Loading...
HomeMy WebLinkAbout20191366 Ver 1_B-4605_Permit Drawings_2019-09-10 final_20191007Highway North Carolina Department of Transportation �s Storm Highway Stormwater Program a STORMWATER MANAGEMENT PLAN (Version 2.08; Released April 2018) FOR NCDOT PROJECTS WBS Element: 38430.1.3 TIP No.: B-4605 County(ies): Pitt Page 1 of 2 General Project Information WBS Element: 38430.1.3 TIP Number: B-4605 Project Type: Bridge Replacement Date: 6/7/2018 NCDOT Contact: William (Galen) G. Cail, PE Contractor/ Designer: TGS Engineers (Ben Henegar, PE) Address: 1590 Mail Service Center Raleigh, NC 27699-1590 Address: 706 Hillsborough Street Suite 200 Raleigh, NC 27603 Phone: 919-707-6711 Phone: 919-773-8887 ext. 123 Email: gcailCa�ncdot.gov Email: bhenegar@tgsengineers.com City/Town: Grimesland County(ies): Pitt River Basin(s): Tar -Pamlico CAMA County? No Wetlands within Project Limits? Yes Project Description Project Length (lin. miles or feet): 550.00 Surrounding Land Use: IForest, Cropland, and Rural Residential Proposed Project Existing Site Project Built -Upon Area (ac.) 0.4 ac. 0.3 ac. Typical Cross Section Description: Two 11' paved travel lanes with 2' paved shoulders and 2' grassed shoulders (5' with guardrail). Two 11' paved travel lanes with 3'-10' grassed shoulders. Annual Avg Daily Traffic (veh/hr/day): Design/Future: 300 Year: 2016 Existing: 300 Year: 2016 General Project Narrative: (Description of Minimization of Water Quality Impacts) Replacement of Bridge No. 730005 on SR 1777 (Blackjack-Grimesland Rd.) over Chicod Creek in Pitt County, NC. The proposed 135' long by 33' wide three -span bridge would replace the existing 91' long by 33' wide two span bridge. The proposed grade will be about 0.5' above existing ground within the vicinity of the bridge and roughly matching existing ground outside of the bridge. Bridge No. 730005 is within the Tar -Pamlico River Drainage Basin and shall adhere to the Tar -Pamlico Buffer Rules. The proposed bridge will have no direct discharge into Chicod Creek. Stormwater runoff from the the proposed bridge is to flow to two traffic bearing grated inlets at each side of the bridge where it will be diffused with a riprap pad at the proposed pipe outlet. All proposed runoff is discharged as far away from the stream and at the lowest velocities as practicable. The proposed deck runoff will outlet outside of buffers. Waterbody Information Surface Water Body (1): Chicod Creek NCDWR Stream Index No.: 29-101 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Nutrient Sensitive Waters (NSW) Other Stream Classification: Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: N/A Buffer Rules in Effect: Tar -Pamlico Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? INo Dissipator Pads Provided in Buffer? INo Deck Drains Discharge Over Water Body? INo (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) *Px Iighway North Carolina Department of Transportation StOCm Highway Stormwater Program MW STORMWATER MANAGEMENT PLAN (Version 2.08; Released April 2018) FOR NCDOT PROJECTS WBS Element: TIP No.: B-4605 County(ies): Pitt Page 2 of 2 Preformed Scour Holes and Energy Dissipators Sheet No. Station & Coordinates (Road and Non Road Projects) Surface Water Body Energy Dissipator Type Riprap Type Drainage Area (ac) Conveyance Structure Pipe/Structure Dimensions (in) Q10 (cfs) V10 (fps) BMP Associated w/ Buffer Rules? 