Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutNCC192226_ESC Approval Submitted Complete_20191010ROY COOPER
Governor
MICHAEL S. REGAN
secretary
S. DANIEL SMITH
Director
NORTH CAROLINA
Environmental Quality
October 1, 2019
LETTER OF APPROVAL WITH MODIFICATIONS
City of Concord
Attention: Andrea Cline, Substation / SCADA Coordinator 11
Post Office Box 308
Concord, North Carolina 28026
RE: Project Name: Heglar Road Substation
Acres Approved: 4.5
Project ID: CABAR-2020-019
County: Cabarrus, City: Concord
Address: 1920 Heglar Road
River Basin: Yadkin-PeeDee
Stream Classification: Other
Submitted By: City of Concord
Date Received by LQS: September 23, 2019
Plan Type: New
Dear Andrea Cline:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this letter of Approval with Modifications. The
Modifications Required for Approval are listed on the attached page. This plan approval shall expire three
(3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required
by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000
Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of
any land disturbing activity on the above named project. The NOT form may be accessed at
deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at
Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and
correct N01 Form, a COC will be emailed to you within three business days. A S100 fee will be charged
annually. This fee is to be sent to the DEMLR Storrnwater Central Office staff in Raleigh.
Title 15A NCAC 4B .0118(a) and the NCGO 1 permit require that the following documentation be kept on
file at the job site:
1. The approved E&SC plan as well as any approved deviation.
XEQNCMii i_F C' --11.
North Carolina Department of Environmental Quality I Division of Energy. Mineral and land Resources
Mooresville Regional Office l 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115
Ind till 1h99
Letter of Approval with Modifications
City of Concord
October 1, 2019
Page 2 of 3
2, The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G. S. 113A-61.1(a) of our right of periodic inspection to insure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, the
erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973 (North Carolina General Statute I13A-51 through 66), this office may
require revisions to the plan and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to
this land -disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any
change in the information included on the form. In addition, it would be helpful if you notify this office
of the proposed starting date for this project. Please notify us if you plan to have a preconstruction
conference.
Your cooperation is appreciated.
S. 7ely,
Christopher Graybeal
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NCG01 Fact Sheet
c: ESP Associates Inc
Attention: Dan E. Brewer, PE
20484 Chartwell Center, Drive Suite D
Cornelius, North Carolina 28031
Inspection Department
Letter of Approval with Modifications
City of Concord
October 1, 2019
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Heglar Road Substation
Project ID: CABAR-2020-019
County: Cabarrus
Modifications pursuant to applicable North Carolina General Statutes and/or Regulations:
1. Additional measures may be required - The applicant is responsible for the control of sediment on -
site. If the approved erosion and sedimentation control measures prove insufficient, the applicant
must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC
4B .0115]
2. It is recognized the stockpile location is not ideal but limited to site conditions. The stockpile must
be wrapped in silt fencing on the downgradient side and the site must be maintained such that flow
to the sediment basin is not hindered by the stockpile. [G.S. 113A-57(3), 15A NCAC 4B .01151