HomeMy WebLinkAboutWQ0041137_Application (FTSE)_20190827DWR
1310slon of Water Resources
State of North Carolina
Department of Environmental Quality
Division of Water Resources
15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
FTA 04-16 & SUPPORTING DOCUMENTATION
Application Number: 0 t7 �I f (to be completed by DWR)
All items must be completed or the application will be returned
1. APPLICANT INFORMATION:
1. Applicant's name: ;gown of Fuquay-Varina (company, municipality, HOA, utility, etc.)
2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership
❑ Federal ❑ State/County ® Municipal
3. Signature authority's name: Jay T. Meyers, PE per 15A NCAC 02T .0106(b)
Title: Public Utilities Director
4. - Applicant's mailing address: 401 Old Honeycutt Road
City: Fu u_�C ay_Varina State: NC Zip: 27526-9307
5. Applicant's contact information:
Phone number: (919) 567-3911 Email Address: jmeyerst<fuouay-varina.ore
IL PROJECT INFORMATION:
❑ Privately -Owned Public Utility
❑ Other
1. Project name: Meadow Bluffs Subdivision - Phase III
2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project
If a modification, provide the existing permit number, WQ00._ and issued date: _ -
If new construction but part of a master plan, provide the existing permit number: WQ00_
3. County where project is located: Wake
4. Approximate Coordinates (Decimal Degrees). Latitude: 35.619554' Longitude:-78.753300°
5. Parcel ID (if applicable): 0677299412
(or Parcel ID to closest downstream sewer)
111. CONSULTANT INFORMA*16N:
1, Professional Engineer: Don Curry, PE License Number: 26970
Firm: The Curry Entineerina Group, PLLC
Mailing address: 205 S. Fuouay Avenue
City: Fuquay-Varina State; NC, Zip: 27526-2212
Phone number. (99) 552-0849 Email Address: don a.curryengz.cotn
IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION:
I. Facility Name: Terrible Creek WWTF Permit Number: NCO066516
Owner Name: Town of Fuquay-Varina
V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF):
I. Permit Number(s). WQLL00u%0q
System Wide Collection System PermitNumber(s) (if applicable): WQCS 000 3
OwnerName(s): r
mil 4'Fulua4"Vari7C1,_
FORM: FTA 04-16 Page I of 5
VI. GENERAL REQUIREMENTS
I . If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached?
❑ Yes ❑No ®NIA
2. If the Applicant is a Developer of lots to be said, has a Developer's Operational Agreement (FORM: DEV) been attached?
❑ Yes ❑No ®NIA
3. If the Applicant is a Home/Prone Owners' Association has nn O erational A reement FORM: I•IOA been attached?
❑ Yes ❑No ®NIA
4. Origin of wastewater: (check al I that apply):
® Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash
❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels
❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse
❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash
❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment)
5. Nature of wastewater: 100 % Domestic/Commercial % Commercial
% Industrial (See_ 15A NCAC 02T .0103(201)
�hIs there a Pretreatment Program in effect? ❑ Yes ❑ No
6. Has a flow reduction been approved under I5A NCAC 02T .0 114(f)? ] Yes ❑ No
D if ves, provide a cony or now reduction approval letter I `
7. Summarize wastewater generated by project:
Establishment Type (see 02T.01140
Daily Design Flow'.e
No. of Units
Flow
Single Family Subdivision lots
225 gal/day
41
9,225 GPD
gal/
GPD
gal/
GPD
gal/
GPD
gal/
GPD
gall
GPD
—T—t—
T71a1
9,225 GPD
a See 15A NCAC 02T .0114 b d e I and a 2 for caveats to wastewater design flow rates (i.e., minimum flow per
dwelling; proposed unknown non-residential development uses; public access facilities located near high public use
areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals
as defined in G.S. 42A-3).
b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified (in table 15A NCAC 02T.01 lai shall
be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data.
S. Wastewater generated by project: GPD (per 15A NCAC 02T .0114)
D Do not include future flows or previously permitted allocations
If permitted flow is zero, indicate why:
❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line
❑ Flow has already been allocated in Permit Number:
❑ Rehabilitation or replacement of existing sewer with no new flow expected
❑ Other (Explain):
FORM: FTA 04-1 G Page 2 of 5
VII.
Vlll.
GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers):
I. Summarize gravity sewer to be permitted:
Size (inches)
Length (feet)
Material
8"
1824
PVC
D Section H & 11[of the MDC for Permitting of Gravity Sewers contains information related to design criteria
>r Section III contains information related to minimum s:opes for gravity sewer(s)
> Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC
PUMP STATION DESIGN CRITERIA (If Applicable) n 02T .0305 & MDC (Pump Stations/Force Mains):
COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
Pump station number or name:
2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: -...._
3. Design flow of the pump station: millions gallons per day (firm capacity)
4. Operational point(s) of the pump(s): gallons per minute at i feet total dynamic head (TDH)
5. Summarize the force main to be permitted (for this Pump Station):
Size (inches) Length (feet) Material
6. Power reliability in accordance with 15A NCAC 021-.0305(h)[ I ):
❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(I)(B)_
>r Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
D Must be permanent to facility
Or if the pump station has an average daily flow less than 15,000 gallons per day:
❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T
.0305(h)(1)(C)
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry - t5A NCAC 02T .0305(h)(1)(C):
D It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement)
and is compatible with the station.
D If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations'
storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be
provided in the case of a multiple station power outage.
FORM: FTA 04-16 Page 3 of
IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T.0305(f)):
1. Does the project comply with all separations found in 15A NCAC 02T.0305(f) & (g)
t 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems:
® Yes ❑ No
Setback Parameter*
Separation Required
Storm sewers and other utilities not Iisted below (vertical)
24 inches
Water mains (vertical -water over sewer including in benched trenches)
18 inches
Water mains (horizontal)
10 feet
Reclaimed water lines (vertical - reclaimed over sewer)
IS inches
Reclaimed water lines (horizontal - reclaimed over sewer)
2 feet
**Any private or public water supply source, including any wells, WS-i waters of Class I or
Class It impounded reservoirs used as a source of drinking water
100 feet
"Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal
high water (or tide elevation) and wetlands (see item IX.2)
50 feet
"Any other stream, lake, impoundment, or ground water lowering and surface drainage
ditches
10 feet
An.y buil foundation
5 feet
-ing
Any basement
10 feet
Top slope of embankment or cuts of 2 feet or more vertical height
10 feet
Drainage systems and interceptor drains
5 feet
Any swimming pools
10 feet
Final earth grade (vertical)
36 inches
9 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(cannot be achieved.
**Stream classifications can be identified using the Division's NC Surface Water Classifications webpapc
D If noncompliance with 02T.0305(f) or (a) see Section X of this application
Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes ❑ No
• Seethe Division's draft separation requirements for situations where separation cannot be meet
D No variance is required if the alternative design criteria specified is utilized in design and construction
• As built documents should reference the location of areas effected
3. Does the project comply with all setbacks found in the river basin rules per 15A NCAC 02B _0200? ® Yes ❑ No
L This would include Trout Buffered Streams per 15A NCAC 213.0202
4. Does the project comply with an individual 404 Permit or any 401 Certifications? ® Yes ❑ No
➢ Wetland -related permits shall be requested, obtained, and adhered to for projects that impact wetlands or surface waters
> Information can be obtained from the 401 & Buffer Permitting Branch
5. Does project comply with 15A NCAC_02T.01p5(c)(6f (additional permits/certifications)? ® Yes [:]No
Per 15A NCAC 02T_0I05(c)(6), directly related environmental permits or certification applications are being prepared, have
been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and
sedimentation control plans, stormwater management plans, etc.).
6. Does this project include any sewer collection lines that are deemed "high -priority?"
Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer
positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer.
� Q .� Yes X No
> If yes, include an attachment with deta0f-hr .10 each line, including type (aerial line, size, material, and location).
High priority lines shall be inspected by the permittee or its representative at least once every six -months and
inspections documented per ISA NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit.
FORM: FTA 04-16 Page 4 of 5
X. CERTIFICATIONS:
I. Does the submitted system comply with I SANCACO2"1', the Minimum Design Criteria for the Permitting of Pump Stations
and I orce Mains (latest version), and the Gravity- Sewer Minimum Design Criteria (latest version) as applicable?
® Yes ❑ No
If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents
for review. A roval of the request is required prior to submittal of the Fast Track Application and supporting
documents.
2. Professional Engineer's Certification:
1, PM tr . ZV TXZ
(Professional Engineer's name from Applicati
Item 111.1.)
attest that this application for
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications,
engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best
of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer
Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track
Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain
portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this
material and have judged it to be consistent with the proposed design.
NOTE In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation.
North Carolina Professional Engineer's seal, signature, and date:
3. Applicant's Certification per 15A NCAC 02T .0106(b):
Mora P G �Ub I' G A-U,a seer , attest that this application for
(Signalfire Authority's n0ne & title from Application Item 1 3.)
has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of
this application are not completed and that if all required supporting documentation and attachments are not included, this
application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -
discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties,
injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a
condition of this permit be violated. 1 also understand that if all required parts of this application package are not completed
and that if all required supporting information and attachments are not included, this application package will be returned to
me as incomplete.
