Loading...
HomeMy WebLinkAbout20051360 Ver 3_More Info Received_20061228r~~~ ~; ; ~ r,' ~ n ~ ~ APPLICATION FOR DEPARTMENT OF THE ARMY PER¢IIIT. ~UU6 OMB APPROVAL NO. 0710-0003 (33 CFR 3?5/ WFr~+N~S,~,~,,, "~:r~;N;;,,,, _ Expires December 31, 2004 The Public burden for this collection of information is sestimated to average 10 hours per re~'~R~ ough the majorky of applications should require 5 hours or less. This includes the time for reviewing instructions, searching existing data sources, ga and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including auggestans for reducing this burden, to Department of Defense, Washington Headquarters Service Dirsctofate of Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302; and to the Office of Msnagement and Budget, Paperwork Reduction Project 10710-0003-, Washington, DC 20603. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information 'rf it does not display a currently valid OMB control number. Reese DO NOT RETURN your form to ekher of those addresses. Completed applications must be submitted to the District Engineer having jurisdiction over the location of the proposed activity. PRIVACY ACT STATEMENT Authorkies: Rivers and Harbors Act, Section 10, 33 USC 403; Clean Water Act, Section 404, 33 USC 1344; Msrine Protection ,Research and Sanctuaries Act, 33 USC 1413, Section 103. Principal Purpose: Informatan provided on this form will ba used in evaluating the applicstion for a permk. Routine Uses: This information may be shared with the Department of Justice and other federal, state, and local government agencies. Submission of requested information is voluntary, however, if information is not provided the permit application cannot be evaluated nor can a permk be issued. One set of original drawings or good reproducible copies which show the location and character of the proposed activity must be attached to this application (see sample drawings and instructions) and be submitted to the District Engineer having jurisdiction over the location of the proposed activity. An application that is not completed in full will be returned. 1. APPLICATION N0. ~ 2. FIELD OFFICE CODE ~ 3. DATE RECEIVED ~ 4. DATE APPLICATION COMPLETED ~rTCenc Rc~ nw rn ac cu r rn Rv aver rrarvn 5. APPLICANT'S NAME 8. AUTHORIZED AGENT'S NAME AND TITLE (anapenrisnotre°uired! Mr. Russ Overton, P.E. Mr. Charles. E. Benton 6. APPLICANT'S ADDRESS 9. AGENT'S ADDRESS Town of Cary, Engineering Department URS Corporation, 1600 Perimeter Park Dr., P.O. Box 8005, Cary, NC 27512-8005 STE 400, Morrisville, NC 27560-8421 7.. APPLICANT'S PHONE NOS. W/AREA CODE 10. AGENT'S PHONE NOS. W/AREA CODE a. Residence a. Residence b. Business (919) 4 6 9- 4 0 3 6 b. Business (919) 4 61-14 3 5 11, STATEMENT OF AUTHORIZATION I hereby authorize, Charles E . Benton to act in my behalf as my agent in the processing of this application and to furnish, upon -equest, supplemental information in support of this permit application. ~~ 7 APPLICANT'S SIGNATURE DATE NAME, LOCATION AND DESCRIPTION OF PROJECT OR ACTIVITY 12. PROJECT NAME OR TITLE (aeeirstrucri°nsr Morrisville Parkway Extension -Phase Ic, II; and IIId 13. NAME OF WATERBODY. IF KNOWN /t~we,~i:alnW~ 114. PROJECT STREET ADDRESS pl sppGcebJe/ Hatchet Grove Tributary - Crabtree Creek 15. LOCATION OF PROJECT Wake NC E~,Yt't~~`~T RECEIVED COUNTY STATE 16. OTHER LOCATION DESCRIPTIONS, IF KNOWN, rseeinsuucrkvul Project Begin: 35°48'49.35"N, 78°52'21.64"W End: 35°48'48.82"N, 78°50'53.34"W (NAD83/WGS84) 17. DIRECTIONS TO THE SITE From Raleigh, take Route 40 West to Aviation Parkway (Exit 285); continue straight onto Morrisville-Carpenter Road; turn left onto Route 55. Project site begins approximately 1/2 mile on the left (proposed NC 55/Morrisville Parkway intersection). See Figure 1: Vicinity Map (attached) . EDITION OF FEB 94 IS OBSOLETE. (Proponent: CECW-OR) 18. Nature of Activity (Description or projeu, inuude aft features) Road construction. See attachment labeled Block 18. 19. Project PUfpOSe (Describe the reason orpurpose of the projeG, see instructions) The project purpose is to extend Morrisville Parkway and finish some of the missing gaps of this roadway to provide a continuous 4-lane divided median divided roadway section from NC 55 to NC 54. The start and complete dates are 07/07 and 12/08 respectively. USE BLOCKS 20.22 IF DREDGED ANDIOR FILL MATERIAL IS TO BE DISCHARGED 20. Reason(s)for Discharge The proposed activity will require the unavoidable discharge of fill into wetlands and streams for the construction of the road embankment, bridge placement, culvert placement, and erosion control. 21. Type(s) of Material Being Discharged and the Amount of Each Type in Cubic Yards See attachment labeled Block 21. 22. Surface Area in Acres of Wetlands or Other Waters Filled (seeinstruaions) See attachments labeled Block 22, and Table 1. 23. Is Any Portion of the Work Already Complete? Yes ._No __1~YES, DESCRIBE THE COMPLETED WORK 24. Addresses of Adjoining Property Owners, Lessees, Etc., Whose Property Adjoins the Waterbody (If more than can be entered here, please attach a supplemental list). See attachment labeled Block 24. 25. List of Other Certifications or Approvals/Denials Received trom other Federal, State or Local Agencies for Work Described in This Application. AGENCY TYPE APPROVAL' IDENTIFICATION NUMBER DATE APPLIED DATE APPROVED DATE DENIED NCDENR Permit 'Would include but is not restricted to zoning, building and flood plain permits 26. Application is hereby made for a permit or permits to authorize the work described in this app ication. I certify that the information in this application is complete and accurate. I further certify that I possess the authority to ~rt e t e work describ herein or am actin as the duly authorized agent of the applicant. ~a s o~ SIGNATURE OF APPLICANT DATE SIGNATURE OF AGENT DATE The application must be signed by the person who desires to undertake the proposed activity (applicant) or it may be signed by a duly authorized agent if the statement in block 11 has been filled out and signed. 18 U.S.C. Section 1001 provides that: Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly and willfully falsities, conceals, or covers up any trick, scheme, or disguises a material fact or makes any false, fictitious or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false, Tictitious or fraudulent statements or entry, shall be fined not more than 510,000 or imprisoned not more than Tive years or both. ENG FORM 4345 -BLOCK 18 18. NATURE OF ACTIVITY The proposed project is located in the Town of Cary, Wake County, North Carolina (see Figure 1), and is situated within the Neuse River Basin (Hydrologic Unit Code 03020201). The overall proposed activity is a road construction project that would extend the Morrisville Parkway and finish some of the missing gaps of the roadway to provide a continuous 4-lane median divided roadway section from NC 55 to NC 54. The proposed project includes three areas of construction activity (Phase Ic, Phase II, and Phase IIId). The Phase Ic project segment is a proposed connection of an existing section of the Morrisville Parkway at the intersection with Louis Stephens Drive to an existing section of the Morrisville Parkway near Preston Village Way, the Phase II project segment would connect an existing section of the Morrisville Parkway at the intersection near Ashmore Drive to an existing section of the Morrisville Parkway at the intersection with Davis Drive, and the Phase IIId project segment is a proposed connection of the existing section of the Morrisville Parkway at the intersection with Carpenter-Upchurch Road to NC 55. 1$.1 EXISTING CONDITIONS Phase Ic -Bridge: The Phase Ic -Bridge project segment is bordered to the east and west by existing sections of the Morrisville Parkway, and to the north and south by undeveloped forested land (see Figure 2A). The existing conditions within this project segment include upland hardwood/pine forest, Section 404 jurisdictional forested wetlands, and a perennial stream named Hatchet Grove tributary. The upland forest is dominated by loblolly pine (Pinus taeda) and sweetgum (Liquidambar styraciflua) with saplings of red maple (Ater rubrum). American elm (Ulmus americana), and willow oak (Quercus phellos) dominate in the understory. The forested wetland is dominated by sweetgum and red maple, with loblolly pine present in lesser quantities. Tag alder (Alms serrulata) is dominant in the understory. The on-site stream is located approximately 500 feet upstream of an impounded lake. This impoundment is part of the Crabtree Creek flood storage system and is controlled by Natural Resource Conservation Service Dam Number 2. A U.S. Corps of Engineers (USAGE) jurisdictional determination has been completed for this proposed project segment (see Appendix A). Phase II -Culvert: The Phase II -Culvert project segment is bordered to the west by an existing section of the Morrisville Parkway, to the east by Davis Drive, and to the north and south by undeveloped forested land and residential properties (see Figure 3A). The existing conditions within this project segment include upland mixed hardwoods, Section 404 jurisdictional forested wetlands, isolated forested wetlands, and an unnamed perennial stream. The upland forest canopy is comprised of loblolly pine, sweetgum, red maple, American beech (Fagus grandifolia), and sourwood (Oxydendron arboreum). The forested wetlands contains predominantly loblolly pine, sweetgum, and red maple, with slippery elm (Ulmus rubs) and ironwood (Carpinus caroliniana) present in lesser quantities. The on-site stream is located approximately 700 feet upstream of its confluence with Hatchet Grove tributary, which drains to Crabtree Creek. A USAGE jurisdictional determination has been completed for this proposed project segment and has verified the wetland and stream features listed above (see Appendix A). One wetland area within this project segment was determined by the USAGE to be hydrologically isolated, and Town of Cary Morrisville Parkway Extension Phases Ic, II, & IIId Block 18: page 1 of 3 ENG FORM 4345 -BLOCK 18 therefore is a non jurisdictional wetland under Section 404 of the Clean Water Act. The North Carolina Division of Water Quality (NCDWQ) may take jurisdiction over this isolated wetland. Phase IIId - NC 55 Connector: The Phase IIId - NC 55 Connector project segment is bordered to the west by NC 55, to the east by Carpenter-Upchurch Road, to the north by an undeveloped wooded property, and to the south by a developed property that contains a mulch storage facility (see Figure 4A). The existing conditions within this project segment include both developed and undeveloped properties. The developed property is used primarily for the storage and distribution of mulch and other landscape products. A section of rail line is also located within this project segment. The undeveloped portion of this project segment contains upland mixed hardwood/pine forest, and an isolated forested wetland. The upland forest is dominated by tulip poplar (Liriodendron tulipifera), sweetgum, and loblolly pine. The isolated wetland is dominated by sweetgum, loblolly pine, and black willow (Salix nigra). A USACE jurisdictional determination has been completed for this proposed project segment (see Appendix A). The on-site wetland area was determined by the USACE to be hydrologically isolated, and therefore is a non jurisdictional wetland under Section 404 of the Clean Water Act. NCDWQ may take jurisdiction over this isolated wetland. 