Loading...
HomeMy WebLinkAboutNCG210136_Inspection Report_20191010ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director Columbia Forest Products Attention: Jarrett Rhinehart Post Office Box 1148 Old Fort, North Carolina 28762 NORTH CAROLINA Environmental Quality October 10, 2019 Subject: Compliance Evaluation Inspection Permit: NCG210000 Certificate of Coverage: NCG210136 McDowell County, North Carolina Dear Mr. Rhinehart: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on October 3, 2019. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Sincere i Isaiah Reed, PS Q, .SCI, MS4CECI Environmental Specialist Land Quality Section Enclosure: Inspection Report D QJv North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 12090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 rvoArHwwem, 828.296.4800 Compliance Inspection Report Permit: NCG210136 Effective: 08/01/18 Expiration: 07/31/23 Owner: Columbia Forest Plywood Products SOC: Effective: Expiration: Facility: Columbia Forest Plywood Produc County: McDowell 369 Columbia Carolina Rd Region: Asheville Old Fort NC 28762 Contact Person: Larry Hartman Title: Phone: 828-724-4191 Ext.2324 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 10/03/2019 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Certification: Phone: Entry Time: 09:30AM Exit Time: 12:30PM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Timber Products Stormwater Discharge CDC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm water (See attachment summary) Page 1 of 3 permit: NGG210136 Owner -Facility: Columbia Forest Plywood Products Inspection Date: 10/03/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary On October 3, 2019 this facility was inspected for compliance. I met with Jarrett Rhinehart and Heather Bartlett on site. During the inspection, the following items were noted: 1) Secondary Containment was not provided for the waste water tank in the equipment area discussed on site. The permittee is directed to immediately begin modifications to the industrial process to provide secondary containment for all bulk storage of liquid materials on site. 2) Qualitative monitoring has not been conducted and documented on site. The permittee is directed to immediately include qualitative monitoring as outlined in the permit. 3) Maintenance of the SWPPP including annual non-stormwater discharge evaluations have not been documented. the permittee is directed to conduct and document non-stormwater discharge evaluations as outlined in the permit. 4) Additional outfalls were observed at the North end of the facility. The permittee is directed to evaluate the area for additional outfalls and include them in future monitoring practices and site map modifications. Please give the above items your immediate attention. If you have any questions, please contact this office at (828) 296-4614 If you have any questions, please contact this office at (828) 296-4614 Page 2 of 3 Permit: NCG210136 Owner -Facility: Columbia Forest Plywood Products Inspection Date: 10/03/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ El El # Does the Plan include a "Narrative Description of Practices"? E ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? E ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ 0 ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ 0 ❑ ❑ Comment: See summary for more information Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? El 0 ❑ ❑ Comment: Qualitative monitoring has not been conducted at the facility. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ Q # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ 1-10 ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 El ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non Stormwater) discharges? 0 ❑ ❑ ❑ Comment Page 3 of 3