NOTE — In accordance with General Statutes 143-215.6A and 143-215,6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation.
Signature:
FORM: FTA 04-16 Page 5 of 5
OF WAT�c� State of North Carolina
`O� PG Department of Environment and Natural Resources
r Division of Water Quality
-1c Flow Tracking/Acceptance for Sewer Extension Permit Applications
(FTSE 06-13)
Project Applicant Name: Town of Fu ua -Varina
Project Name for which flow is being requested: Meadow Bluffs Subdivision -Phase 3
More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump
stations along the route of the proposed wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: _
b. WWTP Facility Permit #
Terrible Creek WWTP
NCO066516
c. WWTP facility's permitted flow
d. Estimated obligated flow not yet tributary to the WWTP
e. WWTP facility's actual avg. flow
f Total flow for this specific request
g. Total actual and obligated flows to the facility
h. Percent of permitted flow used
All flo►vs are in MGD
3.000
0.797
1.353
0.009
2.159
71.97%
II. Complete this section for each pump station you are responsible for along the route of this
proposed wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A)
(B)
Design
Pump
Average Daily
Approx.
Station
Firm Flow**
Current Avg.
(Name or
Capacity,* (Firm; po,
Daily Flow,
Number)
MGD MGD
MGD
(C)
(D)=(B+C) (E)=(A-D)
Obligated,
Not Yet
Total Current
Tributary
Flow Plus
Daily Flow,
Obligated Available
MGD
Flow Capacity***
* The Firm Capacity of any pump station is defined as the maximum pumped flow that
can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking
factor (pi) not less than 2.5.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is a 0.
Page l of 6
FTSE 06-13
Certification Statement:
I Jay T. Meyers, P.E., Public Utilities certify to the best of my knowledge that -the addition of
Director
the volume of wastewater to be permitted in this project has been evaluated along the route to the
receiving wastewater treatment facility and that the flow from this project is not anticipated to
cause any capacity related sanitary sewer overflows or overburden any downstream pump station
en route to the receiving treatment plant under normal circumstances, given the implementation
of the planned improvements identified in the planning assessment where applicable. This
analysis has been performed in accordance with local established policies and procedures using
the best available data. This certification applies to those items listed above in Sections I and II
plus all attached planning assessment addendums for which I am the responsible party.
Signature of this form indicates acceptance of this wastewater flow.
Page 2 of 6
FTSE 06-13
btate of North Carolina
Department of Environment
and Natural Resources
Division of Water Quality
Michael F. Easley, Governor
William G. Ross Jr., Secretary
Gregory J. Thorpe, Ph.D., Acting Director
November 7, 2001
Mr. Michael A. Allway, Assistant Town Manager
Town of Fuquay-Varina
401 Old Honeycutt Road
Fuquay-Varina, North Carolina 27526
Dear Mr. Ailwav:
I
a
1 �
E
mom
r�
NCDENR',
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES C
� a
�YV C82to
01
Tom of pgiw-Va"
Subject: Town of Fuquay-Varina
Flow Reduction Approval
Wake County
On September 10. 7001, the Division of Water Quality Non Discharge Permitting Unit received your
flow reduction request for future and present, but not yet tributary, singe -family dwellings in the Town of
Fuquay-Varina. The letter requests approval of a residential flow value of 220 GPD/residence for these
dwellings.
The information provided water use information for 2000 and actual daily waste water flow recordings
For their peak month of May. Other supporting data was provided. The evaluation covered 90 homes that are
representative of the subdivisions in Fuquay-Varina in accordance with 15A NCAC 2H ,0219(I)(3)-
Based on the information submitted. the Division hereby approves the use of 75 GPD per bedroom
per dwelling for residential units (225 GPD per three bedroom home) in all applicable non -discharge permit
applications for future sewer line extensions and present, but not yet tributary projects for the Town of Fuquay-
Varina. The Division did note that the average flow per residence in February 2000 was 271 GPD. Regardless
of the adjusted design daily wastewater flow rate. at no time shall the wastewater flows exceed the effluent
limits defined in the Town's NPDES permit for the'treatment facility or exceed the capacity of the sewers
downstream of any new sewer extension.
Please submit a separate letter to the Raleigh Regional Office that requests flow reductions for
specific previously permitted projects (indicate 2ermit number, ro'ect name e_ratitted flaw, pew flow
under reduction and the difference between them). If you have any questions or comments regarding this
matter, please contact Marie Doklovic at (919)733-5083 ext. 371.
Since
C'
Gregory J. Thorpe, Ph.D.
cc: Raleigh Regional Office
Flow Reduction File
1617 Mail Service Center. Raleigh, North Carolina 27699-1617 Telephone 919-733-5083 Fax 919-715-6048
An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper
AP 141;e
.f;��b J �°• , � . '1 � • x, tea �r '� q,• , Z.
-r-L- _
moo' L]
- �'• � •� �. �®-�.=— �� �' "�`-: � . fix. b �, {
w%q-
Y I . A- Y
��
F��� �'-I. �y�^�'t�irtl'•y'jle
r
w � �
10Ln
I r
' O
TLD
ANSI
n �'r
U
dr
cu
19
4
r�
All
p o 5- MPA11NEW or mE iKrr ion ruQUAY-4AIUNA QUADN GLE
�U$GS rld reusuwly err •[•••T•r• .ORTnGWIY,
W US IDpD , siw,ur[ u.in
av • � a � ,rx
„ r _ " - ...-...- ` j i }•-.... .4n- .o+f.,,,. ; SITE LOCATION
kli—
�41AA,�t
M
s
I,wMluew+++V.r YA+L I Z•® OWfI•IWr•.+'i•
T.ti.".., .,_ - 4411 6�,��L0.--� � •—per' w:
rUQu+r-rwaw&.#E a(�
1016 ��i
CurrY
ENGINEERING
TRANSMITTAL FORM
TO: NC Dept. of Environmental quality
Div. of Water Resources
Raleigh Regional Office
Water Quality Section
1628 Mail Service Center
Raleigh, NC 27699-1628
919- 791-4200
SUBJECT: Meadow Bluffs Subdivision - Phase 3
CURRY PROJECT NO: 2016-049
We are sending you the following items:
COPIES ITEM
2 Application
2 Forms
Check
TIC Dent of Environmental Qua};t}
AUG 2 7 2019
RalcigliRegiO"al office
DATE: August 26, 2019
SENT BY: Ed Loeffler
DESCRIPTION
Fast Track Sewer Application - Meadow Bluffs Subdivision - Phase 3
FTSE 06-13 !Town of Fuquay-Varnnai
$480 00 Fee, Sewer Application
These are transmitted as checked below:
For Information _ Approved as Noted - Rev.se and Resubmit
As Requested _ Not Approved - Revise and Resubmit
For Review and Comments For Record and File
For Revision Submittal
x For Approval _ For Recording
Approved _ For Signature, then return to:
REMARKS:
Attached please find the signed Fast Track Sanitary Sewer Applications for the Meadow Bluffs
Subdivision - Phase 3 property at 6021 Johnson Pond R3ad in Fuquay-Vanna. Please contact me with
any questions. Thank you.
T 19191 552-0849 205 S Fuquay Avenue
h 1919) 552-2043 Fuquay-Varina. NC 27526
�JVRY E IV Glti\
FA
EFS
0 10
\�j �P /
h'CAR01.\ /
0
Curr
ENGINEERING
NC Dept ot'Enviruninental Quality
AUG 2 7 2019
August 26, 2019
Raleigh Regional Office
NC Department of Environment Quality
Division of Water Resources
Raleigh Regional 4ffizze
Water Quality Section
1628 Mad Service Center
Raleigh, NC 27699-1628
19191791-4200
RE! Meadow Bluffs Subdivision — Phase 3
Sewer Fast Track Sanitary Sewer Application Cover Letter
Dear Sir,
Enclosed please find documentation, design data, apphcatron fee and other resources necessary to
review the Fast Track Applicat,ons for the public sanitary sewer system of the Meadow Bluffs
Subdivision - Phase 3, :n Fuquay-Varina, NC. The project consists of construction of 41 single (amity
subdivision lots, with connection to an existing public sewer line at the east side of the property, which
feeds to the Terrible Creek Waste Water Treatment Plant. The Meadow Bluffs Subdivision is located at
6021 Johnson Pond Road in Fuquay-Varina. The property involved is located within the City of Fuquay-
Varina. NC planning jurisdiction. Phase I of this project, which consists of smatter Phases 1 and 2,
was previously approved on May 14, 2018 with Permit No. W00039960.
The sanitary sewer system for Phase 3 consists of 1824 feet of 8" PVC and gravity service from the
subdivis{on connecting to a public gravity main line. There are ten 1101 new manholes to be installed
in Phase 3.
