HomeMy WebLinkAboutWQ0031674_Residual Annual Report 2014_20150213City of
Marion
City of Marion, NC
Water Filtration Plant
2014 Annual Report
Land Application Program
NC Permit No. WQ0031674
RECEIVED
FE8 13 ?015
DWR SECTION
INFORMATION PROCESSING UNIT
ANNUAL LAND APPLICATION CERTIFICATION FORM
WQ Permit#: WQ0031674 County:
Facility Name (as shown on permit):
Land Application Operator:
McDowell I Year: 2014
City of Marion
Southern Soil Builders, Inc. Phone' 336-957-8909
Land applicat' n of residuals as allowed by the permit occurred during the past calendar year?
❑ Yes' ( No - If No, skip Part A, and Part B and proceed to Part C. Also, If residuals were
generated but not land applied,; please attach an explanation on how the residuals were handled.
Part A: -;.Residuals Application Summary. -
Total number of application fields in the; erniit:
NA
Total number of fields! utilized for land application during the year:
0-
Total amount of dry' tons applied during the year for all application sites:
0
Total number: of acres utilizes for land application during the year:
0,
Part B -' Annual Compiance Statement:
Facility .was compliant during calendar year 2014 with all conditions of the land application permit
(including but not limited to items 1-13 below) issued by the Division of Water Resources. H Yes ❑ No
If no please, provide a written description why the facility was not compliant, the dates, and explain corrective action
taken.
1) Only residuals approved for this permit were applied to the permitted sites.
2) Soil 'pH was adjusted as specified in the permit and lime was applied (if needed) to achieve a soil pH of at least 6.0 or
the limit specified in the permit.
3) Annual soils analysis were performed on each site receiving residuals during the past calendar year and three (3) copies
of laboratory results are attached.
4) Annual TCLP analysis (if required) was performed and three (3) copies of certified laboratory results are attached.
5) All other monitoring was performed in accordance with the permit and reported during the year as required and three (3)
copies of certified laboratory results are attached.
6) The facility did not exceed any of the Pollutant Concentration Limits in 15A NCAC 02T .1105(a) or the Pollutant
Loading Rates in 15A NCAC 02T .1105(b) (applicable to 40 CFR Part 503 regulated facilities).
7) All general requirements in as specified in the Land Application Permit were complied with (applicable to 40 CFR Part
503 regulated facilities).
8) All monitoring and reporting requirements in 15A NCAC 02T .1111 were complied with (applicable to 40 CFR Part
503 regulated facilities).
9) All operations and maintenance requirements in the permit were complied with or, in the,case of a deviation, prior
authorization was received from the Division of Water Resources.
10) No contravention of Ground Water Quality Standards occurred at a monitoring well or explanations of violations are
attached to include appropriate actions and remediations.
11) Vegetative cover was maintained and proper crop management was performed on each site receing residuals, as
specified in the permit.
12) No runoff of residuals from the application sites onto adjacent property or nearby surface waters has occurred.
13) All buffer requirements as sPecified on the permit were maintained during each application of residuals.
Part C -, Certification:
"I certify, under penalty of law, that the above information is, to the best of my knowledge and belief;; true,;accurate,
and complete. I am aware that there are significant penalties for submitting false information, including the
possibility of fines and imprisonment for knowing violations."
ZT ];?pbe- A k1Q5e.1- 2-Ct7-1
Permittee Name and Title (type or print) a e ofPermitteeDate
2-T-is-
a- 1
!�iatWr6 of Preparer* Date Sign tune of Land Applier Date
(if different from Permittee) (if different from Permittee and Prepares,)
* Preparer is defined in 40 CFR Part 503.9 (r) and 15A NCAC 02T .1102 (26) DENR FORM ACF (12%2006)
All of the alum residuals produced by the City of Marion's Water Filtration Plant were stored on
site, in the two ponds. Both of the ponds were completely cleaned out in 2013, and a distribution
event is planned for 2015.