Loading...
HomeMy WebLinkAboutWQ0028587_Application (FTSE)_20191015Permit Number VVQ0028587 Program Category Non -discharge Permit Type Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions Primary Reviewer dean hunkele Coastal SWRule Permitted Flow 633,143 Facility Facility Name Brunswick Forest Collection System Location Address Owner Central Files: APS Permit Tracking Slip SWP _ 5/3/2019 Status Project Type In review Major modification Version Permit Classification Z11 Individual Permit Contact Affiliation Major/Minor Region Minor Wilmington County Brunswick Facility Contact Affiliation Owner Name Owner Type Town of Leland Government - Municipal Owner Affiliation A. Hollis 4-CADavid oU PE 6 p v1� 6 Q/ p y 102 Town Hall Dr ; Dates.'Events Leland NC 28451 Scheduled Ong Issue App Received Draft Initiated Issuance Public Notice Issue Effective Expiration 3/24/2005 5/2/2019 (H, OI-�/\,l—t 1Q Regulated Activities 1�� Requested /Received Events Apartment complex `1�a3 I Additional information requested Condominium Additional information received Hanover Design Services, P.A. Land Surveyors, Engineers, Land Planners April 30, 2019 Mr. Dean Hunkele Department of Environment and Natural Resources Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Re: Brunswick Forest: Liberty Healthcare Senior Living New submittal (W00028587) Town of Leland Brunswick County Dean: Enclosed please find the sewer submittal package for Brunswick Forest: Liberty Health Care Senior Living. This is an application for a pump station and force main only. Flow has already been allocated in a previous commercial permit modification. • A check for $480 • Fast Track Sewer Application and one additional copy • 1- Sewer system Location Map • 1- USGS Site location map If you have any questions or comments, please feel free to contact me. Thanks. Sincer y, r dam H. Grady, PE Hanover Design Services P.A. agrady@hdsilm.com (910) 343-8002 Office (910) 343-9941 Fax RECEIVED%NCDENR/DWR Water Quality Regional Operations Section Wilmington Regional Office " "- 1 e�_ )_a ( 1123 Floral Parkway Wilmington, N.C. 28403 Phone (910) 343-8002 Fax 910) 343-9941 Business Firm License No. C-0597 State of North Carolina DWR Department of Environmental Quality Division of Water Resources 15A \CAC 02"r ,0300 — FAST TRACK SERER SYSTEM ExTENSION APPLICATION Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: (to be comple-ed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Town of Leland (company, municipality. IIOA, utility. etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ® Municipal ❑ Other 3. Signature authority's name: David A. Hollis, P.E. per 15A ACAC 02T .0106(bi Title: Town Manager 4. Applicant's mailing address: 102'rown hall Dr. City: Leland State: NC Zip: 28451 5. Applicant's contact information: Phone. number: (910) 371-0148 Email Address: DHollisCatownofleland.com II. PROJECT INFORMATION: W "l 1. Project name: Liberty Healthcare Brunswick Forest Senior Living/ 2. Application/Project status: osed (:Sew Permit) ® Existing Permit/Project If a modification, provide the existing permit number: W000 and issued date: If new construction but part of a master plan, provide the existing permit number: W00028587 3. County where project is located: Brunswick County 4. Approximate Coordinates (Decimal Degrees): Latitude: 34.1979' Longitude:-78.0539' 5. Parcel ID (if applicable): 0580000748 0580000735 0580000731 (or Parcel ID to closest downstream sewer) /A} j4 f III. CONSULTANT INFORMATION: 1. Professional Engineer: Adam Grady License Number: 43166 Firm: Hanover Design Services, P.A.SSS Mailing address: 1123 Floral Parkway If6 City: Wilmington State: NC Zip: 28403- I'�Vb Phone number: (910) 143-8002 Email Address: Agrady@hdsilm.