HomeMy WebLinkAboutNC0081621_Other Correspondence_20191010ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Director
Mr. Timothy R. Kiser, PE
NORTH CAROLINA
Environmental Quality
October 10, 2018
Engineering Director
Water and Sewer Authority of Cabarrus County
232 Davidson Highway
Concord, NC 28027
SUBJECT: Muddy Creek WWTP
6 Months Sampling Requirement
NPDES Permit NCO081621
Cabarrus County
Dear Mr. Kiser:
Please note that this letter is to notify you that condition number four (4.), in footnotes of the
subject NPDES permit, has been satisfied. The required sampling 3/Week for the first 6 months
after expansion to 0.3 MGD has been accomplished. No compliance problems were reported
during this required sampling period; therefore, sampling will revert to 2/Week after the first six
months of operations. The 6-month period ran from April 1, 2019 through September 30, 2019.
If you should have any further questions in regard to this matter, please do not hesitate to contact
myself or Roberto Scheller at (704) 235-2204 or roberto.schellerggncdenr.gov.
Sincerely,
DocuSigned by:
pa'�uu' ii N uft for
F161 FB69A2D84A3...
W. Corey Basinger, Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ
cc: EmailORC: KimHoltkWSACC.org
File (Laserfiche) -
D Q
� North Carolina Department of Environmental Quality I Division of Water Resources
Mooresville Regional Office 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115
NOAn-icJwauNn i
nwm,em of eem—woviRv 704,663.1699