HomeMy WebLinkAboutNC0049867_NOV-2019-LM-0066 Response_20191009Town of Cleveland
302 East Main Street
P.O. Box 429
Cleveland, NC 27013
(704)278-4777
October 9, 2019
W. Corey Basinger, Regional Supervisor
Water Quality Regional Operations Section
NCDEQ-Mooresville Regional Office
610 East Center Ave., Suite 301
Mooresville, NC 28115
SUBJECT: Response to NOV-2019-LM-0066
Dear Mr. Basinger:
This letter is in response to the above Notice of Violation received on September 26, 2019. The
cause can only be related to possible rain and/or slightly above normal influent flow (see attached
e-mail). August results were 18.1. 11.6, 8.2 and 23.2 mg/l. The last week of August the No. 1
clarifier drive bearing failed resulting in having only No. 2 clarifier processing both aerators for 2
weeks (see attached e-mail).
The effluent BOD results for September are 5.38, 9.22, 3.37 and 22 mg/l. The digestor was land
applied on September 26, 2019. See attached BOD trend chart which indicates we are back to
normal process ability.
Temperature water degree (°c) — The temperature was not recorded for July 4 since it was a
holiday. Review of previous holidays show no recording if a change is required to record
holidays, please advise.
Sinc
Danny Gabriel
Mayor
cc: Commissioner Gerald Osborne
attachments
SENT VIA EMAIL — corey.basineerna ncderingov
SENT VIA EMAIL — roberto.scheller&ncdenr.gov
HARD COPY SENT FIRST CLASS MAIL
Cleveland WTP
Lab
R&A
BOD
mgl
Date
AVG.
Max.
Min.
1/31/2018
6.202
8.91
3.61
2/28/2018
5.84
6.64
4.82 I
3/31/2018
7.64
9.94
4.61
4/30/2018
13.5
27.9
7 Hvy. Rain
5/31 /2018
6.6
8.9
3.7
6/30/2018
6.77
7.02
6.38
7/31/2018
7.01
9.04
5.5
8/31/2018
8.21
10.4
6.95
9/30/2018
7.54
10.1
4.5
10/31/2018
7.77
13
4.98
11/30/2018
6.66
10.2
4.96
12/31/2018
18.04
33.3
3.62
1/31/2019
82.6
156
40.7 III. Dump
2/28/2019
34.3
62.1
17.8
3/31/2019
37.1
64.8
17.7
4/30/2019
34.5
56.2
18.4
5/31/2019
25.2
36.7
17.4
6/30/2019
16.15
23.8
11.2
7/31/2019
12.18
35.1
2.08
8/31/2019
15.3
23.2
8.2
9/31/19
5.04
9.22
2.2
180
160
140
120
t WiP. R&A mg/I
100
AVG.
80
-WTP. R&A mg/I
Max.
60
40
20
0
m
eo
ao
ao
0o
00
co
m
cv
co
co
co
0)
0)M
0)
0)
rn
M
CD
0
N
0
N
0
N
06
N
N
0
N
0
N
0
N
0
N
0
N
0
N
0
N
0
0
0
0
0
M
0
0
M
OJ
N
<
M
O
M
M
CDO
M
M
M
M
M
CDw
M
M
M
N
M
O
M
M
O
M
M
M
O
N
M
V
M
M
r
O
N
N
M
V
M
M
r
OD
Date: 08/02/2019 [05:41:25 AM CDT]
From: pland@clevelandnc.org
To: "Schaller, Roberto" <roberto.scheller@ncdenr.gov>
Subject: Town of Cleveland high BODs
Good morning, Roberto. This pains me to no end to have to report yet another high BOD result but I
think maybe we can blame it on the rain this time.
Since the last email I sent ya on 6/5/19 we have had excellent BOD numbers but our 7/24 results was a
35.1 mg/l. The only thing I can put focus on is we had rain on the day before sampling day and the
day of. The day before had 1" of rain then the day of sampling had another 1" with .184 and .201 gls
of flow on 7/22 and 7/23. I would not consider these to be extreme flow rates and visually the plant
didn't show any indication of a high flow event. The sample that was sent was clean and clear and all
other sample results both influent and effluent were normal.
I had our lab run a COD of this weeks sample which came back 39.0 mg/1 so looks like the BODs will be
back down to normal which makes it appear that it was an isolated event. I'm just very hopeful that
our previous issue is not returning and I have not seen any indication that my plant is showing a
down turn. Have monitored our bug populations and our new PH/ORP probes and have not seen any extreme
swings that would cause concern.
Thank you for your time and I will keep you informed going forward.
Hope you have a great weekend,
Paul Land
Date: 09/06/2019 (07:26:33 AM CDT]
From: pland@clevelandnc.org
To: roberto.scheller@ncdenr.gov
Subject: Town of cleveland
Good morning, Roberto. we almost had perfect August BOD numbers but had a sligh . crease. Our
numbers for the month were 18.1, 11.6, 8.20 then on the last week of the month(2-3.22 our weekly limit
is 22.5 and our monthly is 15.0. This will cause our monthly to be over by only`- ! I can't express
just how upsetting that is. Thought for sure August was gonna be the month I didn't have to send
another email.
Possible the high number on week 4 came from us having to run on one clarifier for over 2 weeks. The
solids really built up high in #2 ditch but we're now back to normal operation with repairs complete
on #1.
Thank you and hope you have a great weekend,
Paul Land