Loading...
HomeMy WebLinkAbout20191362 Ver 1_Copy of (SF-830162)_HYD_SMPv2.08_(20180727) (Apr 2018)_20191007Highway North Carolina Department of Transportation - Stormwater Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version 2.08; Released April 2018) FOR NCDOT PROJECTS NINE: WBS Element: 17BP.10.R.133 TIP No.: SF-830162 County(ies): Stanly Page 1 of 1 General Project Information WBS Element: 17BP.10.R.133 ITIP Number: SF-830162 Project Type: Bridge Replacement Date: 7/27/2018 NCDOT Contact: Marc Shown Contractor / Desi ner: STV Engineers Inc. / Shirshant Sharma Address: 1020 Birch Ridge Drive Raleigh, NC 27610 Address: 900 West Trade Street, Ste. 715 Charlotte, NC 28202 Phone: 919 707-6751 Phone: 704 816-2556 Email: mshown@ncdot.gov Email: Shirshant.Sharma@stvinc.com City/Town: Norwood Count ies : Stanl River Basin(s): Yadkin -Pee Dee ICAMA County? I No Wetlands within Project Limits? No Project Do lion Project Length (lin. miles or feet): 0.089 miles T Surrounding Land Use: IRural, wooded, agricultural Proposed Project Existing Site Project Built -Upon Area ac. 0.3 ac. 0.2 ac. Typical Cross Section Description: Bridge : Two 10' lanes, 3'-3" paved shoulders Approach: Two 10' lanes, 3'-0" paved shoulders Bridge: Two 7.9' lanes, no shoulders Approach: Two 8' lanes, 4' grassed shoulders Annual Avg Daily Traffic (veh/hr/day): Design/Future: 800 Year: 2025 Existing: 400 Year: 2001 General Project Narrative: (Description of Minimization of Water Quality Impacts) The existing single span 25'-8" bridge over Hardy Creek on SR 1923 (Old Cottonville Rd) is being replaced with a single span (1@70') 24" cored slab bridge with 4' end bent caps. The bridge will be superelevated at 4% with 10' travel lanes and 3'-3" shoulders, 26"-6" clear width and 30'-0" OTO width. The existing bridge structure will be removed and the aburtments will be cut off at elevation 344 ft. Overall drainage patterns will be maintained. There are roadside ditches that flow towards the bridge on both sides of the structure. The proposed design will interfere with three of the existing ditches flow patterns. Proposed ditches and a channel change will be used to maintain flow to the bridge. On the end side of the bridge, a concrete flume was placed on the left side of the roadway in the shoulder berm gutter to pick up runoff from the bridge. Class -II rip rap abutment protection on both banks of the stream is also proposed to prevent future erosion and stream migration. No deck drains are needed. No dissipator pads were used because the Class -II rip rap will prevent erosion and dissipate flow. A proposed water line crossing construction will also be performed as part of this project which will cross the stream downstream of the proposed bridge. The work area shall be cordoned off with impervious dikes and pump around operation and the sediment laden water within the work area shall be filtered out using a special stilling basin. Waterbody Information Surface Water Body 1 : Hardy Creek NCDWR Stream Index No.: 13-17-42 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: None Other Stream Classification: None Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? iYes I Deck Drains Discharge Over Buffer? INo Dissipator Pads Provided in Buffer? INo Deck Drains Discharge Over Water Body? INo (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) L. (If yes, provide justification in the General Project Narrative) I