Loading...
HomeMy WebLinkAbout20191304 Ver 1_Email_20191016Moore, Andrew W From: Philip Ellis<pe@robinsondesignengineers.com> Sent: Wednesday, October 16, 2019 2:13 PM To: Moore, Andrew W Cc: Hunter Marks; cg@robinsondesignengineers.com Subject: Re: [External] No Army Corps of Engineers Notification Required for Use of NWP 3 - Adkins Residence Pond 519 Claremont Drive, Flat Rock, Henderson County Attachments: 2019-10-16 14.02.39.pdf mm(@nc.gov External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Andrew, Per our conversation yesterday, please find the attached diagram and construction sequence for the spillway extension. Do you think you will be able to process this permit today? Philip Ellis, MS, PE (864) 901-1611 robinsondesignengineers.com On Oct 16, 2019, at 10:45 AM, Chris Grose<cg@robinsondesignengineers.com> wrote: I apologize for that. The incorrect one must have gotten uploaded. Here is the signed version. <Signed Agent Authorization 190921.pdf> Sincerely, Chris Grose, MS, EI (828) 606-7392 robinsondesignengineers.com On Oct 16, 2019, at 9:51 AM, Moore, Andrew W <andrew.w.moore@ncdenr.L,ov> wrote: Philip/Chris, The agent authorization provided with the PCN is not signed by the owner/applicant. Please provide a signed agent authorization. Andrew W. Moore, PG Environmental Specialist — Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 828 296 4684 office email: Andrew.W.Moore@ncdenr.gov 2090 U.S. Hwy. 70 Swannanoa, N.C. 28778 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Philip Ellis[mailto:pe@robinsondesignengineers.com] Sent: Monday, October 14, 2019 4:32 PM To: Moore, Andrew W <andrew.w.moore@ncdenr.gov> Subject: [External] Re: No Army Corps of Engineers Notification Required for Use of NWP 3 - Adkins Residence Pond 519 Claremont Drive, Flat Rock, Henderson County External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Andrew, I got your voicemail this morning, sorry I missed you. I will be in the office all day tomorrow. Call me at your convenience. Philip Ellis, MS, PE (864) 901-1611 robinsondesignengineers.com On Oct 11, 2019, at 2:47 PM, Philip Ellis <pe@robinsondesignengineers.com> wrote: Thanks David! Andrew, I just left you a voice mail. I understand that you are out of the office and will return on October 14th. Once you have read through David's email below, give me a call — the land owner is ready to go to construction, and we want to make sure they are following any requirements in the Water Quality Certification. Philip Ellis, MS, PE (864) 901-1611 robinsondesignengineers.com On Oct 11, 2019, at 10:09 AM, Brown, David W CIV USARMY CESAW (US) <David.W.Brown@usace.army.mil> wrote: Robinson Design Engineers Asheville, NC Philip Ellis and Chris Grose Thank you for meeting with me on October 2, 2019, and reference is made to your recently received Pre - construction Notification/Application (PCN), submitted on behalf of the Vernon and Anne Adkins Trust, to utilize Nationwide Permit (NWP) 3, which authorizes activities in waters of the U.S. (WoUS) associated with maintenance. The work you described includes modifications to an existing pond in order to aid in remedying a slope failure which has encroached on the foundation of a house. The project is located at 519 Claremont Drive in Flat Rock, Henderson County, North Carolina. After review of the submitted PCN, drawings, and discussions during the site meeting, the Corps determined the proposed pond modifications meet the terms of NWP 3. As described, the proposed project would involve approximately 60-75 linear feet of permanent impacts to an unnamed tributary of Bat Fork and decrease the size of the existing pond by 0.056 acres. The project work is within the footprint of the existing pond and involves limited impacts to WoUS. On March 19, 2017, the regional conditions of NWP 3 pertaining to notification requirements changed. These changes affect the requirements for submittal of pre -construction notification for work conducted in the western counties of North Carolina. Based upon details provided for your project, you are not required to submit pre - construction notification to our office. You may proceed with your work as proposed provided it is accomplished in accordance with all the conditions of the attached NWP 3. Your project is not located in a North Carolina Wildlife Resources Commission designated trout watershed. Therefore, regional condition 1.2 does not apply. This statement does not preclude the need to obtain other applicable federal, state, or local authorizations for your project. The changes to NWP 3 may not affect the pre -construction notification requirements to receive the required corresponding Clean Water Act Section 401 Water Quality Certification from North Carolina Division of Water Resources (DWR). Please contact Andrew Moore, at 828-296-4500, to determine the required pre -construction notification/permit application submittal process for DWR. If you have any questions regarding this information, you may contact me at 828-271-7980 x. 4232. Sincerely, David Brown, PG Regulatory Specialist/Geologist USACE Wilmington District -Asheville Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, NC 28801-5006 828-271-7980, ext. 4232 david.w.brown@usace.army.mil <2017NWP03.pdf> 4