HomeMy WebLinkAboutNCG140387_NOV_20191015ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
NORTH CAROLINA
Environmental Quality
October 15, 2019
CERTIFIED MAIL 47017 0190 0000 9526 9185
RETURN RECEIPT REQUESTED
Benton Ready -Mix of Brunswick, Inc.
Attn: Keith A. Benton Sr.
197 Barnhill Road NW
Supply, NC 28462
CERTIFIED MAIL #7017 0190 0000 9526 9178
RETURN RECEIPT REQUESTED
Thomas Concrete of South Carolina, Inc.
Attn: Alan Wessel, President
2500 Cumberland Pkwy Ste 200
Atlanta GA 30339
CERTIFIED MAIL #7017 0190 0000 9526 9154
RETURN RECEIPT REQUESTED
Thomas Concrete of South Carolina, Inc.
Attn: Alan Wessel, President
3733 National Drive, Ste 124
Raleigh, NC 27612
Subject: Compliance Evaluation Inspection & Resulting Notice of Violation
NPDES General Stormwater Permit NCG140000
Certificate of Coverage NCG140387 (Benton Ready -Mix of Brunswick Inc.)
NOV#: NOV-2019-PC-0695
Shallotte Ready Mix Facility
Brunswick County
Dear Mr. Benton and Mr. Wessel:
On October 14, 2019, Brian Lambe from the Which Regional Office of the Division of Energy, Mineral,
and Land Resources (DEMLR), conducted a compliance evaluation inspection for Name of Facility
located in 197 Barnhill Road of Brunswick County, North Carolina. The site drains to Williams Branch,
which is currently classified as Class C;Sw,HQW Waters in the Lumber River Basin.
The following observations and violations or permit condition violations were noted during the DEMLR
inspection and file review:
1. Currently the site is permitted to Benton Ready Mix of Brunswick, Inc. The facility is
operated by Thomas Concrete of South Carolina Inc. The property is owned by Benton Rentals,
LLC. The permit must be addressed to the responsible party.
2. The stormwater pollution prevention plan (SPPP) must be maintained on a regular basis
including yearly updates and certifications, documentation of maintenance of Best Management
Practices (BMPs), and documentation of spill response.
3. Qualitative Monitoring has not been conducted per permit requirements.
North Carolina Department of Environmental Quality Division of Energy, Mineral and Land Resources
Wilmington Regional Office 127 Cardinal Drive Extension Wilmington. North Carolina 28405
o�..m oivanm.aw wai� 910.796.7215
NCG 140387
Benton Ready Mix of Brunswick, Inc.
Page 2 of 2
4. Analytical Monitoring has not been conducted per permit requirements. Analytical
monitoring must be conducted quarterly according to Section D: Process Wastewater Discharges
Analytical Monitoring Requirements. Williams Branch is classified as HQW.
5. Wastewater is comingling with stormwater. This conflicts with state stormwater permit
SW8 080937 and is not allowed.
Required Response
Accordingly, you are directed to respond to this letter in writing within 30 calendar days of receipt of
this Notice. Your response should be sent to this office at the letterhead address and include the
following:
1. Submit a Notice of Intent for coverage under NCG140000.
2. Discuss improvements to the SPPP and BMPs. The BMPs may need to be adjusted to be
in accordance with state stormwater permit SW8080937 requirements.
3. Immediately begin sampling per permit requirements.
Thank you for your attention to this matter. This Office is considering sending a recommendation for
enforcement to the Director of DEMLR regarding these issues and any future/continued violations that
may be encountered. This office requires that the violations, as detailed above, be abated
immediately and properly resolved. Environmental damage and/or failure to secure proper
authorizations have been documented on the subject tract as stated above. Your efforts to undertake
activities to bring the subject site back into compliance is not an admission, rather it is an action that
must be taken in order to begin to resolve ongoing environmental issues.
Pursuant to G.S. 143-215.6A, these violations and any future violations are subject to a civil penalty
assessment of up to a maximum of $25,000.00 per day for each violation. Your above -mentioned
response to this correspondence, the degree and extent of harm to the environmeht and the duration
and gravity of the violation(s) will be considered in any civil penalty assessment process that may
occur. Should you have any questions regarding these matters, please contact Brian Lambe or me at
910-796-7215 or brian.Lambe@ncdenr.gov
Sincerely,
0_��a
Daniel Sams, PE
Regional Engineer
Land Quality Section
Attachments:
1. BIMS Inspection Checklist
2. NO1
cc: Central Files —LF
WiRO Files — Land Quality
Permit:
NCG140387
SOC:
County:
Brunswick
Region:
Wilmington
Compliance Inspection Report
Effective: 08/01/17 Expiration: 06/30/22 Owner: Benton Ready Mix of Brunswick Inc
Effective: Expiration: Facility: Shallotte Ready Mix Facility
197 Bamhill Rd
Contact Person: Keith A Benton
Title: President
Supply NC 28462
Phone: 843-369-4000
Directions to Facility:
From the intersection of Royal Oak Rd (SR 1845) and US 17 northeast of Shallotte travel east toward Wilmington apx 0.7 miles turn
left on Barnhill Road and travel apx 033 miles to entrance of site
System Classifications:
Primary ORC: Certification: Phone:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
SW8080937 Benton Ready Mix of Brunswick Inc - Shallotte Ready Mix Facility
Inspection Date: 10/14/2019 Entry Time: 11:15AM Exit Time: 12.00PM
Primary Inspector: Brian P Lambe Phone:
Secondary Inspector(s):
gin
Reason for Inspection: Ro Inspection Type: Compliance Evaluation
Permit Inspection Type: Ready Mix Concrete SlormwalerNVaslewater Discharge COC
Facility Status: ❑ Compliant E Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
permit: NCG140387 (timer - Facility: Benton Ready Mix of runswick Inc
Inspection Date: 10/14/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Inspection of the Shallotte Ready Mix Facility revealed that Thomas Concrete of South Carolina Inc. are the current
operators of the facility. The facility was notified of a need to transfer the permit in 9/2017 and 2/2019. The facility failed to
submit appropriate documents for transfer of the permit. Thomas Concrete of South Carolina is operating without a permit
The facility has a stormwaler pollution prevention plan (SPPP) with the required elements. However, there is no
documentation of maintenance, spills, plan updates since 2017. Employee training was documented in 5/2019.
Qualitative and Analytical Monitoring has not been occurring onsite. No records were available onsite. Facility should be
sampling quarterly. The TSS wastewater benchmark is 20 mg/L (2009). The sampling point is overgrown with vegetation and
is not visible.
Page 2 of 3
Permit: NCG140387 Owner - Facility: Benton Ready Mix of Brunswick Inc
Inspection Date: 10/14/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
0
❑ ❑ ❑
# Does the Plan include a General Location (USGS) map?
0
❑ ❑ ❑
# Does the Plan include a "Narrative Description of Practices"?
0
❑ ❑ ❑
# Does the Plan include a detailed site map including outfall locations and drainage areas?
0
❑ ❑ ❑
# Does the Plan include a list of significant spills occurring during the past 3 years?
❑
0 ❑ ❑
# Has the facility evaluated feasible alternatives to current practices?
❑
0 ❑ ❑
# Does the facility provide all necessary secondary containment?
❑
0 ❑ ❑
# Does the Plan include a BMP summary?
E
❑ ❑ ❑
# Does the Plan include a Spill Prevention and Response Plan (SPRP)?
0
❑ ❑ ❑
# Does the Plan include a Preventative Maintenance and Good Housekeeping Plan?
0
❑ ❑ ❑
# Does the facility provide and document Employee Training?
❑
0 ❑ ❑
# Does the Plan include a list of Responsible Pany(s)?
❑
0 ❑ ❑
# Is the Plan reviewed and updated annually?
❑
0 ❑ ❑
# Does the Plan include a Stormwater Facility Inspection Program?
❑
E ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented?
0
❑ ❑ ❑
Comment: Documentation of yearly inspection and maintenance of SPPP and BMPs has not been
conducted in 2019. One document for employee training occurred on 5/1/2019. Other
documents refer to 2017
Qualitative Monitoring
Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ❑
Comment: No monitoring has occurred onsite.
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ ❑ ❑
# Has the facility conducted its Analytical monitonng from Vehicle Maintenance areas? ❑ 0 ❑ ❑
Comment. No monitoring has occurred onsite.
Permit and Outfalls
Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site?
❑
❑ ❑
# Were all outfalls observed during the inspection?
E
❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division?
❑
❑ ❑
# Has the facility evaluated all illicit (non stormwater) discharges?
❑
❑ ❑
Comment. Permit has not been transferred to current operators
Page 3 of 3