18.2 PROJECT DESCRIPTION The road design for the proposed project segments would be similar to the existing sections of the Morrisville Parkway. The proposed design is an approximately 105-foot wide, 4-lane median divided roadway, including 5-foot wide sidewalks and 5-foot wide utility strips to be situated on both sides of the roadway. Fill slopes within the project area are 2:1. To accommodate the roadway alignment, two stream crossings are required (bridge and culvert, 35° 48' S1"N, 78° 51' 46"W and 35° 48' S0"N, 78° 51' OS"W (NAD83/WGS84), respectively). The project would use standard road construction methods and use of heavy equipment, such as cranes, backhoes, bulldozers, and dump trucks. Phase Ic -Bridge: A new 4-lane median divided roadway, approximately 1,130 feet in length, would be constructed to connect the existing section of the Morrisville Parkway at the intersection with Louis Stephens Drive to an existing section of the Morrisville Parkway near Preston Village Way. To minimize wetland and stream impacts, a 180-foot long, 82-foot wide, prestressed concrete, three-span bridge is proposed to be constructed over the Hatchet Grove tributary within this project segment. The bridge would be constructed using cranes placed above and on the side of the bridge site. Two bents would be placed on top of drilled piers set approximately fifteen feet below ground surface. The bridge has been designed to accommodate the 100-year flood. A temporary haul road would be constructed to access the bridge site. Design elements for this project segment are depicted on Figures 2B and 2C. Phase II -Culvert: A new 4-lane median divided roadway, approximately 1,260 feet in length, would be constructed to connect the existing section of the Morrisville Parkway near the intersection with Ashmore Drive to an existing section of the Morrisville Parkway at the intersection of Davis Drive. To allow the road crossing of an unnamed perennial stream within this project segment, the installation of a 162-foot long, 12-foot by 8-foot, reinforced concrete single box. culvert is Town of Cary Morrisville Parkway Extension Phases Ic, II, & IIId Block 18: page 2 of 3 ENG FORM 4345 -BLOCK 18 proposed. The culvert would be constructed using cranes and other standard heavy equipment. A temporary channel would be constructed to divert flow prior to constructing the culvert. In addition, two temporary gravel and rip rap filter basins would be installed to trap sediment. These temporary basins would be converted to permanent preformed scour holes for on-going erosion and sediment control. Design elements for this project segment are depicted on Figures 3B and 3C. Phase IIId - NC 55 Connector: A new intersection would be constructed at NC 55 to connect to the existing terminus of the Morrisville Parkway at the intersection with Carpenter-Upchurch Road. The distance from NC 55 to Carpenter-Upchurch Road is approximately 415 feet. The design of the new intersection requires an at grade crossing rail crossing. Design elements for this project segment are depicted on Figure 4B. 15.3 PROJECT IMPACTS TO WETLANDS AND STREAMS The proposed project would require the unavoidable discharge offill material into wetlands and streams. These impacts are described in detail by project segment in the attachment labeled Block 22, and are summarized in Table 1. 15.4 PROJECT IMPACTS TO RIPARIAN BUFFERS The project is subject to riparian buffer rules for the Neuse River, as established in 15A NCAC 2B .0233. Project impacts within 50-foot riparian buffer areas are presented by project segment in Table 2. 15.5 AVOIDANCE AND MINIMIZATION Avoidance and minimization measures have been incorporated in the roadway design to limit the amount of wetland, stream, and buffer impacts. Alternative alignments for the roadway were limited by the fixed endpoints of the existing sections of the Morrisville Parkway. Fill slopes were designed at 2:1 to limit fill within wetlands and streams. In addition, the design incorporates a bridge, rather than a box culvert, to limit impacts to Hatchet Grove tributary and its adjacent wetlands. Moreover, the proposed bridge has been specifically designed to limit the footprint of disturbance. The bridge design incorporates an "hour-glass" shape that requires a lesser amount of fill than traditional bridge designs. The project has been designed to avoid temporary wetland impacts to the greatest extent practicable. Where temporary wetland impacts are unavoidable, the heavy equipment working in wetlands would be placed on mats to minimize soil disturbance. All temporary disturbed wetlands would be restored to pre-construction conditions. In addition, the project would include a comprehensive sediment and erosion control plan to ensure that sedimentation and turbidity within wetlands and surface waters are minimized to the greatest extent practicable. 15.6 MITIGATION The applicant proposes to mitigate for their requested wetland and stream impacts through payment to the North Carolina Ecosystem Enhancement Program (NCEEP). A letter from the NCEEP indicating that they are willing to accept payment for the mitigation has been obtained (see Appendix B). Town of Cary Morrisville Parkway Extension Phases Ic, II, & Illd Block 18: page 3 of 3 ENG FORM 4345 -BLOCK 21 21. TYPE(S) OF MATERIAL BEING DISCHARGED AND THE AMOUNT OF EACH TYPE IN CUBIC YARDS Within each of the three project segments, the roadway would be constructed using agravel/soil fill that meets NC Department of Transportation roadway ernbankment specifications. The bridge would be constructed using two reinforced concrete bents that are placed on top of eight drilled reinforced concrete piers set approximately fifteen feet below ground surface. Within the Phase II project segment, a 162-foot long, 12-foot by 8-foot, reinforced concrete single box culvert is proposed. In addition, Class I Rip Rap will be used for erosion control at the culvert's inlet and outlet, and for the construction of permanent scour holes. The fill material amounts within Section 404 jurisdictional waters for each project segment are presented in Table 3. Town of Cary Morrisville Parkway Extension Phases Ic, II, & Illd Block 21: page 1 of I ENG FORM 4345 -BLOCK 22 22. SURFACE AREA IN ACRES OF WETLANDS OR OTHER WATERS FILLED Each of the three project segments would require unavoidable fill material discharge into wetlands and/or streams. All impacted wetland areas are forested wetlands, and both on-site streams are classified as perennial. Specific descriptions of the permanent fill areas and temporary impact areas within each project segment are provide below, and these impacts are summarized in Table 1. Phase Ic -Bridge: This project segment would require 0.40 acre of permanent fill material discharge into Section 404 jurisdictional wetlands (see Figure 2A). The permanent placement of fill within the wetlands is required for construction of the proposed road embankment. Bulldozers would be used for grading activities, and cranes would be used to install the bridge. Fill slopes are designed at 2:1 in this project segment. In addition, the project segment would temporarily disturb 0.27 acre of Section 404 jurisdictional wetlands, and 12.2 linear feet of stream. The temporary impacts are required for the construction of a temporary haul road and the area required for the heavy equipment operation during bridge construction. All heavy equipment would be placed on mats within the temporary wetland impact areas. Phase II -Culvert: This project segment would require permanent fill material discharge into 0.51 acre of Section 404 jurisdictional wetlands, and 0.09 acre of isolated wetlands. In addition, the project would involve the piping and fill of 250.4 linear feet of a jurisdictional channel (see Figure 3A). The permanent placement of fill within the wetlands is required primarily for the construction of the proposed road embankment, and to a lesser extent for the construction of permanent preformed scour holes. The permanent stream impact is required for the construction of a 162-foot long, 12-foot by 8-foot wide, reinforced concrete single box culvert. Bulldozers would be used for grading activities, and cranes would be used to install the culvert. Fill slopes are designed at 2:1 in this project segment. In addition, the project segment would temporarily disturb 0.16 acre of Section 404 jurisdictional wetlands, 0.03 acre of isolated wetlands, and 32.1 linear feet of stream. The temporary impacts are required for the construction of temporary gravel and rip rap filter basins and for a temporary construction easement. Except for the areas that that would be converted to permanent preformed scour holes, the temporary filter basins would be restored to pre-construction conditions. Impacts associated with the temporary construction easement are limited to clearing activities; no ground disturbance is anticipated. Phase IIId - NC 55 Connector: The proposed connection of NC 55 to the existing portion of the Morrisville Parkway at the intersection of Carpenter-Upchurch Road would require 0.15 acre of permanent impacts, and 0.05 acre of temporary impacts to an isolated wetland (see Figure 4A). The permanent placement of fill within the wetlands is required for construction of the proposed road embankment. Fill slopes are designed at 2:1 in this project segment. Bulldozers would be used for grading activities. Impacts associated with the temporary construction easement are limited to clearing activities; no ground disturbance is anticipated. Town of Cary Morrisville Parkway Extension Phases Ic, II, & lild Block 22: page 1 of I N U O O w z W O w a 0 Q 0 w A N A E~ W O A d w a M0 W b ~. v d h CC a o 00 O ,-~ 00 V t~ N ~ v l~ ~ ~- \O N ~ ~ ~ ~ O O~ _ O _ ~--~ N ~--~ ~ 00 M 0 ~ 0 M 0 M 0 M 0 M 0 ~1' 0 W ~..) R.' o W w w ~ ~ U a ~ e x a a x x U ° a ~ a ~ ~..