At the completion of construction, the system wit; be --ertified by a licensed professional engineer in
a--cordance with NCDEQ and State and local regulations.
Sincerely,
Ed Loeffler, Project Manager
7 19191 552-0849 205 5 Fuquay Avenue
F 19191 552-2043 Fuquay-Varrna, NC 27526
F�
Es r t:ZZ::7 v+
0 14
\�yCARO�� /
Deck, Erin M
From: Don Curry <don@curryeng.com>
Sent: Friday, October 11, 2019 9:21 AM
To: Deck, Erin M
Cc: jmeyers@Fuquay-varina.org; Ed Loeffler
Subject: RE: [External] RE: Meadow Bluffs Subdivision -Phase III
• M . External erhail. Do not in -Inks or open attachments unless you verify. Send all skrsplciows email as an attac;ment to
Yes, it is under the stream. See the image below for a snippet of the plans.
r
Sincerely,
DON CURRY, PE
President
SStlr;c • 5 ]Ii I
C't''.Cr 6LFi1!IG PIr _4154 PLAIN!> C;;N--
F Clp?f .GC JtirAF ",� �QE c4
F�Sc"RV--,D;LIi,Rc 1N
Xi.--E ASCESS
==Cr.EhriEi1
L------ -----__—�— �W 7 7_J
CUrryENGINEERING
205 S. Fuquay Ave.
Fuquay-Varina, NC 27526
�/ \ �274LF9*C-)'PVC 6t,)i0's
Llly"i� ` N TAL1.'dIA11GC;G.Ar
-I.EFC'J5'1HL4FF57rJ:'� I
STA. 24-U;i
� � r
SS CONNECTOR PLAN V;;_!A
3 STATION T11`150-13+25
C-n SCALE. I -
' I
IG i'CRECENIN" PIi—
I r
I
I
I
1
wk (919) 552.0849 x101
dir (984) 225.4149
ce!! (919) 880 9857
don currveng.com
www.currveng.com
From: Deck, Erin M <erin.deck@ncdenr.gov>
Sent: Wednesday, October 09, 2019 10:41 AM
To: Don Curry <don@curryeng.com>
Cc: jmeyers@Fuquay-varina.org; Ed Loeffler <ed@curryeng.com>
Subject: RE: [External] RE: Meadow Bluffs Subdivision -Phase III
Is the crossing of the stream depicted on the plans, sub surface? Also, I need the applicants permission to make the
revisions also. Thank you.
Erin Deck
Department of Environmental Quality
Division of Water Resources
Raleigh Regional Office
Office: 919-791-4258
f
ic
Emad correspondence to and from this address is subject to the North CarOhna Public Records Law and may be disclosed
to third parties
From: Don Curry [mailto:don cur en .com
Sent: Wednesday, October 9, 2019 9:21 AM
To: Deck, Erin M <erin.deck ncdenr. ov>
Cc: 'me ers Fu ua-varina.or ; Ed Loeffler <ed2currveng.com>
Subject: [External] RE: Meadow Bluffs Subdivision -Phase III
.0r ail. #1 .. $" pees. eFr'riienfs t1es yp a alr fi iol+s r{rc�i as ,e . httb
Erin,
Thanks for reaching out about this. To answer your questions:
1. Yes, please check the flow reduction box here.
2. There are no high priority lines here. Please revise to uncheck this box.
Thanks again for your help.
Sincerely,
DON CURRY, PE
President
CUr yENGINEERJNG
205 5. Fuquay Ave.
Fuquay-Varina, NC 27526
wk (919) 552.0849 x101
dir (984) 225.4149
cell (919) 880.9857
don(a currvena.com
www.currvena.com
From: Deck, Erin M <erin.deck ncdenr. ov>
Sent: Tuesday, October 08, 2019 2:49 PM
To: imeyers@Fuquay-varina.org; Don Curry <donAcurrvene.com>
Subject: Meadow Bluffs Subdivision -Phase III
Good afternoon -
We are in the process of reviewing the subject fast track sewer extension permit and require additional information
before we can complete our review.
-Section VI.6. Flow reduction- no box was checked, but a flow reduction was utilized and a letter confirming the flow
reduction was provided in the application packet. With the permittee's permission we can check "yes."
-Section IX. 6 High Priority lines is checked "yes" however no details for the high priority lines were included with the
application.
Once the information is received we can move forward with drafting the permit.
Erin Deck
Department of Environmental Quality
Division of Water Resources
Raleigh Regional Office
Office: 919-791-4258
-1-INothing Compares
Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed
to third parties.