Loading...
HomeMy WebLinkAbout20191399 Ver 1_PCN Form Submission_20191008DWR MOM— of Water Resources Pre -Construction Notification (PCN) Form September 29, 2018 Ver 3 21nitial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* G Yes r No Change mly if needed. BIMS # Assigned * Version#* 20191399 1 Is a payment required for this project?* r No payment required r Fee received Reviewing Office* r Fee needed - send electronic notification Mooresville Regional Office - (704) 663-1699 Select Project Reviewer* Donna Fbod:eads\drhood Information for Initial Review 1a. Name of project: Replacement of Bridge #291 on SR 1348 (Old NC Hwy 90) 1a. Who is the Primary Contact?* Trish Beam 1b. Primary Contact Email:* pdbeam@ncdot.gov Date Submitted 10/8/2019 Nearest Body of Water Duck Creek Basin Catawba Water Classification Class C, Tr 1c. Primary Contact Phone:* (980)552-4218 Site Coordinates Latitude: Longitude: 35.926593-81.308417 FA. Processing Information U County (or Counties) where the project is located: Alexander Is this project a public transportation project?* r Yes r No Is this a NCDOT Project?* r Yes r No (NCDOT only) T.I.P. or state project number: WBS # (?) 17BP.12.R.88 1a. Type(s) of approval sought from the Corps: W Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What types) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) r' Regional General Permit (RGP) r' Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? t' Yes r No Nationwide Permit (NWP) Number: 03 - Maintenance NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: fJ 401 Water Quality Certification - Regular F Non-404 Jurisdictional General Permit F Individual Permit le. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: r 401 Water Quality Certification - Express r Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* C Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? C Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? C Yes t No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? C Yes r No 1j. Is the project located in a designated trout watershed? C Yes r No F. Applicant Information 1d. Who is applying for the permit? [J Owner r Applicant (other than owner) le. Is there an Agent/Consultant for this project? r Yes C No 2. Owner Information 2a. Name(s) on recorded deed: NCDOT 2b. Deed book and page no.: 2c. Responsible party: Mark Stafford 2d.Address Street Address 1710 East Marion Street Address Line 2 city Shelby Fbstal / Zip Code 28151 2e. Telephone Number: (980)552-4200 2g. Email Address:* State / Frovinee / R�gion NC 0�untry USA 2f. Fax Number: (704)480-5401 * C Yes r No r Yes C No mstafford@ncdot.gov C. Project Information and Prior Project History U 1. Project Information 1b. Subdivision name: (i appropriate) 1c. Nearest municipality/ town: Taylorsville 2. Project Identification 2a. Property Identification Number: 2c. Project Address Street Address Address line 2 Oty Fbstal / Zip 03de 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Duck Creek 3b. Water Resources Classification of nearest receiving water:* Class C, Tr 3c. What river basin(s) is your project located in?* Catawba 3d. Please provide the 12-digit HUC in which the project is located. 030501010902 4. Project Description and History 2b. Property size: State / ftovince / Fbgion O�untry 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Ebsting bridge on paved secondary road. Landuse in vicinity is cropland and pasture 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes r No r Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) 14-12-0006 Alexander Topo.pdf 853.54KB 4e. Attach an 81/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Bridge291_Soil _Map.pdf 236.37KB 4f. List the total estimated acreage of all existing wetlands on the property: 0 4g. List the total estimated linear feet of all existing streams on the property: 100 4h. Explain the purpose of the proposed project:* To replace a deteriorating bridge for the safety of the travelling public 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* To replace an eAsting 3 span 20 foot wide reinforced concrete girder bridge with a 3 span 30 foot wide cored slab bridge. The proposed bridge will incorporate sloped abutments with 4 foot caps. 8" x 4" slot deck drains, left and right will be required. Typical heavy construction equipment (trackhoes, backhoes, cranes) will be utilized for the construction of the bridge. 4j. Please upload project drawings for the proposed project. SF-010291_Hyd_Permit_Package 05232019.pdf 2.12MB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No O Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: NCDOT Environmental Office Other: 5d1. Jurisdictional determination upload 6. Future Project Plans 6a. Is this a phased project?* r Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): r Wetlands 7 Streams -tributaries r Open Waters r Pond Construction 3. Stream Impacts r Buffers 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact* 3d. S. name * 3e. Stream Type * 3f. Type of 3g. S. width * 3h. Impact ❑ M Jurisdiction* length* S1 Bank stabilization at ditchline Permanent Bank Stabilization Duck Creek Perennial Both 30 7 (L-16+25, 35' LT) Average (feet) (linearfeet) S2 Bank stabilization at ditchline Tem ora P ry Bank Stabilization Duck Creek Perennial Both 30 10 (L-16+25, 35' LT) Average (feet) (linear feet) S3 Bank stabilization at ditchline Permanent Bank Stabilization Duck Creek Perennial Both 30 6 (L-16+25, 35' RT) Average (Feet) (lir�earfeet) S4 Bank stabilization at ditchline Tem ora P ry Bank Stabilization Duck Creek Perennial Both 30 10 (L-16+25, 35' RT) Average (feet) (linearfeet) S5 Bank stabilization at ditchline Permanent Bank Stabilization Duck Creek Perennial Both 30 6 (L -16+25, 40'LT) Average (feet) (lir�earfeet) S6 Bank stabilization at ditchline Tem ora P rY Bank Stabilization Duck Creek Perennial Both 30 10 (L-16+25, 40' RT) Average (feet) (linear feet) S7 Bridge Replacement (L - Temporary Dewatering Duck Creek Perennial Both 30 20 16+15 & 16+35) Average (feet) (linearfeet) 31. Total jurisdictional ditch impact in square feet: 0 31. Total permanent stream impacts: 19 3i. Total stream and ditch impacts: 69 3j. Comments: E. Impact Justification and Mitigation 1. Avoidance and Minimization 3i. Total temporary stream impacts: 50 la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Runoff from the bridge will be captured and discharged onto deck drain dissipater pads. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: L^J Minimal impact to stream Men removing existing bridge components 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes C No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Existing bridge being replaced with bridge CStormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No If no, explain why: The bridge is not located in an area with protected riparian buffers 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* C Yes r No Comments: Stormwater management plan attached G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)?* r Yes r No Comments:* The project is listed as a type and class of activity which qualifies as a non -major action under the Minimum Criteria ruels; therefore, a minimum criteria checklist has been completed for the project. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15ANCAC 2H .0500), Isolated Wetland Rules (15ANCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15ANCAC 2B .0200)? * r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. This is a minimum criteria project with little anticipated impacts. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* C Yes C No r N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) Sa. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5c. If yes, indicate the USFWS Field Office you have contacted. Asheville 5d. Is another Federal agency involved?* r Yes r No Se. Is this a DOT project located within Division's 1-8? f- Yes r No 5f. Will you cut anytrees in order to conduct the work in waters of the U.S.? r Yes r No 5g. Does this project involve bridge maintenance or removal? r Yes f No 5g(1). If yes, have you inspected the bridge for signs of bat use such as staining, guano, bats, etc.? r Yes r No If you answered "Yes" to 5g(1), did you discover any signs of bat use? f Yes r No f Unknown 5h. Does this project involve the construction/installation of a wind turbine(s)?* r Yes r No r Unknown Si. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r^ Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NC Natural Heritage database and on -site surveys. Division 12 is located in the white nose syndrome area; however, there are no known hibernacula or roosting trees in Division 12 counties. Consultation Documentation Upload 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* Per Natural Heritage database, there are no salt marshes, oyster reefs or seagrass beds in the vicinity of the project. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* Cultural resources review and approval (tracking no. 14-12-0006) 7c. Historic or Prehistoric Information Upload 14-12-0006NHPARevised2.pdf 4.42MB PA 14-12-0006 Alexander Update (NSR).pdf 4.31 MB 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year flood plain?* r Yes r No 8b. If yes, explain how project meets FEMA requirements: NCDOT hydraulic unit coordination 8c. What source(s) did you use to make the floodplain determination?* NCDOT hydraulics unit Miscellaneous Comments Miscellaneous attachments not previously requested. B4980 PDR Photos.pdf NLEB_memo.pdf B-4980 V2 NRTR_Revision 6_25_15.pdf Vicinity_B-291 _B-4980. pdf Hazardous Spill Checklist.pdf cover_letter.pdf Signature 12.76MB 115.79KB 13.81 MB 653.21 KB 4.38KB 223.38KB v m By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); . I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND . I intend to electronically sign and submit the PCN form. Full Name: Trish Beam Signature Date 10/8/2019