~ ~ 0 ~ 0 ~ W ~ w z F ~ ~ x x ~ W ~ w ~ ~ a ~ ~ ~ ~ ..~ .a C7 U a o °o ~ ~o oo o~ oMo a ~ N .- -- N M ~ ~ ~ 00 Q1 ~ ~ ~ h ~ N ~ ~ N v~ o U z o o ~ U z N Q O ¢ ~ ~ O~ ¢ o ~ U ~-~ U ~ ~ N ~ N ~n N U ~ o ~ x z z ~ z x ~ a ~ ~ ~ ~ H N V ~ W U ~ W z U U ~ H ~ ~ W v ~" a ~,; ~; 0 W a 0 ~"' 0 ~" U a U W A ¢ O v 0 U 0 U W ~ ~ i "' i c ~ a w w ~ a ~ ~ W o °x ~ '~ '~ ~ 7 ~ ~ (~ ,-. 0 ~1 ~1 C M ~ ° `O O ° o M O a, ~ o . o , O H ~ .a Q ~ A o ~- ~ z a ~ A ~ ~23 ~ ~23 U ~ ~ ~ °~ ~ ~ o ~ x w z a a W ~ o U ~ O U ¢ A ,~ "'a .-. F" x ~ ul w v~i w ~i ~ w U ~ r 3 3 ~ z a O ~ A w x w ¢ O U h C~ a ~/"i O ~D ~t 'cY O~ M l~ M O Y1 h l~ N ~D O~ ~ ~ ~ 00 M 01 N M O ~ 7 ~ M M M M M M M M _ Vl O~ V M O V) 01 0 0 0 0 O ~-- a ~ x ~ a , a a a a a U -1 ~ o a x x x a ~ > a A A v~ ~ a ~ ~ ~ w ~ A w ~ A w ~ A ~ ¢ ~ ¢ ~ o W D O x x x ~"' M ~n ~ o O o~ O~ o~ --~ Pw 0 0 0 0 M M ~A O h N N U z M `' ~" ~ ¢ V1 C~ V1 01 O 00 0 ~ N (~ v~ o, v'1 o~ M oo ~ 1 o U ~ ~ ~ ~ ~ ~ ~ z ~! W ~n l~ N vi l~ N vl l~ N O~ ~ N ~O N "x W z z z N w z ~ z x AC~ U a U U U a' W E,., ~ w ~ z a z a z a v ¢ `" A v~i Fx- Fx-~ H A ~ O Q ~-- w a w a w a ~, ~ o ~ w ~ a o ~ A ~ A ~ A , ¢ ~, X a W ~ x x x A O 3 ~ O O N M O ~ O ~ O O M Qi O M x x w ~ x U ¢ ~ F O a w W ~ ~ ~ ¢ ~ ~ ¢ _ ~ >- ¢ Q ~ ~ ¢ ~C ¢ A o ~ o F ¢ ~2i ~3 v~ ~al A z a a~ x ~ ~ x ~ ~ H ~ W w ~ A ~ o > ~ ZW a C7 w ~ ~" C7 U > O w ~ O W ¢ E-~ ¢ O V a. W 3 3 > z ~ x A ~. 0 u as 0 z a 00 ~n V' 0o oo ~t O~ oo N v~ O N O M N V'i M O~ O C~ N I~ o0 vi O~ 00 ~--~ O O O O 0 0 0 0 0 0 0 0 ~"~ M M M M M M M M M ~. Q~i U U O U x F ~ d ~ F" ~ ~ ~ ~ ~ ~ ~ F" W x x x x x x x W ~, ~ ~ ~ ~ ~ ~ ~ W p., ¢ U U Z U Z U Z U Z U Z U Z U Z ¢ U a O ~, O ~ ~O ~ ~ ~ ~ ~ OM ~ N ~ ~ ~ M ~ C~. N M M M M M M M N 7 M V'1 N ° O ,~ M °O M M U z ~ O N ~ ~ M O N O N ~ ~O O ~ O ~..~ oMO ~o ° ~o ~o N M U N ,~ O ~o N [~ N O ~o N O ~o N U z /~ A!-~ Ri z ~ ~ ~ U z ~ ~ x N x a ~ z ~ z z ~ z h W U W ~ W W ~ ~ R: ~ z a . A a .~ . ( ~ U U ,' ~ Q W Q fx Q f~ p ; W ~ w ~ A A a Q A v~ U ..l ~ a ° i ~ Z Z O > v~ d o N v °o °° w O w w ,~ aC ~ ~ a x x x H a ~ x H x ~- U ~ ~- a o 7W r, O W O W ¢ ~ w N ¢ ~ ¢ ~ aa V7 0 ~ ~ M ~ O a a ~ N ~ `~' M °~ z z z ~ z z A w A A ~ ~ ~ ¢ x 3 ~ ~ x 3 ~ 3 z ~ a ~ w ~ w w w U w W 3 k. 0 ~n ~ z ~ v~ ~ v~ ~ w .a ¢ E-~ w Fx.+ em Z u" ~ z ~ Z GG W x U Q a Q O ~, o a 0 o o ~ „ p ~ z U W ~ ~ ~ _7 . w ~ W N U O ~' U 0 3 h ENG FORM 4345 -FIGURES FIGURES Town of Cary Morrisville Parkway Extension Phases Ic, II, & Iild Figures Figure 7: Vicinity Map Morrisville Parkway Extension Phases Ic, II and Illd Town of Cary, NC Legend Proposed Morrisville Parkway Centerline - Bridge Culvert Slope Stake Limits N A o zsa soo ~ Feet Mwnwae,NC TOWN Of CARP Nx~rx Cnret~un Sources: Wks County, NG', ESRI, Inc; Town of Gary, NG, era URS Garp. °~ .i , :. - ~ fir, . ~ , a.' +tk+ y `+~"'~ ., r , ' Louis Stevens Dnve" ~r f ~ f. ,x~ Wetland/Stream Impacts "`~ - ~' - i°`' . Permanent Section 404 Wetland Impacts = 0.40 AC ~ .rs~r 'e ~ r5 _ ti p Temporary Section 404 Wetland Impacts = 0.27 AC // ~, fiy ~, , P ~ u ~ _ Temporary Stream Impacts = 12.2 LF + e , ~ t'~'V ~ ~, ~~ys a t . ' r~ t 7 J'~ ~` ~~^ '.wv..~ .rrT'~~ ?~ -:may 1 "Jt 1. ~ .~ "~ ~ +tr' ,~~ ~. ~ 12.2 LF ~.- ~;'~ l a i ~ J t`. ~.. a .. r I - ice, M tar I bt fp(f'`r 1 k'~ a~ . ;` a ~-+s GT .1~ - ~II -'y 4" 4 't ~ 11~ ~ 1 Y,' ~: t - ~~ ~, ~ A ~%' , „ ~ k~ omsville Figure 2A: Phase Ic: Bridge Morrisville Parkway Extension Phases Ic, II and Illd Town of Cary, NC Legend Jurisdictional Wetland Boundary Jurisdictional Stream 50' Riparian Buffer Proposed Morrisville Parkway Cen[edine - Bridge - Slope Stake Limits Temporary Haul RoaO Proposed Impacts to Wetlands and Streams ® Permanent Section 404 Wetland Impact ® Temporary Section 404 Wetland Impact Temporary Stream Impact N A 0 50 100 ~ Feet Nla,bvae.NL Town of Cnxv Nna'r C~aoti.v~ Sources: Naka County. NC; ESRI. Inc: Tewn o! Cary, NC; and NRS Cap. IONAL WETLAND BOUNDARY I RB ~ . .~ i. I JIX2ISDICTIONAL STREAM CHANNEL / _ ITOP OF BANNI fj_ m ~~ - - ~~ - - - j ~ +j _ /~ . . ~ TEMPORARY CONSTRUCTION EASENENT ~ ~ `_ \_ _ ~\ \~ _ ~ 5'UTIL. STRIP .. ., ., .. ., ,. \ i[E v TCE T~ - - ' MH it[ i[E-~- ` ` ,• ` itE -. _.._[,. EXISITNC IB'R 1CF - ~_ ~icE TEMPORARY HAUL ROAD wee ra \ -_ -_ _ ____ _ " ...........M .....~.... ` ....... ...... 1[E ~.. \ . ~ .. m -~___.~-i[E .-•---- FILL ~ \ j~,,~,,' } _ -ta -"--_._.-'-' . ' IEKISTINC -....-- `.~ ~ RIPRAP AREA 5'UTIL. STRIP \ q ~i. I t' I ~- ......8 SIDEWALK HOODS Y r I '. m AR ...• . r i1' LANE ~ SURVE7 -l- r j ~ . ..~ ~- ,~~ ,~ E'AI57iNG R'pR~AP r _ -..... r ____ . r. ~~ _... r MORRISVILLE PAREBAV - ......, r I~°'0° ~ "'----- ~.."~ ~" B'DTIL. STRIP TO CARPENTER-UPCHURLH R0. 12'LANE 88888» - ' - 5'SIDEwALK 11'LANE ~ - ~ FRl_-..--"'~~ - ' '~ wooDs '~:' .y~.e ' `, MN ': . B'SIDEBALK ~"'18~. ~~ ://. '-~',. - - B' UiIL. STRIP m - ~ '` " _._. i -"-"""` '----------_ FILL /~` ~ BRIDGE APPROACH SLAB ` ~pPj m .............~__._~_._,._ ~ . ,~/ ~~ + / ~~o / ~ PRESTRESSED CONCRETE BRIDGE Bo'RIPARIAN BUFFER ~ / ~ ~ ~ app` ~ /N - - - - - - ~ - /~ - - f BENT AND URILLEO PIERS . /F-// / /. BO'RIPARIaN BUFFER - - r /- - - - ~. ,tea NLB wLB i~ SO OAVSS OR1VE O I F oe~ o=~r :rg~ oW ~ i a ~ 7 e ' OL i ~ E _ ! a o c ~a -_°~y~ n$ ag u~ -~- ~ aoE7i ~ ~~~~ ~~ W m m W I ~ ~ U Z U W J L.~ N ~ Q 2 a o.ru OCTOBER 2006 wur ~': C. O. CLEYA3 BtOfO n. 1 J. BARCp18 a~nsaNs 11823100 SCALE: I' = 60' w¢r w6 60 D 70 60 ~~ wL 5- woods r- B' SIDEWALK I I I I ~ I I I I ~ I I I I ~ I I I I ~ I I I I ~ I I I I ~ I 129.00 119.50 130.00 130.50 131.00 I3I.50 f IIL fAtE (a END BEN7 1 5T A. 129.14.000 -L- AN A AN SPAN CC FIIL FACE a ENO BENT 2 GRADE POINT EL. 749.7/4 1'-0' MIN. ; ST A. 131.05.500 -L- EARTH BERN E BEN7 I ( BEN1 2 ~ i'-0' NIN. CRADE POI N7 EL. 748.691 ' EAR 7H BERM FF%P. FI% '; FI% FIX '', FIX L. I'-6' MI N: ~. Z'-O'CL,LSS II 2:1 SLOPE :'I'-6' NIN. RIPRAP IIYP.I i0E OF SIOPE INORNAL TO CAP1 FILL t 5TA.730.76.734-L- ~- fllL~ IiTP.I EL 337.8• lOE OF SLOPE EL319.900 ~ - 4'-O'COLUNN 17YP.1 STA. 129.49.610-1- i - r- EL. 334.3? EL. 311.900 I lOP OF GRILLED PIER '' \\t '- - -' j EL. 729.800 EL 331 3e EL. 330.2! - HP11%57 STEEL PILES ITTP.1 L. 731.6! ------------~ '- ~ EL 730 7 NORNAL w. S.~ _ -------- - ___________________________ _____ ELL. _-= ' -_ - ' ---~---------- -- EL. 729.1 * - /-` E1. 334.1! GROUND LINE EL. 371.0! ~ ~' :~_ %~ i L EL. }72.8! EL. 330.1+ 6'-O'DRILLEO PIER I7 TPA ~ EL. 728.0? ~ EL. 332.1? ~EL. 328.2f i0P OF ORIL L EO PIER EL. 719.600 GRADE DATA -L- GRADE DATA -L- ENO BENT I BENT I END BENT 2 BENT 2 P.L=sTA.ul.oo.oo P.I.= ST A. 117.30.00 EL= 348.19' EL.= 7so.65' SECTION THRU ~ SURVEY -L- vc ' 110' vG = 480' SECTIONS Ai BEN7$ Alm END BENTS ARE A7 RIGHi ANGLES -0.5279% 1.6979% _ -5.5000--~ -n ~-- i0 F Lnl~ PILES ARE NOT SxOwN IN PLAN vIEw FOR CLARITY HORIZONTAL CURVE DATA •L- P.1.= Si A. 130.81.95 Q= IS° 28'17.0'IL iI L = 270.03' i = 135.84' R = 1.000.00' HORIZONTAL CURVE DATA -LRT- (RIGHT EOPI P.I.= STA. 130.0777 ~ ' IS° 2B'17.0'lL it L = 688.57' 7 = 346.39' R = 2.550.00' HYORAIA.IC DATA DESIGN DISCHARGE = 600 CFS FREQUENCY OF DESIGN FL000 = 50 1175. OESI GN HIGH wA7ER ELEVATION = 333.21 DRAINAGE AREA = 1.76 SO. MI. BASIC DISCHARGE 101001 = 770 CGS BASI[ HIGH HATER ELEVATION OVERiOPP ING FREOIIENCY = 773.48 : 500. YRS. SCALE: I' = 31' u 0 16 31 F b ~ '^ boo; L y ~ ; T ~ b ~ w ~ Z tL V ~ O ~ ~ ~ ~ If C o ~ E i I d O o a ba_-_°~~ o$ ~~ b ~07~~ ~~~~ ~x W C7 Z ~ O CY N m at5 G~ W I Z lW/1 ~ V Q ~ - J V1 c? a Ln L` N °~ Q U 2 a am aroeER zoD6 arm C. o. cTCVAs a[an n. 11BWCONB REVISIONS I 31077100 I Figure 3A: Phase II -Culvert Morrisville Parkway Extension Phases Ic, II and Illd Town of Cary, NC Legend Jurisdictional Wetland Boundary Jurisdictional Stream 50' Ripadan Buffer Proposed Morrisville Parkway Centedine Culvert Slope Stake limits Proposed Impacts to Wetlands and Streams ® Permanent Section 404 Wetland Impact ® Temporary Section 404 Wetland Impact ® Permanent Isolated Wetland Impact Temporary Isolated Wetland Impact - Permanent Stream Impact Temporary Stream Impact N A 0 50 100 *~~ Feet V iW nwrnwa., NC Tower of Cnxv Nr. e'rx C~xntiu• Sources: Nkke Cow#y, NC; ESRI, Inc; Tawn of Cary, NC; aM URS Corp. CULVERT CONSTRUCTION SEDUENCE 1. CONSTRUCT 1EKPORARY CHANNEL MITH LINER 5' DEPTN 12'BASE PERMANENT 2:1 SLOPES I I I DRAINAGE EASEMENT 2. CONSTRUCT IMPERVIOUS DIKE JURISDICTIONAL STREAM I CHANNEL (70P OF BANK/ 3. CONSTRUCT CULVERT CHANGE WITNNIINER I I TEMPORARY GRAVEL AND RIP RAP /. DIVERT MATER THROUGH CULVERT FILTER BASIN wITN SKIMMER 5. COMPLETE ROADRAY I IMPERVIOUS 1 1 DIKE ITYP.) CUSS I RIP RAP TOC PflEFORMEp SCOUR HOLE I N. ITYP.1 WITH LEVEL SPREADER APRON JURISDICTIONAL WETLAND BOUNDANY I 'iCF 10 BE INSTALLED AFTER BASIN IS REMOVED FI a po ._._ POE C ~ ~ t - ISOLATED WETlANO BOUNDAR7 b ~ ~ .-'- -.~ t~rv z -~i4 '' ~ iCE _ .~ ~~. Q ~ ~ y ! ...___._..._...._ ._.~....- _ - y' ~. - c- C - ia~~ _._._.____ --TO ASHMORE DRIVE - \ ( o ~ «+ B ii"„'.," ~ fY v~~TEMPOflARY CONSTRUCTION EASEMENT ~ e E z f .:.::. . a o00 iai.aa ioi.O~ ? ........_._.._..w.~..... .....................~................_........... .m a ~. lEt. i-............_............. ~ 1 - .~ , .:... -. -....y,....,f. ~ ~ ~ - ___.. NORRISVIILE PARKWAY ~ Y• - vt -- ~ KCCE55 ROKO _. _____. ~~ w..,y, _ _- _. _- -'" ~ __ ~.