Loading...
HomeMy WebLinkAboutSW1190801_3827 Review Responses_10/17/2019Michael S. Agee Steven A. Campbell Randy W.. r Craig Bradley C. Craig Wm. Thomas Austin . Mattern & Craig Edwin K. Mattern,Jr.1949-1982 J ( ) Gene R. Cress (1935-2014) David P. Wilson Sam H. McGhee, III (1940-2018) James B. Voso ENGINEERS • SURVEYORS Stewart W. Hubbell (Retired) Randy L. Dodson J. Wayne Craig (Retired) Chad M. Thomas Jason A. Carder October 1, 2019 Mr. Jim Farkas Water Quality Regional Operations Section NCDEQ Division of Water Resources 2090 U. S. Highway 70 Swannanoa, NC 28778 Re: Request for Additional Information Stormwater Permit No. SW 1190801 Leicester Volunteer Fire Department Buncombe County - Commission No. 3827 Dear Mr. Farkas: The additional information requested by the North Carolina Department of Environmental Quality (NCDEQ) for the Stormwater Permit No. SW 1190801 has been addressed. The construction documents have been updated to reflect the requested changes per the guidelines found in the NCDEQ BMP Manual. The stormwater report has been updated to include all necessary information. The attached letter of responses indicates where revisions have been made in response to the inquiries from the NCDEQ. MBA/mba Enclosures Sincerely, MATTERN & CRAIG, INC. Jacob D. Grieb, PE Project Manager 403 E. Market Street . Johnson City, TN 37601 (423) 979-2220 Fax (423) 979-2222 www.matternandcraig.com Michael S. Agee Steven A. Campbell Randy W.. r Craig Bradley C. Craig Wm. Thomas Austin . Mattern & Craig Edwin K. Mattern,Jr.1949-1982 J ( ) Gene R. Cress (1935-2014) David P. Wilson Sam H. McGhee, III (1940-2018) James B. Voso ENGINEERS • SURVEYORS Stewart W. Hubbell (Retired) Randy L. Dodson J. Wayne Craig (Retired) Chad M. Thomas Jason A. Carder October 1, 2019 Jim Farkas North Carolina Department of Environmental Quality 2090 U.S. Highway 70 Swannanoa, North Carolina 28778 Re: Request for Additional Information Stormwater Permit No. SW 1190801 Leicester Volunteer Fire Department Buncombe County - Commission No. 3827 Dear Mr. Farkas, Please see the following responses for the additional required information in the letter of receipt dated September 20,2019. 1. Please use the project name "Leicester Volunteer Fire Department" so that the application is consistent with the plans, O&M Agreement, etc.... (Section I, 1& Section VI, 8, a). The title block for the construction documents has been updated with the correct project name on all sheets, and the Stormwater Management Permit Application Form has been updated in Section I, I to reflect this title. 2. As shown, the project does not qualify as low density (Section 11, 2). Having a BUA percentage less than 24% is just one aspect of having a low -density project. Low density projects must also maximize dispersed flow and utilize vegetated conveyance. Vegetated conveyances were not utilized as the stormwater is piped around the site. A full list of the requirements for a low -density project can be found at the following link: (https://files.nc. gov/ncdeq/Energy%20Mineral%20and%2OLand%2OResources/Stormwat er/BMP%20Manual/E-1%2OLow%2ODensity%20FINAL.pdf). If you would like the project to be a low -density project, please change the design to reflect this and address 403 E. Market Street . Johnson City, TN 37601 (423) 979-2220 Fax (423) 979-2222 www.matternandcraig.com Mr. Michael Smith Leicester Volunteer Fire Department, Inc. September 4, 2019 Page 2 of 5 the low -density comments. If you would like the project to be a high -density project, please address the high -density comments. The project is now considered high -density, and the high -density comments were addressed. 3. Since the applicant is the property owner, Section III, 2 does not need to be filled out and Section IX does not need to be signed. Section III, 2 has not been filled out, Section IX has not been signed in the Stormwater Management Permit Application Form. 4. If the project is low density and contains SCMS for quantity management only, they should not be included in the application or submission package (Section IV, 1). Project is high density; comment is not applicable. 5. If the project is low density, the "Total Drainage Area" value in the "Drainage Area" table in Section IV, 10 should be equal to the "On -Site Drainage Area" value and there should not be any "Off -site Drainage Area". Also, the "Total Drainage Area" value should be equal to the entire site area. Project is high density; comment is not applicable. 6. If the project is high density, each SCM should have its own column in the "Drainage Area" table in Section IV, 10 that is based on the area draining to it. The "Drainage Area" table in Section IV, 10 has been updated to include both the SCMs for the project. 7. The "Existing BUA" row of the "Impervious Surface Area" table should only include the existing BUA that will remain after development. The imperious areas listed in this table should add up to the "Proposed Impervious Area" value in the "Drainage Area" table (Section IV, 10). The "Drainage Area" table in Section IV, 10 has been updated to reflect the correct values. 