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Noetheast Brunswick Regional WWTI Permit Number: NCO086819 Owner' Brunswick Countv V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): W00028587 Downstream (Receiving) Sewer Size: 8 inch System Wide Collection System Pei nut Number(s) (if applicable): WQCS Owner Name(s): Town of Leland FORM: FTA 04-16 Page 1 of 5 Nl1. GRAVITY SENIE:R DESIGN CRITERIA (if Applicable) - 02T .0305 & MDC (Gravili Sewers): 1. Summarize gravity sewer to be permitted: - Section 11 &. III of the MDC for Permitting of Gravity Sewers contains information related to design criteria i Section III contains information related to minimum slopes for gravity sewer(s) Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. POMP STATION DESIGN CRITERIA (If Applicable) —o2-r.0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACIE PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name PUMP STATION 1'9 2. Approximate Coordinates (Decimal Degrees): Latitude: 34.1979� Longitude:-78.0538` 3. Design flow of the pump station: 0.252 millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): 184 gallons per minute at 26.4 feet total dynamic head (TDII) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Malerial 4 321 DR-18/C900 6. Power reliability in accordance with ISA NCAC 02T .0305(h )(1 ): ® Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)Q )(B)_ ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day i Must be permanent to facility Or if the pump station has an average daily flow less than 15.000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02'I.0305(11)(I)(C): i It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. i If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes. shall be provided in the case of a multiple station power outage. FORM: FI A 04-16 Page 3 of 5 IN. SETBACKS & SEPARATIONS - (02B .0200 & 15A NCAC 02T.0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T^0305(D & W N Yes El No ➢ 15A NCAC 02T.0305(f) contains minimum seoarations that shall be nrovided for sewer systems: Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 24 inches Water maim vertical -water over sewer including in benched trenches inches _- Water mains horizontal 10 feet _ Reclaimed water lines vertical_ reclaimed over sewer) --18 18 inches__ Reclaimed water lines (horizontal - reclaimed over sewer) _ 2 feet "Any private or public water supply source, including any wells, W S-1 waters of Class I or Class H impounded reservoirs used as a source of drinking water i 100 feet -_ *"Waters classified WS (except WS-1 or W S-V), B, SA, ORW, HQW, or SB from normal high water or tide elevation and wetlands see item IX.2) 50 feet "Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet _ Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feel Any swimming pools I0 feet _ Final earth grade (vertical) 36 inches ➢ !SA NCAC 02T.03_ 05(a) contains alternatives where separations in 02T.0305(ft caunot be achieved ➢ "Stream classifications can be identified using the Division's NC Surface Water Classifications weboage ), If noncompliance with 02T.0305(f) or (a). see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) N Yes [-]No ❑ N/A ➢ Seethe Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and coastmction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per I SA NCAC 02D .0200 N Yes ❑ No ❑ N/A ➢ This would include Trout Buffered Streams per 15A NCAC 2I1.0202 4. Does the project require coverage/authorization under a 404 Nationwide or N Yes ❑ No individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certification)? N Yes ❑ No Per 15A NCAC 02T.0105(c)(.1 directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402 "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes N No C] N/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 i P n PUMP STATION 9 USGS LOCATION MAP Z — l 2'4 D r > r _ C G • t C Y µ aiLlNf ��' # •fib � � rv� � � � � � � - - x .d'� y«�pi%, 'ram \ , �;m•; �*''F`w. r*,'b. /} il - t ' ,, �. esri BRUN91flti9R19f II a Maw �cFocanona US HWY 1] WEST SIDE COMMERCIAL JL VIIag,Phase2 IF `PROPOSED r i — >ew `s 9 G Lh South Village Phase GATE vvzros G,SCRpTCN Sews Flees 71-1 H. EAST VILLAGE PIWSE-1 COMMERCIAL Z1Xe &WCB07 EAST VILLAGE FFASE-1 COMMERCIAL -BARK Pe 91113000 SWM III WMMERCL9L Seat SV2ME DANGER CENTER 1. iao l 16 pse SSxTv.1 fl Be. uM Wellreea Lames, aW N31NJS EMERGE ORMO _ 3,,w 4I1fill LIBERTY PHASE I Rcuced PlcFleaell (Ohllef Gu.1.1 Derce PcaOemy lOasllel _ _ ]t.]M 1. 687 NTAL CO EOERCIPL USEGa BATE `L.19) Ramaln Mm Allouoon 9]6aJ U.S. HWY. 12 Nnmly a, Grel suwry 4 61 L Fail G Sl Feage FeLIINy�p j f Q rIJ J FVIIMOe �RIRF— Gommertlel A.. 11 \\VV(( •1 -+� � MIIUG Uee BUIl01nYe EQas4 Jaws Wimlag/ .mm r Si finmr 1 mi rsm ' WILGINGM south Village I ae RMnemm Fmm Hwtio K c l r 0.4, 0.q maes wu mesa spa " orvmrxrn %r aU1LOINGL PM QIY Jw CMrutim Oehbacs _ Slde F— Ire VILLAGE BREPKOOWN Reading EAST VIILI-AGE�RFASE-1 BUILDING I G, DID 8 FARM BUREAU Iso CAMS v s s us. el Gan Seer -ey ,eCase,Cer lsyy NeM1 PUE BUILU NG F TNe GoesRa omee Gesien Hastann, Imewalea emmma th...as a Memw Gerorlm.m $M1uckn $MGk 5ou1M1.11... ICmmmerc al Anal hi 11'.1 p .A., 0. Su9ory Blue W—Omlulry BeM Financ.ai Grtup SE pe FaclMy MNOVER DESIGN SERVICES PA. G= QD OVERALL SUMMARY GPD NOTES COMMERCIAL BALANCE INCLUDES JEFFERSON LANDING REDUCTION 60.080 INCLUDES JL REDUCTION VOLUME SEE COMMERCIAL SUMMARY RESIDENTAL BALANCE 14,680 BALANCE FROM PERMITS MOSTLY FROM 5A ALLOCATION FROM 8/28 TOTAL BALANCE COMMERCIAL AND RESIDENTIAL 74,760 PROPOSED ALLOCATIONS LIBERTY 21,280 THIS PERMIT FUTURE EAST VILLIAGE PHASE 2 41,130 SF OF RETAIL 4,130 THIS PERMIT PHASE 9 SECTION 4B 82 SF LOTS 17.220 APPROACHING PERMITTING PHASE 3 SECTION 3 90 SF LOTS 18,900 APPROACHING PERMITTING PHASE 8 SECTION 3 63 SF LOTS 13,230 APPROACHING PERMITTING TOTAL PROPOSED ALLOCATIONS 74,760 BALANCE THIS WOULD BRING THE BALANCE TO ZERO WITH NO RESERVE TO KEEP TRACK OF. THE 3 PROPOSED SECTIONS WE ARE CURRENTLY FINISHING THE THREE SECTIONS RIGHT NOW FOR PERMITTING. COMMERCIAL SUMMARY: 2005 ORIGINAL ALLOCATION COMMERCIAL SEWER ALLOCATION FROM ORIGINAL PERMIT INCLUDING JEFFERSON LANDING DATE 5/2/2005 7/18/2008 DESCRIPTION EAST VILLAGE PHASE-1 COMMERCIAL Sewer Flows 20,079 9/1/2008 SOUTH VILLAGE COMMERCIAL 5,661 5/2/2005 GARDEN CENTER 150 Various JEFFERSON LANDING (278 UNITS @ 210 GPD) 58,380 10/27/2016 Phase 6-Section 1 & Sales and Wellness Centers 800 5/2/2005 EMERGE ORTHO 3,750 11/30/2017 HOUSE PICKLEBALL 300 11/30/2017 COASTAL DANCE 500 4/16/2019 LIBERTY PHASE 1 (PROPOSED) 21,280 EXISTING FLOW TO DATE 89,620 EXISTING PLUS PROPOSED 110,900 REMAINING BALANCE 38,800 VILLAGE BREAKDOWN EAST VILLAGE-PHASE-1 BUILDING SF GPD 1 Lowes Foods 43,990 4,920 2 CVS Pharmacy 13,225 1,325 3 BUILDING J 7,566 3,420 4 BUILDING M 7,250 2,462 5 BUILDING L 4,550 570 6 BUILDING K 9,475 3,760 7 ATMC 3,200 412 8 FARM BUREAU 5,920 200 9 BUILDING F 9,915 2,760 10 BB&T 4,000 250 East Village Phase-1 Total 20,079 SOUTH VILLAGE 11 MOB 44,600 3,511 12 Bluewave Dentistry 828 500 13 Storage Facility 435 14 Oral Surgery 750 15 Vet Office 390 16 Berry Financial 75 TOTAL SOUTH VILLAGE 5,661 TOTAL COMMERCIAL 1 1 25,740 East Village Phase 1 (Commercial Area Mixed Use Buildings RETAIL J USE IND. VAR. SF GPD/SEAT PER 1000 SF GPD Retail/office RETAIL 7,000 100 700 Pizzetta's FOOD 68 2,448 40 2,720 Total: 9,448 3,420 BUILDING M Retail/Office RETAIL 4,620 100 462 Restaurant FOOD 50 2,630 40 2,000 Total: 7,250 2,462 BUILDING L Port City Java FOOD 15 1,850 20 300 Retail Office RETAIL 2,700 100 270 Total: 4,550 570 Building K Retail/Office RETAIL 5,539 100 554 Flights Craft Beer FOOD 40 1,895 20 800 Irish Pub FOOD 60 2,041 40 2,400 Total: 9,475 3,760 BUILDING F Restaurant FOOD 50 2,213 40 2,000 Office Office 2,600 100 260 Retail/Office RETAIL 5,002 100 500 Total: 2,760 South Village (Commercial Area) Medical Building Austin Oral Surgery Blue Wave Dentistry Berry Financial Group Storage Facility East Village Phase 1 (Commercial Area Mixed Use Buildings RETAIL J Edward Jones Hairology Pizzetta's Shoe Center FULL SERVICE BUILDING M Bell Residential Farm House Kitchen FULL SERVICE Family Dog Natural Nail and Spa BUILDING L Port City Java SINGLE Cherubmi Orthodontics State Farm Ins. Building K CAMS Legacy Homes Flights Craft Beer SINGLE Swell Vision Center Joyce Irish Pub FULL SERVICE BUILDING F True Homes Design Studio Coastal Integrated Health Brunswick Business & Industry Development Shuckin' Shack FULL SERVICE South Village (Commercial Area) Medical Building Austin Oral Surgery Blue Wave Dentistry Berry Financial Group Storage Facility Vet Submittal Flow Date Issued Date Area Serving Allocated Used Balance 3/11/2005 3/24/2005 Main 300 homes and commercial 0 0 0 3/28/2005 5/5/2006 Infrastrcuture Only Add flow 149,700 41,700 108,000 6/15/2005 7/22/200S Infrastrcuture Only 0 108,000 2/14/2006 3/10/2006 Jeff Landing 1 131 lots 47,160 60,840 2/16/2006 4/7/2006 Infrastrcuture Only 0 60,840 4/24/2006 5/26/2006 Jeff Landing 2 149 lots 53,640 7,200 9/15/2006 10/27/2006 Phase 6 Sec 1 sales/wellness (4-13-07 permit) 800 6,400 9/25/2006 11/3/2006 Jeff Landing 2 FM 0 6,400 12/1/2006 12/22/2006 Phase 1 Sec 2 193 lots 69,480 69,480 6,400 3/9/2007 4/13/2007 Phase 6 Sec lA/B & 2 56 lots, 30 three-br,30 two-br 38,610 38,610 6,400 3/29/2007 4/20/2007 Phase 1 Sec 3 94 lots 33,840 33,840 6,400 5/16/2007 6/8/2007 East Village Comm Lots 1&2 bank 6,400 7/25/2007 9/7/2007 Phase l Sec 2 Village 1-A 72 lots 25,920 25,920 6,400 9/18/2007 10/12/2007 Phase 1 Sec 2 Village 4-A 62 three-br/10 two-br, garden center 24,720 24,720 6,400 6/19/2008 7/18/2008 East Village Phase 1 grocery store, etc 6/19/2008 8/1/2008 South Village Phase 1 medical building 9/26/2008 10/17/2008 Infrastrcuture Only 0 6,400 12/22/2008 1/30/2009 Phase 5A 324 lots 124,920 116,640 14,680 1/9/2009 2/6/2009 Phase l Sec 2 Village 2-A 48 three-br/72 two-br 34,560 34,560 14,680 1/27/2009 2/13/2009 Phase 3 & Country Club 193 lots, etc 79,570 79,570 14,680 3/30/2011 4/21/2011 Phase 1 Sec 6A 13 lots (flow reduction) 1,820 1,820 14,680 3/5/2012 3/21/2012 Phase 213 Sec 1 135 lots/units 28,350 28,350 14,680 1/24/2013 3/6/2013 South Village Lot 10 medical office 8/29/2013 10/9/2013 Phase 2 Sec 2 123 25,830 25,830 14,680 11/21/2013 12/19/2013 Phase l Sec 6B 43 9,030 9,030 14,680 4/15/2014 5/23/2014 Phase 1Sec 4 96 20,160 20,160 14,680 12/11/2014 1/1S/2015 Phase 2 Sec 5 44 9,240 9,240 14,580 4/22/2015 6/2/2015 Phase 2 Sec 3 131 27,510 27,510 14,680 7/9/2015 8/3/2015 Phase 2 Sec 4 220 46,200 46,200 14,680 9/10/2015 10/26/2015 Phase S Sec B-1 119 24,990 24,990 14,680 3/11/2016 4/14/2016 Phase 3Sec 3 80 16,800 16,800 14,680 8/10/2016 9/14/2016 Phase 1 Sec 5 28 5,880 5,880 14,680 12/19/2016 1/19/2017 Phase 9Sec 3 200 42,000 42,000 14,680 8/19/2017 9/12/2017 Phase 9 Sec 5 75 15,750 15,750 14,680 1/30/2018 3/1/2018 Phase 5Sec B-2 169 36,960 35,490 14,680 2/26/2018 3/21/2D18 Phase 1 Sec B-4 58 12,180 12,180 14,680 2/27/2018 3/23/2018 Phase Sec 103 21,630 21,630 14,680 2/26/2019 4/10/2019 Phase 2 Sec 3B 24 5,040 5,040 14,680 6/19/2019 7/29/2019 Main PS 0 14,680