Pre -Construction Notification (PCN) Form
September 29, 2018 Ver 3
21nitial Review
Has this project met the requirements for acceptance in to the review process?*
r Yes
r No
Is this project a public transportation project?*
G Yes r No
Change only if needed.
BIMS # Assigned
20191425
Is a payment required for this project?*
r No payment required
r Fee received
r Fee needed - send electronic notification
Select Project Reviewer*
Kevin Mitchell:eads\rkmitchell
Information for Initial Review
1a. Name of project:
Replacement of Bridge #100079 on NC9 over the Broad River
1a. Who is the Primary Contact?*
NCDOT
1b. Primary Contact Email:*
jhemphill@ncdot.gov
Date Submitted
10/17/2019
Nearest Body of Water
Broad River
Basin
Broad
Water Classification
C;Tr
Version# *
1
Reviewing Office*
Asheville Regional Office - (828) 296-4500
1c. Primary Contact Phone:*
(919)707-6126
Site Coordinates
Latitude: Longitude:
35.525473-82.250963
FA. Processing Information U
County (or Counties) where the project is located:
Buncombe
Is this project a public transportation project?*
r Yes r' No
Is this a NCDOT Project?*
r Yes r No
(NCDOT only) T.I.P. or state project number:
BR-0009
WBS # (?)
67009.1.1
1a. Type(s) of approval sought from the Corps:
W Section 404 Permit (wetlands, streams and waters, Clean Water Act)
r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
1b. What types) of permit(s) do you wish to seek authorization?
W Nationwide Permit (NWP)
r' Regional General Permit (RGP)
r' Standard (IP)
1c. Has the NWP or GP number been verified by the Corps?
r Yes r No
Nationwide Permit (NWP) Number:
NWP Numbers (for multiple NWPS):
1d. Type(s) of approval sought from the DWR:
fJ 401 Water Quality Certification - Regular
F Non-404 Jurisdictional General Permit
F Individual Permit
33 - Temporary Construction
le. Is this notification solelyfor the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
r 401 Water Quality Certification - Express
r Riparian Buffer Authorization
1f. Is this an after -the -fact permit application?*
r Yes r No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
r Yes r No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
r Yes r No
Acceptance Letter Attachment
1h. Is the project located in any of NC's twenty coastal counties?
r Yes r No
1j. Is the project located in a designated trout watershed?
E Yes r No
FB. Applicant Information
1d. Who is applying for the permit?
[J Owner r Applicant (other than owner)
le. Is there an Agent/Consultant for this project?
r Yes r No
2. Owner Information
2a. Name(s) on recorded deed:
N/A
2b. Deed book and page no.:
2c. Responsible party:
2d.Address
Street Address
1598 Mail Service Center
Address Line 2
city
Raleigh
Fbstal / Zip Code
27699-1598
2e. Telephone Number:
(919)707-6126
2g. Email Address:*
State / Frovinre / R�gion
NC
Q�untry
Wake
2f. Fax Number:
*
r Yes r No
r Yes r No
pharris@ncdot.gov
C. Project Information and Prior Project History U
1. Project Information
1b. Subdivision name:
(i appropriate)
1c. Nearest municipality/ town:
Black Mountain
2. Project Identification
2a. Property Identification Number:
2c. Project Address
Street Address
Address line 2
Oty
Fbstal / Zip 03de
3. Surface Waters
3a. Name of the nearest body of water to proposed project:*
Broad River
3b. Water Resources Classification of nearest receiving water:*
C,Tr
3c. What river basin(s) is your project located in?*
Broad
3d. Please provide the 12-digit HUC in which the project is located.
030501050301
4. Project Description and History
2b. Property size:
State / ftovince / Fbgion
O�untry
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
Rural residential with forested land.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?*
r Yes 6 No r Unknown
4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR)
4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR)
4f. List the total estimated acreage of all existing wetlands on the property:
0.00
4g. List the total estimated linear feet of all existing streams on the property:
1, 537'
4h. Explain the purpose of the proposed project:*
The purpose of the proposed project is to replace a deficient bridge. Bridge No. 168 is considered structurally deficient with a sufficiency rating of 32.31 out of 100. Being structurally
deficient does not mean that the bridge is unsafe, but does mean the bridge is in need of repair or replacement. As a bridge ages, the cost of repairs and continued maintenance
eventually necessitate the need for replacement. The current bridge was constructed in 1929 and is reaching the end of its useful life.
