0 o I � — w cv I I / 91.Lij 00o NI N I / w TV. 8" PIPE I I ELEV=101 .12 _I I OIL/WATER/SAND SEPAR I I TOP ELEV=103.84 I c.s I �o INV IN=100.92Uj - I o INV OUT=100.72 GQ1 / - / ANTI -SLIP TEXTURE LINER I I IRRIGATION PUMP INV 8" PIPE �100 / / LEV=100.52 6" DRAIN TILE @ 0.25% / START INV=89.00 ��/ / �1p0 / oo � OTT 0/c_ 90 0� /o O� I s9 o I 98 \ �0 0, O \ X a / 91 \ ? 0 0 , I I / STAFF GAUGE yOCATI v / a (SEE DETAIL ON EET 5) �/ I 0 WIDE SPILLWAY .00 95 6" DRAIN 1 � ELEV=99.90 _ TILE OUTLET \_\ — \/moo I / > Q 30 15 0 30 -r \iiiia X 93 SCALE: 1 INCH=30 FEET 12( 71 11( Q 8 0+50 1 +00 \ 7� FLOW PROFILE 1 SOLID SET SPRINKLER TOP OF DIKE=102.50 i � 1 MAX LIQUID LEVEL=100.50 WASH PRIMARY STAGE IRRI TION PERMANENT POOL=10 .50 PUMP / SPILLWAY ELEV=99.90 1 1 OI WATER/SAND SEPARATOR PRIMARY 2NQ-STA E STAGE (90 DA 8" PIPE (90 DAYS SLUDGE SLUDGE - PERMANENT) STORAGE \ LEVEL=91.50 — _ MIN LIQUID IRRIGATION ELEV=90.50 ELEV=90. 0 LEVEL=91.50 PIPE DRAIN TI ELEV=89.00 SHOWN FOR ELEVATION AND SCHEMATIC ONLY. ACTUAL LOCATION IS NORTH OF PROPOSED LAGOONS. 2+00 3+00 4+00 5+00 6+00 7+00 8+00 Station 9+00 10+00 11 +00 12+00 HORIZONTAL: 1 "=100' VERTICAL: 1 "=10' E 0 E O )0 % 11 0 13+00 13+50 LLJ Storage Basin Volumes Freeboard 1st Stage Permanent Storage 1st Stage Sludge Storage 2nd Stage Temporary Storage 2nd Stage Permanent Top Berm Width (ft) 234 Top Berm Length (ft) 127 Max. Liq Width (ft) 214 112 58 102 48 Max. Liq Length (ft) 115 115 61 115 61 Bottom Width (ft) 58 52 48 42 Bottom Length (ft) 61 55 61 55 Side Slope 3 3 3 3 3 Liq. Depth (ft) 9 1 9 1 freeboard (ft) 2 Volume (ft3) 55,200 69,507 3,193 61,587 2,613 GENERAL NOTES: 1. TOPSOIL AND ORGANIC MATTER SHALL BE STRIPPED FROM LAGOON AREAS PRIOR TO PLACING FILL. THIS MATERIAL SHALL BE STOCKPILED AND SHALL BE PLACED ON BACKSLOPES TO HELP REESTABLISH VEGETATION. THESE MATERIALS SHALL NOT BE USED AS STRUCTURAL FILL. STUMPS AND/OR ROOTS SHALL NOT BE ALLOWED WITHIN THE LAGOON AREA. ANY STUMPS ENCOUNTERED IN SIDE SLOPES OR BOTTOM MUST BE COMPLETELY REMOVED. 