Loading...
HomeMy WebLinkAbout20191323 Ver 1_Shoreline Stabilization_20190930State of North Carolina Department of Environment and Natural Resources Division of Water Resources - 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization - FORM: SSGP 02-2017 Shoreline Stabiliza Aj V!,etion Form 1 9 1 3 2 3 Three copies of the application (including attachments) and the application fee should be sent to: If sending via US Postal Service If sending via delivery service (UPS, FedEx,. etc.) Karen Higgins Karen Higgins DWR — 401 & Buffer Permitting Branch DWR — 401 & Buffer Permitting Branch 1617 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699-1617 Raleigh, NC 27604 A. Applicant Information 115A NCAC 02H .0502(x)] 1. Owner information Name: LE Mailing Address: Telephone Number: E-mail Address: v :c9 IeA r 3 0 Fax Number: l Qrrr►it:ing Sir.: „a r 42 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signed this application form. (A form can be downloaded here: lila fiydty4'savr usace arm�r mill'Fchafs�59ldoes„e-� idi0i,/:'2 L1:rL/Permits/SAsdiflLE AGENT AUTHORIZ ATION FORM.Pdf) Name: Company Affiliation: Mailing Address: Telephone Number: Fax Number: E-mail Address: B. Project Information (15A NCAC 02H .0502(«) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. FORM: SSGP 02-2017 Page 1 of 3 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized (include a scale of some sort a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) Al/� County: o rc�w _ w.. v Nearest Town: W ` C T (cv j WC Lake/ river/ ocean adjacent to property: Le,.kr —T; I Iwo Property size (acres): . 88 Subdivision name or site address (include phase/lot number): (isvy Tvaa2:-E�e., (o(-A�- 1031 Directions to site - please include %ad namespnd nyAnbers, landmarks, etc: Latitude (in dedmal degrees)?57,,;WP% Longitude (decimal degnees)Z--��,RY S. Describe the existing land use or condition of the ti of this application (residential, undeveloped, etc.):/ S'ir 6. VA Describe proposed work (include 8. Total amount of impacts below the normal pool lake level / Normal Water Level Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet. Temporary impac9 in square Beet: 9. Total -amount of impacts above the normal pool lake level /Normal Water Level and 50 feet land -ward back fill, excavation, rip rap, retaining walls, etc.) in square feet: Temporary impacq&Wporary clearing, constriction corridor) in square feet: 10. Please describe the vegetation above the normal pod lake level/ Normal Water and 50 feet landward to be impacted (number of trees, for instance): 11. Agent's Signature` [15A NCAC 02H .0502(01 7 /9-/2 D Agent's signature is valid onlyifan authorization tetterfrom the owner is provided. FORM: SSCP 02-2017 Page 2 of 4 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation Lake (At Full Pond/ Normal Water Level) Full Pond/ Norma! Water Shoreline y Plan View FORM: SSGP 02-2017 Lake IQFun PMWH"dYJWMLCWQ Existing Dock / 30 [t:7 it •� •a•• •aa�,a �ya�• rrrrsrlrrrrrrrr� r rrr Full Pond/ Normal Water ,r�lrr•, �>r •rr r• me r{ii`i�f�r a �i •�i?iriia �� iiiii PaPlan View ge 3 of 4 70 c Side View CL 10 ft. bank Side Vi FORM: SSGP 02-2017 3 fL below full pond water level 4 fL above full pond water level 2 fL adefidonal clearing If necessary 7 Existing bank AMPLE Page 4 of 4 �� Nj V , Found: oyh 1-1/4" Iron A Pipe X03 uun�f: It 4111 Rol )Iir Found: 1-1/4" Iron Pipe /' ' � • X08 p9" Found: ��°/ 1-1/4" Iran �AN4 Pipe �./�Olb Found: / 3/4" Iron ./ Rebor ./ Hq,se too CP Foundation In place Lot No. 1032 Fronk/in Roy A//en & W, -e, Breon G A//en Deed Book 585 Poge 849 PIN.- 6576-04-64-1624 Lot No. 1031 Foun 1/2" 1 Reba