Loading...
HomeMy WebLinkAbout20191423 Ver 1_PCN Form Submission_20191015DWR IDIOM n of Water Resources Pre -Construction Notification (PCN) Form September 29, 2018 Ver 3 21nitial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* G Yes r No Change only if needed. BIMS # Assigned * Version#* 20191423 1 Is a payment required for this project?* * No payment required What amout is owed?* * Fee received r $240.00 r Fee needed - send electronic notification r $570.00 Reviewing Office* Select Project Reviewer* Wilmington Regional Office - (910) 796-7215 Chad Coburn:eads\cccoburn Information for Initial Review 1a. Name of project: 902 East Pelican Drive 1a. Who is the Primary Contact?* Dana A. Lutheran 1b. Primary Contact Email:* 1c. Primary Contact Phone:* dlutheran@segi.us (910)228-1841 Date Submitted 10/15/2019 Nearest Body of Water Unnamed saltwater tributary Basin Cape Fear Water Classification SA;HOW Site Coordinates Latitude: Longitude: 33.915519-78.152865 FA. Processing Information U County (or Counties) where the project is located: Brunswick Is this project a public transportation project?* r Yes r No 1a. Type(s) of approval sought from the Corps: * Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization? rJ Nationwide Permit (NWP) r- Regional General Permit (RGP) r Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: W 401 Water Quality Certification - Regular r Non-404 Jurisdictional General Permit r Individual Permit 18 - Minor Discharges le. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: r 401 Water Quality Certification - Express r Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r- Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r- No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r- Yes r- No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r- No 1i. Is the project located within a NC DCM Area of Environmental Concern (AEC)? r- Yes r No r- Unknown 1j. Is the project located in a designated trout watershed? C Yes r No F. Applicant Information 1d. Who is applying forthe permit? R Owner r Applicant (other than owner) le. Is there an Agent/Consultant for this project? r Yes r- No 2. Owner Information 2a. Name(s) on recorded deed: Jon and Mary Bonelli 2b. Deed book and page no.: 4026/596 2c. Responsible party: 2d. Address Street Address 327 9th Street NW Address Line 2 Cfty State / Frovinee / R�gicn Hickory NC Fbstal / Zip Code Q�untry 28601 Us 2e. Telephone Number: 2f. Fax Number: (704)668-4444 2g. Email Address:* jbonelli4444@gmaii.com C. Project Information and Prior Project History r- Yes r No r- Yes r No u 1. Project Information 1b. Subdivision name: If appropriate) 1c. Nearest municipality/town: Oak Island 2. Project Identification 2a. Property Identification Number: 235PA00410 2c. Project Address Street Address 902 East Pelican Drive Address Line 2 City Oak Island Fbstal / Zip Code 28461 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Unnamed saltwater tributary 3b. Water Resources Classification of nearest receiving water:* SA;HOW 3c. What river basin(s) is your project located in?* Cape Fear 3d. Please provide the 12-digit HUC in which the project is located. 030300050802 4. Project Description and History 2b. Property size: 0.26 State / Rovinoe / %gion NC Country US 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The property is currently undeveloped and wooded. General land use in the vicinity is residential. The site abuts a unnamed tidal tributary, which has a coastal wetland fringe, that transitions into Riverine Swamp Forest. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes r No r Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) 4f. List the total estimated acreage of all existing wetlands on the property: 3500 SF / 0.08 AC 49. List the total estimated linear feet of all existing streams on the property: NA 4h. Explain the purpose of the proposed project:* The purpose of the project is to construct +/- 2040 SF, two story, single-family dwelling, with attached decks, off the front and back of the structure, associated driveway, stormwater treatment measures, a 13' x 27' swimming pool, with varying width, concrete apron, and minimal maintenance apron, around the structure and pool (see Appendix D). 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* The project will consists of removing vegetation, within the limits of disturbance, and backfilling 812 SF (0.02 AC) of the riparian wetlands, with clean earthen soil, in preparation of the construction of the dwelling and installation of the pool apron. Heavy machinery, such as bulldozers, dump trucks and excavators will be used to perform the work. 4j. Please upload project drawings for the proposed project. 