41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:*
A new bridge will be constructed on the current alignment with a temporary bridge installed to the north of the eAsting bridge to serve as an onsite detour during construction. The
proposed replacement bridge is a single span, 65 feet long, 33' 6" wide, cored slab bridge. Typical road building equipment such as trucks, dozers, and cranes will be used to construct
the bridge.
4j. Please upload project drawings for the proposed project.
BR-0009 PCN Cover Letter.pdf 211.73KB
BR-0009 Permit Drawings.pdf 1.42MB
5. Jurisdictional Determinations
Sa. Have the wetlands or streams been delineated on the property or proposed impact areas?*
r: Yes r No O Unknown
Comments:
5b. If the Corps made a jurisdictional determination, what type of determination was made?*
r Preliminary r Approved r Not Verified r Unknown r NIA
Corps AID Number:
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known): Scott Shifflett
Agency/Consultant Company: ATCS
Other:
5d1. Jurisdictional determination upload
6. Future Project Plans
6a. Is this a phased project?*
r Yes r No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
r Wetlands W Streams -tributaries ❑ Buffers
r Open Waters r Pond Construction
3. Stream Impacts
3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact * 3d. S. name* 3e. Stream Type * 3f. Type of 3g. S. width * 3h. Impact
(?) Jurisdiction* length*
❑
Detour Bride Tem ora Other Broad River Perennial Both 36 60
S1 9 p ry
Avera<C7e (feet) (linear feet)
Bridge Abutment Removal
9
L-mporaryOtherBroad
River
Perennial
BothS2
Average (feet)
(linear feet)
31. Total jurisdictional ditch impact in square feet:
0
3i. Total permanent stream impacts: 3i. Total temporary stream impacts:
0 110
3i. Total stream and ditch impacts:
110
3j. Comments:
Workers may need to enter the water for abutment removal and Temporary Detour Bridge installation and removal.
E. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
Current structure has abutments at waters edge. The new structure will be longer and therefore will increase the hydraulic opening at this crossing.
Permanent impacts to the Broad River were avoided in the design process with both the proposed bridge and the detour bridge spanning the river. No
deck drains discharge directly over Broad River. NCDOT will adhere to Design Standards in Sensitive Watersheds.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
Best Management Practices will be adhered to.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
r Yes r No
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
There are no permanent impacts from this project.
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
C' Yes r No
If no, explain why:
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?*
r Yes r No
Comments
G. Supplementary Information
1. Environmental Documentation
la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?*
r Yes r No
L^J
1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina)
Environmental Policy Act (NEPA/SEPA)? *
r Yes r No
1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House?*
r Yes r No
Comments:
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 21-1.1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15ANCAC 2B .0200)? *
r Yes r No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?*
r Yes r No
3b. If you answered "no," provide a short narrative description.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?*
r Yes r Nor N/A
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?*
r Yes r No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?*
r Yes r No
5d. Is another Federal agency involved?*
r Yes r No C' Unknown
5e. Is this a DOT project located within Division's 1-8?
r Yes r No
5f. Will you cut anytrees in order to conduct the work in waters of the U.S.?
r Yes r No
5g. Does this project involve bridge maintenance or removal?
r Yes r No
5g(1). If yes, have you inspected the bridge for signs of bat use such as staining, guano, bats, etc.?
r Yes r No
If you answered "Yes" to 5g(1), did you discover any signs of bat use?
r Yes r No r Unknown
Sh. Does this project involve the construction/installation of a wind turbine(s)?*
r Yes r No
5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?
r Yes r No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
USFWS county list, Bat Memo (attached) - No effect for aquatic species (Appalachian elktoe, Tan riffleshell, Spotliin chub don't occur in the Broad
River Basin) - limited habitat for Virginia spiraea though no specimens were recorded during a July 2019 Field visit.
Consultation Documentation Upload
BR-0009 BAT memo.pdf 221.93KB
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
r Yes r No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
NMFS County Index
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?*
r Yes r No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
SEPA Documentation
7c. Historic or Prehistoric Information Upload
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain?*
r Yes r No
8b. If yes, explain how project meets FEMA requirements:
NCDOT Hydraulics Unit coordination with FEMA
8c. What source(s) did you use to make the floodplain determination?*
FEMA Maps
Miscellaneous
Comments
Miscellaneous attachments not previously requested.
Signature
*
W By checking the box and signing below, I certify that:
• I have given true, accurate, and complete information on this form;
. I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Michael Turchy
Signature
Ili i"
u
Date
10/17/2019