Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NC0089885_More Information (Received)_20190830
Land Application Infiltration Galleries Closed Loop Remediation Wells Surface Waters Land Aquisistion Costs $70,000,000.00 $25,000,000.00 $25,000,000.00 $0.00 Equipment Costs $170,000.00 $20,000.00 $120,000.00 $75,000.00 Labor Costs $95,000.00 $20,000.00 $30,000.00 $15,000.00 Installation Costs $95,000.00 $20,000.00 $100,000.00 $25,000.00 Design Costs $50,000.00 $50,000.00 $50,000.00 $50,000.00 Total Capital Costs $70,410,000.00 $25,110,000.00 $25,300,000.00 $165,000.00 O&M Costs $6,750.00 $7,500.00 $7,500.00 $7,500.00 Laboratory Costs $48,000.00 $48,000.00 $48,000.00 $48,000.00 Operator Costs $50,000.00 $50,000.00 $50,000.00 $75,000.00 Residual Disposal Costs None known None known None known None known Connection Fees None known None known None known None known Permit Fees None known None known $5,000.00 $5,000.00 Utility Cost $3,000.00 $1,500.00 $3,000.00 $860.00 Total Recurring Cost $107,750.00 $107,000.00 $113,500.00 $136,360.00 $34,485,278.20 $12,331,863.46 $12,427,957.81 $147,374.01 O&M - Operation and Manitenance * - Assumes a six (6) month operation period Capital Costs Recurring Costs* PCVA Charlotte Metro Office Tower Construction Table 1: EAA COST ANALYSIS Engineering Alternative