} , - ` ~ ~ .. r •. - ______-. ~~ •. ~e ne ., "- ` ' ~~~ ~'' SIDEWALK ,^4 . - ._. - ~~... e. -. _ _. - e. ,~ Fr[ ~` .~ .~ -' ~ w TEE .: - ...., ~ . -' ,. i~ ~~~` ~` `,~ .. a •.,, - \ ~~ _ ~~W _- . _ 5' UTIL STRIP ~ i P w`e.l ~ Iq L4~ -~ , / ~`' 1 1 1 i \ ~ .. ,y.~ = . - - - ~ \.. ''~ \ iCE TEES 50'ftIPAPIAN 1 1 u ~ -~ ~ - - -~i~\ I9 (qAq.~~ - M - m ~ W / BIYFEfl 1 yl ~ - f` U > / \ _ _ I~-`_ _ f( fill ~ t8 - ...T....... iaf. ~ _ Z / ae .. .. _ _ .. - - - _ _ z.... ~ _ Lt_ N CL yy / \. 1 1 0 \ lCF - ~ TO DAV Q / v 5O'RIPARIAN BUFFER rie - - - - - ``~-_~~ - I$ DRIVE _~ ~ .-FEE / / N1 ~ ~ - - ~'0 _iCE `......_ ..~ _ . _ R.w OCTOBER 2006 / \ a iCE ' ••..~ ~ RPrl n~ C. 0. CL6:VAS TEMPORARY GRAVEL ANO RIP flAP ~ SURVEY -LI- TEE _ uatD n. J. J. BARCOMB FILLER BASIN wITN SKIMMER 1 ~1 JURISDICTIONAL wETlANO BOlWOANY 1 ~ AI aEV15g225 n an 1 PREFORMED SCOUR HOLE wITN LEVEL SPREAOEP APRON TO BE INSTALLED AFTER BASIN IS REMOVED z1 SCALf: 1': 60' J~8231O0 60 0 30 60 Ski wK n~ ~ I I ]a-r . .k" 90• 79• 11' 10'-0' SKEW TRIANGLE WING FOOIING FLOOR SLABS CONST. JT. FLOOR SLAB WING FOOIINO DETAIL CONNECTION OF WING f00TING AND FLOOR SLAB WHEN SLAB IS THICKER THAN f00TING ~ o oo~ u-rv o r Y C w aw ° o a ~ p o s ° oc 9 fr E i i a o c e oay~ °o _o. u'P ~ d ~ a sus ~~~~ ~~~w s a `W^°O"o = X m r CL (V W ~ _ r W M W ~ J W (Jj Z U Z O ~ V1 L~ u*t. OCi08ER 7006 ar m E. 14IVER6W MOYO In J. J. BARCCNB HEVISgN$ I wx7, x.r.9. I 12'-2~'/i 6•BEVEI 12'-0' 9 10'-5 9 ' p O END ELEVATION NORMAL TO SKEW I SiuNao I CULVERT SECTION NORMAL TO ROADWAY PART PLAN -ROOF SLAB PART PLAN - fL00R SLAB Wetland/Stream Impacts 9 ~ ~ ~;r, ~2'- "~ ~ " Permanent Isolated Wetland Impacts - 0.15 AC '~, .~ ~ ~~ _t rl~ ,_ ;~_ Temprary Isolated Wetland Impacts - 0.05 AC ~ ~ ~ •,. ~ •.. /I 'a y y o '7 L r , ~ "~ r, r R Y~ ' ~.ai`.,, r / .+~t.~ t,,- .~o~ - = 7. 5AC rl ~ ,I' v.. ~ ;~ .~~^ r~' a~ '1w`'~ °'~ J.04 i°~C 1111 t'/ ~'~ ilyf C! .! .t F'W'~ R _' .. i ~ i' ~ y , yaM4aa'/~"' ' i 4°' _ ~ ~ ~- .. - - r ...,..y -`--- .r,~ - 3 .ter - ~ ~ ~~~ Morrisville Parkway y ,~ , ;t* ;,i^ `# ~, r ~ ^ •~ ..mow r ~ _n-~ +~t'' fir. i ,'A~, ~~ ~ f ~"^ ~ '' I ~., ~ ~" ~q - ~,, t ~ iH f % xa. ~ N .Iii ~ ., ii.ii" :.. ~' Rall ,. ~• ~. S g~~'` A y1~ }t ° ~, +~"~; t... ~~ ~ ~ 'n1. `la~'•/ ~ r • ` NC 55 •~ n.} , r`. ~ ~` /C ~'u q „ ~ t Carpenter-Upchurch Road i°.; ,, .^~ Wetland Delineation by URS on 12/6/2D05. ~ , , K .., ~~,,~` y, USACE Junsdictional Determination on 5/4/2006. ID# 200620573 ~'; '~ ~~' r . Y _ ~ _ _ ~ ~ I P. ..tlt a a ' .. 'r Figure 4A: Phase Illd - NC 55 Connector Morrisville Parkway Extension Phases Ic, II and Illd Town of Cary, NC Legend Jurisdictional Wetland Boundary Proposed Morrisville Parkway Centerline Slope Stake Limks Proposed Impact ®Permanent Isolated Wetland Impact Temporary Isolated Wetland Impact N A 50 100 *~~ Feet V iw .yk TOWN Of CARP ii Novr Cnnoi.i~a Sources. Wke CouKy. NC: ESRI, Inc: Town o! Cary. NC; arb URS Cory. 1 1 '-------- a 1'I ''I 111 III ,I 11 _ _ __ - 1 .Y V' ~ /~Y TEMPOAARY ~~ a ;'~ CONSTRUCTION~i ~ ~ EASEUENtr17 ~ „ ~~ __ . - I r 11~~____-_ ~ _ _ - ~ ~ " _ , ~~ _ , ~' '. ' eoueioae:Iaxu wcnAro ~ `____ , 1---_ 1 ' ~ ' '~" '~' ~~~ I, ~~~ ~ ; ~~ ~ TEMPORARY CONSTAUCTION EASEMENT_ _ -'"" ~~ , ~ , ~ >, H c ,~ ,4 ,4 ~ g ~ E%ISTING GRPVEL ROPO _ ¢ ~ ~, ,~i $ n II n Iii I' u°c '• ,, „ ~, ~ ~' ' , ,r. .~ __ n ce ~ ~ n. r ___. __ i i i ~ , n _ _ --___- .. __ G ap u 7 ~ ~ ii ~i ~ . . . ___ 0 2 , _____ 8 ~ O l ' o ° E i M .. r r.~,..~ r~..y ..~,I. ~ f1 >s o. U~o~ " ,~ ~ ~ ~~~~ ~~ , iEMPOAAAY EASEMENRY CONSTRUCTION ~ , , >4 ~ EASEMENTTION ~ 1. ~ ; 1 ... .. .r ... i6,., ~•F~~""'~ F1L: ~ 1¢ v°~'r 3 . `~ a ~--ia - , , •.• ~ ..- 'i ~ -~~ r¢ T¢ fI~L. ~.fIlL ~i¢ is FILL , a.. ' , ~ '~ CUi e' '` "' "' " "' ~ ...............................'- •• 5'Ui II. STAIP ~ 1 ALB ~ SURVEY -L I- ---~~''-='='_----__ -" ~ i0 NC NWY. 55 4 w ~~ - ~ 14'LANE _ - '- -- I~, _- - - f - - - - (~ 4'MON. ISlANO ~ 12'LANE - - ,mwo '~ _ _ .... _._~;r_._. ...... ....... .... .. ....... .... ... ...... ..._ ._. _._._. 4'MON. ISLAND I2'LANE~.~-'-~- ~ MDAAISVILLE PARKWAY ~~ _ - _ 8- , ~~ 's' d, Iq•LpNE ~- - i0 IEWIS SiEVENS OAIVE -~ , ,' ~ iii , ', p _ rT ~~ , _______ ~ e , , __________ , , x , , , , , i ', ~ Pip ._____________________ ~ , __ , {i ~ ' __ _•• -' CU?- FILL ILL .~, FIL ...~ra ~`-. IDEWALI( __ __ _ m ~ LwJ W cll}•-••••• -__ra CUi % • ~ia ~- FILL - Z ~ -i¢ ~ra is ~r 4 Y ~ 5'Ui IL. STR IP ~ ~ Z TEMPORAAY ~ N U Q CONSTRUCTION J TEMPORARY CONSTRUCTION EASEMENT LL = ~ CL EASEMENT r ~ v a , a z a ~~ ( ~TEMPORAAY axru O[TOBEN 2006 CONSTRUCTION nrlm C CASTIEBFART p EASEMENT OWOW-ro J..LBWCOYB ~ NEhSbN$ 1w1. Wi[ M I\ ~ tl SCLLE: I' = 60' \ i I 60 0 SO 60 gy'p' , n u , OIOtN00 vttr wn w..rz o 5• ROAD SED STATION 103+50 PA P A : A ro DENOTES WETLAND ~ o $o~ o3Na ue`a r s ~ f bi o Z d u 7 0 F STATION 103+00 ° ~ o c g c m~ ~ .as s A tl og ° E i Y ~n u ss ____ ona ________ ________ ________ ________ ________ _ _ _______ ~ + W ~ ° o A o s na 00 N ~ U ~ N ~ ` J Iw IIO Iw n w to w So -~a w w 1o a ID m n n n n m n n 1m Ila Ro ~~~_ y~s ~uo 3 ~ N P P STATION 102+50 ~ O ~x A rne:ss .nv '~ U p U cu„ i~ ss .. = W H c - Z ~n _______ ________ ________ _______ ~sz V _ ________ ________ _ 'x A _______ ________ ________ ________ ~ N O t~/1 U ~a~o - _ U ~ - Z C~ _ __ __e am WY 2006 im iro .w w -w +o w w -w w n io . .e ro n a w w ,o n n iw .w iro our m [. GSiLfBEeRY a(OYD m J. J. 88800YB Rf Vl$IONS R WIf XLL[1 IIgQ~ Kllii ML°L 71821100 WEi b OY111° n S- ENG FORM 4345 -TABLES TABLES Town of Cary Morrisville Parkway Extension Phases Ic, II, & Illd Tables: page 1 of 2 ENG FORM 4345 -TABLES TABLE Z. SUMMARY OF WETLAND AND STREAM IMPACTS Pro~ect Se neat Phase Ic Phase II Phase IIid Bride Culvert NC 55 Connector Total Section 404 Forested Wetlands acre 0.40 0.51 - 0.91 Permanent impacts Isolated Forested Wetlands (acre) - 0.09 0.15 0.24 Perennial Streams linear feet) - 250.4 - 250.4 Section 404 Forested Wetlands acre) 0.27 0.16 - 0.43 Temporary Impacts isolated Forested Wetlands acre - 0.03 0.05 0.08 .Perennial Streams inearfeet 12.2 32.1 - 44.3 TABLE 2. SUMMARY OF RIPARIAN BUFFER IMPACTS _ Pro'ect Se ment _ Phase Ic Phase lI Phasc IIId Bride Culvert NC 55 Connector Total P t I t ft Section 404Wetlands 814 2,379 N/A 3,193 Z 1 ermanen mpac .) s (sq. U lands 1,102 9,985 NSA 11,087 one T I t ft Section 404 Wetlands 4,553 285 NSA 4,838 emporary mpac s (sq. .) U lands 0 2,754 N~/~ 2,754 Perm n t I t ft Section 404 Wetlands 224 1,534 NSA 1,758 Z 2 a en mpac s (sq. .) U lands 2,878 5,053 NSA 7,931 one Tem orar I ) t ft Section 404 Wetlands 2,828 1,273 NSA 4,101 p y mpac s (sq. . U lands 48 1,708 NSA 1,756 TABLE 3. SUMMARY OF FILL MATERIALS WITHIN JURISDICTIONAL WATERS Pro~ect Se ent Phase Ic Phase II Phase Illd Fill Material Bride Culvert NC 55 Connector Total Gravel/Soil Road Embankment cubic ards 6,000 7,500 1,500 15,000 Class I Ri Ra cubic ards N/A 4 N/A 4 Reinforced Concrete Drilled Piers # er site 8 N/A N/A 8 Reinforced Concrete Box Culvert # er site) N/A 1 162' x 12' x 8' N/A 1 Town of Cary Morrisville Parkway Extension Phases Ic, II, & Iild Tables: page 2 of 2 ENG FORM 4345 -APPENDIX A APPENDIX A: USACE JURISDICTIONAL DETERMINATIONS Town of Cary Morrisville Parkway Extension Phases Ic, II, & IIId Appendix A U.S. AR.1~71' CORPS OF ENGINEERS - WILMINGTON DISTRICT Action Id. 200620573 County: \~1'ake U.S.G.S. Quad: C_ ar' N OTIFI CAT] ON OF JURISDICTIONAL DETER]~'DNATION Property Owner/Agent: Town of Carv Attn: )\7ike Babuin Address: PO Box 8005 Cary, NC 27512 Telephone No.: 919-462-3931 Size and location of property (waterbody, road name/number, town, etc.) The property is located east of the eai~tinQ ceQment of Morriwille Parkwav and extends toward Davis Drive, near Cary in Wake County. NC and is identified as 111orriwille Parkwav Extension, Phase 1. Indicate ~'1'hich of the Follovt~ing AUpIV: _ Based on preliminary information, there maybe Wetlands and Streams on the above described property. We strongly suggest you have this property inspected to determine the extent of Department of the Army (DA) jurisdiction. To be considered final, a jurisdictional deternvnation must be verified by the Corps. X There are Wetlands and Streams on the above described property subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC § ] 344). Unless there is a change in the law or ow published - regulations, this determination maybe relied upon for a period not to exceed five-years from the date of this notificatioi% _ We strongly suggest you have the Wetlands and Streams on yow property delineated. Due to the size of yow property and/or our present workload, the Corps may not be able to accomplish this wetland delineation in a timely manner. For a more timely delineation, you may wish to obtain a consultant. To be considered final, any delineation must be verified by the Corps. _ The «'et]ands and Streams on yow property have been delineated and the delineation has been verified by the Corps. We strongly suggest you have this delineation surveyed. Upon completion, this swvey should be reviewed and verified by the Corps. Once verified, this survey will provide an accwate depiction of al] areas subject to CWA jurisdiction on your property which, provided there is no change in the law or ow published regulations, may be relied upon for a period not to exceed five years. X The Vetlands and Streams have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on May 4, 2006. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five yeazs from the date of this notification. There are no waters of the U.S., to include wetlands, present on the above descrbed property which aze subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or ow published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA). You should contact the Division of Coastal Management in V~Tashington, NC, at (252) 946-6481 to deten~nine their requirements. Remarks: ~~ Cores Regulatory Official: Monte Matthews __T Date May 4.2006 Expiration Date Mav 4.2011 Page 1 of 2 Action ]d. 200620573 Placement of dredged or fill material within waters of the US and/or wetlands without a Department of the Army permit may constitute a violation of Section 30l of the Clean V~'ater Act (33 USC § 13l 1). If you have any questions regarding this determination and~or the Corps regulatory program, please contact 1\9onte )\9atthews at 919-876-844] x30. Basis For Determination• Areas on thi< cite exhibit ~~~etland criteria as described in the 7987 Corps R'etland Delineation 1\7anual and are adjacent to UT of Crabtree Creek. The properh~ also contains stream channels that exhibit an Ordinary Ai~h V1'ater ~9ark a~ indicated by changes in soil character and absence or terrestrial veeetation and are hvdrolo~ically connected to Crabtree Creek in the Neuse River Basin. Appeals Information: (This information applies only to approved jurisdictional determinations as indicated above) This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR part 331. Enclosed you will find a I~'otification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the South Atlantic Division, Division Office at the Following address: 1\~. A4ichae] F. Bell, Administrative Appeal Review Officer CESAD-ET-CO-R U.S. Army Corps of Engineers, South Atlantic Division 60 Forsyth Street, Room 9M15 ~ ~~ Atlanta, Georgia 30303-880] In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by July 4, 2006. **It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this corespondence.** Corps Regulatory Official (Initial): ~~ FOR OFFICE USE ONLY: • A plat or sketch of the property and the wetland data form must be attached to the file copy of this form. • A copy of the "I~'otification Of Administrative Appeal Options And Process And Request For Appeal" form must be transmitted with the property owner/agent copy of this form. • If the property contains isolated wetlands/waters, please indicate in "Remarks" section and attach the "Isolated Determination Information Sheet" to the file copy of this form. CF: URS Attn: Ray Bode ] 600 Perimeter Park Drive, Suite 400 Morrisville, NC 27560 '^ - .. ~ > ... _e ~- ~ .L_ .5.- rf` '~%i ~.+.t -G~~ G4.,S. !. `Y-.tiL4yye....r-. ty ~..- ~J ~..~ "". .. ~. ~ p^'. -fe'K ~ . \!£' ~-.[LT~~ f'~ ~/nJ_ ^T:' l - .~. 3T~ ~ NO'TIF]CAT]ON OF ~DT7II~~]STR~TIVE 4PPFAZ GPTIOI~S AND PROCESS AI~~D ~ r~~."~ ~~ ~~°~- REQUEST FOR~APPEAL - s- ~ t. d t ~~~ ;~~ ~{~ ~^ rte' i K ~ . . M __ . ~, ~.2 . r~ ..~ y: Applicant: Town of Cary File Number: 200620573 Date: May 4, 2006 Attn: Mike Babuin At tached is: See Section below INITIAL PROFFERED PERMIT (Standard Permit or Letter of A ermission PROFFERED PERMIT (Standard Permit or Letter of ermission B PERMIT DENIAL C X APPROVED JURISD]CTlONAL DETERMINATION D PRELIMINARY JUR]SDICTIONAL DETERMINATION E :.. ~ .. SECTION I -The following identif es. your rights and options"regarding an administrative appeaTof the above `° decision. Additional informatton-may be found'at http~//~a~wv.usace:.armv.mil%inet/functions/cw/cecwo/reg or .:- , . Co .s e )ations at 33 CFRyPart 331 ~; . , ` . A: 1TilT1AL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and'yow work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its eniirety, and waive al] rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or }you will forfeit yow right to appeal the permit in the futwe. Upon receipt of your letter, the district engineer will evaluate yow objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of yow objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating yow objections, the district engineer will send you a proffered permit for yow reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and ;=ow work is authorized. Your signatwe on the Standard Permit or acceptance of the LOP means that }you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose io decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer: This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section D of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISD]CTIONAL DETERMINAT]ON: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: ]f you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section D of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISD]CTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you ~~~ish, you may request an approved JD (which maybe appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II -REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Descr7be yow reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADD]T]ONAL 17~'FORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative-record. "POINT OF CONTACT FOR lTEST]ONS' OR INFORIyIATION° ` '~ ~ '' `~" If you have questions regarding this decision If you only have questions regarding the appeal process you and/or the appeal process you may contact: may also contact: Monte Matthews Mr. Michael F. Bell, Administrative Appeal Review 6508 Falls of the Neuse Road Officer Suite 120 CESAD-ET-CO-R Raleigh, NC 276]4 U.S. Army Corps of Engineers, South Atlantic Division 919-876-8441 x30 60 Forsyth Street, Room 9M15 Atlanta, Geor is 30303-8801 R]GHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportunity to participate in all site investi ations. Date: Telephone number: Signature of appellant or agent. DNISION EI\'GIl~'EER: Commander U.S. Army Engineer Division, South Atlantic 60 Forsyth Street, Room 9MI5 Atlanta, Georgia 30303-3490 ~<<, ""''~ I h~ ~G' ~ c U cc°~ W `s ~FCO'`t ° $ C1, Y a d10RR~SVrLI£~ a CAFFENrEF hG SITE VOPp1cVlllE MOFFISVILLE = PKWY. FK WY. o FFOFOSEO i ~ c n MOkkISVILLE p ~, z FAkKWAY vl s z c` ti c1 c,A cy RQ NoY To scALE VICINITY MAP DATUM DESCRIPTION THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT IS EASED ON THE S1ATE PLfJJE COORDINATES ESTABLISHED BY 07HERS FOR MONUMENT'IN 100' WITH NAD 83 STATE PLANE GRIG COORDINATES OF NORTHING 751,265.7021A) FASTING: 2,037,7992951ft) 7HE AVERAGE COfd61NED GRID FACTOR USED ON THIS PROJECT (GROUND 10 GRID) IS: 0.99990]459 THE N.C. LAMBERT GRID BEARING AND LOCALIZED HORRONTAL GROUND DISTANCE FROM 'TN 100' TO N.C.G :.'CHANDLER' IS N 74' 00' OB' E 355.161(1) ALL LINEAR DIMENSIONS ARE LOCALIZED HORQONTAL DISTANCES VERTICAL DATUM USED IS NGVD 29 NOTES: 1. THE DEPICTED WETLANDS WERE FIELD SURVEYED BY THIS OFFICE USING CONVEN710NAL SURVEY METHODS. 2. THE PURPOSE OF THIS SURVEY IS TO DEPICT SECTION 404 JURISDICTION WETLANDS ONLY. BOUNDARY AND PROPOSED ROADWAY LINES ARE BY OTHERS AND ARE SHOWN HERE SOLELY FOR ORIENTATION PURPOSES. 1 ~~ - ~ ~ I .TAR-EL n ~ u, v, n ~~ 1 mt ,~ 9, 8, A ~-- = o~ I ~ I g ~~ _I ci a SHEET 2 OF 2 Zv N.C.G.S. •CNANDLER' N= 75t,3633A6 I ESP'1N tOD' ~' E~'~~~'~ N. ~st~ss.TO~ s31u E•2,037,T991B5 ELEV• 361.A5(A) I ECTIO a A10RRISVILLEPgRKWAY W ETLArJDS ExTENSIpN ~i In .~ r--~_. at.lslars• ~.~~EIV]CI3 SEP 2. ~~ 2006 RALEIGH REGULATORY FIELD OFFICE I, JESSE J. PRICE, PROFESSIONAL LAND SURVEYOR HEREBY CERTIFY THAT THIS SECTION 404 WETLAND SURVEY AND SUBSEQUENT PLANS WAS MADE UNDER MY DIRECT SUPERVI~~nI AND THAT IT IS CORRECT 7r?'~'F~C~4.~~,rQF_ MY KNOWLEDGE. ::Q ,, 220 oa-' /- Z 72 ,F~~,.uN...•G: N.C. PROFS A UNAL.S-f1RVEYOR L-8220 ~~..,. NORTH CAROLINA WAKE COUNTY This certifies that this copy of this plat accurately depicts the boundary of the jurisdiction of Section 404 of the Clean Water Act as determined by the undersigned on this date. Unless there is a change in the law a our published regulations, this determination of Section 404 jurisdiction may be relied upon for a period not to exceed fivE years from this dale. Thf6 tleterminatan was made utilizing the 1987 Corps of Engineen; Wetlands Delineation Manual. Regulatory Official: Title S Dater ' G - 0 4 USACE Action ID: zOo(2o.1-7~ GRAPHIC SCALE o zw wo ( W FEET ) 1 inch 500 ft Submllled 01' URS Corporation - NortA Corollna 1600 Perimeter Fork Orlve Morrlsvllle, North Corollno 27560 TELEPHONE (01C) 461-(100 FAx (910) {61-1415 COPTRIGNY ®y000, VR: COfiPOriPmON, wC. e• ~EOr , ~ SECTION 4D4 WETLANDS SURVEY fOR: ~~K, `~ P"' ARMY CORPS OF ENGINEERS .ar:<~r,K~. ESP ASSOCIATES, P.A. izT1A11D=DE11"~Yp"~Y MORRISVILLEFARKWAYEXTENSION engineering•surueying.planning s~E, F1iASE ONE 1 OF 2 = ss1 rri~niry Road GARY, WAI(E COUNTY, NORTH CAROLINA. c Raleigh, NC 29609 (918) 656-8200 .~ r DLTF 3(µt Ot-ii-06 T=3 p~Rw et crrtcN:[ G.K. JJ.F. #e[MTgN FtuwOt nFiwUTlowu SKE7 20F2 i . Z7. OL GFWPNIC SCALE 30 0 3s w so t s ~ ~ ~ ( IN FEET J t in[A • 30 h. T21 Submltied by uR5 Corpaorron - Na7n Coraino 1600 Perlmerer Park Drive Morrisville, North Cara/no 27560 TELEPHONE (ptp) ~Et-ttpp FA% (ptG) ~Et-tats COP7RIGNT Q Y000. URS CORPORATION, RiC. SECTION 404 WETLANDS SURVEY FORS ESP ASSOCIATES P.A. ARMY CORPS OF ENGINEERS f MORRISVILLE PARKWAY EXTENSION engineering•au.TVeying•punning PHASE ONE - 961 Trinity F[oad CARY,WkKE000NIY,NORTHClJtGIINR = Raleigh, NC 29607 (915) b5b-5L=00 U.S. ARA'!Y CORPS OF ENGII~'EERS . 1'1'ilmington District ~ ail, Action ID: 200320957 County: Wake NOTIFICATION OF Jt1R]SDICTI01\'AL DETER)\'iIl\'ATION Property Authorized Owner Town of Cary Agent URS. Group, Inc. Attn: Russ Overton, P.E. ~ ~ ~ ~ Attn: Ray Bode Address P.O. Box 8005 ~ ~ Address l 600 Perimeter Park Drive Cary, NC 27512 Morrisville; NC 27560 Telephone 1\'umber 919-469-4030 Telephone Number 919-461-1100 Size and Location of Property (waterbody. Hi~h~~~ay name/number, town, etc.): The project is located on Louis Stevens.Drive between Heritage Pine and Morrisville-Carpenter Road and on Morrisville Parkway between~Preston Village North and Carpenter Upchurch Road in Morrisville, Wake County; North Carolina. ~ ~ ~ ~ ~ ~ ~ ~ . Basis for Determination: The.site contains wetlands.and stream channels with indicators.of ordinary high water marks, located adjacent to an unnamed tributary of Crabtree Creek in the Netrse River Basin. Indicate 1t1'hich of the Follovvin~ Apply: There are waters of the U.S., to include wetlands, on the above described property which we strongly suggest should be delineated and surveyed. The surveyed wetland lines must be verified by our staff before the Corps will make a final jurisdictional determination on your property. Because of the size of your property and our present workload, our identification and delineation of your wetlands cannot be accomplished in a timely manner. You may wish to obtain a consultant to obtain a more timely delineation of the wetlands. Once the consultant has flagged a wetland line on the property, Corps staff will review it, and, if it is accurate, we strongly recommend that you have the line surveyed for final approval by the Corps. The Corps will not make a final jurisdictional determination on your property without an approved survey. X The waters of the U.S., to include wetlands, on your lot have been delineated, and the limits of the Corps jurisdiction have been explained to you. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. There are no waters of the U.S., to include wetlands, present on the above described property which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the of this notification. Placem t of dredged or fill material in ~i~et)ands on this property ~i~ithout a Department of the Army P rmit is in most cases a violation of Section 301 of the Clean 1'~'ater Act (33 USC 1311). A permi snot required for work on the prorzrty restricted entirely to existing high ground. If you have any questions regarding the Corps of Engineers regulatory program, please contact ' Andrea 11'ade at telephone number (919) 876 - 8441 extension 31. Project Manager Signature ~ ~ c--,~c-~-- Date November ]2, 2003 Expiration Date November 12, 2008 SURVEY PLAT OR FIELD SKETCH OF THE DESCRIBED PROPERTY AND THE WETLAND DELINEATION FORA91\7UST BE ATTACI3ED TO THE FILE COPY OF THIS FORM. Sas ~ 1 L' ~~ ,. ~'' \ ~.^JC J`SL ~.~ F.C.. ~ -i ~~ eA '~1~ i2-.- 5. ti ~~ ~i.. .. _~ ~ ~7~301'7 l OT ~ _~~ J~~1 R O-C ] ~Pl' l~ 1{ ~ ~ l ] S 7 ~ ] ] 0'~~ Ol, .~1D~171'~' ~ i\ 07~]]i l C , I/SS a.. D , r . ~ F ~~ A 1 T l l /l ~]f ~:. '~a+ ] ~~'%~~V]\:-i 1'~'~1 ~ r'~~s J\1~~ ~ ~tii } j ;L ; ~ 1Y ~ 'x' ; - 3 .i }~; : _. lS 3,,~~~ ,,~3 ~~,,,~ ~°i.L-CA.;`. .. ~~ ~7}°-~ l iY r"- ~.. -~. ~~-d_.:.~~?'~-t'-?S^-.~f... r'~t. :~~^y;*FCc_,T ~.. -ka t:t v. _~.~ x .fit -~ -~... .. ~ . Applicant: Town of Cary File 1\'umber: 200320957 Date:Nov 12, 2003 Attached is: See Section below INITIAL PROFFERED PERA~IT (Standard Permit or Letter of ermission) A PROFFERED PERMIT (Standard Permit or Letter of ermission) B PERMIT DENIAL C X APPROVED JURISDICTIONAL DETERMINATION D PRELA~DTIARY JURISD]CT]ONAL DETERM~'ATION ~ E ons recardtna an ac]Ir~~T3t~t~~~tt~~e- ON]~_7 }~e fg}lo`~tn~ ~denttfies dour n~-},t~ ~»d o ~tt ~ SECTJ J ~a~ oft abov,"• PP _ _ - A , ~ _ ~ ~oT~sleva'. €clec~~ton Aa`d:t~onal~T~forn~at on n,ay le found at hfp I/tr=ace ar~n~j nullir~eUfunct -~~ r cec o~lreg~~~ _ ~ - ~ = =- ,~ r - _ ~ ~- rt l -~ - ~ MFR P t ~ la - ~- - -.- - ~~~ < < _ , .. ~-.n. -tom -- - -____-- - - a ~~ ttons :~ a -Co s rePU ~-_.~ : - A: INITIAL. PROFFERED PERMIT: You may accept or object to the permit. ~ - . • ACCEPT: -If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may acceprthe LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object-to the permit .(Standard or LOP) because of certain terms and conditions therein, you may,request that the permit-be modified accordingly: You must complete Section II of this form and return the form to the district. engineer. . Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit, your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (aj modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. ]f you received a Letter of Permission (LOP), you may accept the LOP and yo=u work is authorized. Your c_ignature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DEI\~lAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICT]ONAL DETERlvIINAT]ON: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved ]D. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process~by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISD]CT]ONAL DETERA~AT]ON: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. _.. _ ~ r SELT~ON II _1~ L?LST'FOR` F~PPE.aL or L~BJECTIOI~S:TO ,~N II~~Ti'i~iLFROFF_ERED~' RIB REASONS FOR APPEAL OR OBJECTION'S: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the adminisvative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the adminisvative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the adminisvative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the adminisvative record. ~. ___ _ ._ - - --- - _ .T~ ~ .. ~'07~'T OT CONT.9 CT ]~QR QL~F'STI O}'~ S OR~J,~TFOR?~~TJ OIL ._ ~~~ ~E s_~~~~ ~~ - -- w_._, _ ~ _ if you have questions regarding this decision and/or the appeal If you only have questions regarding the appeal process you may process you may contact: also contact: Ms. Andrea Wade, Regulatory Specialist Mr. Arthur Middleton, Adminisvative Appeal Review Officer Raleigh Regulatory Field Office CESAD-ET-CO-R 6508 Fa11s of the Neuse Road, Suite ]20 U.S. Army Corps of Engineers, South Atlantic Division Raleigh, North Carolina 27615 60 Forsyth Street, Room 9M15 Atlanta, Geor is 30303-8801 RIGHT OF ENTRY: Your signature below grants the right of envy to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportunity to participate in al] site investigations. Date: Telephone number: Signature of appellant or agent. DIVISION ENGINEER: Commander U.S. Army Engineer Division, South Atlantic 60 Forsyth Street, Room 9M15 Atlanta, Georgia 30303-3490 ~o ~}~0 A 0 c a c N ~L a N y0 4 40 ~ C y >,°c ~ CpFPCNTEP EIRE 4pRRp~,t :7-1WN RD. ~` RD. ~C4IrPEN,~R RD• ~"0~ -SITE YORRIEVICl[ ~ 2 PKWY. _ ; O S W D u ~ y~I y A O O GREEN HOPE SG{, RD. .t,~ yy~ LSO 5 'PO • NOT705rALF VICINITY MAP ch Cp E~ I .o u= z... GRAPHIC SCALE o xo soo ( IN FEET ) 1 inch ~ 500 fl NOTES: ' 1. THE DEPICTED WETLANDS WERE FIELD SURVEYED BY THIS OFFICE USING CONVENTIONAL SURVEY METHODS. 2.7HE PURPOSE OF THIS SURVEY IS TO DEPICT SECTION 404 JURISDICTION WETLANDS ONLY. BOUNDARY AND PROPOSED ROADWAY LINES ARE BY OTHERS AND ARE SHOWN HERE SOLELY FOR ORIENTATION PURPOSES. r --- __------- -....._ _ri i i f N.GGS.'CJWtp.6t I ROAD H= 751,383.616 E• Z,RiE,110.iW I F1FV• 3eeS3111) ~ 7p ~HAb t~ ~/ ~t y ~` ~ ~ Jy' b J` TS slrE - t g ~d ~ M ~t~„ VS M 1-40 ~' ~ oy ~ S WAKE COUNTY ~. i NORTH CAROLINA ~f OQ~ 7y~` S~ 0 1 NOT TO t7G1lF LOCATION MAP ~.a_,___~1__ ~ PROPOSED j ROAD i I SECTION 401 WETLANDS ~ I SHEET 3 OF 3 SECT10N404 ` RECEIVED ~W~`"'"°S ~~ ...__. STREAM .Erg. -__---~OCT-0~1-21103___-- ---- -----_..__--- ~~ra r^ rm er av r7E7 n nPP re ~~ 1• ~ SECTION 404 WETLANDS SURVEY FOR: RAP. JJP. ~'~" ~`°~" ARMY CORPS OF ENGINEERS wErw7~#oE.s~4Pm+txsNEV LOUIS STEPHENS DRIVE 8 MORRISVILLE PARKWAY EXTENSION; seT PHASEI~E 1 OF 3 GARY, WAKE COUNTY,1401tTH u.RtxRu DATUM DESCRIPTION THE LOCALZED COORDINATE SYSTEM DEVELOPED FOR PHIS PROJECT ti EASED ON THE 51A1E PLANE COORDINATES ESTABLISHED BY OTHERS FOR MONIIMENi'GPS NaB' WITH NAD 83 STA1T: PUWE GRID COORDINATES OF NORTHING: 750,973.960111) EASTMIG: 2,041,112.160(8) THE AVERAGE COMBINED GRID FACTOR USED ON PHIS PROJECT (GROUND TO GRID) I5: 0.999907159 THE N.C. LAMBERT GRID BEARING AND LOCALIZED HORIZONTAL GROUND DISTANCE FROM 'GPS No.6' TO N.C.G.S.'CHANDLE3t' 6 N 62' 33 19' W 3,007.11(8) ALL UNEAR DIMENSIONS ARE LOCALIZED HORL'_ONTAL DISTANCES VERTICAL DATUM USED S NGVD 1B unoTU reoni u7e ....#:C.u v ra7.lse>. WAKE COUNTY h17y1°sei ,dswµ ...as~.,ie~t..ds R1 rc.~.rai~ p+.+sunt*+ This certifies tt7at this copy of this plat tscevraleq iaEielelhe- . lion a04 of the Clean Water Act in the areas impacted Dy the presets proposed ad3vNy, as determined by V7e undersigned on tl7fs dale. Other areas d jurisdiction may be presets on the site but have rat been delineated. Unless there is a change in the law or otx published regulations, this delem7ir781ion oT Section 104 jurisdiction may be relied upon for a period rat to exceed five years from this date. This deternir7ation was rt7ade utilfzir7p the 1887 Corps of Engir7eers Wetlands Delir7eationMa\nu91. Name:~r~- w ~~- Tttle: l~,a ~~ T.~iS~ Date: t 2 plea z o0 3 LAKE AID: ~ o0 3 a o151 ^•.,,V ~ Subm/tted by ,.~ i 'GP: NaS111 ~, r~ TsoFT3.seo 1 E=107L772110 URS Corpordtlan - NortA CoraJlno El#Y363.341p ~ , I600 PerllrlE7er Park !Xlve MorrlsYiUe. North Cardlno 27560 TF1.EYlCPE 19197 461-1700 FA7I Ia7G7 461-1416 1 co7~,Fio~r C zooo. ua arraa.T Tory 7NG I, JESSE J. PRICE, PROFESSIONAL LAND SURVEYOR HEREBY CERTIFY THAT THIS SECTION a0e WETLAND SURVEY AND SUBSEQUENTP•IANS WAS MADE UNDER MY DIRECT SU IS, SHAT IT IS CORREC ~h KNOYVLEDGE. ~23-r'3 N.C. Trr~v OR L3220 ~~~~ A l~erracon Company ENGINEERING -SURVEYING -PLANNING 540 GREENS DAIRY ROAD, RALEIGH ,N.C. 27816 (919) 8731211 J ., SHEET 2 OF 3 I,ao ~„ ~`:~5:- z{ ~~.,~~ 16E ~ r1 12 ,3E ub 1B _- - 137 ~"-- iB ~, _ 162 to -- 181 198 •~ - ~ 160 ,r' l.w +.,: % 148•' 114 ~. ~ 199 1]1 111 SECTION 404 WETLAND AREA 106,416.62 SOFT. / 2.443 ACRES ,92 ' - - GRAPHIC SCALE ,66 6 66 ,66 eo6 .oo SECTION 404 WETLAND AREA (~ Fes, ~ 4,501.52 SOFT. 10.103 ACRE 1 incII ~ 100 fl 161 L7e1°2ue 1e18 P'+T NOR711111G FISTING ,27 7s„SE.362' 2owrn Aeeo vNT NOfiT711NG FASTING no T8086i.933T 2010710.891tp 12E 78t t1E.9f1f 2D40E27.1927 171 75061E.6110 2010727A779 12f 75108f.E7&' 20,p822A162 172 750832358E 2010'171 3800 730 7s,0,s.~13 2D1o7e3A7oo . 1r. 7so7E3.n6E 201oE36 c/ee 131 750931.H21 20107BE3318 . 17, 750685.6EtE 20~%72x07 t32 75D6,O.E715 z0,o7E+.t9o2 77E 7so.oo.see2 2o,o2Ets7t3 733 75068f.9367 20107D1.OOBB m 75010E.439f 2Da0?23 1663 131 750680.108E 2D108873910 1 . 17E 760385.8202 20101%AS2a 13 . 750E76.B01E 2DaW01A031 176 76037E.7b0E 2010162 8x34 13E 750738.751! 201407.0386 . 1e0 T80120,W23 2010170 0702 137 750793.7101 201428.0316 . te1 760135,7332 2010218 2127 13E 750E30.8671 2014xB.711e . 1e2 75011E 3589 2010256 6761 13f 75082t.~0E 2010507A810 . 189 7543EA183 240287 169e 110 75086E.,707 20,05%2618 . tB, 750+10.8508 2010056 2961 711 750901.382 2010M8A170 u2 75DB17.T3„ 2010519A64p . 1% 750366.088E 2010097A002 1 113 75D870.T3l1 i'010850.1242 6E 760321.1582 2o1oo7a.1ee7 767 75032EA+6E 201001B e576 1w 75t00E.B858 2D1083138W 148 750970.1753 24486 e76B . 186 750311.3026 2038876.6510 1 . 116 750882.85&' 20,481A127 66 750310.016E 203998,5,20/6 190 )8420.7e71 20.0093 6716e 117 757016.1217 2D108.15.6U1 . 191 75031fA931 20398573116 11E T6068E.7803 240561.4721 192 760317.9219 2038006 1227 1aF 750699.9511 20105712101 . 193 75031E.9928 203992e 8106 150 750721.1762 20/0681132 . 1a 780283,0801 2030961 1273 1s1 75075E.B82E 20106».6288 . 1% 7802E2.otet 2D38986A660 152 750n3.8916 2010839,5760 198 78028E2BB3 203BBBOA76p 153 7507BF.088F 2010618.