Loading...
HomeMy WebLinkAboutWQ0034105_Rescission_20191009 (8) ., 4L4, ROY COOPER � y0T ''yal�. Governor it J MICHAEL S.REGAN '` }'' 4 Secretary auw LINDA CULPEPPER NORTH CAROLINA Director Environmental Quality October 9, 2019 Joyce M. Dickens, President Rocky Mount/Edgecombe Community Development Corporation 148 South Washington St Rocky Mount, NC 27802 Subject: Permit Rescinded: Permit Number WQ0034105 The Crossing @ 64-Sewer Extension Edgecombe County Dear Ms. Dickens: A rescission request was recently received for Permit No. WQ0034105, issued June 4, 2009. Staff from the Division of Water Resources has confirmed that this Permit is no longer required. Therefore, in accordance with your request, Sewer Extension Permit No. WQ0034105 is rescinded, effective immediately. If in the future, if you wish again to operate a non-discharge system,you must first apply for and receive a new Wastewater Collection System Permit. Operating a non-discharge system without a valid Wastewater Collection Permit will subject the responsible party to a civil penalty of up to $10,000 per day. 0 If you have any questions or would like to discuss this matter further, please do not hesitate to contact Nyle Hothem at(919) 707-9130 or via email at Nyle.Hothem@ncdenr.gov . Sincerely, by Christyn L. Fertenbaugh, P.E. Environmental Engineer for Linda Culpepper Director, Division of Water Resources cc: Raleigh Regional Office,Water Quality Section Regional Operations Water Quality Central Files-WQ0034105 DE -4 North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh,North Carolina 27699-1617 NORTH CAFPI NA a Effiromantii o� /'d 919.707.9000 Request for Engineering Ceuificatfon Sewer Extension Permit Status Update Date of Letter: September 27,2019 Please complete the applicable portion of this form for each permit and return to the Division by within 30 days of the date of this letter; the delivery method below and NCDEQ/DWR WQPS—PERCS UNIT gy U,S,postal Service: By Laurier/saecial Deflvo�,,. 1617 Matt Service Center 512 N.Salisbury St.Suite 925 E aft: Raleigh,NC 27699-1617 Raleigh,NC 27604 Nyie Hothem Permit No.: WQ0034105 Permittee: Rocky Mount/Edgecombe Community Development Corporation Project Name: The Crossing @ 64: Sewer Extension -------- ********************************************************************************************************** Project Status (Check appropriate box to indicate Permittee's response and complete&sign below) O Permit to Remain Open: The Permittee certifies that the permitted project has not been constructed but shall be constructed in the future in conformity with the approved Permit,project plans,specifications,and supporting documents.The Permittee understands that the appropriate certification documents will need to be forwarded to the Division prior to permit shall be maintained in Active status. otrierattnn Subject C7 The Permitted project.has been constructed and the required Engineer's Certification and supporting documents win be submitted to the Division with this form. Permittee understands that failure to submit required certification documents for an active,in-service system may result in enforcement action. ❑ Request Extension: Permittee requests extension to reply to this letter not to exceed 60 days of the date of this letter. Name&Title(print): Signature: Date: Comments: *********************************************************************************************************** Permit est The Permittee requests that the subject permit be rescinded Rescission ded ndcertifies at the permitted sewer system has nt bee not be constructed nor made operational.We understand that,in the future,should we wish to operate a non discharge sewer all system,we shall apply for and receive a new Wastewater Collection System Permit. Name&Title(P Joyce M. Dickens, President, Rocky Mount/Edgecombe Community Development Corporation Signature: Date:-- � S Comments: Proj ct is urrently not funded and is on hold. Contact Information Updates Updated Contact Person: Joyce Dickens, President, Rocky Mount/Edgecombe Community Development Corporation Updated Mailing Address: 148 S. Washington Street Rocky Mount, NC 27802 Updated Email: rmecdc@embargma€l.com 252.442.5178 ECDC Rocky Mount/Edgecombe Community Development Corporation 148 South Washington Street • Harambee Square • Suite 103 P.O. Drawer 1477 • Rocky Mount, North Carolina 27802-1477 (252)442-5178 • FAX: (252) 442-1675 I I Business Development Center Housing Development Center A (252)442-8364 (252)442-8553 October 3, 2019 NCDEQ DWR WQPS—PERCS Unit Attn: Nyle Hothem 1617 Mail Service Center Raleigh, NC 27609 RE: PERMIT RECISSION REQUEST Permit#: WQ0034105 Project: The Crossing @ 64-Sewer Extension Permittee: Rocky Mount/Edgecombe Community Development Corporation County: Edgecombe County Dear Nyle: In response to the Engineering Certification Request letter dated 9/27/19, we are submitting the enclosed Sewer Extension Permit Status Update and requesting that the subject permit be rescinded. The sewer system has not been installed and the project is on hold due to funding. Please let us know if you have any questions. Si cerely, x----- / f- -cit :1,44) Joyce M. Dickens President/CEO cc: David C.Revoir,PE,Appian "Building Unity In Our Community"