Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutNCC192220_Certificate of Coverage_20191008Certificate of Coverage
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES
GENERAL PERMIT NO. NCG010000
NC Reference No. NCG01-2019-2220
Certificate of Coverage No. NCC192220
STORMWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations
promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water
Pollution Control Act, as amended,
Duke Energy Progress
is hereby authorized authorized to discharge stormwater associated with CONSTRUCTION ACTIVITIES to surface Waters
of North Carolina from a site located at:
Erwin Selma 230 kV Transmission Line Switch Installations and Access Roads
Juniper Church Road
Four Oaks
Johnston County
in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in N.C. General Permit
No. NCG010000.
This Certificate of Coverage is affiliated with E&SC Plan Project No. JOHNS_2019-019
This Certificate of Coverage shall become effective 10/8/2019.
This Certificate of Coverage shall remain in effect for the duration of the General Permit or until rescinded.
for S. Daniel Smith
Director, Division of Energy, Mineral, and Land Resources
By the Authority of the Environmental Management Commission