8. If the project is high density, supporting documents and an explanation of how the off - site drainage area and off site -impervious areas were determined must be included (Section IV, 11). See the Stormwater Narrative, Proposed Development Conditions section for explanation of how the off -site drainage area's impervious areas were determined. Figure 3 in Mr. Michael Smith Leicester Volunteer Fire Department, Inc. September 4, 2019 Page 3 of 5 Appendix C of the Stormwater Report shows the areas and contours used to determine the proposed drainage areas. 9. If the project is low density, the O&M form should only be included if there are swales included in the design and a signed Supplement-EZ form should be provided showing that the project is low density (Section V & Section VI, 3). Project is high density; comment is not applicable. 10. If the project is high density, the O&M form should include both SCMs and a signed Supplement-EZ form should be provided with both SCMS included (Section V & Section VI, 3). The O&M form has been updated to include both SCMS, and a signed Supplement-EZ form has been provided. 11. We require that a copy of the application be included with the submission (Section VI, 1). Only the original application was provided. Please provide a copy of the application. A copy of the application has been provided along with the original application. 12. Please provide a USGS map indication the project location (Section VI, 6). Figure I in the Stormwater Report, Appendix C provides a USGS map location for the project site. 13. Please ensure all plans have a numerical and graphical scale as needed (Section VI, 8, f). For example, Sheet C300, in addition to some other sheets, does not have a scale. Sheets C300, C400, C600, C700, and C800 have been updated to include a graphical and numerical scale. 14. Please dimension all BUA on the plans, similar to how the square footage for the building is shown (Section VI, 8, j.) Sheet C300 has been updated to include the square footage for all BUAs. 15. If the project is high density, please include the off -site contours so the off -site drainage area may be verified (Section VI, 8, k). The off -site contours have been incorporated in Figures 2 and 3 in Appendix C and Figures 4 and 5 in Appendix E in the Stormwater Narrative. 16. Please delineate the wetlands on the plans or provide a note stating that no wetlands exist. Provide documetnion of the quailfications and identity of the individual who made this determination (Section VI, 8, m). Mr. Michael Smith Leicester Volunteer Fire Department, Inc. September 4, 2019 Page 4 of 5 A note has been made on Sheet C300 and C400 stating no wetlands exist on site. In the Project Description of the Stormwater Narrative, it is stated that no wetlands exist. 17. If the project is high density, please show the drainage areas for the SCMs on the plans (Section VI, 8, o). The drainage areas for the SCMs can be found in Figure 3 in Appendix C of the Stormwater Narrative. 18. If the project is high density, the soils report should include the expected infiltration rate for the area that the biorention cell will be placed (Section VI, 9). The Natural Resources Conservation Service soils report now includes the infiltration rate for both SCMs. This can be found in Appendix B. 19. Please write the deed book and a page numbers in the application (Section VI, 10). The deed book and page number for the Leicester Volunteer Fire Department is now included in the Stormwater Management Permit Application Form. 20. Please provide official documents with name, title, and position for those listed in Section III of the application (Section VI, 11). Please also initial this item. The official documents with name, title, position, and initials for those listed in Section III of the application has been attached to the end of the Stormwater Management Permit Application Form. 21. The SCMs were not reviewed for compliance with the MDCs. If the project is high density, ensure that the SCMs are designed in accordance with all applicable MDCs. The MDCs can be found at the following link: (https:Hdeq.nc.gov/aboutdivisions/energy- mineral-land-resources/energy-mineral-land-permit-guidance/stormwater-bmp-manual ) The SCMs were designed according to the bioretention cell MDC specifications found in the NCDEQ BMP manual. 22. If the project is high density and the rainwater storage is being used to meet State stormwater requirements, please include it along with the other SCMs and ensure that all relevant MDCs are adhered to. Rainwater storage is not being used to meet State stormwater requirements and is not included in the SCMs. Mr. Michael Smith Leicester Volunteer Fire Department, Inc. September 4, 2019 Page 5 of 5 23. Provide pdfs of all revisions, 2 hardcopies of revised plan sheets, and 1 hardcopy of other documents. Pdfs must be uploaded using the form at: https:Hedocs.deq.nc.gov/Forms/SW Project Submittal Pdfs of all revisions, 2 hardcopies of revised plan sheets, and I hardcopy of other documents have been provided, and the Pdfs have been submitted online. Sincerely, MATTERN & CRAIG, INC. Jacob D. Grieb, PE Project Manager MBA/mba Enclosures