•i269 161 7b0E 18.6181 20+0880 1160 197 7b07E1.7971 201002awM7 1 , 15E 750851.641E 2040712A367 0f 78D295.7161 2010082.9299 196 7803726249 20101182626 166 750803.8703 201074,0966 200 78032b.6We 2040190A760 767 750850,7039 240719.120.1 201 7b033,At% 2010118 6060 18x 7s1o1l.111! 20Wn7.7102 , 202 76036,.9/e9 2D101a 1420 169 751D71.BBBE 2010)36w762 . 203 750380.6469 201020DA696 180 7bt106.304 2010740,1,1% 201 7503722W9 20402351994 161 781722.8886 2010767,6902 20S 7503%,0616 20W2be.11H 182 761187.076, 240771.4661 211E 760369,1019 2402&Aa0 189 78116E.788E 20107e0A190 207 760362.11% 20102% 1766 1& 761122.1091 010761.%4 , 20E 780393.429 2D109671617 1es 7st1o3.29xa 2407x3.7169 • 206 750983.091! 204412 6690 teE 7s1o711sT9 240718.0292 . 210 760108.194 2404uA690 167 75700.0356 20W726.1627 168 750819.8116 2010787A611 166 760907A7a 20107E1A212 127 . ~~ :: 103 126 ~~{e1 ~ ; p i6a7F ta` ~ S 3~ 126 a' . ~~ u7 g ~,ee~~ ;-~ "tae ~A ,s7~~ ,4 ~ w ,43 t ,16 112 v~ .~ 210 Zoe Su6Mft6d by URS CarFloro/!a7 - North Cordl/>lo 1600 Perimeter Park Drive MorrlavllJel North Cardlno 27560 TE1FA10nE 19191 161-1100 FA71 19191 461-1118 OOPYR I (}IT Q '000. leE CdTOFAT I ON. INO. ,~ oF23:os 1•• 1av SECTION 404 WEl1NJDS SURVEY fOR: T~ ~ ~T C f~/~f/__ Z~ V ~%I~Z~~!/ `~~" ARMY CORPS OF ENGINEERS ,j jjjy G iriQ/j ~ . T~~*~+~' LOUIE STEPHENS DRIVE € MORRISVILLE PARKWAY EXTENSIONS A effaCOn Company ~' PHASE ONE ENGINEERING -SURVEYING -PLANNING 3 OF 3 GFtY, wAl~ coulrlY, No~Tr+c~Rall9lA 5240 GREEN': DAIRY ROAD, RALEIGH ,N.C. 27616 (919) 8732211 uNE sEnniNG ois7nNCe L73 N61.13'»'+'W SE.11' us s6o•30..w 13.19 L7B N27'3.3rE 4537 Ln Nn•3esr6 sD.1r L7! NBE'tT22"E w,52 L7B N6F'1p~8'E 2E.7B Leo soE•,oi.w 36.N' Let sz•DrrrE e3.1D LB2 S20'3007w 1EA0 L83 NE 1'Sf97'W 56.88 Let slr.r.lw 46.w LBS Ni t'30'S2w 31.7E L66 N31'1,32'E 83.80' la7 N65'OD00'E 1JA0 LBB S57'25',7'E 5E2!' LBB HE7'1379'E 22.71' Leo s+rt.•.6-E 16.er Let E7f'3P1CE 8.11? Let N74yP1D'E 2,yg lB9 57f'3EV3'E 3E.ar l81 Nef'tT,14 3E38' L% N73'18',6'E SEA9' L% N3E'tE72-E 21 TT LY7 N73'ST12'E 16.88' L9B NSE'33'S9'E 6,,8E L9e E7,'O!'b1'E 1e.1z L1ao N6E•t1Dt'E 27A2 uo1 Nse•1E•59•s 26.ar 1102 Ne.','1T61'E 28.88' L109 662'7713`E 18.00 L1a N7S•33t1'E eo.Dr L1% NBf•88"17~ 55.1P L,o6 NB3~BU!'E 9E.ar ,H U.S. AR]vIY CORPS OF ENGINEERS WILMINGTON DISTRICT Action ]d. 200620573 County: s't'ake U.S.G.S. Quad: C r NOTIFI CAT] ON OF JURI SDI CTl Ol~'AL DETERMINATION Property Owner/Agent: Town of Cary Attn: )\9ike Babuin Address: PO Box 8005 Can', NC 27512 Telephone No.: 9 ] 9-462-3931 Size and location of property (waterbody, road name/number, town, etc.) The property is located east of the existing segment of Morrisville Parkway and extends toward Davis Drive. near Carv in ~~'ake Counh~, NC and is identified as A~orrisnil/e ParkN~ahExrension, Phase 1. Indicate ~'~'hich of the Follovt~in~ Apply: _ Based on preliminary information, there may be Wetlands and Streams on the above described property. We strongly suggest you have this property inspected to determine the extent of Department of the Army (DA) jurisdiction. To be considered final, a jurisdictional determination must be verified by the Corps. X There are Wetlands and Streams on the above described property subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. We strongly suggest you have the Wetlands and Streams on your property delineated. Due to the size of your property and/or our present workload, the Corps may not be able to accomplish this wetland delineation in a timely manner. For a more timely delineation, you may wish to obtain a consultant. To be considered final, any delineation must be verified by the Corps. _ The Wetlands and Streams on your property have been delineated and the delineation has been verified by the Corps. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. X The VI'et]ands and Streams have been delineated and surve;~ed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on May 4, 2006. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five ;ears from the date of this notification. _ There are no waters of the U.S., to include wetlands, present on the above described property which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC ] 344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area )\9anagement Act (CAMA). You should contact the Division of Coastal Management in R'ashington, NC, at (252) 946-6481 to determine their requirements. Remarks: Corps Regulatory Official: Monte Matthews~,~ ~.lyl~ Date )\9av 4, 2006 Expiration Date Mav 4, 2011 Page 1 of 2 Action Id. 200620573 Placement of dredged or fill material within ~~~aters of the US and/or ~~etlands without a Department of the Army permit may constitute a violation of Section 30] of the Clean \~~ater Act (33 USC § l3l 1). If you have any questions regarding this determination and/or the Corps regulatory program; please contact 1\4onte 1\9atthe~vs at 919-876-844] x30. Basis For Determination• Areas on this site exhibit ~+~etland criteria as described in the 1987 Corps ~'~'etland Delineation Manual and are ad'lacent to UT of Crabtree Creek. The property also contains stream channels that exhibit an Ordinary High V1'ater Mark as indicated by changes in soil character and absence or terrestrial ~~e~etation and are h~~drolo~ical)v connected to Crabtree Creek in the Neuse River Basin. Appeals lnforn~ation: (This information applies only to approved jurisdictional determinations as indicated above) This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the South Atlantic Division, Division Office at the Following address: Mr. Michael F. Bell, Administrative Appeal Review Officer CESAD-ET-CO-R U.S. Army Corps of Engineers, South Atlantic Division 60 Forsyth Street, Room 9M 15 Atlanta, Georgia 30303-880] ]n order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 33 ] .5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by July 4, 2006. **]t is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence.** Corps Regulatory Official (Initial): ~~ FOR OFFICE USE ONLY: • A plat or sketch of the property and the wetland data form must be attached to the file copy of this form. • A copy of the "Notification Of Administrative Appeal Options And Process And Request For Appeal" form must be transmitted with the property owner/agent copy of this form. • If the property contains isolated wetlands/waters, please indicate in "Remarks" section and attach the "Isolated Determination Information Sheet" to the file copy of this form. CF: URS Attn: Ray Bode l 600 Perimeter Park Drive, Suite 400 Morrisville, NC 27560 I ~NS A ~ D PROCE NOTIFICATION OF A]~NII;\15TRATIti'E ~r'PEAL OPT SS; ~~ r , REQUEST FOR APPEAL ;~ ~ - - ` ~ -... .., .. ~ t Applicant: Town of Cary File Number: 200620573 Date: May 4, 2006 Attn: Mike Babuin At tached is: See Section below INITIAL PROFFERED PERMIT (Standard Permit or Letter of A ermission PROFFERED PERMIT (Standard Permit or Letter of ermission B PERMIT DENIAL C X APPROVED JUR]SD]CTIONAL DETERMINATION D PRELIMINARY JUR]SDICTIONAL DETERMINATION E SECTION I -The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information maybe found at http•//www.usace.army.mi]/inet/functions/cw/cecwo/re>? or Co s re ]ations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive al] rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: if you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address al] of your concerns, (b) modify the permit to address some of ~~our objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: ]f you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section I] of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISD]CTIONAL DETERMII~TATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section I] of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. if you ~~~ish, you may request an approved JD (which maybe appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECT]ON II - RE UEST FOR APPEAL or OBJECTIQNS TO AN I1~IITLAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECT]ONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. PO1NT OF CONTACT FOR UESTIONS OR INFORIvIATIOT~i If you have questions regarding this decision If you only have questions regarding the appeal process you and/or the appeal process you may contact: may also contact: Monte Matthews Mr. Michael F. Bell, Administrative Appeal Review 6508 Falls of the Neuse Road Officer Suite 120 CESAD-ET-CO-R Raleigh, NC 27614 U.S. Army Corps of Engineers, South Atlantic Division 919-876-8441 x30 60 Forsyth Street, Room 9M15 Atlanta, Geor is 30303-8801 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a ] 5 day notice of any site investigation, and will have the opportunity to participate in all site investi ations. Date: Telephone number: Signature of appellant or agent. DIVISION ENGINEER: Commander U.S. Army Engineer Division, South Atlantic 60 Forsyth Street, Room 9M15 Atlanta, Georgia 30303-3490 p« ~~ MFy hy~` ~~ o ~ ~ c ~o ~ ~, 4O G,=f o p.D W Y ch a MpRkISVILLr~ p p~FP~^,TER R0. DATUM DESCRIPTION THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT IS. EhSEG ON THE STATE PLANE COORDINATE: ESIAELISHED BY OTHERS FOR MONUMENT'GPS No.B' WITH NAD 83 STATE PLANE GRID COORDINhTES OF NORTHING 750,973.91>Dlfl) FASTING: 2,U41,72i.4B01f1) THE AVERhGE COMBINED GRID FAC10R USED ON THIS PROJECT (GROUND TO GRID) IS: B.9999DT459 THE N.C. LAMBERT GRID BEhRING AND LOCALIZED HORIZONTAL GROUND DISTANCE FROM 'CPS f1o.8' TO N.C.G.S.'CHANDLER' IS N 82' 33' 19' W 3,DD7.12ja) All LINEhR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES VERTICAL DATUM USED IS NGVD 29 RECENE~ FEB0t2~ RpLEIGHTLEGULt''I'ORTF(ELD OFFICE ~ \ A fFOfoseo K Q t MGF R15VILLE p N 2 fiRKW~Y H 0 A . n 1 ~ 4 ny ~a Not to scatE VICINITY MAP I I-' 1 I N.C.G,S.•CH4NDLEfC I I ~ Ik 157.363.586 i i C>,E=2,03E,t409M ~ i I) ELEV= 389.5318) t I I I I ) i i _- •~" - )__=+ 1 N=750.913.980 . lt~~::''~.r1 I I-"-', -~+ ~1 ELEV:353341a1 NOTES: t. THE DEPICTED WETLANDS WERE FIELD SURVEYED EY THIS OFFICE USING CONVENTIONAL SURVEY METHODS. 2. THE PURPOSE OF THIS SURVEY IS TO DEPICT SECTION 404 JURISDICTION WETLANDS ONLY. 60UNDARY AND PROPOSED ROADWAY LINES ARE BY OTHERS AND ARE SHOWN HERE SOLELY FOR ORIENTATION PURPOSES. I, JESSE J. PRICE, PROFESSIONAL LAND SURVEYOR HEREBY CERTIFY THAT THIS SECTION 404 WETLAND SURVEY AND SUBSEQUENT PLANS WAS MADE UNDER MY DIRECT SUPERVISION AND THAT IT IS ' ~ . CORRECT TO lj(iC 13~ST OF MY KNOWLEDGE. 