2. THIS LAGOON SHALL RECEIVE A MINIMUM 40 MIL HDPE LINER OR APPROVED EQUIVALENT. THE LINER SHALL BE INSTALLED BY OTHERS. THE CONTRACTOR SHALL EXCAVATE THE LAGOON AND BUILD THE DIKES TO THE LINES AND ELEVATIONS SHOWN ON THE PLANS. THE LAGOON SUBGRADE SHALL BE FREE FROM FOREIGN MATERIAL, ORGANIC MATTER, WATER, ETC. THE SUBGRADE SHALL BE FIRM, SMOOTH AND UNYIELDING. THE SUBGRADE SHALL BE ACCEPTABLE TO SMITHFIELD REPRESENTATIVES AND THE GEOSYNTHETIC LINER INSTALLATION CONTRACTOR. LINER AND DIKE CROSS SECTIONS AND DETAILS ARE SHOWN ON THIS SHEET AND THE DETAIL SHEET. 3. THE LAGOON SHALL BE PRECHARGED WITH WATER TO AT LEAST 1 /2 THE TREATMENT ZONE DEPTH AS SOON AS THE LINER IS COMPLETE AND HAS BEEN TESTED. THIS IS IMPORTANT TO HELP REDUCE START—UP ODORS AND TO STABILIZE THE SYNTHETIC LINER FROM FLOATING. 4. ALL STRUCTURAL FILL SOIL MATERIAL PLACED ON THE LAGOON DIKES SHALL BE COMPACTED TO A MINIMUM OF 95% OF THE STANDARD PROCTOR (ASTM D-698) MAXIMUM DRY DENSITY. THE NATURAL MOISTURE OF THE STRUCTURAL FILL SOIL SHALL BE f 3% OF THE OPTIMUM MOISTURE. THE SOIL SHALL BE PLACED IN THIN LIFTS, LESS THAN 12—INCHES UNCOMPACTED. A SUFFICIENTLY HEAVY SOIL COMPACTOR SHALL BE USED. 5. ALL PENETRATIONS OF THE DIKE SHALL BE ACCOMPLISHED PRIOR TO PLACEMENT OF SYNTHETIC LINER. 6. LAGOON DIKE SIDE SLOPES ARE 3:1 UNLESS OTHERWISE NOTED ON PLAN. 7. THE FOLLOWING ITEMS SHALL BE DONE WITH REGARDS TO THE LAGOON CONSTRUCTION BEFORE THE FACILITY IS CERTIFIED: EXTERNAL LAGOON DIKES SHALL BE COVERED WITH TOPSOIL, FINE GRADED, FERTILIZED, SEEDED AND MULCHED; SYNTHETIC LINER INSTALLATION AND TESTING SHALL BE COMPLETED. THE STAFF GAUGE SHALL BE INSTALLED; AND THE LAGOON PRECHARGED. 8. EROSION AND SEDIMENTATION CONTROL MEASURES ARE REQUIRED TO PREVENT SEDIMENT FROM LEAVING THE SITE. IT IS THE CONTRACTORS RESPONSIBILITY TO PROVIDE AND MAINTAIN ALL SUCH MEASURES THROUGHOUT THE CONSTRUCTION PERIOD. 9. WELD HDPE TEXTURED MATERIAL TO LAGOON LINER APPROX. 10' WIDE X 40, LONG, TO PROVIDE A TRACTIVE SURFACE FOR POTENTIAL ENTRANCE AND EXIT OF LAGOON. SEEDING NOTES: 1. DISTURBED AREAS SHALL BE SEEDED, FERTILIZED AND MULCHED AS SOON AS POSSIBLE AFTER FINAL GRADING IS COMPLETED. 2. PREPARE DISTURBED AREAS FOR SEEDING BY GRADING IN ALL SURFACE WATER DIVERSIONS AND SHAPING TO FINAL GRADES SHOWN ON PLAN. 3. APPLY LIME AND FERTILIZER THEN DISK TO PREPARE A 3 TO 4 INCH SMOOTH SEEDBED. APPLY SEED AND FIRM SEEDBED WITH A CULTIPACKER OR SIMILAR EQUIPMENT. APPLY MULCH AND SECURE WITH A MULCH ANCHORING TOOL OR NETTING. SOIL AMENDMENTS: 