Loading...
HomeMy WebLinkAbout20191386 Ver 1_BR-0116_Buffer Drawings_20191010W O See Sheet I -A For Index of Sheets See Sheet I-B For Conventloncl Symbols See Sheet IC- I TO IC-2 For Survey Control Sheets l�Si y of 43 Aaentor -+1+ 1506 10 43 PROJ ITE 1403 43 co -it $O Ch-'h 405 17a4 S L 14U G eeK 43 1404 G 3 43 OFF -SITE DETOUR STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS NAS.&T-Ar COUNTY LOCATION: BRIDGE NO. 630080 OVER GIDEON SWAMP ON SR 1403 (COOPER RD.) TYPE OF WORK: GRADING, DRAINAGE, PAVING & STRUCTURE BUFFER IMPACTS PERMIT 1Vq�\ SITE 1 BE I BRIDGE -L- STA. 15+61.50 BEGIN NCDOT PROJECT BR-0116 TO S CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD _ THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. GRAPHIC SCALES 50 25 0 50 100 PLANS 50 25 0 50 100 PROFILE (HORIZONTAL) 10 5 0 10 20 PROFILE (VERTICAL) DESIGN DATA ADT 2019 = 310 PROJECT LENGTH LENGTH ROADWAY PROJECT BR-0116 = 0.079 MI T = 6 %Q LENGTH STRUCTURE PROJECT BR-0116 = 0.020 MI V = 55 MPH TOTAL LENGTH PROJECT BR-0116 = 0.099 MI (TTST = 3%Q + DUAL =3%Q) FUNC CLASS = NCDOT CONTACT.- DAVID STUTTS, PE RURAL LOCAL PROJECT ENGINEER-PEEPROGRAM MGT. SUBREGIONAL TIER +56.50 z SITE 2 _U SR 1403 (COOPER RD) _r TO 743 N DIVISION OF HIGHWAYS STRUCTURES MANAGMENT UNIT 1000 BIRCH RIDGE DRIVE RALEIGH NC, 27610 2018 STANDARD SPECIFICATIONS RIGHT OF WAY DATE: EDWARD G. WETHERILL, PE PROJECT ENGINEER APRIL 3, 2019 LETTING DATE: GREG S. PURVIS, PE OCTOBER 3, 2019 PROJECT DESIGN ENGINEER 9TATR PRaIECn RRFeRHNCe N0. �N0. BR-0116 8TAT8 PROI. NO. A.APAOS.NQ DH80R@TION 67116.1.1 1 PE 1223 Jones Franklin Rd. e Raleigh, N.C. 27606 ETHERILL License No. F-0377 ENGINEERING Bus: 919 851 8077 Fax: 919 851 8107 TRANSPORTATION PLANNING/DESIGN - BRIDGE/STRUCTURE DESIGN CIVIL/SITE DESIGN - GISIGPS - CONSTRUCTION OBSERVATION BRIDGE #630080 BUFFER DRAWING SHEET 1 OF 4 INCOMPLETE PLANS W NOT USE FOR R®W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HYDRAULICS ENGINEER ROADWAY DESIGN ENGINEER P.E. BUFFER IMPACTS SUMMARY IMPACT BUFFER REPLACEMENT SITE NO. STRUCTURE SIZE / TYPE STATION (FROM/TO) TYPE ALLOWABLE MITIGABLE ROAD CROSSING BRIDGE PARALLEL IMPACT ZONE 1 (ft2) ZONE 2 (ft) TOTAL (ft2) ZONE 1 (ft) ZONE 2 (ft) TOTAL (ft) ZONE 1 (ft) ZONE 2 (ft) 1 95' Bridge -L- 15+30 to 16+85 x 211 555 766 1 95' Bridge -L- 15+60 to 16+55 x 2113 367 2480 2 Roadway -L- 17+00 to 18+15 x 1425.0 1162.0 2587 TOTAL: 2324 922 3246 1 1425 1162 2587 0 0 WETLANDS IN BUFFER IMPACTS SUMMARY WETLANDS IN BUFFERS ZONE1 ZONE2 SITE NO. STATION (FROM/TO) (ft) (ft) 1 -L- 16+04 to 16+20 110 TOTAL: 1 1101 0 N.C. DEPT. OF TRANSPORTATION DIVISION OF HIGHWAYS NASH CO. BR-0116 Bridge #630080 on SR 1430 (Cooper Rd.) 8/2/2019 SHEET 4 OF 4 ev. Jan 2007