1 Y h~ I / 22D i /L Z 7.OG ~~ .. \~`- F~~ ~ c~ ~~~^ ~YOR L-3220 N.C. PRO •. $9iOtflP-C ~- I ,. •. , ~ r..:.1 ~ ~ I r - -: •..I_., .`' JI '1 N.C. GRID "' ~i / 1,,~1~ 1 ~ I NORTH CAROLINA :~ ~- ~ '~. ,~ ~~ ~ I WAKE COUNTY '+ `` s.. ~ ~' `r' /l. c ` ~ I This certiflet: that this w of this tat accuratel de Icts the ! ~•, •'~~. i ,''~' ji •. '~Y /~Im+1 ~ ! boundary of the jurisdiction of Section 404 of the Clean Water ~ •--__ti' •.,1.' !'.I`~~1 <•., ~ ~ ~, - - I Act as tletermined by the undersigned on this date. Unless !`. _ I r'•~,•[~•,.,, ~ \ .Y I ~ ~ 1~ ,, there is a change in the law or our published regulations, this F~ } ~-~' ++ ~`•~ .~'•" ~ ~f ~+ ! determination of Section 404 jurisdiction may be relietl upon ~r - - , ---~_;r, '•ti = ~~ ~ j~ „~ .. for a period not to exceed five years from this date. This ''.'; ~4;;~ ~' `~ ) •''•~! ( i ~,^xl~" `~"`- determination was made utilizing the 1987 Corps of Engineers I''.. Wetlands Delineation Manuel. II~~-~~~~*.i%~ ~,~~~~ ~Fil1~\-`__~ RegulatoryOff~cial:/" Iris /"~•f7 `--- (: ,ir :'ter' •"~/'~`~ ~~ ~ '1 i ~ Title:,~_~~•F ~ . \, F,: ~._~.~.. ~7,~ ; ;~StiEETL ~ ~_ ~ j Date: Z aD C i,_J_ ~ I I ~_ I ~ SECTION r~ I i USACE Action ID:~ C Ze.~~ rl-~---~ ~ ~ WETLANDS J i Ii,; !~ ~h i I ~ STR~A,M~~, I ; ~ ~ GRAPHIC SCALE i i j F----- ~ -r i -- j-- ~ ~ ~.-I i i I '~~ --~: ' "--_i I . I I ~ (IN FEET ) I 1 inch 500 ft. SECTION 404 I Submltfed d1' ~-! ! ,'---~ J 'WETLANDS I i~ I L_I I L~J i I I I I i ,I I--- i I I - .. ..' ~`-' ~.._ I-__Il- __.._.- I _._ URS CorporOflan NOrtn Cord/nd DAMS DRIVE } - 1600 Perimeter Pork Drive Morrlsvllle, North Carollrl0 27560 ~vtyue TELEPHONE (019) 161-1100 FAX (91D) set-175 COF/'RIGNT ~' X000, LIRS CORPpR/~TION, INC. ATE `-"" SECTION 404 WETLANDS SURVEY FOR: o7.fT•ab r=sar - ~~K°T L; °e1T ARMY CORPS OF ENGINEERS ESP ASSOCIATES P.A. 145CF/IIOq~ 1;~wsoEtRrEeTnr+swvET MORRISVILLE PARKWAY EXTENSION - enginelrring•avrueying•plan~rting t+eEt PHASE ONE 96f Trinity Road OF 2 CARY, wAKE COUNTY. NCIRTH CANOl9u. = Raleigh, Nc 27607 (8f8) 85E-8200 Coordinate icble Coordinate Table Pl NorthinC Ec~tin Pt Northin Eoetin 500 i5t 363.7 X70 iG«OES.G195 `36 737454.7E7E 20x4055.1461 507 15133 1.3,.22 2Gaa0EE.6644 SJ7 751497.5430 20aa060.8617 502 7613E 4.E341 2GaaD77.5774 538 7S15E3.9116 2Gaa06a.4607 503 i67360.E22E 20ea05E.5354 539 75147E.E937 2Gaa005.E087 SDa~ 'S0E7.CS07 'G<x171.t461 540 751547.9591 2GaaG35.0062 SOS 751311.2539 2G44241.789J 541 7575E29959 2Gaa03E.9860 SO6 151370,5477 2Gax,;15.28b4 Coordinate icble 507 i5t 30E.2986 2D44315.3379 SOB 751250.6E98 2Ga4313.2043 Pt Northin Eoatln 509 r5t22a.E000 20x4329.006 542 751J12.0956 20440E7.4826 510 151209.2222 2Gxa352.b904 543 75049.3089 2044072.0391 511 75n 9E.024J 2Gax J03.2935 544 751 JB 1.5119 20a407a.3677 512 i5117G.7E56 2Ga4329.6915 545 757420.1895 2044075.4365 513 7511 iE.E105 20ex374.4122 548 75ta3E.9973 2Ga4060.4927 514 75itb0.7897 2Gax350.0439 547 7574110.9429 204x090.5426 515 75t1E5.7016 20x<xG2.E730 548 7574b5.7701 20aa08E.E315 516 75127 i.E179 20x4aG3.6827 549 751495.1748 20s409E.1614 517 7St20E.3029 20x4a2E.2724 550 751521.3357 20a409E.2127 518 751279.1909 2G4<aE 1.7878 551 75130E.5292 20x4055.5381 518 751212.4331 2G4a4E7.7+7a6 552 75t34E.0008 20aa0S6.7 512 `20 r572G4.i_59 2Gaxg7.5685 553 757JE3.1ESJ 204x055.8811 521 i511bE.9203 204xa50.5355 554 757424.7768 204<057.0011 522 75t20t.0E21 2D<a510.6871 555 757445.7b54 20aa055.3950 523 751219.5189 2Gxa S1 E.2089 558 751470.3786 2044077.6030 524 7St 2t 0.0266 2Ga4557.a924 557 751492.6605 20a40EE.6024 525 7S727E.7120 2G4a562.1875 558 751502.J347 20aa067.0825 526 75717E.550E 2Gxa556.4185 559 751545.OE7B 2GaaG72.6E53 527 757781.7190 20x45EP.3295 560 7575a9.c120 204a08E.0407 528 75tt9E.5656 2Ga4S53.7S71 561 75756E.E570 20a40E3.6Ga9 Coordinote 1ab7e .562 751564.J572 20441222571 Pt Northin Ecatin 563 751579.0990 2Ga4130.J15D 564 757600.42M 2044134.4644 529 75757 i.3aSE 20aat5E.5724 565 751E3E.9791 2044131.7667 `JO 7St47 i.E328 2Gxa7ES.5731 566 75tES0.i795 20a4120.906J 531 751aaE.6E7J 204x203.9878 567 757E29.2089 2D44720.b700 `32 751 4a7,177J 204x224.1547 568 751602.2b46 2044721.9742 S3J i51aE2E092 2Gsa25a.5270 569 7515b2.2EJ3 2044114.9222 534 151 5029702 20x4266.1748 570 757 SE2.J039 204x090.9505 535 iS154E.5E29 2D4x201.7485 571 7515E i.E50J 20440E5.i898 N.C. GRID O (NAD-83) LINE FEARING DISIANCE LINE FEARING DISTANCE LINE BEARING DISTANCE L1 NSa'OE'S4"E 53:29' L38 579'19.52"W 45.51' L57 N04150TW 36.66' L2 554'x2'08"E iE.94' L39 N43'2E'42"W 38.36' L58 Nltro3'45"E 21.73' L3 Sl6'05'S2"W x2.01' la0 NE5'S0'19"w 256.77 L59 S28'4J'J6'W 16.77 L4 5E3'03'S5"W 3x.07' L41 N00'35'41'W Ja.21' L60 N8277'Ot'W 19.56' L5 NES'a3'05"w 20.22' L42 NOE'02'a6'E 27.6E' L61 N07'IB'40'W 19.14' LE N32'17'OE"w 3a.a8' L4J N00'05'4TE 21.57 L62 S23'04'1TE 37.06' U N3a'20'a7"w x i.b6' l4a NG2'20'Sa'w 26.95 l63 NOOroTSTE 22.16' L6 S53'09'at'E 31.83' US 57525'16"w 21.21' l64 S35'24'38'W 16.45' L9 S03'06'1a'W 66.x7' l46 Sb937'03'E 23.97' L65 504'24'06"E 24.90' L10 SDT3E'J9'w 43.76' La7 N554T00'E 29.12' L66 N2a'36'19'E 24.14' Lit l12 N6a'13'12"w N22'S9'S0"E 55.01' 75.25 Lob lag St i'24'a0'E Sl0'S2'a7"E 2J.65' x3.54' L67 L6B 50372'S2'W NOB'a9'02'E 18.84' 33.07 L73 NOE'2E'S0'E 35.26' L50 S52'73'OS'W 15.79' L69 N03'29'17'E 38.27' Ua N553b'3TE 31.24' L57 5o8ro5'09'E 22.57 L70 NOE'S8'S0'E 37.49 Lt5 N86'39'4a'E 72.61' L52 N33'aE'30'E 29.51' L16 NbE'S5'25'W 70.75' L53 Stt'4.6'a8'w 21.52 506 l L17 56a'aT12"E 73.80' L54 N06'a2'a3'W aLb4' LIB 500'02'24'E 62.25' L55 S00'25'26'E 35.17' U9 502'06'52"W 57.67 L56 N00'S0'S0'E a1.aB' L20 SJ1'37'04"E 30.38' L2t ~ 55eaa'S9"E 28.41 L22 NBO'3T15'E 51.48' 634 L23 569'15'S3'E 26.29' ~ .. ~ 533 L24 N7a'35'a2"E x0.99' y ~ L25 56a'09'S2'E 75.57' ' ' ` , ~~ L26 NJ9'00'12`E 37.15' ~l7r ~ry ~ -'+'t - 505 L27 514'0x'57"E 34.61' L28 N52'S4'a2'E 13.47' ,.4g..a ~~'~ ~ '' 532 L29 S56'It'OS'E 3b.00' «a ~ ~ L30 57E'11'35"W 75.88' 35 u~~,,l' ), ~ t L31 SEa'06'S1"W J1.07' ~ 531 - ~ - ~~ a~y, , ~ ' L32 N6a'45'00'W 52.77 , ~ ~'¢": "_ ~6 L33 NE3'a0'12'w 33.32' ~' fir' Sap . u L34 SSE'JE'S0'W 32.38' ~ ~ ~'" . L35 56i'a9'27'W 41.90' ~1 O sos I N/` ~ l36 577rob'S2'W 73.3x' 529 IJ + L37 SE2'03'49'W 15.78' [crTVw a~ w~T, <",,, „ o«, 565 L5T 554 L58 563~S^ - E,aaE~ SO FT I O.tE ACRES ~ ~k ~4r J .: 666 L43667 L44566 L45 569 ~ '~ t ---~_ 550 LE3 54B _~`'"~- 570 L61~ `57 (~ L65 547 ~~~--. sas I ! 551 Ln9 558 6aB \546 L67 545 L !y '1 y' LAB 559 C~ 557 L51 5r~ ~ ~ } ~- ~. ? SSS L4[ 501 L4' ~Q? ,.~;~y~ . ~' ". .. a~ ~ l53 55d `~ b53 L55 652 L56 SOB 527 ~~ 525 ~ -' 526 ~~ 524 =,~~~ •~r 4 ~vti 523 _y ~'',~~- :522 518 ~&. ~y' `~ 515 '~"'suiy !p "~h!.P47 tr..... G :'ou^,.1M`,~_ 521 D r'k'. x„f', 517 ~.4 ,,,. ~ ..i .~' . 518 ~~~``•~ ~~~~~' ~ 515 .::< f ... :514: ~' >.~:: 1 SECTION 404 WETLAND AREA: 39,771 SC7 FT! 091 ACRES 541 L13 "'~ ~'~' L & 540 ~S,(i ~ ~~ w L7~ r Submllted bl' SECTION x04 WETLAND AREA 4,187 50 FT 10.70 ACRES 539 GRMHIC SCALE URS Caporatlan -North Carollra s o 0 2a afl '°° f6O0 Ferlmeter Pork Drive aFri99b~ Morrlsvflle, NOrth Cordlrw 27560 (IN FEET) TELEPHONE (919) 467-1100 FAX (910) 461-1476 1711x1= son coova10NT p sooo, uas coaPVaAnoN,INC. 01-x.06 1 lu 00' SECTION 404 WETLANDS SURVEY FOR ~x^ `~ p°" ARMY CORPS OF ENGINEERS ~e=~ae,6r. ESP ASSOCIATES P.A. TwoeoELNtAtgr+awvEr >+eE1 MORRISVILLE PARKWAY EXTENSION e~tgi'neeri'ng.au~veyti'ng.planrn{yig 2 OF 2 PHASE C1NE = ss7 r,;T~uy R9aa CARY, WAKE COUNiY, NORTNCAROLINA c Fcalai8h, NC 29609 (918J 858-8200 ENG FORM 4345 -APPENDIX B APPENDIX B: MITIGATION LETTER FROM NCEEP Town of Cary Morrisville Parkway Extension Phases Ic, II, & Iid Appendix B 11-21-'86 13:29 FPOM-DENB EEP 9197152001 T-399 P02/02 U-978 1- ~~ os stem .~. ~... e~.~~et PROGRAM November 21, 2006 Russ Overton Town of Cary PO Box 8005 Cary, NC 275 ] 2~t~ Project: Morrisville Parb~vray Extension, Phases Ic, II, and IIId County: Wake The purpose of this letter is to notify you that the Norih Carolina Ecosystem Enhancement Program (NC EEP) is willing to accept payment for impacts associated with the above referenced project. Please note that this decision does not assure that the payment will be approved by the permit issuing agencies as mitigation for project impacts, It is the responsibility of the applicant to contact these agencies to determine if payment to the NC 1rEP will be approved, This acceptance is valid for six months from the date of this letter. 1t we have not received a copy oP the issued 40~ Permit/401 Certif5cation vc~ithin this time frame, this acceptance vrill eBpire. It is the applicant's responsibility to send copies of.the 404/401/CAMA permits to NC EEP. Once NC FEP receives a copy~of the 404 Permit and/or the 401 Certification an invoice will be issued and payment must be made, Based on the information supplied by you the impacts that may require compensatory mitigation are summarized in the following table, River Basin Wetlands Stresm Buffer Buffer Cataloging (Acres) (Linear Feet) Zone 1 zone 2 Uni[ (Sq. )~t.) (Sq. Ft.) Ri Arian Non-Ri Arian Coastal Marsh Cold Cool Warm Neusc t.34 0.32 0 0 0 295 13,841 9,687 03020201 Upon receipt of payment, EEP will take responsibility for providing the compensatory mitigation for the permitted impacts up to a 2:1 mitigation-to-impact ratio, {buffers, Zone 1 at a 3:1 ratio and Zone 2 at a 1.5:1 ratio). The typo and amount of the compensatory mitigation will be as specified in the Section 404 Permit and/or 401 Water Quality Certification, and/or LAMA Permit. The mitigation will be performed in accordance with the Memorandum of Understanding between the N. C. Depamnent of Environment and Natural Resources and the U. S. Army Corps of Engineers dated November 4, 1998. If you hsve any questions or need additional information, please contact Kelly Williams at (919) 71b-1921. Sincerely, •r~'"v Iv tlliam Crilmore, E Director cc: Cyndi Iiaroly, Wetlands/40l Unit Monte Matthews, USACE-Raleigh Eric Kulz, DWQ- Raleigh Charles $enton, agent (fax) Fitt ~'~~ ~ RP~DYl,K~... ~ ~ ... PYOt~~ OGU' Staff ~ ~ North Carolina Ecosystem Enhancement Program, 1852 Mail Service Center, Raleigh, NC 27699-1652 / 919-715-04761 vrww.neeep.net