Loading...
HomeMy WebLinkAboutWQ0032638_Sewer Extension Permit Status Update_20191002 vk GREIF Global Nuclear Fuel Karen Williams EHS Specialist 3901 Castle Hayne Road Global Nuclear Fuel P.0 Box 780 Wilmington,NC 28402 USA C.910-547-2758 Karen.williams@ge.com October 2, 2019 NCDEQ/DWR WQPS—PERCS Unit Attn: Nyle Hothem 512 N. Salisbury St.Suite 925 �CE`��° Raleigh, NC 27604 f� OCY 0 101% Subject: Sewer Permit Rescission Request I�p��s Permit No. WQ003563 ��� ,QIQwR Permitee: Global Nuclear Fuel—Americas LLC Project Name:Tooling Repair Center Pump Station Mr. Hothem, Enclosed please find the Sewer Permit Rescission Request form for Permit No.WQ003563, Project Name:Tooling Repair Center Pump Station,for Global Nuclear Fuel—Americas LLC. The form requests the termination of the project described as the "GE Tooling Repair Center Pump Station" which has not and will not be constructed due to termination of the project. If you have any questions regarding this request, please contact me at(910) 547-2758. Sinc rely, WAiwuej /6-24p K'ren Williams EHS Specialist Global Nuclear Fuel—Americas, LLC Request for Engineering Certification Date of Letter. August 16,2019 Sewer Extension Permit Status Update Please complete the applicable portion of this form for each permit and return to the Division by the delivery method below and within 30 days of the date of this letter: NCDEQ/DWR • WQPS—PERCS UNIT By U.S.Postal Service: By Courier/Special Delivery: By Email: 1617 Mail Service Center 512 N.Salisbury St.Suite 925 Nyle Hothem Raleigh,NC 27699-1617 Raleigh,NC 27604 Nyle.Hothem@ncdenr.gov OOOO#Os4*s#************#*s*******4**O*****4444****************#4is*44i****s******44*#4*****ii4*O#********* Permit No.:106 6 0351.9 3 Permittee: la l o b ILI NueJ e ar f 1 a P i - /-t-Wt e r i&is L L C.. Project Name: TOO I)h 1JLt r Pu h' o 5-Ii1-i'o✓i Project Status(Check appropriate box to indicate Permittee's response and complete&sign below) ❑ Permit to Remain Open: The Permittee certifies that the permitted project has not been constructed but shall be constructed in the future in conformity with the approved Permit,project plans,specifications,and supporting documents.The Permittee understands that the appropriate certification documents will need to be forwarded to the Division prior to operation. Subject permit shall be maintained in Active status. ❑ The Permitted project has been constructed and the required Engineer's Certification and supporting documents will be submitted to the Division with this form. Permittee understands that failure to submit required certification documents for an active,in-service system may result in enforcement action. ❑ Request Extension: Permittee requests extension to reply to this letter not to exceed 60 days of the date of this letter. Name&Title(print): RECEIVED Signature: Date: OCT .0 4 2019 Comments: MCDEQIDWRINPDES *444444*4#****i4i4440i4i#OOf4ii444i*****4i4444i##****44i4#004**#*4ii4*****#**4*4if0**4**44*004*****ii44ii44 Permit Rescission Request The Permittee requests that the subject permit be rescinded and certifies that the permitted sewer system has not been and shall F` not be constructed nor made operational.We understand that,in the future,should we wish to operate a non-discharge sewer system,we shall apply for and receive a new Wastewater Collectiono System Permit. Name&Title(Print): rad ea.rj ?IQYli' dui tiger- 10 u 'L)ear ,fei -Awievikss Signature: 1/ Date: O G-F - 9-- 2 a I. Comments: 'ec%la•Ps+►h 4-kt stz6jea4- perm i fdsC i h61 ea as 'I prod eel- pI►-ts here -1-erivt'ina d.hd s ermi sewer 51�slervi has no-I- and 61161)1 nd- k tionSii"GcC{PcY" Contact Information Updates Updated Contact Person: Updated Mailing Address: Updated Email: