Loading...
HomeMy WebLinkAbout20191401 Ver 1_B-4931 Permit Drawings_20191014I lii l 1��'21Y North Carolina Department of Transportation tilni7I .!TU ; Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version 2.07; Released October 2016) FOR NCDOT PROJECTS WBS Element: 40134.1.1 TIP No.: B-4931 County(ies): Edgecombe Page 1 of 1 General Project Information WBS Element: 40134.1.1 ITIP Number: B-4931 Project Type: Bridge Replacement Date: 9/19/2019 NCDOT Contact: Tierre Peterson Contractor / Designer: Leah Young, PE Address: 1000 Birch Ridge Dr Raleigh, NC 27610 Address: 4505 Falls of Neuse Road Suite 400 Raleigh, NC 27609 Phone: 919 707-6488 Phone: (919) 783-9214 Email: tr eterson ncdot. ov Email: Leah.Youn kci.com City/Town: None County(ies): Edgecombe River Basin(s): Tar -Pamlico CAMA County? No Wetlands within Project Limits? Yes Project Description Project Length (lin. miles or feet): 0.17 Surrounding Land Use: Woods/rural residential Proposed Project Existing Site Project Built -Upon Area (ac.) 0.7 ac. 0.6 ac. Typical Cross Section Description: 12' TRAVEL LANES WITH 4' PAVED SHOULDER AT BRIDGE; 35.25' OUT TO OUT APPROXIMATE 10' TRAVEL LANES WITH 2' PAVED SHOULDER Annual Avg Daily Traffic (veh/hr/day): Design/Future: 4100 Year: 2040 Existing: 3100 Year: 2020 General Project Narrative: (Description of Minimization of Water Quality Impacts) The project will replace Edgecombe County Bridge #0022 and its approaches. The proposed replacement is 170' long with a clear roadway width of 32'. This structure provides 2-12' travel lanes with a 4' paved shoulder. The proposed bridge will have 1.5:1 sloping riprap abutments and 4' caps at the end bents. Placement and construction of the proposed bridge, end bents, caps, and associated roadway fill will not result in any jurisdictional stream or similar environmental impacts. There will be no permanent channel changes. There are some wetlands present on the far east side of the project within the proposed limits of construction. The removal of the existing structure, excavation under the bridge, and placement of riprap for bank stabilization does not result in any surface water or wetland impacts. There are 30' and 50' buffer zones present outside of the existing stream. STORMWATER CONTROLS: The proposed bridge does not require deck drains. The runoff from the bridge discharges through pipe/inlet systems in all four quadrants ouside of the jurisdictional stream at non -erosive velocities. In all bridge quadrants, roadway runoff is treated via vegetated roadway shoulders and existing vegetated swales prior to entering the stream. Watrb.dy Information Surface Water Body (1): Town Creek NCDWR Stream Index No.: 28-83b NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Nutrient Sensitive Waters (NSW) Other Stream Classification: None Impairments: None Aquatic T&E Species? Yes Comments: ANADROMOUS FISH NRTR Stream ID: N/A Buffer Rules in Effect: Tar -Pamlico Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? INo Dissipator Pads Provided in Buffer? INo Deck Drains Discharge Over Water Body? INo (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) See Sheet I -A For Index of Sheets See Sheet I-B For Conventional Symbols U 134 1357 1603 , - PROJECT 258 SITE / F1200 1604 1301 • 1361 12 130 1601 _ 129 1200 1296 136-9 42 42 43 112 43 124 258 1613 O 1612 VICINITY MAP (NTS) �--�� DETOUR ROUTE n STATE OF NORTH CAROLpNA PERMIT DRAWING DIVISION OF HIGHWAYS SHEET 1 OF 5 EDGyr',COMBE COUNTY LOCATION. REPLACE BRIDGE NO.22. OVER TOWN CREEK ON US 258 TYPE OF WORK: GRADING, DRAINAGE, PAVING AND STRUCTURE WETLAND AND STREAM IMPACTS FERRNCB NQ BR N. N-C- B-4931 1 9TATR PROl.N0. .A.PROINO. OE9CRIPT[ON 40134.1.1 P.E. 40134.2.1 RW & UTIL 40134.3.1 CONST. /o BEGIN TIP PROJECT B -493/ -L- STA. I2*45.00 / ��� j END TIP PROJECT B -493/ -L- STA.2If5I,00 / US 258 1 US 258 TO NC 42/NC43 BEGIN BRIDGE -L- STA.16f14.00 \ ls TO SR 1604 END BRIDGE BROWN FARM RD. -L- STA.I7+84.00 �l THIS PROJECT IS NOT WITHIN MUNICIPAL BOUNDARIES. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III. 01 INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED J PROJECT REFERENCE NO. I SHEET NO. is FRANCIS L. & DOROTHY P. EAGLES REVOCABLE TRUST DB 1639 PG 152 9 RIPRAP PAD AT OUTLET EST 1 TONS CL.'B' ^ EST 5 SY GTE GUYiI ,DE exlsTwc piw — ------w--- — N 9] F / 15" W/2 ELBOWS L4'YAVLV HUAOWAY Ql IN 0*13'47.1i"F US 258 15" W/2 ELBOWS —� i—t T ---- - o *— — 16 o �° R¢P o — — — -_-_--- 3Y / SPECIAL CUT DITCH K�� na I ( � � �P, �. .- -SEEbETAILA _ a EIP I I EIP a I� �E F EC 3 C PD E E E'` V CL 'll' RIPRAP� IPosT Im \ I V I TO ELEV=44.0'LL ^. �3 lal I l o \ \ DONALD R. BRADY, ET. AL. I ° - DB 1201PG 416 I LL EDCECOCOUNTY d w • i \� 1 I _ DB 1286 PG 534 N P I � DAVID 0. EASOM - ------------ \ DB 1636 PG 652 �m MB 15 PG 28 EDGECOMBE COUNTY — DO 107T PG 364 \ \ _ PLAT CABINET 2 SLIDE 148E 'II' RIPRAP ELEV=44.0' W2 ELBOWS I - LY -A -7 - -------- PERMIT DRAWING SHEET 2 OF 5 . O n tlT /y O N� �I N W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INCOMPL1EW E PLANS DO NOT USE FOR R/W ACOUL31I DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ROBERT tAtL WOOTEN,ET.AL. OB 1122 PG 50 PLAT CABINET 2 SLIDE 129A N 21°15'52" E �`- 490.25' �5 XZ p 5 TIMOTHY D.BURDETTE DB 1453 PG 1026 I PLAT CABINET 2 SLIDE 129A m ♦E 'kl Y \k J y -TIMOTHY D. SURD E ` J.. ,,, DB 1453 PG 1026 T_ CONC III F III I I I'o 224'PAVED HOADWAY 1--- �II� Is "I '— I. Ilm T T— — d Q' �D — F - 15" W/ - C C HW II- S EXISTING wow cu L2 ez 7 TDE 36' C NC WIN E 36' CONC WW P�F 1 FIDE PD gl, ANN MOTT g Z 2 Tg TB DB 94-E PC 482 DETAIL A SPECIAL CUT DITCH I NptI. Scale) I Front F,..t 11 Natural 3'� Slope I Ground �7o D F♦ Min. D= 0.7 Ft. I FROM -L- STA. 14+00 TO STA. 15+00 RT 3 A I SP �0 ?� 5• 32°09'S "E ipA 28.62' S 9 ° I 6 9� 6 2B- �0 Ng2 S9 Bq 7�"N, ti I yC S 9 �y9 SBF I � 3310' e EIP 27.00'9 N 31°31'47•E 53.0g TE\ ` PAD AT OUTLET EST 1 N -- EST 5 Y GTL. 'B' JS� CENTERLINE OF TOWN � � /5'GRAVEC �g1 9° N 27°55'2E JJ 1o4.7z' Tg� .1113 po°p ' N a IS PROPERTY LINE - FOR —L— PROFILE SEE SHEET 5 wA �� PROJECT REFERENCE NO. SHEET NO. n ��� � � V � 3 B R^N SHEEP NO. �R4 �3 �b ROADWAY DESIGN HYDRAULICS \<'S H / 5 ENGINEER ENGINEER Sb £ Z ]E PLANS 9O Z 2b DO NOT USE FOR /W ACQUISITION \46 45 b S 4 a W V� � pv � DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED h a N q o? S ti� 0ti O e 3 n k3 b6 ,. �/�VBRII ET AL. O S6 ti ✓ Ab 40 41 �nW �O 41 O M Ll N Iel �� E A �/ 6 Z i '1\ v , 45 6 3 OTHY D. BURDET 1026 PLAT CABI 45 PCSLIIDE 129A FRANCIS L. & S TO ELEV- DOROTHY P. EAG ES n PRAP PA AT OURET 4'_ I REVOCABLE TR T CL\�g RD n_ b 3 ti PD w � DO 1639 PG IS b � EST�S Y E PDE� m .. -- � �m T- 7 E 19A - .. -. - EST 1:TON5_ � --_- - GUY 4� �n a 4 4,__ FS a � � m �DE N F rl)' 97S �= 15" W/2 0b 24' P V " -L - 24' PAVEO � o v�o 48 15" W/2 ELBOWS a - SPE IAL CUT 46!-'� SEEC DETAIL ADITCH + er r 4 - - a• - L 4 „�f a �v>fr F Wr o R _ a a r 2 ELBOWS - 01 ICI 5 E F E� C \ I PDE �� tl 6 TDE j/ 32 3 30 tie/ W r T \ E a E I PDE PD E osT V CL'II'_44.0'�:. DB A9 -EM GT 82 sZ82 B� V1 o TO ELE ro ,I o _ o� la V v- bt t c'll .. A _ L R. BRAD ET. AL. � ED DBC 86EPC 9 4TY - . �,".�.� v z �46 J .i1 �� BI tIe 104, 72� E 0 1201 PG- �' 1 a ml AT P m p A rB �� _ ml r 'S I I- �3 `�' t �\ \ EST Sy TONS Cl. BUTLE i K w BZ 1 �b - - - a EST 5 SY GT D ID O. EASOM ?q�•:- �_IB - 0E 0E DO 1636 PG 652 ME 15 P RN ml EDGECOMBE COUNTY 4 DO IOTT PG 364 \ 41 ` °� PLAT CABINET 2 SLI 148E 9E 3� \ ���� is'cRav _ 34 i am 40 O s S 3 0. LZ 3q C n \ � I D7 iS INa rbl,. 3., I W� .m I 0 W b TA. I�i �41 � • � W S FOR —L— RO H E �5 w- e . n\ n 53308• WETLAND AND SURACE WATER IMPACTS SUMMARY WETILAND IMPACTS SURFACE IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) TOTALS*: 0 0 0 *Rounded totals are sum of actual impacts NOTES: There are no wetland or stream impacts at this location. 2018 Feb