902 E. Pelican Wetland Impact Plan 6-11-19.pdf 355.49KB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* F Yes r No C Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary G Approved r Not Verified r Unknown r WA Corps AID Number: SAW-2018-00336 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Paul Farley Agency/Consultant Company: LMG Other: 5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR See attached 5d1. Jurisdictional determination upload SAW-2018-00336.pdf 666.79KB 6. Future Project Plans 6a. Is this a phased project?* r Yes c No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This project is not part of a phased development and is viable, without future impacts. Utilities are already provided. D. Proposed Impacts Inventory U 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): W Wetlands r Streams -tributaries r Buffers r Open Waters r Pond Construction 2. Wetland Impacts !a. Site #* (?) 2a1 Reason M 2b. Impact type * (?) 2c. Type of W. 2d. W. name * 2e. Forested* 2f. Type of 29. Impact Jurisdicition*(?) area* Building footprint P Riverine Swamp Forest na Yes Corps 0.020 (acres) 2g. Total Temporary Wetland Impact 2g. Total Permanent Wetland Impact 0.000 0.020 2g. Total Wetland Impact 0.020 2h. Comments: Temporary impacts are not associated with this project. Please see Site Plan for the proposed limits of fill. E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: While the Applicant could position the structure beyond the 75' AEC line, but less than 30 linear feet of normal high water, the Applicant situated the house and pool much further back, thereby avoiding approArnately 2700 SF of wetland impact. Also, the Applicant is only impacting wetlands where necessary, to construct the dwelling and pool apron and provide for a minimal maintenance corridor. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Silt fence will be installed prior to any significant land disturbing activities. This should ensure that the sediment does not discharge into the remaining wetlands, located within or outside the project limits. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2c. If yes, mitigation is required by (check all that apply): R DWR W Corps 2d. If yes, which mitigation option(s) will be used for this project? R Mitigation bank r Payment to in -lieu fee r Permittee Responsible program Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: Stone Farm UMB 3b. Credits Purchased/Requested (attach receipt and letter) Type: Quantity: Riparian wetland 0.10 Attach Receipt and/or letter 3c. Comments Mitigation is not being proposed as part of this project. 6. Buffer mitigation (State Regulated Riparian Buffer Rules) - required by DWR 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? If yes, you must fill out this entire form - please contact DWR for more information. O Yes r No F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r- Yes r No If no, explain why: This project is not located within one of the State Regulated Riparian Buffer River Basins. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r- Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? r Yes r- No Comments: The Applicant Will seek a stormwater permit from the Town of Oak Island. G. Supplementary Information ^� 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r- Yes r No 3b. If you answered "no," provide a short narrative description. The proposed project will not provide access to currently inaccessible land, and, with the incorporation of stormwater management measures, storrrmater runoff will be treated prior to discharging into downstream receiving waters. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r- No r- N/A 4b. Describe, in detail, the treatment methods and dispositions (non -discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. Sewer will be furnished by the Town of Oak Island 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5d. Is another Federal agency involved?* r Yes r No Se. Is this a DOT project located within Division's 1-8? r Yes r No 5f. Will you cut anytrees in order to conduct the work in waters of the U.S.? r Yes r No 5g. Does this project involve bridge maintenance or removal? r Yes r No 5h. Does this project involve the construction/installation of a wind turbine(s)?