HomeMy WebLinkAbout20191366 Ver 1_B-4605_Permit Drawings_2019-09-10 final_20191007Highway North Carolina Department of Transportation �s
Storm Highway Stormwater Program a
STORMWATER MANAGEMENT PLAN
(Version 2.08; Released April 2018) FOR NCDOT PROJECTS
WBS Element: 38430.1.3 TIP No.: B-4605 County(ies): Pitt Page 1 of 2
General Project Information
WBS Element:
38430.1.3
TIP Number: B-4605
Project Type: Bridge Replacement
Date: 6/7/2018
NCDOT Contact:
William (Galen) G. Cail, PE
Contractor/ Designer:
TGS Engineers (Ben Henegar, PE)
Address:
1590 Mail Service Center
Raleigh, NC 27699-1590
Address:
706 Hillsborough Street
Suite 200
Raleigh, NC 27603
Phone:
919-707-6711
Phone:
919-773-8887 ext. 123
Email:
gcailCa�ncdot.gov
Email:
bhenegar@tgsengineers.com
City/Town:
Grimesland
County(ies):
Pitt
River Basin(s):
Tar -Pamlico
CAMA County?
No
Wetlands within Project Limits?
Yes
Project Description
Project Length (lin. miles or feet):
550.00
Surrounding Land Use:
IForest, Cropland, and Rural Residential
Proposed Project
Existing Site
Project Built -Upon Area (ac.)
0.4 ac.
0.3 ac.
Typical Cross Section Description:
Two 11' paved travel lanes with 2' paved shoulders and 2' grassed shoulders (5' with
guardrail).
Two 11' paved travel lanes with 3'-10' grassed shoulders.
Annual Avg Daily Traffic (veh/hr/day):
Design/Future: 300 Year: 2016
Existing: 300 Year: 2016
General Project Narrative:
(Description of Minimization of Water
Quality Impacts)
Replacement of Bridge No. 730005 on SR 1777 (Blackjack-Grimesland Rd.) over Chicod Creek in Pitt County, NC. The proposed 135' long by 33' wide three -span bridge would
replace the existing 91' long by 33' wide two span bridge. The proposed grade will be about 0.5' above existing ground within the vicinity of the bridge and roughly matching
existing ground outside of the bridge.
Bridge No. 730005 is within the Tar -Pamlico River Drainage Basin and shall adhere to the Tar -Pamlico Buffer Rules. The proposed bridge will have no direct discharge into
Chicod Creek. Stormwater runoff from the the proposed bridge is to flow to two traffic bearing grated inlets at each side of the bridge where it will be diffused with a riprap pad
at the proposed pipe outlet. All proposed runoff is discharged as far away from the stream and at the lowest velocities as practicable. The proposed deck runoff will outlet
outside of buffers.
Waterbody Information
Surface Water Body (1):
Chicod Creek
NCDWR Stream Index No.:
29-101
NCDWR Surface Water Classification for Water Body
Primary Classification:
Class C
Supplemental Classification:
Nutrient Sensitive Waters (NSW)
Other Stream Classification:
Impairments:
None
Aquatic T&E Species?
No Comments:
NRTR Stream ID:
N/A
Buffer Rules in Effect:
Tar -Pamlico
Project Includes Bridge Spanning Water Body?
Yes
Deck Drains Discharge Over Buffer?
INo
Dissipator Pads Provided in Buffer?
INo
Deck Drains Discharge Over Water Body?
INo
(If yes, provide justification in the General Project Narrative)
(If yes, describe in the General Project Narrative; if no, justify in the
General Project Narrative)
(If yes, provide justification in the General Project Narrative)
*Px Iighway North Carolina Department of Transportation
StOCm Highway Stormwater Program
MW STORMWATER MANAGEMENT PLAN
(Version 2.08; Released April 2018) FOR NCDOT PROJECTS
WBS Element: TIP No.: B-4605 County(ies): Pitt Page 2 of 2
Preformed Scour Holes and Energy Dissipators
Sheet
No.
Station & Coordinates
(Road and Non Road
Projects)
Surface
Water Body
Energy Dissipator
Type
Riprap Type
Drainage
Area
(ac)
Conveyance
Structure
Pipe/Structure
Dimensions
(in)
Q10
(cfs)
V10
(fps)
BMP
Associated w/
Buffer Rules?
4
-L- 13+22 LT
(1)Chicod
Creek
Riprap Pad
Class 'B'
0.1
Pipe
15
0.5
0.5
N/A
35.5460985°,-077.2103912'
4
-L- 15+06 RT
(1)Chicod
Creek
Riprap Pad
Class 'B'
0.1
Pipe
15
0.5
0.5
N/A
35.5464879°,-077.2098915'
Additional Comments
* Refer to the NCDOT Best Management Practices Toolbox (2014), NCDOT Standards, the Federal Highway Administration (FHWA) Hydraulic Engineering Circular No. 14 (HEC-14), Third Edition, Hydraulic Design of Energy
Dissipators for Culverts and Channels (July 2006), as applicable, for design guidance and criteria.
See Sheet 1A For Index of Sheets
See Sheet 18 For Conventlonal Flon Sheet Symbols
See Sheet 1 C- 1 For Survey Control Sheet
NOR F LK OLJ HERNRAILWAY
33
764
1760
766 11760
ND
GRIME TOWN
1778
LIMITS
1760 1767 1768
33
1777
PROJECT
LOCATIO
P�
1771
1565
—
175
-
P
1777
�
1770'�Nd
— 1756
c eed
1772
1780
oss oads
Crds
Crossroa s\
1777
—
1781 1565
—
1782
VICINITY
MAP
0 0 OFFSITE DETOUR
-L- STA. 1 "
TO HAMS
CROSSROADS
E
STATE OF NORTH CAROL INA
DIVISION OF HIGHWAYS
PITT COUNTY
LOCATION: REPLACE BRIDGE S OVER CHICOD CREEK
ON SR 1777
TYPE OF WORK: GRADING, DRAINAGE, PAVING, AND STRUCTURE
WETLAND AND SURFACE WATER IMPACTS
T
—L— * SR 1777 n _
SITE 1
NI
NP
;E END TIP PROJECT B-4
+82.75 -L- STA. 17 + 00.00
* (BLACKJACK—GRIMESLAND - RD)_ -_,^, TO GRIMESLAND
TOTAL
B-4605
TQ PROJ. NO.
.w.PROl.
FSCRIP]TON
38430.1.3
BRZ-1777 007
PE
38430.2.1
BRZ-1777 007
RM/ & UTIL
38430.3.1
BRZ-1777 007
CONST.
PERMIT DRAWING
SHEET 1 OF 4
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II DOCUMENT NOT CONSIDEREDFINAL
UNLESS ALL SIGNATURES COMPLETED
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
GRAPHIC SCALES
50 25 0 50 100
DESIGN DATA
ADT 2019 = 1370
ADT 2039 = 1690
K = 12 %
D = 55 %
T = 5 % •
V = 60 MPH
* TTST 1% + DUAL 4%
FUNC CLASS -
MINOR COLLECTOR
SUB -REGIONAL TIER
PROJECT LENGTH
LENGTH ROADWAY TIP PROJECT B-4605 = 0.077 mile
LENGTH STRUCTURES TIP PROJECT B-4605 = 0.027 mile
Prepared For:
DIVISION OF HIGHWAYS
1000 Birch Ridge Dr., Raleigh NC, 27610
TGS TGS ENGINEERS �-
EN^iNeea 706 HILLSBOROUGH ST PH (919) 773-8887
1�
CORP LICENSE NO
suirEzoo G-0275
RALEIGH, NC 27603
HYDRAULICS ENGINEER
SIGNATURE:
R®fir
S °g�
@r
Q
g
�66p ®Q�
PLANS
550 25 0 550 100
2018 STANDARD SPECIFICATIONS
V. MARCUS LOWERY, PE
TOTAL LENGTH TIP PROJECT B-4605 = 0.104 mile
RIGHT OF WAY DATE:
OCTOBER 26, 2018
ROADWAY DESIGN
ENGINEER
P.E.
SIGNATURE,
PROFILE (HORIZONTAL)
10 5 0 10 20
PROJECT ENGINEER
MICHAEL AMAN, P.E.
LETTING DATE:
SEPTEMBER 25, 2019
NCDOT DIVISION 2 CONTACT
PROFILE (VERTICAL)
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Site
No.
Station
(From/To)
Structure
Size / Type
Permanent
Fill In
Wetlands
(ac)
Temp.
Fill In
Wetlands
(ac)
Excavation
in
Wetlands
(ac)
Mechanized
Clearing
in Wetlands
(ac)
Hand
Clearing
in
Wetlands
(ac)
Permanent
SW
impacts
(ac)
Temp.
SW
impacts
(ac)
Existing
Channel
Impacts
Permanent
(ft)
Existing
Channel
Impacts
Temp.
(ft)
Natural
Stream
Design
(ft)
1
-L- 13+20 to 13+55 LT
3 @ 45' CSU Bridge
< 0.01
< 0.01
1
-L- 13+10 to 13+55 RT
3 @ 45' CSU Bridge
< 0.01
< 0.01
1
-L- 14+50 to 15+10 LT
3 @ 45' CSU Bridge
< 0.01
< 0.01
< 0.01
1
-L- 14+60 to 15+25 RT
3 @ 45' CSU Bridge
< 0.01
0.01
TOTALS*:
0.02
< 0.01
0.03
0
0
0 :J
*Rounded totals are sum of actual impacts
NOTE:
There will be <0.01 acre temporary fill in the hand clearing areas for erosion control devices.
Revised 2016 09 09