1000 LBS/ACRE OF 10-10-10 FERTILIZER 2 TONS/ACRE OF DOLOMITIC LIME 100 BALES/ACRE OF SMALL GRAIN STRAW SEEDING SCHEDULE: WINTER 60 LBS/ACRE OF FESCUE — SEPT 1 TO NOV 30 40 LBS/ACRE OF RYE GRASS — DEC 1 TO MAR 14 30 LBS/ACRE OF RYE GRAIN — NURSE CROP FOR FESCUE 10 LBS/ACRE OF UNHULLED COMMON BERMUDA GRASS SUMMER 60 LBS/ACRE OF PENSACOLA BAHIA GRASS — MAR 15 TO MAY 31 8 LBS/ACRE OF HULLED COMMON BERMUDA GRASS — JUNE 1 — JULY 31 co �n � O o d- W H W q � a q q � w N z O N ~ w w w �0 o O Q O O� J J La N rn rn rn Q N in I W) rn 0 0 O O q O � q 0 ZLI 0 ?A IS, �O AG PROTEIN LAGOON GRADING H TYPICAL PIPE PENETRATION N.T.S. INV. INV. � v WATER LEVEL O � ^ ELEVATION ; SEE NOTE #8 6" TOP ° a P ' SEE NOTE #7 : (OUTLET) y.. >. y 8" DIA. OP'G. TEE M SEE NOTES #3 & #4 SUPPLIED & INSTALLED 1 BY CONTRACTOR 04, SEE NOTE #6 ' y U (INLET) 8" DIA. OP'G 12" MIN CLEARANCE PIPING SUPPLIED .�� = FROM BOTTOM OF TANK & INSTALLED BY e I CONTRACTOR 3" VENT ACROSS TOP OF BAFFLES SEE NOTE #9 0 ,�•y JJJ ��' c J in I :Q , b qi ' 'd LIFTERS I (4) TYP. P7 d Q SEE NOTE #5 a 6" BASE a 1i ' SEE NOTE #3 �Y d . a'. � v y I j All a y lII 9 ° a 4" DIA. PVC o TEE. SUPPLIED Z BY CP&P t"' d N n. C <. d d <. G d °Q ° a a GENERAL NOTES: 1. PRECAST SPECIFICATIONS CONFORM TO THE LATEST C-913 SPECIFICATIONS FOR "REINFORCED CONCRETE WASTE WATER STRUCTURE". 2. CONCRETE COMPRESSIVE STRENGTH 4,000 PSI MINIMUM. 3. STEEL REINFORCING DESIGN TO CONFORM TO THE REQUIREMENTS OF THE LATEST ACI-318 SPECIFICATIONS FOR REINFORCED CONCRETE. 4. DESIGNED FOR H-20-44 LOADING. 5. SECTION JOINTS TO BE SEALED WITH 1 1/4" DIA. BUTYL RUBBER SEALANT, BY CONTRACTOR. 6. ADDITIONAL REINFORCING AT OPENINGS. 7. CONTRACTOR TO ADJUST TO GRADE AS REQUIRED. 4" GRADE RINGS TO BE SUPPLIED BY CP&P OR TO BE FIELD ADJUSTED USING APPROVED METHODS BY CONTRACTOR. 8. CAST IRON RING AND COVERS TO BE AS PER SPECIFICATIONS, SUPPLIED BY EITHER CP&P OR CUSTOMER. 9. BAFFLE WALL(S) TO BE PLACED AND GROUTED BY CONTRACTOR IN FIELD. 10. WEIGHTS: ROOF SECTION- APPROXIMATELY 15,579 LBS. BASE SECTION - APPROXIMATELY 16,050 LBS. BAFFLE - APPROXIMATELY 2,428 LBS. 2,500 GALLON DATE. AUGUST 5, 2013 OIL -WATER -SAND SEPARA1fOR DRAWING N0: 71,cp&p GI-2500-OWS 10364 Design Road Ashland, VA 23005 CONCRETE PIPE & PRECAST, LLC 8000.999.2278 (CAST) Web Site: www.concretepandp.com L L.L Cn (n O L n Q / Q U U O L.� O (n C O L c O n Q / U LJ O IY n / 40 MIL HDPE LINER 3' NER 1' )N WELD (TYP) INSIDE TOP OF DIKE STAKING POINT TOP ELEV = +0.20' SOIL UNEQUIRING-) 12.00' MINIMUM AT TOP ELEV 36" _[24' — — — ENSURE GOOD COMPACTION WHEN BACKFILLING ANCHOR TRENCH LINER DIKE CROSS SECTION TOP OF DIKE INSIDE TOP OF DIKE ;T AND STOP PUMP DESIGN OF LAGOON) INSIDE TOE PREP LINER AREA TO BE PAINTED WITH A LIGHT GRADE SAND PAPER. LINES PAINTED ON SYNTHETIC LINER WITH WHITE PLASTIC PAINT TOP OF DIKE ELEV EXISTING GRADE STRIP TOPSOIL BEFORE PLACING FILL FOR DIKE NOTES: 1. COMPACT FILL FOR DIKE TO A MINIMUM OF 95% STANDARD PROCTOR MAXIMUM DRY DENSITY. 2. EXCAVATION, BACKFILL AND COMPACTION OF ANCHOR TRENCH BY CONTRACTOR. 3. PLACEMENT OF HDPE LINER BY OTHERS. 4. THE SUBGRADE TO BE LINED SHALL BE PREPARED TO BE SMOOTH AND FREE OF ALL ROCKS, STONES, STICKS, ROOTS, SHARP OBJECTS, OR OTHER DEBRIS. IT IS IMPERATIVE THAT THE SUBGRADE BE COMPLETELY DRY AND PROPERLY COMPACTED SO AS TO PROVIDE A FIRM AND UNYIELDING BASE WITHOUT SUDDEN, SHARP, OR ABRUPT CHANGES OR BREAKS IN GRADE. :�I��*111mLei 0 TYPICAL STAFF GAUGE FOR PLASTIC LINED LAGOONS- N.T.S. a Q Q W q N M W m w W �0 Q O U CJ C9 00 O._ a AG PROTEIN DETAILS m n 3 E co c 0 0 n a N i 0 Q L Q) cn c 0 c 0 n a 0 w 0 ry n ' NASH JOHNSON & SONS FARMS \ DB 1096 PG 263 \ �"MOWUM...�� \ "Waft — — ----- oft � onaD Gomm / / r NASH JOHNSON & SONS FARMS / DB 1096 PG 263 I O / LORETTA A CAREY BLUE LINE STREAM / DB 1660 PG 852 AND 100' SPRAYFIELD 00 SETBACK O ,c, db eo — � `�' \sommoce / 04 O db \ $ 7 I - ***'I \ db,--— - � m 1 ce ce � �� i � ✓ >— "-" "—� A"'� ,, 1 v 1 � _I 117 I 1 / EXISTING ANIMAL / I &1 —9 �' \ \ I 1 I / WASTE LAGOON / / �I� ea �� \ / « , l✓� �9/\\ FI \1 \ / / / —I EXISTING ANIMAL WASTE LAGOON , \ - \ ` J A u B: V \\�1-" 100' RESIDENCE � I \ / �I' RB RB , I 1 SPRAYFIELD SETBACK r__ s 1 I SOILS v _ ____ / ': f F _. 1�I \ ` \ S 0 I L 92 I \ 1 (SEE SIGNED WAIVER) I 1 I I \ �� I / �.- �/ �C,\�\ J I \ tip\ \ \ \9 — ► 94 RESIDENTIAL WELL ��_ AND 100 SETBACK A u B : V��J# \ / /100) NVELL SETBACK \ / u- AND 3 WELLS - �p°p= �, :}F \\ \ -96�\ / � j �, SOILS 1 At- 1 I > o_ 40 / Itt\ r/ Fi� l/ / Z e ate r i pery \ ., \ ► \ I� 7 y i ,;' / / 11 \ �- ♦\' % ` `I RESIDENCE /i \ Fes//"-Fom ,/ DM FARMS OF ROSE HILL, LLC ♦ ,� ; / -- I P o ED WA H,r BAY1do- DB 1 179 PG 720 ♦ / \\� 1 1' "t % �o J� I I} / 41;- co /\ Zo�Te'e---�—�— I I r«� •\� g� \ 1 75, PROPERTY LINE/ �4\ SPRAYFIELD SETBACK tur - �TI NI CA p(SEE SIGNED WAIVER)I j! �i ;;;-a —_PROPOS D CHOP Ole_ I "•A`1 co\a� 1 ,`/ \ I \ \ \ ;��\��A�C��WATER DIA�H rorI , 111 03 T- 1 1 ND t0'S-PRAD\ \-TI 04e— DM FARMS OF ROSE HILL, LLC / Os� (:0:) d 1� �• \ \ \ \ \ �, \ \ 1 ',-.1} _,_ 1 DB 1839 PG 76 s \ K, I ICI er',-'� jT \ \ J \ \ \ \1 I $ 1 ' / �_�t__ * �� % I� j� �� _�ul -- _\�°� $� 7 \ 7°�� `';, `'�:;, I 1 - o ( / �— \ \ \ � \ \ \ \ `� \ ` \I /,'o� — c% r =ice I 1 eme �e I I 108, \ \'�, • : ` \ _ _ I \ _ \ \ \ \ \ \ 1 ` — ♦ �9 I �os� \ �� ,� }:\ \ Q I7,etad �I — _--- - $ —�` `, \ \ �ALlB 1^�-i I/ � °� � � '� \SOS ., ., \ � � ew — �` \\ � fop � � � — - 1 - j = �_ -� — — � _ 1Gap r « /ago --goong, Gap ago SOIL III�I/ SE 112� _ �i 108- - ��, \ ```�.\ \ �, i -\-R� SIN \ �� '��1111— — r \ C� I Iago 4b / /� N) 1/ -� \�r1�y — —'r \� �}±` \ �_ 1 v — ——11T134-CSC \ aim ti / 1- \ } —�';713 -'\ \ -� \ ��15\ \ \ �� NOTES: \ `)\ 8a► / / /�--------- / / m = — �. Rs%l� GOP` � 1. ADJACENT PROPERTY LINES AND OWNER INFO IS \ ��\ J doo _ — al / /\ Ij �j / \ - _ �y \ �, I I I I I �B BASED ON DUPLIN COUNTY GIS DATA. Bar-%, RB I� ��� \ \ \ \�* �` j� J �� Ji 2. 100-YEAR FLOODPLAIN SHOWN IS FROM NC FLOOD \�_ ;I I I I I I CS �� RISK INFORMATION SYSTEM. _ �_ — '+' Yam «114- T I I i��6 ~ dowl ow 5q' I� PROPOSED '-115 � HA VEY A SHOLAR & HARRY R \� \\ -r' � - �L / J� - SH LAR & EDWARD SHOLAR; JR �\ \\ - - I 1 aim — DB 1 163 PG 674 o� A tr-V- AQU6L FA & D HAD Y R �'� a' I -- --- �SR 1117) �SHOiA JR AD DM FARMS OF ROSE HILL LLC \ Od R-Sc EDWAR9 , /onp � _ = —'t M Ro DB 1839 PG 76 - - gONH \ HARVEY A SHOLAR & HA RY R \� — — i j / �� L , - I SURFACE WATER DITCH SHOLAR & EDWARD SHOLR �� — -� / /� ��� AND 100' SPRAYFIELD A J\ DB 1 163 PG 674 \ ` \ = _ "'j �// SETBACK VEY A SHOLAR & HARRY R SHOLAR & EDWARD SHOLAR, JR DB 1163 PG 674 100 50 0 100 SCALE: 1 INCH=100 FEET LEGEND a2s]»:i90111Zh — cB cB — COMPLIANCE BOUNDARY — RB RB — REVIEW BOUNDARY -F F F 100-YEAR FLOODPLAIN w �co� V) z 0 N z U W w :2z � z o Cam, O m O O W 0 N J Of w w w JW N � I I In a AG PROTEIN SITE MAP m