4 -L- 13+22 LT (1)Chicod Creek Riprap Pad Class 'B' 0.1 Pipe 15 0.5 0.5 N/A 35.5460985°,-077.2103912' 4 -L- 15+06 RT (1)Chicod Creek Riprap Pad Class 'B' 0.1 Pipe 15 0.5 0.5 N/A 35.5464879°,-077.2098915' Additional Comments * Refer to the NCDOT Best Management Practices Toolbox (2014), NCDOT Standards, the Federal Highway Administration (FHWA) Hydraulic Engineering Circular No. 14 (HEC-14), Third Edition, Hydraulic Design of Energy Dissipators for Culverts and Channels (July 2006), as applicable, for design guidance and criteria. See Sheet 1A For Index of Sheets See Sheet 18 For Conventlonal Flon Sheet Symbols See Sheet 1 C- 1 For Survey Control Sheet NOR F LK OLJ HERNRAILWAY 33 764 1760 766 11760 ND GRIME TOWN 1778 LIMITS 1760 1767 1768 33 1777 PROJECT LOCATIO P� 1771 1565 — 175 - P 1777 � 1770'�Nd — 1756 c eed 1772 1780 oss oads Crds Crossroa s\ 1777 — 1781 1565 — 1782 VICINITY MAP 0 0 OFFSITE DETOUR -L- STA. 1 " TO HAMS CROSSROADS E STATE OF NORTH CAROL INA DIVISION OF HIGHWAYS PITT COUNTY LOCATION: REPLACE BRIDGE S OVER CHICOD CREEK ON SR 1777 TYPE OF WORK: GRADING, DRAINAGE, PAVING, AND STRUCTURE WETLAND AND SURFACE WATER IMPACTS T —L— * SR 1777 n _ SITE 1 NI NP ;E END TIP PROJECT B-4 +82.75 -L- STA. 17 + 00.00 * (BLACKJACK—GRIMESLAND - RD)_ -_,^, TO GRIMESLAND TOTAL B-4605 TQ PROJ. NO. .w.PROl. FSCRIP]TON 38430.1.3 BRZ-1777 007 PE 38430.2.1 BRZ-1777 007 RM/ & UTIL 38430.3.1 BRZ-1777 007 CONST. PERMIT DRAWING SHEET 1 OF 4 CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II DOCUMENT NOT CONSIDEREDFINAL UNLESS ALL SIGNATURES COMPLETED THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. GRAPHIC SCALES 50 25 0 50 100 DESIGN DATA ADT 2019 = 1370 ADT 2039 = 1690 K = 12 % D = 55 % T = 5 % • V = 60 MPH * TTST 1% + DUAL 4% FUNC CLASS - MINOR COLLECTOR SUB -REGIONAL TIER PROJECT LENGTH LENGTH ROADWAY TIP PROJECT B-4605 = 0.077 mile LENGTH STRUCTURES TIP PROJECT B-4605 = 0.027 mile Prepared For: DIVISION OF HIGHWAYS 1000 Birch Ridge Dr., Raleigh NC, 27610 TGS TGS ENGINEERS �- EN^iNeea 706 HILLSBOROUGH ST PH (919) 773-8887 1� CORP LICENSE NO suirEzoo G-0275 RALEIGH, NC 27603 HYDRAULICS ENGINEER SIGNATURE: R®fir S °g� @r Q g �66p ®Q� PLANS 550 25 0 550 100 2018 STANDARD SPECIFICATIONS V. MARCUS LOWERY, PE TOTAL LENGTH TIP PROJECT B-4605 = 0.104 mile RIGHT OF WAY DATE: OCTOBER 26, 2018 ROADWAY DESIGN ENGINEER P.E. SIGNATURE, PROFILE (HORIZONTAL) 10 5 0 10 20 PROJECT ENGINEER MICHAEL AMAN, P.E. LETTING DATE: SEPTEMBER 25, 2019 NCDOT DIVISION 2 CONTACT PROFILE (VERTICAL) WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 -L- 13+20 to 13+55 LT 3 @ 45' CSU Bridge < 0.01 < 0.01 1 -L- 13+10 to 13+55 RT 3 @ 45' CSU Bridge < 0.01 < 0.01 1 -L- 14+50 to 15+10 LT 3 @ 45' CSU Bridge < 0.01 < 0.01 < 0.01 1 -L- 14+60 to 15+25 RT 3 @ 45' CSU Bridge < 0.01 0.01 TOTALS*: 0.02 < 0.01 0.03 0 0 0 :J *Rounded totals are sum of actual impacts NOTE: There will be <0.01 acre temporary fill in the hand clearing areas for erosion control devices. Revised 2016 09 09