HomeMy WebLinkAboutWQ0032638_Sewer Extension Permit Status Update_20191002 vk GREIF Global Nuclear Fuel
Karen Williams
EHS Specialist
3901 Castle Hayne Road
Global Nuclear Fuel P.0 Box 780
Wilmington,NC 28402
USA
C.910-547-2758
Karen.williams@ge.com
October 2, 2019
NCDEQ/DWR
WQPS—PERCS Unit
Attn: Nyle Hothem 512 N. Salisbury St.Suite 925 �CE`��°
Raleigh, NC 27604 f�
OCY 0 101%
Subject: Sewer Permit Rescission Request I�p��s
Permit No. WQ003563 ��� ,QIQwR
Permitee: Global Nuclear Fuel—Americas LLC
Project Name:Tooling Repair Center Pump Station
Mr. Hothem,
Enclosed please find the Sewer Permit Rescission Request form for Permit No.WQ003563, Project
Name:Tooling Repair Center Pump Station,for Global Nuclear Fuel—Americas LLC. The form requests
the termination of the project described as the "GE Tooling Repair Center Pump Station" which has not
and will not be constructed due to termination of the project.
If you have any questions regarding this request, please contact me at(910) 547-2758.
Sinc rely,
WAiwuej
/6-24p
K'ren Williams EHS Specialist
Global Nuclear Fuel—Americas, LLC
Request for Engineering Certification Date of Letter. August 16,2019
Sewer Extension Permit Status Update
Please complete the applicable portion of this form for each permit and return to the Division by the delivery method below and
within 30 days of the date of this letter:
NCDEQ/DWR
• WQPS—PERCS UNIT
By U.S.Postal Service: By Courier/Special Delivery: By Email:
1617 Mail Service Center 512 N.Salisbury St.Suite 925 Nyle Hothem
Raleigh,NC 27699-1617 Raleigh,NC 27604 Nyle.Hothem@ncdenr.gov
OOOO#Os4*s#************#*s*******4**O*****4444****************#4is*44i****s******44*#4*****ii4*O#*********
Permit No.:106 6 0351.9 3 Permittee: la l o b ILI NueJ e ar f 1 a P i - /-t-Wt e r i&is L L C..
Project Name: TOO I)h 1JLt r Pu h' o 5-Ii1-i'o✓i
Project Status(Check appropriate box to indicate Permittee's response and complete&sign below)
❑ Permit to Remain Open: The Permittee certifies that the permitted project has not been constructed but shall be constructed in
the future in conformity with the approved Permit,project plans,specifications,and supporting documents.The Permittee
understands that the appropriate certification documents will need to be forwarded to the Division prior to operation. Subject
permit shall be maintained in Active status.
❑ The Permitted project has been constructed and the required Engineer's Certification and supporting documents will be
submitted to the Division with this form. Permittee understands that failure to submit required certification documents for an
active,in-service system may result in enforcement action.
❑ Request Extension: Permittee requests extension to reply to this letter not to exceed 60 days of the date of
this letter.
Name&Title(print): RECEIVED
Signature: Date: OCT .0 4 2019
Comments: MCDEQIDWRINPDES
*444444*4#****i4i4440i4i#OOf4ii444i*****4i4444i##****44i4#004**#*4ii4*****#**4*4if0**4**44*004*****ii44ii44
Permit Rescission Request
The Permittee requests that the subject permit be rescinded and certifies that the permitted sewer system has not been and shall
F`
not be constructed nor made operational.We understand that,in the future,should we wish to operate a non-discharge sewer
system,we shall apply for and receive a new Wastewater Collectiono System Permit.
Name&Title(Print): rad ea.rj ?IQYli' dui tiger- 10 u 'L)ear ,fei -Awievikss
Signature: 1/ Date: O G-F - 9-- 2 a I.
Comments: 'ec%la•Ps+►h 4-kt stz6jea4- perm i fdsC i h61 ea as 'I prod eel- pI►-ts
here -1-erivt'ina d.hd s ermi sewer 51�slervi has no-I- and 61161)1 nd- k tionSii"GcC{PcY"
Contact Information Updates
Updated Contact Person:
Updated Mailing Address:
Updated Email: