Loading...
HomeMy WebLinkAboutSW3190704_O&M Rev_10/11/2019Vperaz><oln a w�a>Inzenance F►greement; Project Name:ISkyland Drive Townhomes Project Location:1991 Skyland Drive, Mt. Pleasant, NC 28124 Maintenance records shall be kept on the following BMP(s). This maintenance record shall be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s). The BMP(s) on this project include (check all that apply & cc Bioretention Cell Quantity: Dry Detention Basin Quantity: Grassed Swale Quantity: Green Roof Quantity: Infiltration Basin Quantity: Infiltration Trench Quantity: Level SpreaderNFS Quantity: Permeable Pavement Quantity: Proprietary System Quantity: Rainwater Harvesting Quantity: Sand Filter Quantity: Stormwater Wetland Quantity: Wet Detention Basin Quantity: Disconnected Impervious Area Present: User Defined BMP Present: ing O&M tables wil Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): CLICK TO UPDATE O&M MANUAL I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible party. * Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): Email: Earl Coutston Coutston Enterprises Inc. 8332 Regent Parkway Fort Mill, SC 29715 803-547-3500 earl ccoulstondev.com Signature: vU Date: Q 7 I, - nr� S , a Notary Public for the State of f oL-_ ezyg A -a - County of do hearby certify that personally appeared before me this 2 2-r ck day of c�u and acknowledge the due execution of the Operations and Maintenance Agreement. Witness my hand and official seal, N1q„ "�24 v EMILY S. KEARN8 N6TARYPU8KFATE0F8MCAl60lMlA My Commission Expires 512312022 NIII\. My commission expires 7/9/20 SUPPLEMENT-EZ COVER PAGE LOAD SUPPLEMENT FORMS PROJECT INFORMATION 1 Project Name f Skyland Drive Townhomes 2 Project Area ac 4.335 3 Coastal Wetland Area ac 0 4 Surface Water Area ac 0.171 5 Is this project High or Low Density? High 6 1 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided feet 30 8 Will the vegetated setback remain vegetated? Yes 9 Is BUA other that as listed in .1 0034 c-d out of the setback? Yes 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: - - 11 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 0 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 1 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip LS-FS 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 LOAD SUPPLEMENT FORMS DESIGNER CERTIFICATION 27 Name and Title: Barry M. Fay, P.E. 28 Organization: American Engineering Associates - Southeast P.A. 29 Street address: 8008 Corporate Center Drive, Suite 110 30 City, State, Zip: Charlotte, NC 28226 31 Phone numbers : 704) 375-2438 32 Email: bfay@american-ea.com Certification Statement: certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. 0 J ' 3046 '��R►rff�FL � �'� Signature of Designer Date DRAINAGE AREAS 1 Is this a high densityproject? Yes 2 If so, number of drainage areas/SCMs 1 3 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 1 4 Type of SCM Sand Filter 5 Total BUA in project (sq ft 58168 sf 6 New BUA on subdivided lots (subject to permitting) (sq ft 58168 sf i ` 7permitting) New BUA outside of subdivided lots (subject to s 8 Offsite - total area (sq ft 5332 sf 9 Offsite BUA (sq ft 10 Breakdown of new BUA outside subdivided lots: - Parking (sq ft 4329 sf - Sidewalks ft 5391 sf - Roofs ft 21120 sf - Roadway s ft 22340 sf - Future (sq ft) 4988 sf - Other, please specify in the comment box below (sq ft 11 New infiltrating permeable pavement on subdivided lots (sq ft 12 New infiltrating permeable pavement outside of subdivided lots (sq ft 1 13permitting) Exisitng BUA that will remain (not subject to s ft 14 PAMinn RL1A that is alreadv nermitted (so ft) 15 Existing BUA that will be removed (sq ft 16 Percent BUA 17 Design storm inches 18 Design volume of SCM cu ft 19 Calculation method for design volume ADDITIONAL INFORMATION Please use this space to provide any additional information about the 20 drainage area(s): RAI'' `. GE AREA INFORMATION Entire Site 1 4 Type of SCM N/A 5 Total BUA from project (sq ft) 6 1995 rules SL 2006-246 2008 rules 2017 rules 7 New BUA on subdivided lots (subject to permitting) (sq ft) 1995 rules SL 2006-246 2008 rules 2017 rules 8 New BUA outside of subdivided lots (subject to permitting) (sf) 1995 rules SL 2006-246 2008 rules 2017 rules 9 JOffsIte -total area (sq ft) 1995 rules SL 2006-246 2008 rules 2017 rules 10 Offsite BUA (sq ft) 1995 rules SL 2006-246 2008 rules 2017 rules 11 Design storm (inches) 1995 rules SL 2006-246 2008 rules 2017 rules 12 Breakdown of new BUA: - Parking (sq ft - Sidewalk (sq ft - Roof (sq ft - Roadway s ft - Future (sq ft - Other, please specify in the comment box below (sq ft 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement outside of subdivided lots (sq ft 15permitting) Existing BUA that will remain (not subject to s ft 16 Existing BUA that is already permitted (sq ft 17 Existing BUA that will be removed (sq ft 18 Percent BUA 19 Design volume of SCM cu ft 20 Calculation method for design volume ADDITIONAL INFORMATION j 21 Please use this space to provide any additional information about the drainage area(s):