HomeMy WebLinkAboutWQ0008572_Correspondence_20190907 9�
s
ROY COOPER to
Governor /
MICHAEL S.REGAN ` a=
Secretary
LINDA CULPEPPER NORTH CAROLINA
Dimcmr Environmental Quality
September 7, 2019
Terry Houk, Public Services Director
City of High Point
P.O. Box 230
211 South Hamilton Street
High Point, NC 27261
Subject: City of High Point Riverdale Pump Station Permit No. WQ0008572
Guilford County
Dear Mr. Houk:
I received the letter dated August 9, 2019 from Mr. Glenn Dunn on the City of High Point's behalf.
The Division of Water Resources recognizes the City's request to release 150,000 gallons per day of
additional flow through the Riverdale Pump Station. Due to the ongoing construction status and the
by-pass set up of the pump station in question, the Division is unable to release the requested
amount.
As a compromise that we hope you find suitable, the Division will release 60,000 gallons per day of
additional flow to the pump station. Specifically, the Winston-Salem Regional Office will amend
specific sewer extension permits at your discretion that were originally issued with no flow as
"construction only" permits. Please discuss which permits should be amended with the Winston-
Salem Regional Office staff, as they will need to approve each request and track the allocation of the
released 60,000 gallons per day.
For further assistance, please contact Lon Snider or Jenny Graznak in the Winston-Salem Regional
Office at (336) 776-9800 or via e-mail at Jenny.Graznak@ncdenr.Rov or Lon.Snider@ncdenr.Rov.
Sincerely,
{� Linda Culpepper
Director, Division of Water Resources, NCDEQ
cc: Winston-Salem Regional Office Files
PERCS Files
North Carolina Department of Environmental Quality I Division of Water Resources
Winston-Salem Regional Office 1 450 West Hanes Mill Road,Suite 300 I Winston-Salem,North Carolina 27105
336.776.9800