* r Yes r No r Unknown 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? SEGi evaluated the location of the proposed work, which is within a highly developed area, and determined that the project is not likely to adversely affect ES ro DCH. Consultation Documentation Upload 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* While this project is located adjacent to a tidal saltwater, which would provide Essential Fish Habitat, work within tidal waters is not proposed. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* There are no eAsting structures within the project limits and is not located within an area, where known historical or archaeological resources occurrences have been identified. 7c. Historic or Prehistoric Information Upload 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* r Yes r No 8b. If yes, explain how project meets FEMA requirements: The structure and pool will be constructed to meet FEMA AE floodplain requirements. The Applicant will secure a building permit for the work, which will require documentation that the proposed work is in compliance with floodplain development rules. 8c. What source(s) did you use to make the floodplain determination?* Brunswick County GIS Flood Zone Map Miscellaneous Comments This site is adjacent to an SA Water. However, the proposed work is not within the DCM's 75' Estuarine Shoreline AEC (see attached map). Miscellaneous attachments not previously requested. 902 E Pelican 75' AEC Radius Map.pdf 216.25KB Signature * m By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); . I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND . I intend to electronically sign and submit the PCN form. Full Name: Dana A. Lutheran Signature Date 10/15/2019 5EC-3i AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION: Lot 15 BU 51 S-3 PL 2.5/264 West Long Beach LOT NO. PLAN NO. PARCEL I.D. 235PA00410 STREET ADDRESS: 902 East Pelican Drive Applicant (please print): Jon and Mary Bonelli The undersigned, registered property owner of the above noted property, does hereby authorize Southern Environmental Group, Inc. (SEGi)to act on my behalf in matters regarding areas of environmental concern. Applicant's Address (if different than property above): 327 9th St NW Hickory, NC 28601 Telephone & Email: 704-668-4444; jbonelli4444@gmail.com We hereby certify the above information submitted in this application is true and accurate to the best of our knowl dge. Proper Owner Authorized Signature SEGi Authorized Signature Jon Bonelli Print Name 7-10-19 Date Dana A. Lutheran Print Name 7/10/19 Date WETLAND IMPACT WETLANDS 812 SF / 0.02 AC PROPOSED LIMIT OF PROPOSED WETLAND FILL 8' 07/10/19 LIMIT OF DISTURBANCE JON & MARIE BONELLI PID# 235PA00410 P[5 - I 759. Certlh' [hat 0- P4' 2 swvey ALL 015TAIV=5 5tIO" ARE s GROUND f115. was drawn order nay WPe^' from an actual tiDR120NTAL a Iran undue oa -up � � refe—ce fps TNR71ti15 5GRVtY15 OF AN on ,nap: chat any hne, not actuary a"'yed appearas from mforrrutrOn au nottd PN15nN6 PARCEL 09 PARCEL5 OF tAND. E c dalphm u Ivy and were plotted wr the plat' that Ove ratio of prCc—m as calculated is m ter than I: 10.000. that Ore arcs d d "y PRCrfRTYAVDRI55! ptprdmate metf+adc j w sgnaturc. rey5tntron SErr. A.D. 2p r 3. rEuCANDRIVE OtANa beach ..Oer and 3Cal 0- the 1 d of OAK PARCa,f 235PAC0410 Juuyh R. 9rahure - - 7 Fralessiona7 Lands LOT AREA: 11.1 r35f. +I- `'1�dHatHfyyl rok lFGEFfD: y'9� "�'• Q � RAN - RIGHF OP WAYP1PP S � CA- awffRifIVE5t p Lu or - IRoN 57AKE rWAV lRF - IRON ROD5t7 sub. �J,•' g ,' I +,fir+� _: ■I iByfiO ! I r9CW 25' REAR - 20' 1 1 rDE - 8' f r I I BIDE DEAD ENA 5T S' � 1 ! f 1 f1 r PROPfRTYOHr M5 ++� f Kr5ER CUSTOM ✓ CME5 NO7P: , Lot 15, SLOCK 5), -lmcr 03 II MEAN NIGl1 WA71 R 2.35' f , OAK 15LAND,N.C. PLAT-2.5- PG. 264 1 T r r-4.P5' i ) 5 4.55' tottam W canp 1 T5, R r}! l — I ;N :}�1.: •.•.yam^� j�{i 2019-00O-KISER � 5URVE'eED BY, J O 11 DRAWN SY,• AD CHECKED 8Y• JRB 4i f DATE• 0911712019 SCALE 1 1 _•-•-• • - + WETLAND5 MAP FOR x15ER CU5TOM HOME5 1 ! 9G2 E. PELICAN DRIVE !stand 1 OAK 15L4NO, N.C. Surveyors, Inc. P.A. 1 I 5A41MOUE 7W5P• 9RUN5WICK CO- N.C. JOEY6ROCHURE L-1759 102 5.E. 6.9M 5TREET DAM 09116119 5CALf.. 1 • — 3a Oak 1.51and. N.C. 26465 PREUWIV4RY NOT FOR RfCORDATroN CONVEYANCF5 OR 5A[E5' CELL: 910-523-6122 WNM1S�.1$land-gyryCypr'.GOm I Res+dcnt+al � GpmmerGrar Srte Plan 30 r5 0 30 Lot Surveys f P poW Elev. Cert+hcate ` --E' �LI � GRAPHIC 5CALE 1 = 30 email: 15fandsurve�ors�gmall.com l _