Loading...
HomeSearchMy WebLinkAbout20190863 Ver 1_401 Application_2021050420190863 Ver 1_Approval Letter_2021052720190863 Ver 1_Approval Letter_SAW-2019-00833_2021050420190863 Ver 1_As-built Review MY0_202220190863 Ver 1_As-Built_2022_2022062220190863 Ver 1_Draft MP_2021_2021011520190863 Ver 1_Field Meeting Notes_2019072220190863 Ver 1_Initial Release_SLKsigned20190863 Ver 1_Meeting Request Review_2020113020190863 Ver 1_Mitigation Information_2022062820190863 Ver 1_Mitigation Information_2022070720190863 Ver 1_Mitigation Plan_2021_2021032520190863 Ver 1_Mitigation Plan_2021_2021050420190863 Ver 1_Mitigation Submittal_2024010920190863 Ver 1_More Info Received_2021021120190863 Ver 1_MP Approval Letter SAW-2019-00833_2021031120190863 Ver 1_Notice of As-Built Review20190863 Ver 1_NOTICE of Draft Mitigation Plan Review_2021011920190863 Ver 1_Notice of Initial Credit Release20190863 Ver 1_Notice of Intent to Approve SAW-2019-00833_2021022320190863 Ver 1_Notice of NCDEQ MP Review_2021011920190863 Ver 1_OakHillDairy_100120_AB_2023_2023050820190863 Ver 1_OakHillDairy_100120_MY0_2023_2023050820190863 Ver 1_OakHillDairy_100120_MY1_2023_2024010920190863 Ver 1_Post Contract IRT Field Meeting Notes_2019072620190863 Ver 1_PreFiling Acknowledgement Email_2020120320190863 Ver 1_Pre-Filing Meeting Information_2021050420190863 Ver 1_Prospectus Site Review_2019072220190863 Ver 1_SHPO Letter_2019080220190863 Ver 1_Staff Report Davis, Erin B (AB)_2022062220190863 Ver 1_Staff Report Davis, Erin B (Draft MP)_2021011520190863 Ver 1_Staff Report Davis, Erin B (MP)_2021032620190863 Ver 1_Staff Report Davis, Erin B (Year 0 MR)_2022062220190863 Ver 1_Staff Report Maria Polizzi_2024011020190863 Ver 1_Staff Report Ryan.Hamilton_2023051720190863 Ver 1_Staff Report Ryan.Hamilton_20230517 (2)20190863 Ver 1_Technical Proposal_2019051320190863 Ver 1_USACE Permit_2021052620190863 Ver 1_Year 0 Monitoring Report_2022_20220622DWR Comments DMS Oak Hill Dairy As-built ReviewOak Hill_100120_TProp_2019