Loading...
HomeSearchMy WebLinkAboutApproval - Request for Deferral of 2019 Interim Monitoring Plan Reports_20191231Comments on Duke Energy 10-7-19 Letter_20191024Facility Interim Monitoring Plans Networks and Sampling Requirements_20161221FINAL DEQ Response to Proposed IMP Changes_20190404IMP 1st Quarter 2018 FINAL_20171220IMP 2nd Quarter 2018 FINAL_20180406IMP 3rd Quarter 2018 FINAL_20180629IMP 4th Quarter 2017 FINAL_20171019IMP Dissolved and Speciation Letter_20190812IMPs 4th Quarter 2018_20180928IMP-SW Sampling Clarification Letter_20180530Monitoring Letter FINAL_20160916NC0000396_Asheville Interim Monitoring Letter Correction Draft Final V3_20170110NC0004979_IMP 1st Quarter 2018 Allen Revision_20180105NC0005088_Cliffside Revised IMP Letter FINAL_20180123Proposed Revisions to Weatherspoon IMP Approval_20180301Response to April 25 Letter_20190520Revised Interim Monitoring Network_20170517